September 2011 BOR Update Allied Health Science 2 nd Floor Renovations Project Description: Project is to renovate space vacated from move to new Health Science Building. Will serve for instruction on Radiologic Technology, Medical Assisting, Emergency Medical and Technology (EMS). A new program, Diagnostic Medical Sonography will be provided with a new Ultrasound Room necessary for teaching. Schedule: Total Project Cost: Planning & Design: July 2011 –January 2012. $784,258.00 Advertising & Award: February/ March 2012 Construction: May 2012 Occupancy August 2012 Board of Regents Approval & Motions: Project Agreement May 11, 2011 Preliminary Admin Approval June 2, 2011 Status Update: Kumin & Assoc. was selected to provide architectural & engineering construction drawings. Design is in progress. Construction to start May 2012 and be completed by August 2012 for fall semester.

UAA Allied Health Science 2nd Floor Renovations ...2)/September2011.pdf · Constru Occupan Board o Project A Prelimin Status U Architec off meet Beatric Descriptio e renovatio pus

  • Upload
    vuminh

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

 

September 2011 BOR Update 

Allied Health Science 2nd Floor Renovations

Project Description: Project is to renovate space vacated from move to new Health Science Building. Will serve for instruction on Radiologic Technology, Medical Assisting, Emergency Medical and Technology (EMS). A new program, Diagnostic Medical Sonography will be provided with a new Ultrasound Room necessary for teaching.

Schedule: Total Project Cost: Planning & Design: July 2011 –January 2012. $784,258.00 Advertising & Award: February/ March 2012 Construction: May 2012 Occupancy August 2012 Board of Regents Approval & Motions: Project Agreement May 11, 2011 Preliminary Admin Approval

June 2, 2011

Status Update: Kumin & Assoc. was selected to provide architectural & engineering construction drawings. Design is in progress. Construction to start May 2012 and be completed by August 2012 for fall semester. 

 

Project CompletUAA cammechanexterior

ScheduPlanningAdvertisConstruOccupan Board o Project APrelimin Status U Architecoff meet

Beatric

Descriptio

te renovatiompus. The ical systemimproveme

ule: g & Designsing & Awarction: ncy

of Regents

Agreement nary Admin

Update:

cts Alaska wting is sche

ce McD

on:

on of the Beproject will

ms, replacements.

: July 20rd: Februa

May 20August

Approval

Approval

was issued duled for 9/

Donald

eatrice McDinclude HA

ment of elec

011 –Januaary/ March 013 t 2014

& Motions

Ju Ju

a contract /2/11.

Buildin

Donald BuilAZMAT abactrical syste

ary 2013 2013

s:

uly 11, 2011ly 11, 2011

for Program

ng Ren

lding, a 197atement, reems and ar

1 1

mming & Pr

Septem

newal

70’s buildinplacement rchitectural

Total $10,3

re-Design. T

mber 2011 BO

g on the maof boiler aninterior and

Project Co300,000.00

The initial k

OR Update 

ain nd d

ost:

kick

 

Project Planningand teaccommunlabs, soilabs, foumachineThe proj

Schedu

PlanningAdvertisConstruWarrant Board oPreliminFormal P

Status ULivingstoplanningworkshoprovidindesign f

UAA E

Descriptiog, programmching areasnications lails mechaniundation ene shop, wooject will incl

ule:

g & Designsing & Awarction: ty:

of Regentsnary Admin Project App

Update: on Slone Ag and progrops were cog peer revie

funds is bei

Enginee

on: ming, desigs not currenbs, electricics labs, ph

ngineering, od shop, “dlude structu

: May 20rd: Januar

April 21 year

Approval Approval

proval

rchitects, Aramming theonducted inew of the png requeste

ering a

gn and consntly availablal engineer

hotogrammetransportatirty” yard aured parkin

011-Decemry-March 20013-May 20after const

& MotionsNoApcomdesexc

Anchorage, e UAA Eng

n June, Julyprogrammined at the S

nd Ind

struction of le on campring labs, fluetry/cartogrtion and higand confereg for the fa

mber 2012013 015 truction com

s: v 2009 r 2011 BORmprehensivsign, and siceed a tota

Alaska, wagineering any and Augusg phase of eptember B

ustry B

f a 75,000 gpus. Teachuids labs, hraphy/GIS,ghway engiencing/collacility and a

mpletion

R authorizeve planningite evaluatiol cost of $1

as selected nd Industry st 2011. Iraf the projectBOR Meetin

Septem

Building

gsf engineehing areas wheat and maseismic anneering, lan

aborative leny displace

Total

$117,

ed UAA to pg, programmon and sele,000,000.

as lead arcBuilding. P

a Fink is ast. Release ong.

mber 2011 BO

g, Ph 1

ering laborawould incluass transfe

nd earthquand surveyinarning area

ed parking.

Project Co

,000,000

proceed witming, conceection not to

chitect for Programmissisting UAAof remainin

OR Update 

atory de:

er ake ng, as.

ost:

h ept o

ng A by

ng

 

   

 

Project

Design academoffices,gross a

ScheduPlanningAdvertisConstruConstruWarrant Board oPreliminSchemaTotal Pr Status UConditiodelivery maintenaudio/vidbuilding

 

UA

t Descriptio/ construct

mic program classroom

anatomy sp

ule: g & Designsing & Awarction F&F: ction: ty:

of Regentsnary Adminiatic Design oject Cost

Update: onal certifica

and installaance trainindeo equipm. Grand Op

   

AA He

on t approxima

ms of nursinms/ seminar

aces, and s

: Dec 20rd: Oct 20 Aug 20

Dec 201 year

Approval strative ApApproval: Increase:

ate of occuation compng of all me

ment 99% cpening Cere

alth S

ately 65,162ng, WWAM

rooms, labstudent act

007-Sept 20009 -Nov 20009- Dec 20009-Aug 20after const

& Motionsproval: J

FN

pancy receplete. Functechanical acomplete. Semony is sc

 

Scienc

2 gross squI/MEDEX a

boratories foivity spaces

009 009 009 011 truction com

s: une 2008

Feb 2009 N/A

eived Augustional testinnd electrica

Staff and faccheduled fo

   

ces Bu

uare foot faand Allied Hor patient ss.

