1
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
UFRJ – Semana de Engenharia Nuclear
André Salgado – Latin America Director
15/10/2018
2
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Framatome at a glance
For 60 years, Framatome's teams have been
involved in developing safe and competitive
nuclear power worldwide by:
• designing nuclear power plants,
• supplying nuclear steam supply systems,
• designing and manufacturing components and fuel
assemblies,
• integrating automation systems,
• and servicing all types of nuclear reactors.
Original Equipment Manufacturer
of 92 nuclear power plants
14,000 employees serving more than 250
reactors worldwide and
generating a turnover of € 3.3 billion in
2017
3
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
3
Framatome shareholder structure
5%
75,5%
19,5%
• Stock-listed company
• Majority shareholder: French state
Framatome Inc. Framatome GmbH
Framatome GmbH
subsidiaries
Framatome Inc.
subsidiaries
Other subsidiaries
100%
4
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
4
Our vision
High-performing people and technologies for safe and competitive nuclear plants worldwide
5
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
5
Our values
Future Integrity Performance Passion
Safety
Our values define who we are. More than principles, they guide our actions and describe how
we work with our customers, business partners and each other.
6
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
6
Our worldwide presence
14 000 employees working on more than 250 reactors worldwide
at 58 locations in 18 countries
Argentina
Brazil
Bulgaria
Canada
Czech Republic
Hungary
Japan
Russia
Slovakia
South Africa
South Korea
Spain
Sweden
Ukraine
United Kingdom
Germany
4 sites
China
8 sites
USA
7 sites
France
17 sites
Others
locations
7
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Expertise and operational performance at the heart of Framatome’s strategy
Framatome has developed its strategic plan along
five axes:
• proven and sustainable expertise
• performance in delivering
• an agile and adaptive organization
• safe and competitive solutions
• international development
The company's strategy is supported by five cross-
functional programs: operational excellence,
commercial excellence, knowledge management,
systems engineering and digital transformation.
8
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Angra Site
Framatomes’s offices in LATAM
Framatome in Latin America
• A 40 years presence in South America
• Commercial Office in Rio
• Operational presence on site: Atucha & Angra
• OEM of Angra 2 & 3, Atucha 1 & 2
Services & Supply of Equipment and Parts
• Support to the construction and commissioning of the NPPs;
• Services expertise for all types of reactors, all along:
• Angra 1 & 2, Atucha 1&2, Embalse: Specialized engineering,
maintenance expertise, outage services
Fuel
• Components supply
• Manufacturing support
• Design of Angra 2’s fuel in collaboration with INB and ETN
Framatome in Latin America Strong history and partnerships
Framatome’s Office Framatomes site offices
9
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear 9
Framatome
Entered in operation
end of 2018
Taishan
Beginning of operations
end of 2018
Okiluoto Hinkley Point
Angra 3´s resumption Argentinean
New Build Sou
th A
me
rica
G
lob
al
New Brand Name
Keep Assisting Brazilian Nuclear Program through
Services for Angra 1 & 2
Assist Argentinean Nuclear Program
Beginning of operations
end of 2018
Flamanville
Our future / Next Steps / Objectives
10
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
10
Our activities in a nutshell
Engineering & Design Authority: Development, design and licensing of Nuclear Steam Supply
System (NSSS) and associated services
Large Projects: Management and contribution to nuclear reactor new ´build projects
Instrumentation & Control (I&C): Design and fabrication of safety I&C and automation systems
for nuclear power plants
Installed Base: Maintenance, engineering services for existing nuclear fleets and reactors
under construction
Fuel: development, design, licensing and fabrication of fuel assemblies and core components
for PWR, BWR reactors, and research reactors. Development of zirconium products
Component Manufacturing: design and manufacturing of heavy and mobile components
for nuclear islands
11
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Engineering
• Design and manufacturing of the nuclear steam supply system and its
principal items of equipment
• Engineering services for the heart of the power plant, the so-called
"nuclear island", the main components of the reactor’s primary circuit
and instrumentation and control (I&C) systems and fuel
• Contribution to the major EPR construction projects in Finland
(Olkiluoto 3), France (Flamanville 3), China (Taishan 1 and 2), and the
United Kingdom (Hinkley Point C)
At the heart of nuclear power plants design
Framatome, with its thousands of highly skilled engineers
and operators, has completed more than 90 nuclear power
plant projects around the world.
