11
Tyso ns May 8, 2012 May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Embed Size (px)

Citation preview

Page 1: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons

May 8, 2012May 8, 2012

1

Operational Analysis of Dulles Toll Road Ramps to Tysons

Corner

Page 2: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons

Agenda

• Review of Progress

• Preferred Options

• Public and Stakeholder Outreach Schedule

• Next Steps

2

Page 3: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Review of Progress

• Study Kickoff May 24, 2011

• Data Gathering & Analysis June - August 2011

• Alternatives Workshop September 23, 2011• Monthly Progress Meetings Ongoing

(Included representatives from FCDOT, VDOT & MWAA)

• Selection of Preferred Options March 21, 2012

3

Page 4: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Preferred Options

• Developed nine scenarios including providing upgrades to existing Route 7 and Spring Hill Road Interchanges

• Improvements to existing Route 7 and Spring Hill Road Interchanges were not cost effective based on the minimal capacity added

• Compared three preferred alternatives against the “No Build” Alternative

• Measured the Network Performance of each preferred option and compared traffic operations

4

Page 5: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons

DTR & Route 7 Diversion DiamondDTR & Route 7

Diversion Diamond

DTR & Route 7 Modified Interchange

(Flyover Ramp)

DTR & Route 7 Modified Interchange

(Flyover Ramp)

2030 No Build2030 No Build

Preferred OptionPreferred Option 2030 No Build2030 No Build

Compare 2030 No Build vs. Preferred Interchange

modification Option

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Boone Blvd. Ramp& Jones Br. Dr. Ramp

Preferred OptionCombined with

Boone Blvd. Ramp& Jones Br. Dr. Ramp

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Urban Frontage Road

Preferred OptionCombined with

Urban Frontage Road

Preferred OptionCombined with

Urban Frontage Road

Preferred OptionCombined with

Urban Frontage Road

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

Preferred Options

5

Page 6: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Preferred Options

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Greensboro Dr. Ramp& Boone Blvd. Ramp

Preferred OptionCombined with

Urban Frontage Road

Preferred OptionCombined with

Urban Frontage Road

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

2030 No BuildCombined with

Boone Blvd. Ramp &Greensboro Dr. Ramp& Jones Br. Dr. Ramp

2030 No Build2030 No Build

6

Page 7: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Preferred Options

7

Preferred Option 1 – Boone Boulevard, Greensboro Drive

Page 8: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Preferred Options

8

Preferred Option 2 – Urban Frontage Road

Page 9: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Preferred Options

9

Preferred Option 3 – Boone Boulevard, Greensboro Drive, Jones Branch

Page 10: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons

10

Network Performance ComparisonAM

Preferred Preferred Preferred Option 1 Option 2 Option 3

Average delay time per vehicle Seconds 329 370 355 255 Average number of stops per vehicles Number of Stops 9.0 11.8 12.0 7.6 Average speed MPH 13.0 14.4 13.9 16.1 Total delay time Hours 2204 2655 2236 1848 Total stopped delay Hours 713 1151 871 618 Total travel time Hours 3061 3713 3122 2801% Merges with LOS E or F Percentage 0% 0% 0% 0%% Diverges with LOS E or F Percentage 75% 60% 50% 43%

PM

Preferred Preferred Preferred Option 1 Option 2 Option 3

Average delay time per vehicle Seconds 401 367 272 432 Average number of stops per vehicles Number of Stops 9.7 7.7 6.2 9.4 Average speed MPH 12.3 13.6 17.5 11.1 Total delay time Hours 3175 3024 1967 3432 Total stopped delay Hours 1590 1808 1029 1919 Total travel time Hours 4306 4177 2983 4491% Merges with LOS E or F Percentage 50% 50% 25% 14%% Diverges with LOS E or F Percentage 25% 40% 50% 43%

Measure Unit No Build

AM

Preferred Preferred Preferred Option 1 Option 2 Option 3

Average delay time per vehicle Seconds 329 370 355 255 Average number of stops per vehicles Number of Stops 9.0 11.8 12.0 7.6 Average speed MPH 13.0 14.4 13.9 16.1 Total delay time Hours 2204 2655 2236 1848 Total stopped delay Hours 713 1151 871 618 Total travel time Hours 3061 3713 3122 2801% Merges with LOS E or F Percentage 0% 0% 0% 0%% Diverges with LOS E or F Percentage 75% 60% 50% 43%

PM

Preferred Preferred Preferred Option 1 Option 2 Option 3

Average delay time per vehicle Seconds 401 367 272 432 Average number of stops per vehicles Number of Stops 9.7 7.7 6.2 9.4 Average speed MPH 12.3 13.6 17.5 11.1 Total delay time Hours 3175 3024 1967 3432 Total stopped delay Hours 1590 1808 1029 1919 Total travel time Hours 4306 4177 2983 4491% Merges with LOS E or F Percentage 50% 50% 25% 14%% Diverges with LOS E or F Percentage 25% 40% 50% 43%

Measure Unit No Build

AM

PM

Page 11: Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Next Steps

11

• Tysons Partnership Briefing

May 23, 2012

• Public Information Meeting

May 30, 2012

• Evaluate Impacts

Summer 2012

• Second Public Information Meeting

Fall 2012

• Study Completion

Winter 2012