mpletion

st 1, 2011. ng/commissal systems culty have cor October 7

          Septem

uilding

cility to accHealth. Projimulators, M

Total $46,5

Furniture asioning/opecomplete. completed t7, 2011.

mber 2011 BO

g

commodateect includeMed Tech a

Project Co500,000

and equipmeration and Installation the move in

OR Update 

e the s and

ost:

ment

of nto the

 

UA

Project Provide are com

ScheduPlanningAdvertisConstruWarrant Board oFormal PSchema Status UThe projremainsCertificacurrently

This is th

AA MA

Descriptiofire alarm,

mplete. Build

ule: g & Designsing & Awarction: ty:

of RegentsProject App

atic Design

Update: ject has be as the orig

ate of Occuy being add

he final rep

AC Ho

Pha

on: fire sprinkle

ding 6 rema

Phase: Thru Frd: Februa

May 201 year

Approval proval: Approval:

en awardedginal schedupancy on J

dressed.

port for this

ousing

ase IV

er system, ains to be d

e IIII, BuildiFebruary 20ary 2011 – 011- Augusafter const

& MotionsJanDe

d to Orion Cule of May uly 28, 201

project.

g Fire

V, Buil

and exhausone in the f

ing 5 011 March 201

st 2011 truction com

s: nuary 2008cember 20

Constructio2011 – Aug1. Minor pr

Syste

ding 5

st fans in Bfuture.

1

mpletion

8 10

on, and the gust 2011.rogramming

Septem

m Up

5

Building 5. B

Total $515,

constructioThe building adjustme

mber 2011 BO

pgrade

Buildings 1-

Project Co,000

on period ng receivednts are

OR Update 

e

-4

ost:

a

 

                  

Project Phase providinsystem

ScheduPlanningAdvertisConstruWarrant Board oPrelim AFormal PSchema Status UPhase 2remodelcomplet

Phase 3

                       

UAA

Descriptio2 renovateng new phy

ms. Phase 3

ule: g & Designsing & Awarction: ty:

of RegentsAdministratiProject App

atic Design

Update: 2 – Demolitil. New wallse.

3 design is 6

           

A Scien

on: s the rema

ysics, LSIS, is under de

Phase: Nov 20rd: March

May 201 year

Approval ve Approva

proval: Approval:

ion is comps are frame

65% compl

nce Bu

inder of the, Math labsesign and w

e 2 010 –Feb 22011

011 –April 2after const

& Motionsal: Nov 2

April 2(Ph I)

plete. Showed, electrica

ete.

 

uildin

e first floor a, and a majwill complet

011

2012 truction com

s: 2008 2009 ) Sep 2009

wn are the nal and mech

   

g Ren

and half of jor renewalte the build

mpletion

(Ph 2) Sep

new heatinghanical roug

       Septemb

novati

the secondl of the mec

ding renovat

Total Ph I Ph 2 Ph 3 TPC $

p 2010 (Ph

g lines goinggh-in is abo

ber 2011 BOR 

ion

d floor, chanical tion.

Project Co $2,645,60 $5,100,00 $5,300,00

$13,045,60

h 3) June 2

g to the Enout 75%

 Update 

ost: 00 00 00 00

011

ergy

 

UAA

Project 196,000basketbsupport laundry,skiing, tr ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaTotal Pr Status U

Total proBond; $3assumpton the laclearing BreakingSchemaMeeting

A Seaw

Descriptio0 sf multi-usall & volleyspace cons A/V produrack & cros

ule: g & Designsing & Awarction: ty:

of Regentsnary Admin Project App

atic Design oject Cost

Update:

oject fundin34M FY12 tions on proarger facility(<2 acres)

g ceremonyatic Design .

wolf S

on: se facility thball; a pracsisting of a ction, locke

ss country p

: Aug 20rd: Fall 20

Spring1 year

Approval Approval:

proval(s): Approval(sIncrease:

ng of $109MCapital) is ogram & spy as well as has been ay for the neincluding C

Sports

hat will housctice & perfofitness & tr

er & team roprograms.

008- Spring011 (CMAR 2012 to Faafter const

& MotionsAugFeb

s): JunJun

M ($15M FYnow in plac

pace requires finalizing sapproved b

ew Seawolf CMAR appro

s Aren

se a 5,000 sormance gyraining roomooms for ba

g 2012 R process) all 2014 truction com

s: g 2008 b 2009 /Junne 2009/Sene 2011 – a

Y-09 Capitace. Project ements, pasustainabili

by the MOASports Areoval is bein

na

seat perforym for the gm, administasketball, v

mpletion

ne 2011 ept 2011 approved $

al; $60M FYteam is cu

arking, site aity design s

A Planning Dena is schedng requeste

Septem

rmance gymgymnasticstration/coacvolleyball, g

Total $ 109

109M

Y11 Generaurrently verifand traffic cstrategies. Departmenduled for Seed at the Se

mber 2011 BO

mnasium fos program; ching officeymnastics,

Project Co9,000,000

al Obligatiofying earlieconsideratioLimited sitet. Ground eptember 9eptember B

OR Update 

 

r

es,

ost:

n er ons e

9th. BOR

 

UAA

Project UAA has performanage/probleLake and have well standing wstandardsexcellent maintenan

ScheduPlanning &AdvertisinConstructWarranty: Board oPrelim AdFormal PrSchematicProject Ch Status UThe ULB bidders reremainingproject chweather a

A Univers

Descriptioover 1,000,00nce life expecem basis on athe Universitover three hu

water on the fs; new, thickedrainage. Thnce.

ule: & Design:

ng & Award: tion: :

of Regentsdministrative Aroject Approvc Design Apphange Approv

Update: roof project w

esponded andg project balanhange approvaallows.