12
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Equipment manufacturing for nuclear power plants
• Production of the key equipment for nuclear steam supply systems to
equip new-build power plants or to replace items of equipment at power
plants in operation
• Manufacturing of advanced technology heavy equipment (reactor
pressure vessel, steam generators, etc.) and mobile components
(reactor coolant pumps and control rod drive mechanisms)
A key element in nuclear safety
Since 1970, around 10,000 components have been produced:
Framatome components equip more than 100 power plants in
11 countries, always meeting the most demanding nuclear
safety and quality standards.
13
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Instrumentation & Control
• Safety automation systems to automation systems for normal
operation,
• Nuclear instrumentation to lifecycle solutions,
• Simulators and global I&C engineering expertise to human-machine
interface design and human factors engineering.
The brain of the plant
Framatome has installed more than 300 comprehensive
Instrumentation & Control systems in nuclear reactors of all
types across the world.
14
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Fuel
Mastery of the entire process from design to manufacturing of fuels for
light water reactors Pressurized Water Reactors (PWR, excluding
VVERs), Boiling Water Reactors (BWR) and research reactors
• Fuel assembly design
• Production of zirconium and its alloys
• Fuel assembly fabrication
• Services associated with fuel
Cutting-edge technology vital for nuclear power generation
225,000 Framatome fuel assemblies are loaded in more
than 100 reactors in operation around the world.
15
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Operational power plants
• Maintenance, component replacement, inspections and checks,
refueling operations, and optimized management of reactor shutdowns
for maintenance.
• Supply of fuel assemblies and related services, management of
equipment and spare parts, modernization of I&C, and chemistry and
radiochemistry services.
Services and solutions to maintain and modernize and extend their operating lifetime
Framatome has 60 years of international experience in all
types of technologies and maintenance of more than 250
reactors worldwide.
16
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Commissioning and licensing
• Support to our customers through to the commissioning of power plants and offer of all related services
• Support for operators through relationships with their safety authority and in the application of existing
regulations
• Technical Centers and test facilities to qualify equipment and to provide assistance in the preparation of
qualification studies and associated documentation
2,800 tests carried out in our Technical Centers every year for equipment qualification
17
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Construction of reactors and commissioning of new power plants
• Design, through procurement and supply, and onto commissioning for new-build nuclear reactors
• Edvance: an EDF and Framatome joined engineering subsidiary dedicated to new-build reactor projects
Management of large projects
Framatome is actively involved in the construction of six EPR reactors worldwide: in Finland
(Olkiluoto 3), in France (Flamanville 3), in China (Taishan 1 and 2), and in the United Kingdom
(Hinkley Point C).
18
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
18
Our customer’s performance always in mind…
Through a robust portfolio of solutions and services,
our teams address major challenges customers face
today: the optimization, availability, and
competitiveness of their facilities while strengthening
nuclear safety conditions.
Framatome is:
• servicing all types of reactor technologies.
• is attentive to technological breakthrough and
proven cutting-edge solutions to shape the future
of nuclear industry.
Plant Performance - Flexible
Operation
Life Time Extension
Outage & maintenance optimization
Relicensing
Instrumentation & Control
modernization
Fuel assemblies: GAIA, ATRIUM
Advanced Codes & Methods
NSSS components manufacturing
Safety Instrumentation &Control
Some of our Iconic Solutions Our Offer
New Plant
Plant in Operation
Plant’s Long Term
Operation
19
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Framatome: a wide variety of job offers
Framatome provides many opportunities in France and abroad in areas
such as engineering, design, project management, production and
maintenance:
• Project managers
• Engineers
• Technicians
• Fabrication of fuels,
• Manufacturing of heavy components and mobile equipment
• Chemists, metallurgists and boilermakers
Each year, Framatome recruits more than 500 new
employees and trains more than 300 work-study interns.
