September 2011 BOR Update
Allied Health Science 2nd Floor Renovations
Project Description: Project is to renovate space vacated from move to new Health Science Building. Will serve for instruction on Radiologic Technology, Medical Assisting, Emergency Medical and Technology (EMS). A new program, Diagnostic Medical Sonography will be provided with a new Ultrasound Room necessary for teaching.
Schedule: Total Project Cost: Planning & Design: July 2011 –January 2012. $784,258.00 Advertising & Award: February/ March 2012 Construction: May 2012 Occupancy August 2012 Board of Regents Approval & Motions: Project Agreement May 11, 2011 Preliminary Admin Approval
June 2, 2011
Status Update: Kumin & Assoc. was selected to provide architectural & engineering construction drawings. Design is in progress. Construction to start May 2012 and be completed by August 2012 for fall semester.
Project CompletUAA cammechanexterior
ScheduPlanningAdvertisConstruOccupan Board o Project APrelimin Status U Architecoff meet
Beatric
Descriptio
te renovatiompus. The ical systemimproveme
ule: g & Designsing & Awarction: ncy
of Regents
Agreement nary Admin
Update:
cts Alaska wting is sche
ce McD
on:
on of the Beproject will
ms, replacements.
: July 20rd: Februa
May 20August
Approval
Approval
was issued duled for 9/
Donald
eatrice McDinclude HA
ment of elec
011 –Januaary/ March 013 t 2014
& Motions
Ju Ju
a contract /2/11.
Buildin
Donald BuilAZMAT abactrical syste
ary 2013 2013
s:
uly 11, 2011ly 11, 2011
for Program
ng Ren
lding, a 197atement, reems and ar
1 1
mming & Pr
Septem
newal
70’s buildinplacement rchitectural
Total $10,3
re-Design. T
mber 2011 BO
g on the maof boiler aninterior and
Project Co300,000.00
The initial k
OR Update
ain nd d
ost:
kick
Project Planningand teaccommunlabs, soilabs, foumachineThe proj
Schedu
PlanningAdvertisConstruWarrant Board oPreliminFormal P
Status ULivingstoplanningworkshoprovidindesign f
UAA E
Descriptiog, programmching areasnications lails mechaniundation ene shop, wooject will incl
ule:
g & Designsing & Awarction: ty:
of Regentsnary Admin Project App
Update: on Slone Ag and progrops were cog peer revie
funds is bei
Enginee
on: ming, desigs not currenbs, electricics labs, ph
ngineering, od shop, “dlude structu
: May 20rd: Januar
April 21 year
Approval Approval
proval
rchitects, Aramming theonducted inew of the png requeste
ering a
gn and consntly availablal engineer
hotogrammetransportatirty” yard aured parkin
011-Decemry-March 20013-May 20after const
& MotionsNoApcomdesexc
Anchorage, e UAA Eng
n June, Julyprogrammined at the S
nd Ind
struction of le on campring labs, fluetry/cartogrtion and higand confereg for the fa
mber 2012013 015 truction com
s: v 2009 r 2011 BORmprehensivsign, and siceed a tota
Alaska, wagineering any and Augusg phase of eptember B
ustry B
f a 75,000 gpus. Teachuids labs, hraphy/GIS,ghway engiencing/collacility and a
mpletion
R authorizeve planningite evaluatiol cost of $1
as selected nd Industry st 2011. Iraf the projectBOR Meetin
Septem
Building
gsf engineehing areas wheat and maseismic anneering, lan
aborative leny displace
Total
$117,
ed UAA to pg, programmon and sele,000,000.
as lead arcBuilding. P
a Fink is ast. Release ong.
mber 2011 BO
g, Ph 1
ering laborawould incluass transfe
nd earthquand surveyinarning area
ed parking.
Project Co
,000,000
proceed witming, conceection not to
chitect for Programmissisting UAAof remainin
OR Update
atory de:
er ake ng, as.
ost:
h ept o
ng A by
ng
Project
Design academoffices,gross a
ScheduPlanningAdvertisConstruConstruWarrant Board oPreliminSchemaTotal Pr Status UConditiodelivery maintenaudio/vidbuilding
UA
t Descriptio/ construct
mic program classroom
anatomy sp
ule: g & Designsing & Awarction F&F: ction: ty:
of Regentsnary Adminiatic Design oject Cost
Update: onal certifica
and installaance trainindeo equipm. Grand Op
AA He
on t approxima
ms of nursinms/ seminar
aces, and s
: Dec 20rd: Oct 20 Aug 20
Dec 201 year
Approval strative ApApproval: Increase:
ate of occuation compng of all me
ment 99% cpening Cere
alth S
ately 65,162ng, WWAM
rooms, labstudent act
007-Sept 20009 -Nov 20009- Dec 20009-Aug 20after const
& Motionsproval: J
FN
pancy receplete. Functechanical acomplete. Semony is sc
Scienc
2 gross squI/MEDEX a
boratories foivity spaces
009 009 009 011 truction com
s: une 2008
Feb 2009 N/A
eived Augustional testinnd electrica
Staff and faccheduled fo
ces Bu
uare foot faand Allied Hor patient ss.
mpletion
st 1, 2011. ng/commissal systems culty have cor October 7
Septem
uilding
cility to accHealth. Projimulators, M
Total $46,5
Furniture asioning/opecomplete. completed t7, 2011.
mber 2011 BO
g
commodateect includeMed Tech a
Project Co500,000
and equipmeration and Installation the move in
OR Update
e the s and
ost:
ment
of nto the
UA
Project Provide are com
ScheduPlanningAdvertisConstruWarrant Board oFormal PSchema Status UThe projremainsCertificacurrently
This is th
AA MA
Descriptiofire alarm,
mplete. Build
ule: g & Designsing & Awarction: ty:
of RegentsProject App
atic Design
Update: ject has be as the orig
ate of Occuy being add
he final rep
AC Ho
Pha
on: fire sprinkle
ding 6 rema
Phase: Thru Frd: Februa
May 201 year
Approval proval: Approval:
en awardedginal schedupancy on J
dressed.
port for this
ousing
ase IV
er system, ains to be d
e IIII, BuildiFebruary 20ary 2011 – 011- Augusafter const
& MotionsJanDe
d to Orion Cule of May uly 28, 201
project.
g Fire
V, Buil
and exhausone in the f
ing 5 011 March 201
st 2011 truction com
s: nuary 2008cember 20
Constructio2011 – Aug1. Minor pr
Syste
ding 5
st fans in Bfuture.