ity Lake B

on: 00 square feectancy and muan annual basy Lake Annexundred patcheflat roof. Ther and tapered

he new minera

July 200June 20July 20115 years

Approval Approval: al:

proval: val:

was funded wd the low bid ance and FY12al. The Cont

BuildingRoof R

et of various rust be replacesis. The currx Buildings. Tes, extensive

e three inch rigd insulation wal cap built up

09-May 2010011 11-Septembes after constr

& MotionsFebAprAprJuly

ith R&R fundsand award wa2 funding, theractor mobiliz

and UnivReplacem

roofing types oed. UAA inteent FY12 proThese roofs ae UV degradatgid insulation ill bring the bp asphalt roof

r 2011 uction comple

s: b 2009 ril 2011 ril 2011 y 2011

s in May 2011as to Consolide ULB Annex zed to the site

versity Lament

of which manends to replacoject is to replare 27 years otion/cracking is well belowuilding up to af will be durab

etion

1 and subseqdated Enterprwas added to

e in August 20

Septem

ake Build

ny have exceece the roofs baace the roofsold. The expoand numerou

w any current an R-30 levelble and requir

Total $925,0

quently bid Jurises, Inc. for o the scope o011 and work

mber 2011 BO

ding Anne

eded their ased on an

s on the Univeosed asphalt us areas of building l and provide re less

Project Co000

une 2011. Se$460,071. W

of work after k is progressin

OR Update 

 

ex

ersity roofs

ost:

ven With

ng as

 

Project DemolitiAuditoriubackup ScheduPlanningAdvertisConstru

Board oProject APrelim AFormal PSchema Status USubmittaschedule

Wend

Descriptio

ion and repum to energgenerator a

ule: g & Designsing & Awarction:

of RegentsAgreement

AdministratiProject App

atic Design

Update: als have beed for arriva

dy Will

on:

placement ogy saving flassociated

: Nov rd: April

Nov.

Approval

ve Approvaproval: Approval:

een issued, al before co

iamson

Repl

of incandesluorescent with the lig

2009 - Oct2011 – Ma 2011—Jan

& Motions

al: FebMa

MaMa

approved aonstruction

n Audit

aceme

cent light fiand LED sohting replac

2010 ay 2011 n 2012

s: bruary 24, 2

arch 3, 2010arch 22, 201arch 25, 201

and processtart date o

torium

ent

xtures in thources. Recement and

2010 0 10 11

ssed. All fixtof Novemb

Septem

m Light

he Wendy Wview of emd upgrade.

Tota$62

tures are oer 7, 2011.

mber 2011 BO

ing

Williamson ergency

al Project C0,000

n order and

OR Update 

Cost:

d

 

                              September 2011 BOR Update 

 

UAA Kenai Campus Career &Technical Center

Project Description

A new KPC building at the Kenai River Campus for Process Technology, electronics and instrumentation programs, approximately 17,000 sf.

Schedule: Total Project Cost: Planning & Design: March – Nov 2011 $14,500,00 Advertising & Award: December 2011 Construction: April 2012 – July 2013 Warranty: 1 year after construction completion Board of Regents Approval & Motions: Preliminary Project Approval: Feb 2011 Formal Project Approval: February 18, 2011 Schematic Design Approval: Pending Total Project Cost Increase: N/A Status Update: McCool Carlson Green has met with the KPC building committee several times and has developed the schematic design.

 

   

 

Project New stu ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaTotal Pr Status UBettiswoschemat

 

UAA

t Descriptioudent hous

ule: g & Designsing & Awarction: ty:

of Regentsnary Admin Project App

atic Design oject Cost

Update: orth North htic design.

   

Kenai

on sing with 96

: June 2rd: June 2

June 21 year

Approval Approval:

proval: Approval: Increase:

has met witSchematic

Camp

6 Student be

2011 – April2012 2012 – Augu

after const

& MotionsFebFebPeAdd

h the buildiDesign is b

 

pus Stu

eds.

l 2012

ust 2013 truction com

s: b 2011 bruary 18, 2nding ditional $1.

ng committbeing reque

   

udent

mpletion

2011

8 M in fund

tee several ested at the

          Septem

Hous

Total $17,8

ding from Le

times and e Septembe

mber 2011 BO

ing

Project Co800,000

egislature

has develoer BOR Me

OR Update 

ost:

oped the eting.

 

Project This proand hascontractOnce allwill inspexpecte

ScheduPlanningAdvertisConstru Board oPrelim AFormal PSchemaProject C Status Usoil, thisthe site is anticip

U

Descriptiooject will cle significant tor will excal the contamect the excd outcome

ule: g & Designsing & Awarction:

of RegentsAdministratiProject App

atic Design Change Ap

Update: Ons will be donhas been tipated by th

UAA K

on: eanup a site

amounts oavate the sominated soicavation. Th

is to either

: Througrd: Februa

April 2

Approval ve Approva

proval Approval

pproved

ne small arene in Septeilled severae end of su

KPC So

e off campuof diesel conoil and placil is excavahe contamin

clean up o

gh January ary 2010- M2010- Summ

& Motionsal Feb

FebFeb$36

ea will needmber. The

al times. Goummer 201

oil Rem

us that was ntamination

ce it into cleted the Envnated soil wor fully chara

2010 March 2010mer 2011

s: bruary 9, 20bruary 17, 2bruary 17, 26,000 on Ju

d additionacontaminat

ood progres1.

media

used for firn at 14 feetean piles anvironmentawill be spreaacterize the

010 2010 2010 une 1, 2010

l excavatioted soil thass has been

Septem

ation

re training it below ground contaminl Consultanad out and e site.

Total $411,

0

n to removat has been n made and

mber 2011 BO

n the 1980’und level. Tnated piles.nt and the Dland tilled.

Project Co,000

e contaminspread acr

d final clean

OR Update 

 

’s The . DEC The

ost:

nated ross nup

 

UAA

Project A new 7center anew det ScheduPlanningAdvertisConstruWarrant Board oPreliminFormal PSchemaProject C

Status U

The Univgeneral continuelandscapcompletdrawing  This is t

Kache

Descriptio7,433 sf builat the East Cached 720s

ule: g & Designsing & Awarction: ty:

of Regentsnary Admin Project App

atic Design Change Ap

Update:

versity accecontractor

es working ping and me. Owner ts are in pro

the final up

emak B

on: lding with 5Campus to sf storage s

: June 2rd: March

June 21 year

Approval Approval

proval Approval

pproval(s)

epted the bhas now coon small m

misc. site imtraining andogress.

pdate for t

Bay Cam

5 classroomreplace sp

shed.