20
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Innovation and digital transformation to enhance performance
Industrialization priorities defined for our innovation and digital
transformation program
• A paperless business model through the development of electronic
documentation and use of tablets
• Virtual reality, mixed reality and augmented reality
• Asset management with predictive maintenance via data analysis
R&D expenses*: 100 Mio€
Investments*: 200 Mio€
* 2017 figures
21
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Global & Local Challenges for the electricity sector
SECURE FLEXIBLE
AFFORDABLE
DISTRIBUTED
COMPLEX
INDUSTRIAL
AND SOCIAL DEVELOPMENT
PREDICTABLE
INCLUSIVE
COSUMER
DRIVEN CONTINENTAL
SMART CLEAN
22
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Demand vs Social and Economical development
Electricity consumption will grow driven by the economic and social development !
2,6
15,5
13
6,9
4,2
6,6
3,93
0
2
4
6
8
10
12
14
16
18
Brazil Canada UnitedStates
France SouthAfrica
Russia China
Electricity consumption per capita 2015 (KWh)
Electricity consumption / population (MWh/capital)
Brazil´s electricity demand evolution (1990-2014)
• Even if the economic slowdown of Brazil decreased the electricity consumption in 2015 & 2016, the electricity
demand doubled since1990 and will continue increase with the rebound of economic growth;
• Brazil still has a long way to reach the electricity consumption levels of other developing or developed countries,
and needs to get prepared for it;
23
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
2016 vs 2026: Energy Mix - Installed Capacity
• Major contribution for the Growth coming from clean sources : Wind (18,5 GW), Hydro ( 13,7 GW) and Solar (9,6 GW);
• Fossil sources expected to grow 14,5 GW, from which 12,2 GW (6%) coming from “Alternative to peak” generation;
Source: EPE PDE 2026
Hidraulic
89.698
60%
Nuclear
1.990
1%
SHP
5.820
4%
Oil
3.721
3% Natural
Gas
12.532
8%
Solar
21
0%
Wind
10.025
7%
Diesel Oil
1.530
1%
Coal
3.174
2%
Biomass
12.881
9%
Import
7.000
5%
Total = 148 392 MW Hidraulic
103.466
49%
Nuclear
3.395
2%
SHP
8.158
4% Oil
1.774
1% Natural
Gas
17.339
8%
Solar
9.660
4% Wind
28.470
13%
Diesel Oil
612
0%
Coal
3.514
2%
Biomass
16.936
8%
Import
7.000
3%
Alt Peak
12.198
6%
Total = 212.522 MW
2016 2026 Growth +35 %
24
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Potential contracted / source
3885 GW already contracted from the 64 GW forecasted Growth;
0
2.000
4.000
6.000
8.000
10.000
12.000
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Cap
acit
y (M
W)
Biomass Wind Hidraulic SHP Solar Thermal
Sources 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
Biomass 129 172 324 71 155 0 0 0 0 0 851
Wind 2818 2755 1048 0 0 0 0 0 0 0 6621
Hydro 5148 5000 2162 0 0 142 0 0 0 0 12452
SHP 232 218 123 264 0 0 0 0 0 0 837
Solar 940 1029 670 0 0 0 0 0 0 0 2639
Thermal 591 28 340 1521 0 0 0 0 0 1405 3885
25
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Scheduled expansion
0
10.000
20.000
30.000
40.000
50.000
60.000
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Cap
acit
y (M
W)
Alternative to peak Biomass Wind Hidraulic SHP Solar Thermal
Fonte 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Altern. to peak
0 0 0 0 3.064 6.451 8.466 12.077 17.364 17.679
Biomass 0 0 0 0 467 935 1.502 2.070 2.637 3.204
Wind 0 0 0 1.000 4.121 7.241 10.362 13.483 16.604 19.72
4
Hydro 0 0 0 0 0 0 118 577 845 1.519
SHP 0 0 0 0 0 300 600 900 1.200 1.500
Solar 0 0 0 1.000 2.000 3.000 4.000 5.000 6.000 7.000
Thermal 0 0 0 0 0 0 1.500 2.222 2.222 3.110
26
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Regional “potentials” / Energy Flow
Source: ONS
27
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Clean sources participation
Stability of CLEAN Sources in the Matrix !
