49
TWO RIVERS URBAN PARK May 2016 Contextual Informants Setting the Scene (2) In partnership with the City of Cape Town Melanie Attwell and Associates Lucien Le Grange Architects and Urban Planners

TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

TWO RIVERS URBAN PARK

May 2016Contextual Informants

Setting the Scene (2)

In partnership with the City of Cape Town

Melanie Attwell

and Associates

Lucien Le Grange

Architects and Urban

Planners

Page 2: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Hydrology

2

Page 3: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

3

Floodlines (SRK Study, 2012)

Page 4: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Modelling of Flood Mitigation Options

4

Flood modelling - model using updated LIDAR and new

survey data

Provisional findings are as follows:

• The bottom of the Salt River canal at the first rail bridge is more than a meter higher than the bottom of the lower end of the Black River in the site.

• The bottom of the site is below sea level (-0.7 to -0.8 m).• Salt River Canal is the bottle neck. The site is the backwater.

Storage capacity within the site is therefore critical• Rail bridges along Salt River also constrain high volume flows• The N2 Settlers way functions as an obstacle for flood water in

the beginning of the flood on the Black River side• If rain falls evenly over the catchment - Liesbeek floods earlier

than the Black River • Redirecting the outflow from the WWTW’s will not help to solve

flooding; amounts are less than 1% of 1:50 year floods.

M5 crossing the Black River

First rail bridge crossing Salt River

Page 5: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

5

Current weirs and bridges – subject of survey

Modelling of Flood Mitigation Options

Page 6: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

6

-1.5

-1

-0.5

0

0.5

1

1.5

2

2.5

3

3.5

0 1000 2000 3000 4000 5000

Lev

el

(m)

Distance (m)

In Ocean

Salt River survey

Salt river canal -

rectangular outlet

sectionBlack River Survey

Liesbeeck Survey

River Channel Geometry

Modelling of Flood Mitigation Options

Page 7: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

7

Environment

Page 8: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

River water sources from overland stormwater and WWTW’s

Water flows:

• Liesbeek comprised of seasonal and perennial streams

• Black River was previously seasonal - now perennial system

(WWTW’s)

• Salt River does not allow tidal flushing – no estuary condition

anymore

Water quality is challenging due to size of Catchment. Pollution

coming from:

• Agricultural areas and Industrial areas

• Underserviced areas

• Cemeteries and golf courses

• WWTW’s 8

Water source, flows and quality

Page 9: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

DWA, 2005 Ecological State of riperian corridors assessment: measured by state of habitat integrity, vegetation, fish, composition of invertebrates and water quality – different ratings of rivers in the catchment

City of Cape Town: Environmental Water quality index findings:

• Liesbeek River generally better condition than Black River

• Liesbeek River: slight deterioration / slight improvement in parts

• Black River: Upstream of site – Eutrophication resulting in growth of algae. AWWTW’s has a limited dilution role.

Biological Analysis (faecal coliform levels):

• Recommended limit for recreational use = <400 counts / 100ml

• Black River and Liesbeek river not meeting standards

• WWTW’s and Elsieskraal inflow diluting the E.coli in Black River upstream of site

9

Water source, flows and quality cont.

Page 10: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Catchment includes:

• Protected areas: TMNP, Tygerberg Nature Reserve and Rietvlei Reserve

• A number of small critical biodiversity areas (CBA’s)

• Raapenberg Bird Sanctuary and a fish sanctuary

Highly fragmented nature of habitats due to construction of infrastructure

over time, pollution of rivers, transformation of river course BUT still pockets

of high biodiversity value

Moving forward:

• Room to improve current hydrological and ecological functioning of

some wetlands,

• Create corridors at metro level

• Acknowledge and strengthen the sense of place

10

Biodiversity

Page 11: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Opportunity for site as bridge between West Coast Biosphere and TMNP.

Need to look at where / how we create continuity in the system

Page 12: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Green open spaces in the sub district present opportunity to grow the green open space network and look for biodiversity corridors

Maximising on overlap between “semi-natural” river with indigenous remnants

Page 13: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Indigenous remnants and critical biodiversity areas.

Page 14: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

14

Services and Infrastructure

Page 15: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

15

Stormwater Drainage

• Study area drains directly

into rivers

• Limited treatment through

existing wetlands

• Pollution management in

the future is essential

Page 16: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Water Supply

• Insufficient bulk supply and

infrastructure

• Limited existing capacity

• Water saving measures to

be applied

• Potential bulk supply

options:

Upgrade of bulk supply?

Extraction from river and

treatment?

Ground water and treatment?