1
mpletion
8 10
on, and the gust 2011.rogramming
Septem
m Up
5
Building 5. B
Total $515,
constructioThe building adjustme
mber 2011 BO
pgrade
Buildings 1-
Project Co,000
on period ng receivednts are
OR Update
e
-4
ost:
a
Project Phase providinsystem
ScheduPlanningAdvertisConstruWarrant Board oPrelim AFormal PSchema Status UPhase 2remodelcomplet
Phase 3
UAA
Descriptio2 renovateng new phy
ms. Phase 3
ule: g & Designsing & Awarction: ty:
of RegentsAdministratiProject App
atic Design
Update: 2 – Demolitil. New wallse.
3 design is 6
A Scien
on: s the rema
ysics, LSIS, is under de
Phase: Nov 20rd: March
May 201 year
Approval ve Approva
proval: Approval:
ion is comps are frame
65% compl
nce Bu
inder of the, Math labsesign and w
e 2 010 –Feb 22011
011 –April 2after const
& Motionsal: Nov 2
April 2(Ph I)
plete. Showed, electrica
ete.
uildin
e first floor a, and a majwill complet
011
2012 truction com
s: 2008 2009 ) Sep 2009
wn are the nal and mech
g Ren
and half of jor renewalte the build
mpletion
(Ph 2) Sep
new heatinghanical roug
Septemb
novati
the secondl of the mec
ding renovat
Total Ph I Ph 2 Ph 3 TPC $
p 2010 (Ph
g lines goinggh-in is abo
ber 2011 BOR
ion
d floor, chanical tion.
Project Co $2,645,60 $5,100,00 $5,300,00
$13,045,60
h 3) June 2
g to the Enout 75%
Update
ost: 00 00 00 00
011
ergy
UAA
Project 196,000basketbsupport laundry,skiing, tr ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaTotal Pr Status U
Total proBond; $3assumpton the laclearing BreakingSchemaMeeting
A Seaw
Descriptio0 sf multi-usall & volleyspace cons A/V produrack & cros
ule: g & Designsing & Awarction: ty:
of Regentsnary Admin Project App
atic Design oject Cost
Update:
oject fundin34M FY12 tions on proarger facility(<2 acres)
g ceremonyatic Design .
wolf S
on: se facility thball; a pracsisting of a ction, locke
ss country p
: Aug 20rd: Fall 20
Spring1 year
Approval Approval:
proval(s): Approval(sIncrease:
ng of $109MCapital) is ogram & spy as well as has been ay for the neincluding C
Sports
hat will housctice & perfofitness & tr
er & team roprograms.
008- Spring011 (CMAR 2012 to Faafter const
& MotionsAugFeb
s): JunJun
M ($15M FYnow in plac
pace requires finalizing sapproved b
ew Seawolf CMAR appro
s Aren
se a 5,000 sormance gyraining roomooms for ba
g 2012 R process) all 2014 truction com
s: g 2008 b 2009 /Junne 2009/Sene 2011 – a
Y-09 Capitace. Project ements, pasustainabili
by the MOASports Areoval is bein
na
seat perforym for the gm, administasketball, v
mpletion
ne 2011 ept 2011 approved $
al; $60M FYteam is cu
arking, site aity design s
A Planning Dena is schedng requeste
Septem
rmance gymgymnasticstration/coacvolleyball, g
Total $ 109
109M
Y11 Generaurrently verifand traffic cstrategies. Departmenduled for Seed at the Se
mber 2011 BO
mnasium fos program; ching officeymnastics,
Project Co9,000,000
al Obligatiofying earlieconsideratioLimited sitet. Ground eptember 9eptember B
OR Update
r
es,
ost:
n er ons e
9th. BOR
UAA
Project UAA has performanage/probleLake and have well standing wstandardsexcellent maintenan
ScheduPlanning &AdvertisinConstructWarranty: Board oPrelim AdFormal PrSchematicProject Ch Status UThe ULB bidders reremainingproject chweather a
A Univers
Descriptioover 1,000,00nce life expecem basis on athe Universitover three hu
water on the fs; new, thickedrainage. Thnce.
ule: & Design:
ng & Award: tion: :
of Regentsdministrative Aroject Approvc Design Apphange Approv
Update: roof project w
esponded andg project balanhange approvaallows.
ity Lake B
on: 00 square feectancy and muan annual basy Lake Annexundred patcheflat roof. Ther and tapered
he new minera
July 200June 20July 20115 years
Approval Approval: al:
proval: val:
was funded wd the low bid ance and FY12al. The Cont
BuildingRoof R
et of various rust be replacesis. The currx Buildings. Tes, extensive
e three inch rigd insulation wal cap built up
09-May 2010011 11-Septembes after constr
& MotionsFebAprAprJuly
ith R&R fundsand award wa2 funding, theractor mobiliz
and UnivReplacem
roofing types oed. UAA inteent FY12 proThese roofs ae UV degradatgid insulation ill bring the bp asphalt roof
r 2011 uction comple
s: b 2009 ril 2011 ril 2011 y 2011
s in May 2011as to Consolide ULB Annex zed to the site
versity Lament
of which manends to replacoject is to replare 27 years otion/cracking is well belowuilding up to af will be durab
etion
1 and subseqdated Enterprwas added to
e in August 20
Septem
ake Build
ny have exceece the roofs baace the roofsold. The expoand numerou
w any current an R-30 levelble and requir
Total $925,0
quently bid Jurises, Inc. for o the scope o011 and work
mber 2011 BO
ding Anne
eded their ased on an
s on the Univeosed asphalt us areas of building l and provide re less
Project Co000
une 2011. Se$460,071. W
of work after k is progressin
OR Update
ex
ersity roofs
ost:
ven With
ng as
Project DemolitiAuditoriubackup ScheduPlanningAdvertisConstru
Board oProject APrelim AFormal PSchema Status USubmittaschedule
Wend
Descriptio
ion and repum to energgenerator a
ule: g & Designsing & Awarction:
of RegentsAgreement
AdministratiProject App
atic Design
Update: als have beed for arriva
dy Will
on:
placement ogy saving flassociated
: Nov rd: April
Nov.
