UHS Temecula Valley Hospital IFOA Results Speakers: Tara Laski - UHS Ken Lindsey - Southland Industries Dean Shipcott – Bergelectric Tom McCready – DPR Construction Brent Nikolin – Turner Construction

UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric [email protected] [email protected]

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS Temecula Valley Hospital

IFOA Results

Speakers: Tara Laski - UHS

Ken Lindsey - Southland Industries Dean Shipcott – Bergelectric

Tom McCready – DPR Construction Brent Nikolin – Turner Construction

Page 2: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

To Earn CEUs for this Program:

Participants must:

1. Check in with attendance proctor at the door

2. Attend at least 95% of the session.

3. Complete the post-program evaluation.

4. Complete a brief online assessment with a score of 75% of greater.

Detailed instructions on how to log into AGC Connection to complete the CEU process will be emailed to participants.

AGC of America has been accredited as an Authorized Provider by the International Association for Continuing Education and Training (IACET), 1760 Old Meadow Road, Suite 500, McLean, VA 22102; (703) 506-3275.

Page 3: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Learning Objectives By attending this session participants will be able to:

• Discuss the background and structure of the IFOA contract

(Consensus 300 docs)

• Identify the shared risks for collaboration, innovation and trust

• Explain the target value design and the process of continuous

estimating

• Discuss the utilization of collaborative planning and how we

brought Lean to the field

• Discuss how the IFOA agreement helped our team exceed our

targeted productivity rates.

Page 4: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

PROJECT OVERVIEW

• Original Project Start in 2009

• Formed the IPD Team in 2010

• 5 floors totaling 178,000 SF building on 37

Acers

• 150 Million Dollars

• Zero Value Engineering

• One Change Order to add Cardio

Operating Rooms

Page 5: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Temecula Valley Hospital 2013

• 40% below market cost

• 30% operational cost

improvement

• 200%+ increase in

labor productivity

• 7 IFOA partners

• Rapid improvement

• Exceptional team work

• Lots of FUN

Page 6: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

STRUCTURE OF

CONTRACT

UHS

Temecula

Valley

Hospital

IFOA Results

Page 7: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Trusted, qualified, profitable partners

One target cost

Target is aggressive

Owner pays all project costs + overhead

Partner profit is fixed, but…

Partner profit is at risk

Integrated Form of Agreement (IFOA)

THE DEAL

Page 8: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Contract signing

was as symbolic

as it was legally

binding.

All seven parties

present. No

“mailing it in”.

THE DEAL

Page 9: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

An aggressive goal requires tracking:

At-risk cost of work

Not at-risk cost of work

Contingency/Risk items

identified allowances , no % SWAGs

Path back

Savings

Profit

IFOA

Page 10: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

INCENTIVES AND RISK SHARING

Profit can

increase as

Risk

Management

decreases

Innovation

Productivity

Reducing

Waste

Page 11: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

INCENTIVES & RISK SHARING

ESTIMATED %

OF PROFIT POOL

HMC 17.9%

DPR|TURNER 30.5%

SOUTHLAND 25.7%

BERGELECTRIC 14.6%

SOUTHWEST FIRE 1.5%

DPR DRYWALL 9.8%

TOTAL

Page 12: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Enables optimal behaviors

Shares risk and reward

between designers/builders

between owner and partners

Promotes transparency

Promotes collaborative problem-solving

Promotes distributed leadership

Promotes seamless project delivery

IFOA

Page 13: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

SET BASE DESIGN &

DESIGNING IN IFOA

Page 14: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

TRADITIONAL DESIGN PROCESS

• Courtesy of Hanson Bridgett

Page 15: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

EVOLUTION OF SET BASED DESIGN

OPTIONS

1

2

3

1.1

2.1

3.1

1.2

2.2

3.2

2.3

3.3

C

3.4

B

C.1

A

B.1

A.1

4 4.1

TIME

Page 16: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

IPD PROCESS ELEMENTS

• Courtesy of Hanson Bridgett

Page 17: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

A NEW WAY TO DESIGN

INTEGRATED

TEAM

Healthcare User

Operations

MEP/FP IS-IT

Core / Shell Project

Operations

Interiors Build-out

Community

Public Relations

Structural

Site

Medical Equipment

Page 18: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

KEY ELEMENTS PROJECTS APPLYING

LEAN

PLAN

DO STUDY

ADJUST

PLAN:

DO:

STUDY:

ADJUST:

Develop a plan for a program, a

project, or to improve any process.

Execute the plan, first on a small

scale.

Observe, measure, evaluate

feedback to confirm or to adjust

the plan.

Make the plan permanent or

study the adjustments to improve

and start the PDSA cycle again.

Repeat continuously.

