© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Tweddle Place Dry Pond Expansion & 86 / 88 Street Cul-De-Sacs Sewer Upgrades
Construction Open House
1
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Agenda
•Introduction of Project Team
•Project Description
•Construction Impacts
•Planned Detours
•Project Schedule
•Concurrent Construction Projects
•Property Damage Claim Process
2
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Project Team
•Project Owner: City of Edmonton - Utilities Infrastructure
•Engineering Consultant: Stantec Consulting Ltd.
•General Contractor: Weinrich Contracting Ltd.
3
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Project Locations
4
Tweddle Place Dry Pond
86 & 88 Street Cul-de-Sacs
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Project Description
•Expand existing Tweddle Place Dry Pond
•Remove existing earth berm
•Install new sewers, inlets
•Create pathway detour during construction
•Restore pathway after construction along 91 Street, with new connections to neighbourhood pathways and sidewalks
•Install vegetated sound barrier along dry pond
•Install new sewers and restore surface in cul-de-sacs of 86 Street and 88 Street, north of 40 Avenue
5
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Construction Impacts
6
•Construction noise - noise bylaw will be adhered to
•Sidewalk and one-lane road closures on 86 & 88 Street cul-de-sacs
•Temporary full road closure for connection on 40 Avenue (TBC)
•No street parking near construction sites
•Home access will be maintained
•Emergency access will be maintained
•Waste disposal services to be maintained
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Detours
•Multi-use Trail to be closed and bike/pedestrian traffic to be re-routed
•Detour to begin Summer 2017 and last until late summer 2018
7
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Project Schedule
Project Startup: July 2017
Dry Pond Construction•Initial Berm Excavation:•Underground Work in Pond:
July - September 2017 July – October 2017
•Remaining Pond Excavation: October 2017 - March 2018 •Sound Barrier Installation:•Pathway Restoration:
May - August 2018 June – August 2018
•Landscaping/Site Restoration: August – November 2018
86/88 Street Sewer Construction•Underground Construction: July - August 2017•Road Restoration: August – September 2017
8
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.20179
Rendering of Completed Dry Pond Expansion
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017 10
Sample Dry Pond in South Campus
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Current Millbourne Flood Mitigation Projects
11
Tweddle Place Storm & Sanitary Sewer Upgrades Project AreaConstruction:2015 - 2021
Malcolm Tweddle & Edith Rogers Dry Pond and Sewer Improvements Project AreaConstruction: 2017 - 2023
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Malcolm Tweddle & Edith Rogers Dry Ponds and Sewer Improvements Project
12
Dry Ponds Construction: Oct 2017 - July 2018
Sewer Improvements Construction:2018 or 2019 - 2023
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Concurrent Construction Projects
13
88 St. Cul-de-sac
Malcolm Tweddle & Edith Rogers Dry Pond:Oct 2017 - July 2018- Tree removals/relocations tentatively mid June to July- ATCO gas line relocation tentatively July or August- Public information session likely week of September 11
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
88 Street Cul-de-Sac
14
• New storm sewer and catch basins to collect flows from the cul-de-sac and alleyways.
• Includes restoration of landscaping, concrete and asphalt in the street and alleyways.
• Project underway, continuing into July.
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Building Condition Assessment
• If you received a pre-construction assessment in 2015 or 2016, you will receive a post-construction assessment
• 2015 construction on 89 St & south of 42A Ave: Post-construction assessment reports will be delivered to homeowners by the end of June 2017.
• 2016 construction on 89 St & 44 Ave or 88 St south of 44 Ave: Post-construction assessments will be conducted in September 2017 after the construction is completed and will be provided.
• 2017 construction in the cul-de-sacs of 86 St & 88 St: Pre-construction assessments are ongoing, post-construction assessments will only be done if requested.
15
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
• Did damage occur?
• Identify the type of damagea. Damage to exterior property: Contact Project Managerb. Damage inside your home: Submit a claim
• Post-construction assessment A post-construction assessment will be done if requested.
• For more information visit: https://www.edmonton.ca/programs_services/damage-or-injury-claims.aspx
Property Damage Claims Process
16
© City of Edmonton | Integrated Infrastructure Services | Utility Infrastructure Delivery | Tweddle Place Dry Pond Open House | 06.07.2017
Thank You
Thank you for your attendance and we welcome any questions you have.
Tweddle Place Storm and Sanitary Sewer UpgradesGary Fei, P.Eng.Project Manager - Utility Infrastructure Delivery, City of [email protected]
Malcolm Tweddle & Edith Rogers Dry Pond & Sewer ImprovementsDarwin Smith, P.Eng.Project Manager - Utility Infrastructure Delivery, City of [email protected]
17