Approval
ve Approvaproval: Approval:
een issued, al before co
iamson
Repl
of incandesluorescent with the lig
2009 - Oct2011 – Ma 2011—Jan
& Motions
al: FebMa
MaMa
approved aonstruction
n Audit
aceme
cent light fiand LED sohting replac
2010 ay 2011 n 2012
s: bruary 24, 2
arch 3, 2010arch 22, 201arch 25, 201
and processtart date o
torium
ent
xtures in thources. Recement and
2010 0 10 11
ssed. All fixtof Novemb
Septem
m Light
he Wendy Wview of emd upgrade.
Tota$62
tures are oer 7, 2011.
mber 2011 BO
ing
Williamson ergency
al Project C0,000
n order and
OR Update
Cost:
d
September 2011 BOR Update
UAA Kenai Campus Career &Technical Center
Project Description
A new KPC building at the Kenai River Campus for Process Technology, electronics and instrumentation programs, approximately 17,000 sf.
Schedule: Total Project Cost: Planning & Design: March – Nov 2011 $14,500,00 Advertising & Award: December 2011 Construction: April 2012 – July 2013 Warranty: 1 year after construction completion Board of Regents Approval & Motions: Preliminary Project Approval: Feb 2011 Formal Project Approval: February 18, 2011 Schematic Design Approval: Pending Total Project Cost Increase: N/A Status Update: McCool Carlson Green has met with the KPC building committee several times and has developed the schematic design.
Project New stu ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaTotal Pr Status UBettiswoschemat
UAA
t Descriptioudent hous
ule: g & Designsing & Awarction: ty:
of Regentsnary Admin Project App
atic Design oject Cost
Update: orth North htic design.
Kenai
on sing with 96
: June 2rd: June 2
June 21 year
Approval Approval:
proval: Approval: Increase:
has met witSchematic
Camp
6 Student be
2011 – April2012 2012 – Augu
after const
& MotionsFebFebPeAdd
h the buildiDesign is b
pus Stu
eds.
l 2012
ust 2013 truction com
s: b 2011 bruary 18, 2nding ditional $1.
ng committbeing reque
udent
mpletion
2011
8 M in fund
tee several ested at the
Septem
Hous
Total $17,8
ding from Le
times and e Septembe
mber 2011 BO
ing
Project Co800,000
egislature
has develoer BOR Me
OR Update
ost:
oped the eting.
Project This proand hascontractOnce allwill inspexpecte
ScheduPlanningAdvertisConstru Board oPrelim AFormal PSchemaProject C Status Usoil, thisthe site is anticip
U
Descriptiooject will cle significant tor will excal the contamect the excd outcome
ule: g & Designsing & Awarction:
of RegentsAdministratiProject App
atic Design Change Ap
Update: Ons will be donhas been tipated by th
UAA K
on: eanup a site
amounts oavate the sominated soicavation. Th
is to either
: Througrd: Februa
April 2
Approval ve Approva
proval Approval
pproved
ne small arene in Septeilled severae end of su
KPC So
e off campuof diesel conoil and placil is excavahe contamin
clean up o
gh January ary 2010- M2010- Summ
& Motionsal Feb
FebFeb$36
ea will needmber. The
al times. Goummer 201
oil Rem
us that was ntamination
ce it into cleted the Envnated soil wor fully chara
2010 March 2010mer 2011
s: bruary 9, 20bruary 17, 2bruary 17, 26,000 on Ju
d additionacontaminat
ood progres1.
media
used for firn at 14 feetean piles anvironmentawill be spreaacterize the
010 2010 2010 une 1, 2010
l excavatioted soil thass has been
Septem
ation
re training it below ground contaminl Consultanad out and e site.
Total $411,
0
n to removat has been n made and
mber 2011 BO
n the 1980’und level. Tnated piles.nt and the Dland tilled.
Project Co,000
e contaminspread acr
d final clean
OR Update
’s The . DEC The
ost:
nated ross nup
UAA
Project A new 7center anew det ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaProject C
Status U
The Univgeneral continuelandscapcompletdrawing This is t
Kache
Descriptio7,433 sf builat the East Cached 720s
ule: g & Designsing & Awarction: ty:
of Regentsnary Admin Project App
atic Design Change Ap
Update:
versity accecontractor
es working ping and me. Owner ts are in pro
the final up
emak B
on: lding with 5Campus to sf storage s
: June 2rd: March
June 21 year
Approval Approval
proval Approval
pproval(s)
epted the bhas now coon small m
misc. site imtraining andogress.
pdate for t
Bay Cam
5 classroomreplace sp
shed.
2009- March2010- May
2010- Juneafter const
& MotionsMaJunNoJun
building as Sompleted aiscellaneouprovements
d O&M man
this projec
mpus C
ms, 12 officeace now be
h 2010 y 2010 2011
truction com
s: ay 2009 ne 2009 v 2009 ne 2010 / O
Substantialll work on cus owner ins work addnuals are no
ct.