Page 17: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

17

Sewage

• Insufficient bulk drainage

and treatment capacity

• Could consider temporary

storage on site

• AWWTW’s should be

upgraded to treat effluent

effectively

Page 18: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

18

Existing Distribution Furniture

Existing Bulk Electrical

Infrastructure

• Existing capacity limited

• Proposed 50MVA from

132/11 kV Step-down

Substation – location still to

be confirmed

Page 19: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Efficient measures to be implemented to limit bulk

services requirements

Policies to guide interventions:

• 2014 Sustainable Energy Vision for Western Cape

• Cape Town Energy2040 (measures over the next 5 years towards achieving the goal of a low carbon, resilient and resource-efficient city )

• CoCT Smart Living Handbook: Making sustainable development a reality in SA homes

19

Services and Infrastructure: The Future

Page 20: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

20

Energy Management Strategy

Energy conservation

Occupancy monitoring to control lighting and HVAC,

behavioural change to energy use,

maintenance (e.g.

fixing leaks, filters)

Energy Efficiency

Energy efficient lighting systems,

BMS, process optimisation, SWH,

insulation

Energy substitution

Renewables and/or Fuel Switching

Solar PV / Wind

Converting electric boilers

to gas-fired

Regeneration /

own generation

Biomass / Landfill / Biodigestor gas-to-

electricity

Services and Infrastructure

Page 21: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

21

Access and Transport

Page 22: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Access and Transport

Issues / Challenges:

• Road network has capacity constraints

• Roads, rail and rivers are barriers to movement for those on foot

• Stations – difficult to access, unsafe, inconvenient

• Existing NMT routes are not yet part of extensive broader network

Need for significant initiatives to change status quo

Policy focus on:

• Public transport and NMT

• Intensification of land use around particular points and in identified zones

Greater acceptance of alternatives

Challenge in establishing new standards

22

Page 23: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

23

Current services and infrastructure

Page 24: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

24

Barriers for pedestrians

Page 25: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Access and Transport: The Future

• Non Motorised Transport facilities, requiring supportive urban design and land use activity

• Public transport (combination of rail and bus)

• Minimal penetration by private vehicles

• New east-west routes (Station Rd and Berkley Rd to address barrier to achieving one TRU-Park

25

Page 26: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

26

Heritage

Page 27: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Contextual informants: Material culture: Buildings and heritage sites

Preliminary Heritage Informants:

Page 28: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Heritage: Preliminary responses

• Conserve, protect, enhance and integrate tangible heritage and sites into planning process.

• Recognise and integrate the heritage value of the landscape as a whole and historical narrative associated with it.

• Integrate and further explore notions of redress and acknowledgement of apartheid and pre-apartheid historical wrongs.

• Explore mechanisms and opportunities for redress and further cultural acknowledgement.

28

Page 29: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

29

Economic Context

Page 30: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

The site bridges between two systems of economic activity1. Large format industrial2. Smaller scale mix of business

activities

Both are well established and demonstrate the desirability of the area from the perspective of a range of operators

Note: Local retail located within Voortrekker and Main Road Corridors and in Pinelands

Page 31: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

31

Housing Context

Page 32: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Mix of detached, semi’s, row housing, 2-4 storey flats, duplex’s, mixed use arrangements

Page 33: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Housing: Observations

• Highest gross densities in Maitland and Observatory: 19-25du/ha

• With the exception of Pinelands and Sybrand Park, between 30% and 72% of HH’s earn < R3200 / month

• High percentage of HH’s are renting

• With the exception of Pinelands and Sybrand Park there is generally good integration of land uses

Low income households and transitory residents are choosing to locate in the area - choice of affordable accommodation close to jobs, PT, schools etc.

Page 34: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

34

Social Infrastructure

Page 35: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

The total population of212 000 people live within 5km radius from the TRU-Park site area.[one dot=one person]

0-7 250398-18 2970519-35 7423036-65 6733466+ 15444

5km radius

Page 36: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

The TRU-Park site is surrounded by very diverse socio-economic conditions.

5km

1km

3km

Page 37: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

The TRU-Park site is surrounded by very diverse socio-economic conditions.

5km

1km

3km

Page 38: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

TRU-Park is sitting between two patterns of the distribution of social facilities.

Page 39: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

TRU-Park site offers a

great opportunity for

the provision of

additional social

infrastructure.

Locating key

educational, sport

and culture facilities

within the site will

activate the park,

provide passive

surveillance and

encourage movement

through the park.

Page 40: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

40

Page 41: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

41

Spatial Structure

Page 42: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

The TRU-Park site is a fracture, sitting in between continuous urban and introvert islands.

TRU-Park site offers the

opportunity to bridge

this fracture. The future

development around

the different

neighbourhoods could

define the park edges

and, in doing so,

re-establish the

continuity amongst

the neighbourhoods.

Page 43: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Large infrastructure elements and open spaces are often acting as barriers.

Reduce the impact of

large infrastructure as

barrier between

different

neighbourhoods, landscape and water.

Re-establish direct

relation between

people and

landscape.

Page 44: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Enclaves with controlled access and lack of access to sites further inhibit movement

Reduce the

impermeability caused

by enclaves and increase safety

by introducing

some key routes and

converting their perimeter edges into

active interfaces.

Page 45: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Invisible walls due to the discontinuity of the movement network.

Reduce the

discontinuity of the

movement network

by inserting

strategic links.

Page 46: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at
Page 47: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Strategically located

land parcels outside of

the site have the

potential together, to

unlock opportunity to

use the river corridor as

a ‘seam’ to restructure

the sub district

Page 48: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Fragmented under-utilised and open spaces.

Taking advantage of

the porosity of the site

and surroundings, the

open spaces could

work as an ecological

system reconnecting

Table mountain with

the Lagoon,

overlapping with a

system of public

spaces linked by a nmt

network.

Page 49: TWO RIVERS URBAN PARK May 2016 - Western Cape€¦ · Moving forward: • Room to improve current hydrological and ecological functioning of some wetlands, • Create corridors at

Thank You

49