Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Stage One - Computer Aided Design
Stage Two - Prototype Manufacture
Stage Three - Costs and production methods calculated
Stage Four - Materials automatically ordered
Stage Five - Manufacturing begins using CAM
Stage Six - Quality control is applied at every stage
Stage Seven - The product is assembled by robots
Stage Eight - The product is quality checked
Stage Nine - Product distribution.
Stage Ten - Financial accounts are updated
YES
NO
YES
NO
UNLOADINGBAYS
DESIGN CENTRE
COMPUTERMANAGEMENT
CONTROLROOM
PROTOTYPINGCENTRE
AND LOGISTICS
STORES AND DISTRIBUTION
PRODUCTION LINE
TYPICAL CIM PLANT LAYOUT
A computer control room directs all operations inside the factory. The computer system is in control of every stage from design and the ordering of materials to the manufacturing processes and distribution to customers.
COMPUTER INTEGRATED MANUFACTURE (CIM)
www.technologystudent.com © 2017
https://www.facebook.com/groups/254963448192823/
WORLD ASSOCIATION OF TECHNOLOGY TEACHERS
By V.Ryan