Classro
es, learningeing leased
mpletion
October 201
lly Completcontractual nitiated chaned by controw complet
Septem
oom Bu
g resource ad. Work als
Total $3,34
10
te effective punch list inge order wract mod. #te and final
mber 2011 BO
uilding
and testingso includes
Project Co45,000
3/18/11. Titems and work. Additi#7 is now l as-built
OR Update
a
ost:
The
ional
M
Project The projemusic clatheater fo
ScheduPlanning &AdvertisinConstructWarranty: Board oPrelim AdProject AgFormal Pr Status U
We receivconsultanproceedinSeptembe
Mat-Su
Descriptioect will desigassroom, draor lectures, p
ule: & Design:
ng & Award: tion: :
of Regentsdministrative Agreement roject Approv
Update:
ved proposalst for the proje
ng with plannier BOR Meeti
Valley
on: gn and constama lab, inspublic gathe
July 201June 20July 2011 year a
Approval Approval:
al:
s from six desect. Meetingsng activities aing.
y Cent
truct a new ftrument storrings and co
11-May 2012012 12-July 2014after construct
& MotionsFebAugPen
sign firms whis have definedand concepts
ter for
facility at therage, displayonferences.
tion completio
s: bruary 2011 gust 22, 2011nding
ch led to the d the prelimin. Formal Pro
r Arts
e Mat-Su Cay areas, gath
on
selection of Knary scope of oject Approval
Septem
& Lea
ampus that whering/study
Total $20,00
Kumin & Assowork and thel is being requ
mber 2011 BO
arning
will provide ay spaces and
Project Co00,000
ociates, Inc ase consultant isuested at the
OR Update
a d a
ost:
s the s
Project Provide Building
ScheduPlanningAdvertisConstruWarrant Board oPrelim AFormal PSchema Status UThe projThe conremain t
This will
Mat-S
Descriptioa new roof to replace
ule: g & Designsing & Awarction: ty:
of RegentsAdministratiProject App
atic Design
Update: ject was bid
ntractor is suto be comp
be the fina
Su HV
on: ftop mounte35 year old
: Januarrd: Nov –
April 21 year
Approval ve Approva
proval: Approval:
d on Novemubstantiallyleted.
al report for
AC &
ed air handd existing u
ry 2009 – JDec 2010011 – Oct 2after const
& Motionsal: Oc
ApMa
mber 18, 20y complete
r this projec
Boiler
ling unit anunits.
uly 2010
2011 truction com
s: tober 2009ril 2010
ay 18, 2010
010. The loon August
ct.
r Repl
d boilers fo
mpletion
9
0
ow bidder w05, 2011.
Septem
lacem
or the Jalma
Total $2,44
was Goertz Minor clean
mber 2011 BO
ment
ar M. Kerttu
Project Co40,000
Construction up items
OR Update
ulla
ost:
on.
Mat-
Project The Snostorage addition
ScheduPlanningAdvertisConstru Board oPrelim AFormal PSchema Status Uscope ofestimateto relocaSchemaapprova
-Su Co
Descriptioodgrass Hafor the parato the Mat-
ule: g & Designsing & Awarction:
of RegentsAdministratiProject App
atic Design
Update: Thf work and e based on ate a septicatic Design al.
ollege P
on: ll addition wamedic and-Su campu
: Februard: April 2
June 2
Approval ve Approv
proval: Approval:
hrough meeis finalizingthe concep
c tank that wApproval h
Param
will include d nursing prs.
ary 2011-M012
2012 – Dece
& Motionsval: No
NoPe
etings with tg the concept. The MSwas not in tas been su
edic/N
new classrrograms. T
arch 2012
ember 2013
s: vember 20vember 18nding
the campuseptual drawiSC campus
he original ubmitted for
Nursing
rooms, offiche FY10 G
3
09 , 2010
s, the consuings and prhas addedscope of w
r review and
Septem
g Lab A
ces, labs, wGO Bond fun
Total $3,62
ultant has droceeding w
d $125,000 work. A reqd
mber 2011 BO
Additio
workspace anded this
Project Co25,000
defined the with the costo the projeuest for
OR Update
on
and
ost:
st ect
P
Project The FY1Campusentrancelighting rreplacemenergy c
ScheduPlanningAdvertisConstru Board oPrelim AProject AFormal PSchema Status Ufacility. Schema
PWSCC
Descriptio11 GO Bons Renewal. e and counreplacemenment of galvconservatio
ule: g & Designsing & Awarction:
of RegentsAdministratiAgreementProject App
atic Design
Update: KuThe cost e
atic Design
C Wel
& C
on: d funded ge The work ter space; nnt and electvanized wa
on controls;
: Februard: Decem
April 2
Approval ve Approv: proval Approval
umin Architestimate basApproval is
lness
Camp
eneral renowill includenew flooringtrical upgra
ater lines; ITand exterio
ary 2011-Nomber 2011-F012 – July
& Motionsval: No
NoDePe
ects, Inc. hsed on the s being requ
Cente
us Re
ovation of the: ADA comg and finish
ades; electroT upgradesor siding im
ovember 20February 202013
s: vember 20vember 18cember 10nding
as completschematic uested at th
er Ren
enewa
he existing mpliant lockehes; new doronic entry ss; mechanicmprovement
011 012
09 , 2010 , 2010
ted the schedesign is whe Septemb
Septem
novat
al
Wellness Cer/restroomoors and hasystem; ACcal system uts.
Total $5,00
ematic deswithin the prber BOR M
mber 2011 BO
tion
Center and ms; new ardware;
CM removalupgrades;
Project Co00,000
ign for the roject budg
Meeting.
OR Update
l;
ost:
et.