2009- March2010- May

2010- Juneafter const

& MotionsMaJunNoJun

building as Sompleted aiscellaneouprovements

d O&M man

this projec

mpus C

ms, 12 officeace now be

h 2010 y 2010 2011

truction com

s: ay 2009 ne 2009 v 2009 ne 2010 / O

Substantialll work on cus owner ins work addnuals are no

ct.

Classro

es, learningeing leased

mpletion

October 201

lly Completcontractual nitiated chaned by controw complet

Septem

oom Bu

g resource ad. Work als

Total $3,34

10

te effective punch list inge order wract mod. #te and final

mber 2011 BO

uilding

and testingso includes

Project Co45,000

3/18/11. Titems and work. Additi#7 is now l as-built

OR Update 

a

ost:

The

ional

M

Project The projemusic clatheater fo

ScheduPlanning &AdvertisinConstructWarranty: Board oPrelim AdProject AgFormal Pr Status U

We receivconsultanproceedinSeptembe

Mat-Su

Descriptioect will desigassroom, draor lectures, p

ule: & Design:

ng & Award: tion: :

of Regentsdministrative Agreement roject Approv

Update:

ved proposalst for the proje

ng with plannier BOR Meeti

Valley

on: gn and constama lab, inspublic gathe

July 201June 20July 2011 year a

Approval Approval:

al:

s from six desect. Meetingsng activities aing. 

y Cent

truct a new ftrument storrings and co

11-May 2012012 12-July 2014after construct

& MotionsFebAugPen

sign firms whis have definedand concepts

ter for

facility at therage, displayonferences.

tion completio

s: bruary 2011 gust 22, 2011nding

ch led to the d the prelimin. Formal Pro

r Arts

e Mat-Su Cay areas, gath

on

selection of Knary scope of oject Approval

Septem

& Lea

ampus that whering/study

Total $20,00

Kumin & Assowork and thel is being requ

mber 2011 BO

arning

will provide ay spaces and

Project Co00,000

ociates, Inc ase consultant isuested at the

OR Update 

 

a d a

ost:

s the s

 

Project Provide Building

ScheduPlanningAdvertisConstruWarrant Board oPrelim AFormal PSchema Status UThe projThe conremain t

This will

Mat-S

Descriptioa new roof to replace

ule: g & Designsing & Awarction: ty:

of RegentsAdministratiProject App

atic Design

Update: ject was bid

ntractor is suto be comp

be the fina

Su HV

on: ftop mounte35 year old

: Januarrd: Nov –

April 21 year

Approval ve Approva

proval: Approval:

d on Novemubstantiallyleted.

al report for

AC &

ed air handd existing u

ry 2009 – JDec 2010011 – Oct 2after const

& Motionsal: Oc

ApMa

mber 18, 20y complete

r this projec

Boiler

ling unit anunits.

uly 2010

2011 truction com

s: tober 2009ril 2010

ay 18, 2010

010. The loon August

ct.

r Repl

d boilers fo

mpletion

9

0

ow bidder w05, 2011.

Septem

lacem

or the Jalma

Total $2,44

was Goertz Minor clean

mber 2011 BO

ment

ar M. Kerttu

Project Co40,000

Construction up items

OR Update 

ulla

ost:

on.

 

Mat-

Project The Snostorage addition

ScheduPlanningAdvertisConstru Board oPrelim AFormal PSchema Status Uscope ofestimateto relocaSchemaapprova

-Su Co

Descriptioodgrass Hafor the parato the Mat-

ule: g & Designsing & Awarction:

of RegentsAdministratiProject App

atic Design

Update: Thf work and e based on ate a septicatic Design al.

ollege P

on: ll addition wamedic and-Su campu

: Februard: April 2

June 2

Approval ve Approv

proval: Approval:

hrough meeis finalizingthe concep

c tank that wApproval h

Param

will include d nursing prs.

ary 2011-M012

2012 – Dece

& Motionsval: No

NoPe

etings with tg the concept. The MSwas not in tas been su

edic/N

new classrrograms. T

arch 2012

ember 2013

s: vember 20vember 18nding

the campuseptual drawiSC campus

he original ubmitted for

Nursing

rooms, offiche FY10 G

3

09 , 2010

s, the consuings and prhas addedscope of w

r review and

Septem

g Lab A

ces, labs, wGO Bond fun

Total $3,62

ultant has droceeding w

d $125,000 work. A reqd

mber 2011 BO

Additio

workspace anded this

Project Co25,000

defined the with the costo the projeuest for

OR Update 

 

on

and

ost:

st ect

 

P

Project The FY1Campusentrancelighting rreplacemenergy c

ScheduPlanningAdvertisConstru Board oPrelim AProject AFormal PSchema Status Ufacility. Schema

PWSCC

Descriptio11 GO Bons Renewal. e and counreplacemenment of galvconservatio

ule: g & Designsing & Awarction:

of RegentsAdministratiAgreementProject App

atic Design

Update: KuThe cost e

atic Design

C Wel

& C

on: d funded ge The work ter space; nnt and electvanized wa

on controls;

: Februard: Decem

April 2

Approval ve Approv: proval Approval

umin Architestimate basApproval is

lness

Camp

eneral renowill includenew flooringtrical upgra

ater lines; ITand exterio

ary 2011-Nomber 2011-F012 – July

& Motionsval: No

NoDePe

ects, Inc. hsed on the s being requ

Cente

us Re

ovation of the: ADA comg and finish

ades; electroT upgradesor siding im

ovember 20February 202013

s: vember 20vember 18cember 10nding

as completschematic uested at th

er Ren

enewa

he existing mpliant lockehes; new doronic entry ss; mechanicmprovement

011 012

09 , 2010 , 2010

ted the schedesign is whe Septemb

Septem

novat

al

Wellness Cer/restroomoors and hasystem; ACcal system uts.

Total $5,00

ematic deswithin the prber BOR M

mber 2011 BO

tion

Center and ms; new ardware;

CM removalupgrades;

Project Co00,000

ign for the roject budg

Meeting.

OR Update 

 

l;

ost:

et.

