Upload
alanandrew
View
217
Download
0
Embed Size (px)
Citation preview
8/9/2019 TW - Project Methodology
1/4
Afour Intelligent Solutions pg. 1 2010-06-29
qwertyuiopasdfghjklzxcvbnmqwerty
uiopasdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfghjklzx
cvbnmqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmrtyuiopasdfghjklzxcvbn
mqwertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyuiopas
Project Methodology
2010-06-29
Alan B. Andrew
8/9/2019 TW - Project Methodology
2/4
Afour Intelligent Solutions pg. 2 2010-06-29
Copyright 2010, Afour Intelligent Solutions CC. All rights reserved. Unless otherwise noted,
the contents of this document may not be reproduced, transmitted, transcribed, translated,stored in a retrieval system, or translated into any language in any form without the written
permission of Afour Intelligent Solutions CC.
For information contact:
Afour Intelligent Solutions CC.3 Wilmeria Street
Lambton, 1401
Germiston, Gauteng
South Africa
011-827-2131
8/9/2019 TW - Project Methodology
3/4
Afour Intelligent Solutions pg. 3 2010-06-29
Overview
Introduction This document contains information about the Afour Intelligent Solutions
documentation project life cycle methodology. It lists the summarised methodology
cycle from the pre-engagement meeting with a potential client all the way through
to delivery.(See Project Life Cycle document for full detail questionnaire and list.)
The phases of the documentation life cycle methodology include:
Definition,
Design,
Production, and
Delivery.
8/9/2019 TW - Project Methodology
4/4
Afour Intelligent Solutions pg. 4 2010-06-29
Definition
1. Pre-engagement Meeting 1st time meeting. Submit questionnaire.
2. General Project Issues Establish exact requirement.3. Documentation Issues Establish type of document; User Manual, Tutorial, Online Help, etc
Require Defaultmanual or a How-to manual or Both?4. Audience Analysis Establish the User Type.5. Publication Issues Establish type of document distribution.6. Technical Assistance Establish the project Sponsor (Decision Maker)?
Establish the SMEs (Subject Matter Experts) for this project?
Establish access to system software.
7. The Review Process Establish the standard review process?8. Scheduling Establish timeline, review cycles, slippage, milestones, changes and updates.9. Administrative Issues Establish project name, contact person, status reporting, invoicing, system
access.
Analyse software system.
Using questionnaire & analysis, submit quotation.
Design
10. Kick-off meeting Confirm the objectives, and the structure.11. Determine the Theme Design When client has own standards requirement.
Company standards (logos, branding, theme, colours, fonts )?
Style sheets?
Templates to use for this project?
Copyright notices?
12. Estimate size and capability ofproject software.
Ensuring we understand both the visible and the invisible functionality, if
any.
13. Determine the functionaldesign
A list of features, benefits and business processes.
14. Manage user errors How do you want this scenario managed?15. Detailed system analysis Detailed analysis and demo/training of system software for TW by SMEs16. Prototype Prepare and present short prototype to illustrate sample of project
material.
Production
17. Write the content Using all gathered information and materials, plan and author thedocumentation content.
18. Editing Submit and edit reviews.
Delivery
19. Submit final output Establish form & target.20. Infrastructure Establish Document management method.