August 2011 CIP Update
Schedule:
Planning & Design: October 2009‐April 2011
Advertising & Award: June‐July 2011
Construction: August 2011‐March 2012
Board of Regents Approval & Motions:
Preliminary Project Approval March 31, 2010
Formal Project Approval April 16, 2010 ($7,530,000 for both the Arctic Health and Kuskokwim CANHR Health Clinics‐NIH CO6 Grant)
Schematic Design Approval November 5, 2010 ($3.657M Arctic Health Clinic)
Status Update: The project bids were received on June 23rd. An award was issued the last week of July 2011 to GBC, Inc. Work will require the north entrance of the facility to be closed. Construction in is anticipated between June and December 2011. The project completion date has slipped to March 2012 due to extended review periods by NIH.
Arctic Health CANHR Health Clinic (AHCHC)
Total Project Cost:
$3,657,000
Arctic Health CANHR Health Clinic
Project Description This project will build about 3200 gsf of new space and renovate another 2800 gsf to support initiatives under the Center for Alaska Native Health Research. The facility will include a nutritional and physical assessment lab on the first floor and a shelled out space on the second floor which will be developed with future grants.
Architect/Engineer:
General Contractor:
Funding Source:
NIH C06 Grant
Design Alaska, Inc.
GBC, Inc.
August 2011 CIP Update
Schedule:
Planning & Design: June 2010 to March 2011
Advertising & Award: July‐August 2011
Construction: September 2011 ‐ August 2012
Board of Regents Approval & Motions:
Preliminary Project Approval March 31, 2010
Formal Project Approval April 16, 2010 ($7,530,000 for both the Arctic Health and Kuskokwim CANHR Health Clinics‐NIH CO6 Grant)
Schematic Design Approval November 5, 2010 ($3.8M Kuskokwim Campus Clinic)
Status Update: The bid opening was successful and within the engineer's estimate. The contract was awarded to Denali General Contractors, Inc. on August 8, 2011. The contractor will forward a schedule and tentatively start on the site work September 7, 2011. The barge schedule may delay the start of major work until May of 2012.
Kuskokwim Campus CANHR Health Clinic (KCHC)
Total Project Cost:
$3,800,000
Kuskokwim Campus CANHR Health Clinic
Project Description This project will renovate and construct a new CANHR Health research facility within the existing Voc‐Ed building, on the Kuskokwim Campus. The new space will be designed to accommodate Telehealth medicine (secure video conferencing) and distance education video conferencing. Additive Alternate #1, Kuskokwim Campus Gymnasium and Second Floor Renovation (KCGR), will be built above the clinic. Additive Alternate #2 is for selected mechanical work.
Funding Source:
NIH C06 Grant/USDE Title III Grant Architect/Engineer:
General Contractor:
Livingston Slone, Inc.
Denali General Contractors, Inc.
ADDITIVE ALTERNATE #1
CANHR HEALTH CLINIC
August 2011 CIP Update
Schedule:
Planning & Design: February‐June 2011
Advertising & Award: July‐August 2011
Construction: September 2011‐August 2012
Board of Regents Approval & Motions:
Preliminary Project Approval December 13, 2010
Formal Project Approval February 14, 2011
Schematic Design Approval June 8, 2011
Status Update: This project is additive alternate #1 to KCHC (noted previously). Bids have been received and an award is in progress.
Kuskokwim Campus Gymnasium and Second Floor Renovation (KCGR)
Total Project Cost:
$1,928,500
Kuskokwim Campus Gymnasium and Second Floor Renovation
Project Description This project will build a gymnasium in a portion of the open floor area of the Voc‐Ed building, above the Kuskokwim Campus CANHR Health Clinic (KCHC). Testing and distance education modules and new faculty offices will also be built. Construction on the KCHC and KCGR projects will be done simultaneously.
Funding Source:
USDE Title III Grant
Architect/Engineer:
General Contractor:
Livingston Slone, Inc.
TBD
GYMNASIUM AND SECOND FLOOR RENOVATION
August 2011 CIP Update
Schedule:
Planning & Design: February‐June 2011
Advertising & Award: July‐August 2011
Construction: August 2011‐September 2012
Board of Regents Approval & Motions:
Preliminary Project Approval December 13, 2010
Formal Project Approval February 14, 2011
Schematic Design Approval July 21, 2011
Status Update: Bids were received and an award is in progress as we actively collect submittals to complete the contracting. Construction will be underway the end of August 2011.
Bristol Bay Science Lab and Clinical Space (BBSL)
Total Project Cost:
$1,985,000
Bristol Bay Science Lab and Clinical Space
Project Description This project will increase science laboratory and research space by 780 square feet, increase student study and testing areas by three rooms, and increase distance education training space and classroom space by 640 square feet. This project and grant will also provide pre‐planning documents for additional clinical and laboratory space for high‐demand areas (i.e., Allied Health/Nursing program).
Funding Source:
USDE Title III Grant
Architect/Engineer:
General Contractor:
McCool Carlson Green
TBD
August 2011 CIP Update
Schedule:
Planning & Design: February‐June 2011
Advertising & Award: July 2011
Construction: August 2011‐September 2012
Board of Regents Approval & Motions:
Preliminary Project Approval December 13, 2010
Formal Project Approval February 14, 2011
Schematic Design Approval July 21, 2011
Status Update: Bids were received and an award is in progress as we actively collect submittals to complete the contracting. Construction will be underway the end of August 2011.
Chukchi Flight Simulator Room and Classroom (CCFSR)
Total Project Cost:
$1,804,960
Chukchi Flight Simulator Room and Classroom
Project Description The renovation and expansion plan will create a new flight simulator room and modify the
adjacent classroom to accommodate the flight simulator computer lab. Additionally, a battery
storage room will be included in this project. This renovation will reduce the size of the back
classroom and create a hallway that leads to the flight simulator area.
Funding Source:
USDE Title III Grant
NVision Architecture
TBD
Architect/Engineer:
General Contractor:
August 2011 CIP Update
Schedule:
Planning & Design: July 2010‐January 2011
Advertising & Award: February‐March 2011
Construction: May‐August 2011
Board of Regents Approval & Motions:
Formal Project Approval September 8, 2010
Schematic Design Approval September 8, 2010
Project Change Approval March 29, 2011
Status Update: The contractor is progressing well on this project and is approximately 95% complete. A
substantial completion inspection is scheduled for August 31, 2011.