August 2011 CIP Update 

Schedule: 

Planning & Design:  October 2009‐April 2011 

Advertising & Award:  June‐July 2011 

Construction:  August 2011‐March 2012 

Board of Regents Approval & Motions: 

Preliminary Project Approval  March 31, 2010 

Formal Project Approval  April 16, 2010  ($7,530,000 for both the Arctic Health and Kuskokwim CANHR Health Clinics‐NIH CO6 Grant) 

Schematic Design Approval  November 5, 2010 ($3.657M Arctic Health Clinic) 

Status Update: The project bids were received on June 23rd.  An award was issued the last week of July 2011 to GBC, Inc.  Work will require the north entrance of the facility to be closed.   Construction in  is anticipated between June and December 2011. The project completion date has slipped to March 2012 due to extended review periods by NIH. 

Arctic Health CANHR Health Clinic (AHCHC)

Total Project Cost: 

$3,657,000 

Arctic Health CANHR Health Clinic 

Project Description This project will build about 3200 gsf of new space and renovate another 2800 gsf to support initiatives under the Center for Alaska Native Health Research.  The facility will include a nutritional and physical assessment lab on the first floor and a shelled out space on the second floor which will be developed with future grants. 

Architect/Engineer: 

General Contractor: 

Funding Source:

NIH C06 Grant

Design Alaska, Inc. 

GBC, Inc. 

August 2011 CIP Update 

Schedule: 

Planning & Design:  June 2010 to March 2011 

Advertising & Award:  July‐August 2011 

Construction:  September 2011 ‐ August 2012 

Board of Regents Approval & Motions: 

Preliminary Project Approval  March 31, 2010 

Formal Project Approval  April 16, 2010 ($7,530,000 for both the Arctic Health and Kuskokwim CANHR Health Clinics‐NIH CO6 Grant) 

Schematic Design Approval  November 5, 2010 ($3.8M Kuskokwim Campus Clinic) 

Status Update: The bid opening was successful and within the engineer's estimate.  The contract was awarded to Denali General Contractors, Inc. on August 8, 2011.  The contractor will forward a schedule and tentatively start on the site work September 7, 2011.  The barge schedule may delay the start of major work until May of 2012.  

Kuskokwim Campus CANHR Health Clinic (KCHC) 

Total Project Cost: 

$3,800,000 

Kuskokwim Campus CANHR Health Clinic 

Project Description This project will renovate and construct a new CANHR Health research facility within the existing Voc‐Ed building, on the Kuskokwim Campus. The new space will be designed to accommodate Telehealth medicine (secure video conferencing) and distance education video conferencing.  Additive Alternate #1, Kuskokwim Campus Gymnasium and Second Floor Renovation (KCGR), will be built above the clinic.  Additive Alternate #2 is for selected mechanical work. 

Funding Source: 

NIH C06 Grant/USDE Title III Grant Architect/Engineer: 

General Contractor: 

Livingston Slone, Inc. 

Denali General Contractors, Inc. 

ADDITIVE ALTERNATE #1 

CANHR HEALTH CLINIC 

August 2011 CIP Update 

Schedule: 

Planning & Design:  February‐June 2011 

Advertising & Award:  July‐August 2011 

Construction:  September 2011‐August 2012 

Board of Regents Approval & Motions: 

Preliminary Project Approval  December 13, 2010 

Formal Project Approval  February 14, 2011 

Schematic Design Approval  June 8, 2011 

Status Update: This project is additive alternate #1 to KCHC (noted previously).  Bids have been received and an award is in progress.   

Kuskokwim Campus Gymnasium and Second Floor Renovation (KCGR) 

Total Project Cost: 

$1,928,500 

Kuskokwim Campus Gymnasium and Second Floor Renovation 

Project Description This project will build a gymnasium in a portion of the open floor area of the Voc‐Ed building, above the Kuskokwim Campus CANHR Health Clinic (KCHC).  Testing and distance education modules and new faculty offices will also be built.  Construction on the KCHC and KCGR projects will be done simultaneously. 

Funding Source: 

USDE Title III Grant 

Architect/Engineer: 

General Contractor: 

Livingston Slone, Inc. 

TBD 

GYMNASIUM AND SECOND FLOOR RENOVATION 

August 2011 CIP Update 

Schedule: 

Planning & Design:  February‐June 2011 

Advertising & Award:  July‐August 2011 

Construction:  August 2011‐September 2012 

Board of Regents Approval & Motions: 

Preliminary Project Approval  December 13, 2010 

Formal Project Approval  February 14, 2011 

Schematic Design Approval  July 21, 2011 

Status Update: Bids were received and an award is in progress as we actively collect submittals to complete the contracting.  Construction will be underway the end of August 2011.

Bristol Bay Science Lab and Clinical Space (BBSL) 

Total Project Cost: 

$1,985,000 

Bristol Bay Science Lab and Clinical Space 

Project Description This project will increase science laboratory and research space by 780 square feet, increase student study and testing areas by three rooms, and increase distance education training space and classroom space by 640 square feet. This project and grant will also provide pre‐planning documents for additional clinical and laboratory space for high‐demand areas (i.e., Allied Health/Nursing program). 

Funding Source:

USDE Title III Grant

Architect/Engineer: 

General Contractor: 

McCool Carlson Green 

TBD 

August 2011 CIP Update 

Schedule: 

Planning & Design:  February‐June 2011 

Advertising & Award:  July 2011 

Construction:  August 2011‐September 2012 

Board of Regents Approval & Motions:

Preliminary Project Approval December 13, 2010

Formal Project Approval February 14, 2011

Schematic Design Approval July 21, 2011

Status Update: Bids were received and an award is in progress as we actively collect submittals to complete the contracting.  Construction will be underway the end of August 2011.

Chukchi Flight Simulator Room and Classroom (CCFSR) 

Total Project Cost: 

$1,804,960 

Chukchi Flight Simulator Room and Classroom 

Project Description The renovation and expansion plan will create a new flight simulator room and modify the 

adjacent classroom to accommodate the flight simulator computer lab.  Additionally, a battery 

storage room will be included in this project.  This renovation will reduce the size of the back 

classroom and create a hallway that leads to the flight simulator area. 

