5
UC3: Complications Related to Unscheduled performed instead scheduled (TK) Raw visit number VISITNUM LBDY LBDTC 2 missing 99 17 2014-03-17 3 3 28 2014-03-28 VISIT VISITNUM SVDY SVDTC SVUPDES Week 1 2 14 2014-03-14 Week 1 Unscheduled 17 2014-03-17 Lab Test Week 2 3 28 2014-03-28 L B SV Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed Is it still unsched uled visit?

UC3: Complications Related to Unscheduled performed instead scheduled (TK)

  • Upload
    yanka

  • View
    30

  • Download
    1

Embed Size (px)

DESCRIPTION

UC3: Complications Related to Unscheduled performed instead scheduled (TK). Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed. LB. Is it still unscheduled visit?. SV. - PowerPoint PPT Presentation

Citation preview

Page 1: UC3: Complications Related to Unscheduled performed instead scheduled (TK)

UC3: Complications Related to Unscheduled performed instead scheduled (TK)

Raw visit number VISITNUM LBDY LBDTC

2 missing

99 17 2014-03-17

3 3 28 2014-03-28

VISIT VISITNUM SVDY SVDTC SVUPDES

Week 1 2 14 2014-03-14

Week 1 Unscheduled 17 2014-03-17 Lab Test

Week 2 3 28 2014-03-28

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?

Page 2: UC3: Complications Related to Unscheduled performed instead scheduled (TK)

UC3: Complications Related to Unscheduled performed instead scheduled (TK) option 1

Raw visit number VISITNUM LBDY LBDTC

2 missing

2 17 2014-03-17

3 3 28 2014-03-28

VISIT VISITNUM SVDY SVDTC SVUPDES

Week 1 2 14 2014-03-14

Week 1 Unscheduled 17 2014-03-17 Lab Test

Week 2 3 28 2014-03-28

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?

Page 3: UC3: Complications Related to Unscheduled performed instead scheduled (TK)

UC3: Complications Related to Unscheduled performed instead scheduled (TK) option 2

Raw visit number VISITNUM LBDY LBDTC

2 missing

2.1 17 2014-03-17

3 3 28 2014-03-28

VISIT VISITNUM SVDY SVDTC SVUPDES

Week 1 2 14 2014-03-14

Week 1 Unscheduled 2.1 17 2014-03-17 Lab Test

Week 2 3 28 2014-03-28

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?

Page 4: UC3: Complications Related to Unscheduled performed instead scheduled (TK)

Why do we need the result for uscheduled instead of result for scheduled

• To use results for analysis as results for scheduled visits (e.g. In summary statistics) => decision and derivation of stats >ADAM

• To use results as Baseline (e.g. Set up of Baseline flag) => Company decision >SDTM IG

Page 5: UC3: Complications Related to Unscheduled performed instead scheduled (TK)

UC2 Pros & ConsPros Cons

Arguments as scheduled visits

•no lost information • Could overlap with the next visit• Difficulty in creation of SV domain• SDTM programming and mapping

more challenging (e.g. need to include additional result identifier)

• Potential issue with Open CDISC

Arguments as unscheduled visits

• SV is cleaner• data traceability

• Multiple unscheduled visits possible, including SVDTC populated with the same date

• Challenges in further analysis