NW Campus Nagozruk Building Heating Upgrade (NWMHU)
Total Project Cost:
$568,700
NW Campus Nagozruk Building Heating Upgrade
Project Description This project will replace three existing boilers that were installed with the original building in 1978 with one new boiler, perimeter fin tube element heating and a heat recovery ventilator (HRV) unit. The current system does not provide adequate heat for the spaces within the building. The fans in the forced air furnaces use a substantial amount of electricity to move air. Costs will be reduced by replacing the fans with an HRV and boiler system.
Funding Source:
FY11 State Appropriation
RSA Engineering, Inc.
ASRC Builders, LLC
Architect/Engineer:
General Contractor:
Revised Total Project Cost:
$873,209
August 2011 CIP Update
Schedule:
Planning & Design: January‐August 2010
Advertising & Award: November 2010‐January 2011
Construction: April 2011– January 2012
Board of Regents Approval & Motions:
Formal Project Approval February 18, 2010 (Life Sciences Facility)
Schematic Design Approval June 3, 2010
Status Update: The steel frame and concrete foundation are complete and the first floor slab has been poured. In‐slab mechanical and electrical were installed the week of July 18, 2011 and followed by the 2nd floor slab pour the last week of July 2011. The greenhouse structure arrived in Fairbanks and is being erected with the mechanical and electrical rough‐in to begin soon.
Arctic Health SNRAS Research Greenhouse (AHRG)
Total Project Cost:
$5,325,000
Arctic Health SNRAS Research Greenhouse
Project Description This project will replace the West Ridge Greenhouse which will be removed from the proposed construction site for the Life Sciences Research and Teaching Facility. UAF will construct a new, multi‐level, 10,000 gsf research greenhouse connected to the southwest wing of the Arctic Health Research Building. The greenhouse will allow the School of Natural Resources and Agricultural Sciences (SNRAS) to conduct northern climate plant research.
Funding Source:
UA Revenue Bond
Architect/Engineer:
General Contractor:
Design Alaska, Inc.
GHEMM Company, Inc.
GO Bond
August 2011 CIP Update
Schedule Phase 1C:
Planning & Design: January 2009 ‐ June 2009
Advertising & Award: May‐July 2011
Construction: July 2011 ‐ August 2012
Board of Regents Approval & Motions:
Formal Project Approval April 8, 2011
Schematic Design Approval June 2, 2011
Status Update: Construction began July 1, 2011. Switchgear was delivered on August 24, 2011 and a major transformer is scheduled to be delivered in late September 2011. Electrical equipment will be installed and commissioned over winter 2011‐2012 and two feeders will be energized in June 2012. Additional feeders will be energized in summer 2012. Anticipated completion date is the fall of 2012.
Critical Electrical Distribution Renewal Phase 1C (UTERC)
Total Project Cost:
$13,500,000
Project Description Phase 1C scope will install all the major electrical equipment in the building constructed in Phase 1B, including switchgear, transformers, switches, and cable for two new electrical feeders. Additional feeders will be installed as funds are available. This project will also provide additional power in building hub rooms as required for Voice over Internet Protocol (VoIP).
Critical Electrical Distribution Renewal Phase 1C
Funding Source:
FY12 R&R Funding
Architect/Engineer:
General Contractor:
PDC Inc. Engineers
Kiewit Building Group, Inc.
August 2011 CIP Update
Schedule Phase 1A:
Planning & Design: April 2009
Advertising & Award: February ‐ March 2011
Construction: May 2011 ‐ November 2011
Board of Regents Approval & Motions:
Formal Project Approval April 8, 2009
Schematic Design Approval February 18, 2010 (Phase 1A)
Project Change Approval December 9, 2010
Revised Formal Project Approval September 2009
Status Update: The foundation for the Test Modules was completed October 15, 2010 by Kiewit Building Group under the
Critical Electrical Upgrade Phase 1B project. Groundbreaking took place on May 12, 2011. Structural steel
is complete including the installation of insulated panels. The building is closed‐in with electrical
and mechanical installation currently on schedule.
Energy Technology Facility Phase 1A (ETTM)
Total Project Cost:
$3,000,000
Project Description This project, Phase 1A, will prepare the site for the Energy Technology Facility (ETWP), and will construct the four alternative energy test bay modules for ACEP in advance of the construction of the main facility.
Energy Technology Facility Phase 1A (ETTM)
Tes
t M
od
ule
s
Revised Total Project Cost:
$4,700,000
Funding Source:
FY11 Capital Appropriation
Architect/Engineer:
General Contractor:
Bettisworth North, Inc.
Kiewit Building Group, Inc.
University Receipts
August 2011 CIP Update
Schedule:
Planning & Design: May 2011‐July 2012
Advertising & Award: Fall 2012
Construction: 2013
Board of Regents Approval & Motions:
Preliminary Project Approval September 9, 2006
Formal Project Approval June 4, 2010
Schematic Design Approval TBD
Status Update: Consultant ECI/Hyer & NBBJ was selected in mid‐May 2011. The Consultant and the College of Engineering and
Mines (CEM) are currently in the programming and concept design phase for the facility. Ira Fink, author of the
2010 UA Engineering Report, continues to provide program review and input. The gross square foot building
need will be established as part of the current work effort. Draft programming and concept design submittals
are currently under review to meet the August 29, 2011 deadline in preparation for the September 2011
Board of Regents meeting.
UAF Engineering Facility (ENNF)
Total Project Cost:
TBD
Project Description This project will construct a new, multi‐story facility that will house existing and new engineering programs. The facility will include office, classroom, class laboratory, and research laboratory space. Specialty spaces such as high‐bay test labs, strong floors and materials testing labs will also be included.
UAF Engineering Facility
Funding Source:
FY 11 Capital Appropriation for $4,000,000 of which $1,000,000 is allocated for programming and concep‐tual design.