Funding Source: 

USDE Title III Grant 

NVision Architecture 

TBD 

Architect/Engineer: 

General Contractor: 

August 2011 CIP Update 

Schedule: 

Planning & Design:  July 2010‐January 2011 

Advertising & Award:  February‐March 2011 

Construction:  May‐August 2011 

Board of Regents Approval & Motions: 

Formal Project Approval  September 8, 2010 

Schematic Design Approval  September 8, 2010 

Project Change Approval  March 29, 2011 

Status Update: The contractor is progressing well on this project and is approximately 95% complete.  A 

substantial completion inspection is scheduled for August 31, 2011. 

NW Campus Nagozruk Building Heating Upgrade (NWMHU)

Total Project Cost: 

$568,700 

NW Campus Nagozruk Building Heating Upgrade 

Project Description This project will replace three existing boilers that were installed with the original building in 1978 with one new boiler, perimeter fin tube element heating and a heat recovery ventilator  (HRV) unit.  The current system does not provide adequate heat for the spaces within the building.  The fans in the forced air furnaces use a substantial amount of electricity to move air. Costs will be reduced by replacing the fans with an HRV and boiler system. 

Funding Source: 

FY11 State Appropriation 

RSA Engineering, Inc. 

ASRC  Builders, LLC 

Architect/Engineer: 

General Contractor: 

Revised Total Project Cost: 

$873,209 

August 2011 CIP Update 

Schedule: 

Planning & Design:  January‐August 2010 

Advertising & Award:  November 2010‐January 2011 

Construction:  April 2011– January 2012 

Board of Regents Approval & Motions: 

Formal Project Approval  February 18, 2010 (Life Sciences Facility) 

Schematic Design Approval  June 3, 2010 

Status Update:  The steel frame and concrete foundation are complete and the first floor slab has been poured.  In‐slab mechanical and electrical were installed the week of July 18, 2011 and followed by the 2nd floor slab pour the last week of July 2011.   The greenhouse  structure arrived in Fairbanks and is being erected with the mechanical and electrical  rough‐in to begin soon. 

Arctic Health SNRAS Research Greenhouse (AHRG)

Total Project Cost: 

$5,325,000 

Arctic Health SNRAS Research Greenhouse 

Project Description This project will replace the West Ridge Greenhouse which will be removed from the proposed construction site for the Life Sciences Research and Teaching Facility.  UAF will construct a new, multi‐level, 10,000 gsf research greenhouse connected to the southwest wing of the Arctic Health Research Building.  The greenhouse will allow the School of Natural Resources and Agricultural Sciences (SNRAS) to conduct northern climate plant research. 

Funding Source: 

UA Revenue Bond 

Architect/Engineer: 

General Contractor: 

Design Alaska, Inc. 

GHEMM Company, Inc. 

GO Bond 

August 2011 CIP Update 

Schedule Phase 1C: 

Planning & Design:  January 2009 ‐ June 2009 

Advertising & Award:  May‐July 2011 

Construction:  July 2011 ‐ August 2012 

Board of Regents Approval & Motions: 

Formal Project Approval  April 8, 2011 

Schematic Design Approval  June 2, 2011 

Status Update: Construction began July 1, 2011.  Switchgear was delivered on August 24, 2011 and a major transformer is scheduled to be delivered in late September 2011.  Electrical equipment will be installed and commissioned over winter 2011‐2012 and two feeders will be energized in June 2012.  Additional feeders will be energized in summer 2012.  Anticipated completion date is the fall of 2012. 

Critical Electrical Distribution Renewal Phase 1C (UTERC) 

Total Project Cost: 

$13,500,000 

Project Description Phase 1C  scope will  install all  the major electrical equipment  in  the building  constructed  in Phase  1B,  including  switchgear,  transformers,  switches,  and  cable  for  two  new  electrical feeders.    Additional  feeders will  be  installed  as  funds  are  available.    This  project will  also provide additional power  in building hub rooms as required  for Voice over  Internet Protocol (VoIP). 

Critical Electrical Distribution Renewal Phase 1C 

Funding Source: 

FY12 R&R Funding 

Architect/Engineer: 

General Contractor: 

PDC Inc. Engineers 

Kiewit Building Group, Inc. 

August 2011 CIP Update 

Schedule Phase 1A: 

Planning & Design:  April 2009 

Advertising & Award:  February ‐ March 2011 

Construction:  May 2011 ‐ November 2011 

Board of Regents Approval & Motions: 

Formal Project Approval  April 8, 2009 

Schematic Design Approval  February 18, 2010 (Phase 1A) 

Project Change Approval  December 9, 2010 

Revised Formal Project Approval  September 2009 

Status Update: The foundation for the Test Modules was completed October 15, 2010 by Kiewit Building Group under the 

Critical Electrical Upgrade Phase 1B project.  Groundbreaking took place on May 12, 2011.  Structural steel 

is complete including the installation of insulated panels.  The building is closed‐in with electrical  

and mechanical installation currently on schedule. 

Energy Technology Facility Phase 1A (ETTM) 

Total Project Cost: 

$3,000,000 

Project Description This project, Phase 1A, will prepare the site for the Energy Technology Facility (ETWP), and will construct the four alternative energy test bay modules for ACEP in advance of the construction of the main facility. 

Energy Technology Facility Phase 1A (ETTM) 

Tes

t M

od

ule

s

Revised Total Project Cost: 

$4,700,000 

Funding Source:

FY11 Capital Appropriation 

Architect/Engineer: 

General Contractor: 

Bettisworth North, Inc. 

Kiewit Building Group, Inc. 

University Receipts 

August 2011 CIP Update 

Schedule: 

Planning & Design:  May 2011‐July 2012 

Advertising & Award:  Fall 2012 

Construction:  2013 

Board of Regents Approval & Motions: 

Preliminary Project Approval  September 9, 2006 

Formal Project Approval  June 4, 2010 

Schematic Design Approval  TBD

Status Update: Consultant ECI/Hyer & NBBJ was selected in mid‐May 2011.  The Consultant and the College of Engineering and 

Mines (CEM) are currently in the programming and concept design phase for the facility.  Ira Fink, author of the 

2010 UA Engineering Report, continues to provide program review and input.  The gross square foot building 

need will be established as part of the current work effort.    Draft programming and concept design submittals 

are currently under review to meet the August 29, 2011 deadline  in preparation for the September 2011       

Board of Regents meeting. 