0%
20%
40%
60%
80%
100%
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
86% 86% 87% 87% 87% 86% 86% 85% 84% 83% 83%
14% 14% 13% 13% 13% 14% 14% 15% 16% 17% 17%
Emissoras de GEF
LIMPAS
28
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Reference Scenario – Generation Expansion
Need of Thermal sources to act as Base Load Source: EPE PDE 2026
• Growth in share of the Intermittent sources and reduction od the Hydro share;
• Hydro storage capacities are also reducing;
• Thermal capacity remains approximately constant;
0% 0% 0% 0% 1% 1% 2% 4%
6% 6%
64% 64% 63% 62% 60% 59%
57% 55%
53% 52%
21% 22% 23% 24% 25% 26% 27% 28% 29% 30%
15% 14% 14% 14% 14% 14% 14% 13% 12% 13%
0%
10%
20%
30%
40%
50%
60%
70%
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Par
tici
pat
ion
of
Sou
rces
(%
of
inst
alle
d p
ow
er)
Alternative to peak Hidraulic SHP + Wind+ Bio + Sol Thermal
29
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Long Term Perspectives
Source: EPE PDE 2026
Growing necessity of baseload
NUCLEAR GÁS
NATURAL CARVÃO
POTÊNCIA COMPLEMENTAR E ARMAZENAMENTO
Fonte: EPE
30
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Among the thermal options... Why Nuclear?
NUCLEAR is ...
Strategic
Affordable / Competitive
Reliable
Safe
CLEAN
31
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Brazil masters the nuclear cycle for Power Generation
Source: INB
Coversion INB
U235 enrichment Brazilian Navy/ INB
Fuel Assembly INB
Mining (Yellow cake) INB
Reconversion INB
Uranium pellets INB
Electricity Generation Eletronuclear
Angra 1, 2 and 3
• 6th highest resources of Uranium in the world and only 30% of the territory has been prospected;
• Expertise along the whole uranium value chain for Power Generation;
32
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Nuclear power allows security of the grid by covering baseload needs
Nuclear can also operate in Load Follow
Source: RTE 2015
• France which has the highest part of nuclear, has the lowest price of electricity in Europe;
• Nuclear allows economic and workforce development by creating 3 times as many local jobs as competing technologies.
33
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
FGV Study – Impacts of a New NPP
Investing in Nuclear will maintain the expertise, create jobs & bring economical development
• In 2015 FVG prepared a study that evaluates the impact of the construction of 1 New Nuclear Power Plant in Brazil –
Angra 3 has been used as the case study;
• Huge impacts in jobs creation and in the GDP compared with other sources;
Brasil
2,28
Sudeste 1,97
RJ 1,57
Local
1,12
PBI Multiplicators
34
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Nuclear is safe
• Nuclear is the power generation technology with
the lowest number of death/TWh produced and
is the most controlled power generation technology:
• IAEA Safety standards: framework for protecting people and
environment;
• Key sensitive topics overseen by international conventions;
• The support of IAEA at each step of a nuclear program ensure
the highest level of safety.
Source: The Next Big Future, 2016
244
52
20
50 50
0,1 0,15 0,1 0,04
Number of deaths per TW/h produced per energy production
35
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Nuclear is clean
Cane Bagasse
BIOMASS
Tops and leaves
45 gCO2/KWh
COAL
Lignite
1005 gCO2/KWh
Natural Gas
Natural
Gas
500 gCO2/KWh
Oil
Oil
670 gCO2/KWh
NUCLEAR
25 gCO2/KWh
Uranium
36
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Obrigado!
37
© Framatome All right reserved
UFRJ - Semana da Engenharia Nuclear
Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations.
p.37