Architect/Engineer:
General Contractor:
ECI/Hyer & NBBJ
TBD
UA
F p
hoto
by
Tod
d P
aris
August 2011 CIP Update
Status Update: Steel erection was completed August 19, 2011. Work continues on installing the steel decking and in‐slab conduit, hangers,
and reinforcing steel. Sewer line work has begun again along Sheenjek Drive. The new utilidor connection is half‐way
complete. Work has begun on the exterior studs and vapor barrier, a key milestone that needs to be completed in the next
four weeks to ensure timely dry‐in of the facility. The final design deliverable will occur the last week in August and review
will begin in earnest. Overall the project remains on schedule and budget.
Project Description Life Sciences will provide multiuse teaching and research labs, classrooms, and office space for life science research and academic purposes. The research portion will provide nearly 60,000 gsf lab space for biology research. The teaching portion will provide 40,000 gsf of academic classroom and lab space for biology and wildlife degree programs.
UAF Life Sciences Research and Teaching Facility
Schedule Bar Chart: Design
Construction
Basic Project Info:
Designer: Bezek Durst Seiser Inc, Smith Group, PDC Inc, RFD Inc
CM@Risk: Davis Constructors
Board Approvals: FPA February 2010 SDA November 2010
TPC: $88,275,000 Construction Cost: $67,100,000
Occupancy Date: Fall 2013 Funding Source: GO Bond UA Revenue Bond
0%
0%
100%
100% Groundbreaking
Mar-2011 Completion Sept-2013
UAF Life Sciences Facility (LFRF)
For actual values refer to attached budget sheet
$0 $50 $100
Project Management
Building Completion
Construction
Design
Millions
Budget vs ActualActual
Budget
August 2011 CIP Update
UAF Life Sciences Research and Teaching Facility
UAF Life Sciences Facility (LFRF)
Formal Project Approval: $108,600,000 to fund three projects associated with the construction of the new facilities: ‐Life Sciences Facility ($88,275,000) TPC Increase September 2011 for $303,000 ‐West Ridge Steam Capacity Expansion ($15M) ‐Arctic Health Greenhouse ($5,325,000) ‐ Refer to AHRG CIP Update
UNIVERSITY OF ALASKA
Project Name:
MAU: UAF
Building: New‐Life Sciences Facility August 9, 2011
Campus: Fairbanks Wohlford
Project #: LFRF 2010100 512035‐50216
Total GSF Affected by Project: 101,100
PROJECT BUDGET Budget Actual
A. Professional Services
Advance Planning, Program Development $0 $0
Consultant: Design Services $5,787,572 $5,787,572
Consultant: Construction Phase Services $1,162,000 $384,595
CM@Risk Preconstruction Services $378,005 $378,005
Misc Consulting and Peer Reviews $317,000 $186,907
Soils Testing & Engineering $0 $0
Special Inspections $0 $0
Plan Review Fees / Permits $275,000 $0
Other $0 $0
$7,919,577 $6,737,079
B. Construction
General Construction Contract (s) $67,700,000 $24,067,077
Other Contractors (List: West Riedge Parking, Building Relocations) $1,378,159 $1,218,248
Construction Contingency $3,051,945 $0
$72,130,104 $25,285,325
Construction Cost per GSF $713.45
C. Building Completion Activity
Equipment $500,000 $0
Fixtures $100,000 $0
Furnishings $650,000 $0
Signage not in construction contract $50,000 $0
Move‐Out Cost/Temp. Reloc. Costs $0 $0
Move‐In Costs $300,000 $0
Art $200,000 $0
Other (List:________________________) $0 $0
OIT Support $450,000 $2,272
Maintenance/Operation Support $250,000 $55,389
$2,500,000 $57,661
D. Owner Activities & Administrative Cost
Project Planning and Staff Support $3,714,736 $1,443,603
Project Management $2,144,333 $276,672
Misc Expenses: Advertising, Printing, Supplies $169,250 $60,111
$6,028,319 $1,780,386
E. Total Project Cost $88,578,000 $33,860,451
Total Project Cost per GSF $876.14 Remaining Budget
F. Total Appropriation(s) $88,578,000 $54,717,549
Professional Services Subtotal
Construction Subtotal
Building Completion Activity Subtotal
Owner Activities & Administrative Cost Subtotal
Life Sciences Research and Teaching and Facility
Date:
Prepared By:
Account No.:
August 2011 CIP Update
Schedule:
Planning & Design: November 2009 ‐ May 2010
Advertising & Award: June ‐ July 2010
Construction: August 2010 ‐ May 2011
Board of Regents Approval & Motions:
Formal Project Approval September 24, 2009
Schematic Design Approval May 4, 2010
Status Update: Substantial completion inspection occurred in early April 2011. Residence Life has re‐occupied Skarland Hall as of mid‐ May. The project is 98% complete.
Skarland Hall Shower Repairs (SKSR)
Total Project Cost:
$3,800,000
Skarland Hall Shower Repairs
Project Description This project demolished and reconfigured the shower rooms and toilet areas on all three residence floors of Skarland Hall, because the infrastructure of the shower and toilet areas were failing. The reconfiguration included bringing the ventilation and electrical systems up to current standards, including ADA regulations and codes. This project also provided increased security, especially in the shower rooms. During construction, Skarland Hall was completely shut down to student use.
Funding Source:
Residence Life Auxiliary Funds Architect/Engineer:
General Contractor:
Nvision Architecture, Inc.