UAF Engineering Facility (ENNF) 

Total Project Cost: 

TBD 

Project Description This project will construct a new, multi‐story facility that will house existing and new engineering programs.  The facility will include office, classroom, class laboratory, and research laboratory space.  Specialty spaces such as high‐bay test labs, strong floors and materials testing labs will also be included. 

UAF Engineering Facility 

Funding Source: 

FY 11 Capital Appropriation for $4,000,000 of which $1,000,000 is allocated for programming and concep‐tual design. 

Architect/Engineer: 

General Contractor: 

ECI/Hyer & NBBJ 

TBD 

UA

F p

hoto

by

Tod

d P

aris

August 2011 CIP Update 

Status Update: Steel erection was completed August 19, 2011.  Work continues on installing the steel decking and in‐slab conduit, hangers, 

and reinforcing steel.  Sewer line work has begun again along Sheenjek Drive.  The new utilidor connection is half‐way 

complete.  Work has begun on the exterior studs and vapor barrier, a key milestone that needs to be completed in the next 

four weeks to ensure timely dry‐in of the facility.  The final design deliverable will occur the last week in August and review 

will begin in earnest.  Overall the project remains on schedule and budget. 

Project Description Life  Sciences will  provide multiuse  teaching  and  research  labs,  classrooms,  and  office  space  for  life  science  research  and academic purposes. The research portion will provide nearly 60,000 gsf lab space for biology research. The teaching portion will provide 40,000 gsf of academic classroom and lab space for biology and wildlife degree programs.  

UAF Life Sciences Research and Teaching Facility 

Schedule Bar Chart: Design

Construction

Basic Project Info:

Designer: Bezek Durst Seiser Inc, Smith Group, PDC Inc, RFD Inc

CM@Risk: Davis Constructors

Board Approvals: FPA February 2010 SDA November 2010

TPC: $88,275,000 Construction Cost: $67,100,000

Occupancy Date: Fall 2013 Funding Source: GO Bond UA Revenue Bond

0%

0%

100%

100% Groundbreaking

Mar-2011 Completion Sept-2013

    UAF Life Sciences Facility (LFRF)

For actual values refer to attached budget sheet 

$0 $50 $100

Project Management

Building Completion

Construction

Design

Millions

Budget vs ActualActual

Budget

August 2011 CIP Update 

UAF Life Sciences Research and Teaching Facility 

UAF Life Sciences Facility (LFRF)

Formal Project Approval:  $108,600,000  to fund three projects associated with the construction of the new facilities:  ‐Life Sciences Facility   ($88,275,000) TPC Increase September 2011 for $303,000 ‐West Ridge  Steam Capacity Expansion ($15M)  ‐Arctic Health Greenhouse  ($5,325,000) ‐ Refer to AHRG CIP Update 

UNIVERSITY OF ALASKA 

Project Name:

MAU: UAF

Building: New‐Life Sciences Facility August 9, 2011

Campus:   Fairbanks Wohlford

Project #:   LFRF 2010100 512035‐50216

Total GSF Affected by Project: 101,100 

PROJECT BUDGET Budget Actual

A. Professional Services

Advance Planning, Program Development $0 $0

Consultant: Design Services     $5,787,572 $5,787,572

Consultant: Construction Phase Services $1,162,000 $384,595

CM@Risk Preconstruction Services $378,005 $378,005

Misc Consulting and Peer Reviews $317,000 $186,907

Soils Testing & Engineering $0 $0

Special Inspections $0 $0

Plan Review Fees / Permits $275,000 $0

Other $0 $0

$7,919,577 $6,737,079

B. Construction

General Construction Contract (s) $67,700,000 $24,067,077

Other Contractors (List: West Riedge Parking, Building Relocations) $1,378,159 $1,218,248

Construction Contingency     $3,051,945 $0

$72,130,104 $25,285,325

Construction Cost per GSF $713.45

C. Building Completion Activity

Equipment  $500,000 $0

Fixtures $100,000 $0

Furnishings $650,000 $0

Signage not in construction contract $50,000 $0

Move‐Out Cost/Temp. Reloc. Costs $0 $0

Move‐In Costs $300,000 $0

Art $200,000 $0

Other (List:________________________) $0 $0

OIT Support $450,000 $2,272

Maintenance/Operation Support $250,000 $55,389

$2,500,000 $57,661

D. Owner Activities & Administrative Cost

Project Planning and Staff Support $3,714,736 $1,443,603

Project Management $2,144,333 $276,672

Misc Expenses: Advertising, Printing, Supplies $169,250 $60,111

$6,028,319 $1,780,386

E.  Total Project Cost $88,578,000 $33,860,451

    Total Project Cost per GSF $876.14 Remaining Budget

F.  Total Appropriation(s) $88,578,000 $54,717,549

Professional Services Subtotal

Construction Subtotal

Building Completion Activity Subtotal

Owner Activities & Administrative Cost Subtotal

Life Sciences Research and Teaching and Facility

Date:

Prepared By: 

Account No.: 

August 2011 CIP Update 

Schedule: 

Planning & Design:  November 2009 ‐ May 2010 

Advertising & Award:  June ‐ July 2010 

Construction:  August 2010 ‐ May 2011 

Board of Regents Approval & Motions: 

Formal Project Approval  September 24, 2009 

Schematic Design Approval  May 4, 2010 

   

Status Update: Substantial completion inspection occurred in early April 2011.  Residence Life has re‐occupied Skarland Hall as of mid‐ May.  The project is 98% complete. 

Skarland Hall Shower Repairs (SKSR)  

Total Project Cost: 

$3,800,000 

Skarland Hall Shower Repairs 

Project Description This project demolished and reconfigured the shower rooms and toilet areas on all three residence floors of Skarland Hall, because the infrastructure of the shower and toilet areas were failing.  The reconfiguration included bringing the ventilation and electrical systems up to current standards, including ADA regulations and codes.  This project also provided increased security, especially in the shower rooms.  During construction, Skarland Hall was completely shut down to student use.  

Funding Source: 

Residence Life Auxiliary Funds Architect/Engineer: 

General Contractor: 

Nvision Architecture, Inc. 

