U OF C Information Technologies
Network Services Group
Voice Services
Network Operations
Security Services
Agenda
• Overview of Network Services– Voice Services– Data Services
• Current Challenges
• Future Challenges
• Tour of Physical Facilities
Presenters
• Harold Esche, P.Eng, MBA– CIO, University of Calgary
• Tom Seto, BSc, BComm– Associate Director, Information Technologies
Convergence
• Prior to April, 2004, Telecommunications was a department of Campus Infrastructure
• On April of this year, Telecom was merged with Information Technologies’ Network Services Group
• While Network Services was responsible for networks on campus, they subcontracted the actual installations to Telecomm
Current Organization Chart
Manager
Network Operations
Router Team
Security Services
Voice Services
Current Infrastructure
• Two parallel infrastructure– Cabling– Equipment
• Both are costly to install and maintain– Moves, Adds, Changes (MAC)
Network Services
• Voice Services
• Network Operations
• Security
• Other
Telephone Systems
• Nortel SL 100 Software Rel. MSL 14
• 9550 installed telephone services
• 672 bi-directional PRI trunks
• 20 % future spare capacity
• ~108,000 calls per day
Telephone Systems
• 40,000 kilometers of copper cable
• 57 main distribution Telecom rooms
• 320 intermediate distribution rooms
• 25,000 pairs leave the main switch room
Voice Systems
• Cabling– Cables are pulled from the Admin Bldg to each
other building on campus– These cables are 400 to 800 pairs– They end in main distribution rooms (MDT)– There are intermediate distribution rooms
throughout the building (IDT) from which cable is installed for each user location (home runs)
Cabling
• 80% of home runs are Cat 3
• Require Cat 5 or greater for current technologies – gigabits/sec
Installing a Telephone Service
• A pair of cables in the home run is selected• A connection is made in the IDT from the home
run cable to a pair in the riser cable which goes down to the MDT
• A connection is made in the MDT from the riser pair to a pair in the cable going back to the telephone switch in the Admin Bldg
• In the Admin Bldg, a connection is made from that pair to a line card in the phone switch
Voicemail Systems
• Avaya Aria 350 • Software Rel. 3.1• 5500 installed personal mailboxes• 55 special application mailboxes• ~300,000 calls to system per
month• Accepted as a “Messaging
System”
Telecom Systems
• Voice Services
• Network Operations
• Security
• Other
Networking Systems
• Over 10,000 Active Network Connections to support Research, Administration and Teaching
• Central Network Management (SNMP)
• 10 / 100 Mega-bit Speeds• Gigabit backbone links• AirUC – wireless network
Networking Systems
• Fiber optics backbone• 816 kilometers of fiber• 32 Fiber nodes on campus• Remote direct connections to
Mount Royal College and University of Alberta
• Secure / Non Secure Networks• Internet Access
Backbone Network Topology
User Networks
AirUC
• Wireless network for all IT username holders
WANs
• Internet – ISP is Telus• Shaw – Direct 100Mbps connection• Netera – high speed to worldwide research
networks• SuperNet• Intranets
– Wireless– Dark fiber
Network Services
• Voice Services
• Network Operations
• Security
• Other
Security Systems
• Alarm Systems installed city-wide
• Full monitoring system in security
• Campus 1 Card• Access control• CCTV surveillance• Emergency Alarms
Telecom Systems
• Voice Services
• Network Operations
• Security
• Other
Other Systems
• Olympic Oval Timing and Scoreboards
• Radio Systems• Paging Systems• Help Phones• Cable Management• TelePlus Billing
Information Commons Original Estimate and Cost
Task Estimate Actual Difference Voice 4,150.00$ 721.51$ 3,428.49
Ethernet 128,950.00$ 135,547.44$ (6,597.44)250 Plan -$ -$ 0.00 Security -$ -$ 0.00
J&T 18,300.00$ 9,895.17$ 8,404.83Total 151,400.00$ 146,164.12$ 5,235.88
Extra Work Estimate and CostTask Estimate Actual Difference
Voice -$ -$ -$ Ethernet -$ -$ -$ 250 Plan -$ -$ -$ Security -$ -$ -$
J&T -$ -$ -$ Total -$ -$ -$
Total Project cost is: 146,164.12$
Balance Owing for ProjectProgressive billing Amount billed Total Cost Balance
DOO244 103,802.09$ 146,164.12$ 42,362.03$ 0 -$ -$ -$ 0 -$ -$ -$
Total 103,802.09$ 146,164.12$ 42,362.03$
63%
0%
60%
0% 0% 2%
37%
0%
32%
0% 0%4%
0%
10%
20%
30%
40%
50%
60%
70%
Total Voice Ethernet 250 Plan Security J&T
%Parts
%Labour
Tri-Faculty Lab Original Estimate and Cost
Task Estimate Actual Difference Voice -$ 37.00$ (37.00)
Ethernet 51,912.00$ 49,470.03$ 2,441.97250 Plan -$ -$ 0.00 Security 1,572.45$ 1,510.83$ 61.62
J&T 10,631.00$ 11,601.00$ (970.00)Total 64,115.45$ 62,618.86$ 1,496.59
Extra Work Estimate and CostTask Estimate Actual Difference
Voice -$ -$ -$ Ethernet -$ -$ -$ 250 Plan -$ -$ -$ Security 200.00$ 200.00$ -$
J&T 750.00$ 750.00$ -$ Total 950.00$ 950.00$ -$
Total Project cost is: 63,568.86$
Balance Owing for ProjectProgressive billing Amount billed Total Cost Balance
99/07/21 35,286.70$ 63,568.86$ 28,282.16$ 0 -$ -$ -$ 0 -$ -$ -$
Total 35,286.70$ 63,568.86$ 28,282.16$
70%
0%
62%
0% 1%7%
28%
0%
15%
0% 1%
12%
0%10%20%
30%40%50%60%
70%80%
Total Voice Ethernet 250 Plan Security J&T
%Parts
%Labour
Computer Sciences Original Estimate and Cost
Task Estimate Actual Difference Voice -$ -$ 0.00
Ethernet 68,484.45$ 61,634.81$ 6,849.64250 Plan -$ -$ 0.00 Security 35,930.00$ 37,265.93$ (1,335.93)
J&T 26,040.00$ 22,600.14$ 3,439.86Total 130,454.45$ 121,500.88$ 8,953.57
Extra Work Estimate and CostTask Estimate Actual Difference
Voice -$ -$ -$ Ethernet -$ -$ -$ 250 Plan -$ -$ -$ Security -$ -$ -$
J&T -$ -$ -$ Total -$ -$ -$
Total Project cost is: 121,500.88$
Balance Owing for ProjectProgressive billing Amount billed Total Cost Balance
doo245 41,908.00$ 121,500.88$ 79,592.88$ 0 -$ -$ -$ 0 -$ -$ -$
Total 41,908.00$ 121,500.88$ 79,592.88$
68%
0%
39%
0%
23%
6%
32%
0%
12%
0%8%
12%
0%10%20%
30%40%50%60%
70%80%
Total Voice Ethernet 250 Plan Security J&T
%Parts
%Labour
Challenges
• Converging Voice and Data over one infrastructure
• Wireless – Local Area and Wide Area
• Bandwidth Challenges
• Upcoming Technologies
• $$$$$