Richard Stanton Construction Co. FY11 R&R Funding
Revised Total Project Cost:
$3,000,000
August 2011 CIP Update
Schedule:
Planning & Design: February ‐ May 2011
Advertising & Award: April ‐ July 2011
Construction: August 2011 ‐ October 2012
Board of Regents Approval & Motions:
Formal Project Approval November 9, 2011
Schematic Design Approval April 8, 2011
Status Update: Design‐Build Qualifications were received May 10, 2011. Three contractors were short‐listed and proposals were received. Kiewit Building Group had the highest ranked proposal and a Notice of Intent to Award was issued June 30, 2011. The bids were about $2M lower than the estimate and an additional water line was added to the project to improve fire protection capabilities on the West Ridge. Construction is scheduled to begin August 29, 2011 and completion is expected in the fall of 2012.
Utilities West Ridge Steam Capacity Expansion (UTCE)
Total Project Cost:
$15,000,000
Project Description This project installs a 10‐inch steam line and a 6‐inch condensate line from the Atkinson Power Plant to the West Ridge in the vicinity of the Arctic Health Research Building to increase the steam capacity for West Ridge and the new Life Sciences Facility. A new utilidor will also be constructed to house the steam piping and other utilities from the utilidor near the Lola Tilly Building to the utilidor west of the Student Recreation Center.
Utilities West Ridge Steam Capacity Expansion
Funding Source:
GO Bond (Life Sciences)
Architect/Engineer:
DB Contractor:
PDC Inc. Engineers
Kiewit Building Group Design Alaska
September 2011 Board of Regents
Anderson Building Remodel & Pedestrian Access
Project Description: This project will totally remodel the Juneau campus principal science instruction space to accommodate the needs of the UAS Science program. The project is divided in to two separate construction contracts. The first is the building remodel including classrooms, teaching labs, faculty offices, and research spaces. The second contract will be for the construction of a pedestrian crossing of Glacier Highway. These two elements are being designed, bid and constructed as separate contracts due to the different nature and schedules for the work. In the remodel work major building components will be upgraded or replaced including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space will be reconfigured to improve effectiveness of the teaching and research areas. The number of faculty offices will be reduced. The work has required the building to be vacated during renovation. Interim space for offices and labs is being accommodated elsewhere on campus, at the UAF Fisheries facility at Lena Point and at the old NOAA lab adjacent to the Anderson Building. The pedestrian access work will include a pedestrian bridge connecting to the third floor of the Anderson Building and a paved and lighted pathway to the main campus. Total Project Cost: $10,700,000 Project Schedule: Building Remodel Pedestrian Access
Final Design 9/2008 –9/2009 3/2009 – 1/2012 Bid & Award 10/2009-11/2009 2/2012 -3/2012 Construction 12/2009 – 9/2010 4/2012 – 10/2012
Project Approvals:
Formal Project Approval September 2008 Schematic Approval February 2009
Status Update: Building Remodel: Final contract closeout is in progress. Pedestrian Overpass: UAS is awaiting detailed design data on the Alaska DOT&PF’s proposed re-alignment of Glacier Highway. DOT&PF and UAS are re-examining the impacts of the future road and right-of-way re-alignment. Construction is intended for 2012 assuming DOT&PF makes a determination on road alignment soon.
September 2011 Board of Regents
Auke Lake Way Corridor Improvements & Reconstruction
Project Description:
• Reconstruction of Auke Lake Way from Hendrickson to the Egan bus circle to replace pavement, signage and lighting, and add traffic control devices and provide for service and emergency access;
• Reconstruction of the Novatney parking area to a service turn-around; • Construction of a paved and lighted pedestrian connection from the Hendrickson
Building to the Auke Creek bridge path, eliminating pedestrian use of the road; • Reconstruction, paving and drainage of the Chapel-by-the-Lake parking lot as
required by the parking agreement; • Construction of a roof structure atop the path between the main parking lots and the
Whitehead entrance; • Revised entry canopies at the intersections of the Novatney and Whitehead exterior
walkways. • Traffic and signage improvements at the Loop Road intersection.
Total Project Cost: $4,300,000 Project Schedule
Planning & Design: 1/2011 – 9/2011 Bid & Award (phase 1): 5/2011 – 6/2011 Construction (phase 1): 6/2011 - 10/2011
Project Approvals
Formal Project Approval December 2010 Schematic Approval (Phase 1) April 2011
Status Update: Phase 1 has been bid in two increments: North Entry improvements are completed and the South entry improvements have been awarded with work starting in September.
June 2011 Board of Regents
Juneau – Campus Lift Station Replacement
Project Description: The eight principal buildings within the Auke Lake core campus are all served by a single sewage lift station near the edge of Auke Lake, the lowest point on campus. The mechanical and electrical components of the sewage ejection system are at the end of their useful life. In addition the simple building that houses the equipment has been partially undermined by site erosion over many years. This project will demolish the existing building and construct a new lift station. Total Project Cost: $625,000 Project Schedule
Design 09/2010 – 3/2011 Construction: June through August 2011
Project Approvals
Formal Project Approval October 2010 Schematic Design Approval October 2010
Status Update: A contract was awarded to Southeast Earthmovers and construction is scheduled to be completed by mid September.
September 2011 Board of Regents
Sitka Career & Technical Education Center
Project Description: A Title III grant is providing funding over the next two federal fiscal years to remodel portions of the existing facility. The project will:
• Expand the existing student success center, • Create a new instructional design center, • Reconstruct the construction technology laboratory, • Construct new records storage, and • Construct a new lecture hall.
Total Project Cost: $3,410,000 Project Schedule
Planning & Design 11/2008 – 9/2009 Bid & Award 9/2011 – 10/2011 Construction: 11/2011 - 10/2012
Project Approvals
Formal Project Approval December 2010 Schematic Approval July 2011
Status Update: Design development plans are due in early September.
September 2011 Board of Regents
Ketchikan – Ziegler Building Roof Replacement
Project Description: This project will install a new membrane roof, new roof insulation, new flashing and make repairs to the wood mansard roof fascia. Total Project Cost: $515,000 Project Schedule
Design 11/2010 – 3/2011 Construction: June through August 2011
Project Approvals
Formal Project Approval December 2010 Schematic Design Approval December 2010
Status Update: Work will be substantially complete on September 1.