Page 19: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

A3 PROBLEM SOLVING

Page 20: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Accurate documents

Trade Ideals higher Level of Problem solving

Early Constructor input, move information

forward

Labor savings by design

Much higher rate of information flow

Cost decisions

Much tighter tolerances

Right sized systems

Innovations

COORDINATION

Page 21: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

DESIGN TEAM TRANSFORMATION

Select collaborative team members

Teach team our design process

Submittals as Documents

Reorganizing of traditional design

documentation.

Page 22: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

TARGET VALUE DESIGN

& SELECTING PARTNERS

Page 23: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

IDENTIFY THE TARGET

Page 24: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VALIDATE THE TARGET

Page 25: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

CONTINUOUS TRACKING

Page 26: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VALIDATE THE TARGET

CONSTRUCTION COSTS PER SF

$680 / SF

$500 / SF

$480 / SF

0

100

200

300

400

500

600

700

800

CA Ave. Hospital Cost (SF) Temecula Target (SF) Temecula Actual (SF)

30%

Reduction

Page 27: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VALIDATE THE TARGET

ALL IN COSTS PER BED

(NO LAND ACQUISIT ION)

$1.8MM / Bed

$1.1MM / Bed

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

CA Ave. Hospital Cost per Bed Temecula Ave. Hospital Costs per Bed

40%

Reduction

Page 28: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

CHOOSING BY ADVANTAGES

Page 29: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

SELECTING PARTNERS

Page 30: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Choose by Advantages not Relationship

Onboard all Partners

Be Transparent with the Budgets

Develop Cluster Targets

IFOA Delivers Cultural Change

LESSONS LEARNED

Page 31: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

COLLABORATIVE

SCHEDULING

Page 32: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PLANNING

• ADePT

Not compatible with our needs

• Vizio

Great visuals but no reporting capabilities

• SIP Link

Great but too much time required

• OurPlan

Best to date

• Flowline

Work flow

Page 33: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PLANNING

• Started planning 1.5 years before construction

• General Foremen & Superintendents met once

a week

• Time for Trust

Page 34: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PLANNING

Page 35: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

TAKING LEAN TO THE

FIELD

Page 36: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

TAKING LEAN TO THE FIELD

Page 37: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

TAKING LEAN TO THE FIELD

Page 38: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

UHS

Temecula

Valley

Hospital

IFOA Results

PRODUCTIVITY AND

INNOVATION

Page 39: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PRODUCTIVITY

Productivity Tracking

How did we collect data

What tools did we use to be more productive

What Have We Learned

Day to Day Decision

Qualifying Pre-Con Decisions

Rethinking Future Project Plans

Page 40: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PRODUCTIVITY TRACKING

Page 41: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

PRODUCTIVITY TRACKING

Page 42: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VIDEO STUDIES

Page 43: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VIDEO STUDIES

VALUE

WASTE

Page 44: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VIDEO STUDIES

2nd Floor Ext. Framing

Page 45: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VIDEO STUDIES

3rd Floor Ext. Framing

Page 46: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VIDEO STUDIES

Video Studies

2nd Floor Ext. Framing — LF/MD 3rd Floor Ext. Framing — LF/MD

67% Install Increase

100% Rework Decrease

Page 47: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

VALUE STREAM MAP

VSM – Door Delivery & Install

Page 48: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

LEVERAGING PRODUCTIVITY

DAY TO DAY DECISIONS

Day to Day Decisions

Changed batched size

Resulted in trade

stacking impacted

production rates

Immediately adjusted

Plumbing Cast Iron — LF/MD

Electrical In-Wall – HRS/RM

Page 49: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

LEVERAGING PRODUCTIVITY PREPLANNED

DECISIONS

Preplanned Decisions

Install plumbing prior

to framing

Showed that plumber

had significant

advantages

Plumbing Manpower

Plumbing Cast Iron — LF/MD

Page 50: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

LEVERAGING PRODUCTIVITY

RETHINKING WORK WEEK

Overtime

Page 51: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

LEVERAGING PRODUCTIVITY

RETHINKING SCHEDULING

Holiday Schedule

Working during the holidays

175 Partners working during holidays

30% to 40% Reduction in production

~$200,000 loss

Copper Pipe – LF/MD

Round Ductwork — LF/MD

Page 52: UHS Temecula Valley Hospital IFOA Results · Brent Nikolin Tara Laski Dean Shipcott Turner Construction Universal Health Services Bergelectric bnikolin@tcco.com tara.laski@uhsinc.com

Q&A

PRESENTER: Brent Nikolin Tara Laski Dean Shipcott

Turner Construction Universal Health Services Bergelectric

[email protected] [email protected] [email protected]

213.216.7869 949.466.9647 310.420.9557

Ken Lindsey Tom McCready

Southland Industries DPR Construction

[email protected] [email protected]

562.572.1907 949.933.0386