Richard Stanton Construction Co. FY11 R&R Funding 

Revised Total Project Cost: 

$3,000,000 

August 2011 CIP Update 

Schedule: 

Planning & Design:  February ‐ May 2011 

Advertising & Award:  April ‐ July 2011 

Construction:  August 2011 ‐ October 2012 

Board of Regents Approval & Motions: 

Formal Project Approval  November 9, 2011 

Schematic Design Approval  April 8, 2011 

Status Update: Design‐Build Qualifications were received May 10, 2011.  Three contractors were short‐listed and proposals were received.  Kiewit Building Group had the highest ranked proposal and a Notice of Intent to Award was issued June 30, 2011.  The bids were about $2M lower than the estimate and an additional water line was added to the project to improve fire protection capabilities on the West Ridge.  Construction is scheduled to begin August 29, 2011 and completion is expected in the fall of 2012. 

Utilities West Ridge Steam Capacity Expansion (UTCE) 

Total Project Cost: 

$15,000,000 

Project Description This project installs a 10‐inch steam line and a 6‐inch condensate line from the Atkinson Power Plant to the West Ridge  in the vicinity of the Arctic Health Research Building to  increase the steam capacity for West Ridge and the new Life Sciences Facility.   A new utilidor will also be constructed to house the steam piping and other utilities from the utilidor near the Lola Tilly Building to the utilidor west of the Student Recreation Center. 

Utilities West Ridge Steam Capacity Expansion 

Funding Source: 

GO Bond (Life Sciences) 

Architect/Engineer: 

DB Contractor: 

PDC Inc. Engineers 

Kiewit Building Group  Design Alaska 

September 2011 Board of Regents

Anderson Building Remodel & Pedestrian Access

Project Description: This project will totally remodel the Juneau campus principal science instruction space to accommodate the needs of the UAS Science program. The project is divided in to two separate construction contracts. The first is the building remodel including classrooms, teaching labs, faculty offices, and research spaces. The second contract will be for the construction of a pedestrian crossing of Glacier Highway. These two elements are being designed, bid and constructed as separate contracts due to the different nature and schedules for the work. In the remodel work major building components will be upgraded or replaced including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space will be reconfigured to improve effectiveness of the teaching and research areas. The number of faculty offices will be reduced. The work has required the building to be vacated during renovation. Interim space for offices and labs is being accommodated elsewhere on campus, at the UAF Fisheries facility at Lena Point and at the old NOAA lab adjacent to the Anderson Building. The pedestrian access work will include a pedestrian bridge connecting to the third floor of the Anderson Building and a paved and lighted pathway to the main campus. Total Project Cost: $10,700,000 Project Schedule: Building Remodel Pedestrian Access

Final Design 9/2008 –9/2009 3/2009 – 1/2012 Bid & Award 10/2009-11/2009 2/2012 -3/2012 Construction 12/2009 – 9/2010 4/2012 – 10/2012

Project Approvals:

Formal Project Approval September 2008 Schematic Approval February 2009

Status Update: Building Remodel: Final contract closeout is in progress. Pedestrian Overpass: UAS is awaiting detailed design data on the Alaska DOT&PF’s proposed re-alignment of Glacier Highway. DOT&PF and UAS are re-examining the impacts of the future road and right-of-way re-alignment. Construction is intended for 2012 assuming DOT&PF makes a determination on road alignment soon.

September 2011 Board of Regents

Auke Lake Way Corridor Improvements & Reconstruction

Project Description:

• Reconstruction of Auke Lake Way from Hendrickson to the Egan bus circle to replace pavement, signage and lighting, and add traffic control devices and provide for service and emergency access;

• Reconstruction of the Novatney parking area to a service turn-around; • Construction of a paved and lighted pedestrian connection from the Hendrickson

Building to the Auke Creek bridge path, eliminating pedestrian use of the road; • Reconstruction, paving and drainage of the Chapel-by-the-Lake parking lot as

required by the parking agreement; • Construction of a roof structure atop the path between the main parking lots and the

Whitehead entrance; • Revised entry canopies at the intersections of the Novatney and Whitehead exterior

walkways. • Traffic and signage improvements at the Loop Road intersection.

Total Project Cost: $4,300,000 Project Schedule

Planning & Design: 1/2011 – 9/2011 Bid & Award (phase 1): 5/2011 – 6/2011 Construction (phase 1): 6/2011 - 10/2011

Project Approvals

Formal Project Approval December 2010 Schematic Approval (Phase 1) April 2011

Status Update: Phase 1 has been bid in two increments: North Entry improvements are completed and the South entry improvements have been awarded with work starting in September.

June 2011 Board of Regents

Juneau – Campus Lift Station Replacement

Project Description: The eight principal buildings within the Auke Lake core campus are all served by a single sewage lift station near the edge of Auke Lake, the lowest point on campus. The mechanical and electrical components of the sewage ejection system are at the end of their useful life. In addition the simple building that houses the equipment has been partially undermined by site erosion over many years. This project will demolish the existing building and construct a new lift station. Total Project Cost: $625,000 Project Schedule

Design 09/2010 – 3/2011 Construction: June through August 2011

Project Approvals

Formal Project Approval October 2010 Schematic Design Approval October 2010

Status Update: A contract was awarded to Southeast Earthmovers and construction is scheduled to be completed by mid September.

September 2011 Board of Regents

Sitka Career & Technical Education Center

Project Description: A Title III grant is providing funding over the next two federal fiscal years to remodel portions of the existing facility. The project will:

• Expand the existing student success center, • Create a new instructional design center, • Reconstruct the construction technology laboratory, • Construct new records storage, and • Construct a new lecture hall.

Total Project Cost: $3,410,000 Project Schedule

Planning & Design 11/2008 – 9/2009 Bid & Award 9/2011 – 10/2011 Construction: 11/2011 - 10/2012

Project Approvals

Formal Project Approval December 2010 Schematic Approval July 2011

Status Update: Design development plans are due in early September.

September 2011 Board of Regents

Ketchikan – Ziegler Building Roof Replacement

Project Description: This project will install a new membrane roof, new roof insulation, new flashing and make repairs to the wood mansard roof fascia. Total Project Cost: $515,000 Project Schedule

Design 11/2010 – 3/2011 Construction: June through August 2011

Project Approvals

Formal Project Approval December 2010 Schematic Design Approval December 2010

Status Update: Work will be substantially complete on September 1.