    1. TVM In-line Inspection ProcedureIn-line inspection at factories shall be performed per PO when 20% of the goods are

    ready.

    Factory shall invite TVM QA for in-line inspection for every PO 3 days before

    inspection date, using the chart TVM Invitation for in-line / nal inspection (See

    Appendix 1).

    For in-line inspection QC shall prepare and take the following to the factories:

    blank inspection form of the PO (See Appendix 2)

    printed PO

    printed MC

    size set comments (received from TVM merchandiser)

    photo sample comments (received from TVM merchandiser)

    photo sample

    any concerned comment, detail attached to PO system

    In-line inspection steps at factories:

    based on 2.5 AQL standard (See Appendix 3) choose samples randomly from

    different operation stages (sewing, trimming, nishing, packing etc.) and check

    for fabric, style, seam quality, workmanship, print, garment labels, size, packaging

    way, materials

    ll in manually TVM inspection form with ndings, request factory to sign, leave

    copy to factory, keep original for TVM QA le

    ll in manually actual garment measurements, leave copy to factory, keep original

    for TVM QA department le (See Appendix 4)

    collect and attach to a sheet samples of garment labels used in production

    take one ready garment sample for wash test, take it to TVM ofce, wash it, ll in

    wash test report, le it (See Appendix 5)

    take production fabric swatch for fabric weight test, measurement result ll in

    TVM Wash/Weight test report, le it (See Appendix 6)

  • 7/30/2019 TVM QA Procedures

    3/143

    2. TVM Final Inspection ProcedureFinal inspection at factories shall be performed per PO, when 100% of the goods

    are nished (packed in marked cartons) or in urgent case if min 80% of the goods

    are nished (packed in marked cartons).

    Factory shall invite TVM QA for nal inspection for every PO 3 days before

    inspection date, using the chart TVM Invitation for in-line / nal inspection (See

    Appendix 1).

    For nal inspection QA shall prepare and take the following to the factories:

    In-line inspection report

    blank nal inspection form of the PO See Appendix 2

    printed PO

    printed MC

    size set comments (received from TVM merchandiser)

    photo sample comments (received from TVM merchandiser)

    photo sample

    any concerned comment, detail attached to PO systemFinal inspection steps at factories:

    count total carton quantity to ensure 100% or min 80% of the goods are ready

    cartons must be sealed and marked

    choose cartons randomly to inspect based on 2.5 AQL Normal level standard

    (See Appendix 3), mark the chosen cartons (sign or stamp) do not leave the

    chosen cartons unattended until inspection is started

    select garments to inspect randomly from cartons

    inspect garments for fabric, style, print, seam quality, workmanship, garment

    labels, size, packaging way, packaging materials check cartons for marking details

    ll in manually inspection form with ndings, request factory to sign, leave copy

    to factory, keep original for TVM QA department le

    ll in manually actual garment measurements, leave copy to factory, keep original

    for TVM QC department le

    make photos of defects found, garment packing, carton marking

    collect original sample and attach to a sheet from: care label, hangtag, main

    label, size label, patch, stickers, license tag, price tag, etc.

    take one fully packed garment as reference production sample from every PO

    inspected

    in case of rejection factory shall 100% recheck the entire lot, correct the defects

    and present the goods for re-inspection.

  • 7/30/2019 TVM QA Procedures

    4/144

    3. TVM Inspection Report Filing/Data-entry Procedure

    In-line inspection reports led in TVM ofce:

    in-line inspection reports should be led in dossiers per customer (eg. Auchan,

    January-June, 2007)

    the led in-line inspection report shall contain:

    manually lled in-line inspection form manually lled actual measurements chart

    wash/weight test results form

    printed MC

    sheet containing attached samples of production garment labels

    the washed sample shall be stored in ofce, tagged with full identication of the PO

    the round fabric swatch measured for weight should be attached to Wash/Weight

    test report and led in the dossier

    Final inspection reports led in TVM ofce:

    reports should be led in dossiers per customer, date to be marked (eg. Auchan,

    January-June, 2007)

    a full nal inspection report shall contain:

    in-line inspection report of the PO lled in manually

    wash/weight test results form

    nal inspection report of the PO lled in manually

    printed MC

    actual garment measurements made at in-line, nal inspection

    sheet containing attached samples of care label, hangtag, main label, size label,patch, stickers, license tag, price tag, etc. of the PO

    the reference production sample shall be stored in ofce, tagged with full

    identication of the PO

    Inspection reports entering into TVM PO System:

    Both in-line inspection and nal inspection ndings shall be entered into the QA

    report of the relevant PO in the POSystem See Appendix 7 and Appendix 8

    Wash, weight and measurement ndings shall be scanned and attached to the

    relevant in-line or nal inspection report Photos of the defects, packed garment, carton marking shall be attached to the

    relevant in-line or nal inspection report See Appendix 9.1 and 9.2

  • 7/30/2019 TVM QA Procedures

    5/145

    4. Tvm - Minor, Major And CriticalDefects

    Minor defect:

    Does not affect the durability or the usability but affects the outlook of

    the garment

    Is unlikely to result in customer complaint or return

    Usually is observed by inspector, but may be overlooked by the

    customer

    Major defect:

    Affects the durability or the usability and the outlook of the garment

    With big possibility will result in customer complaint or return

    Usually is observed by inspector and by customer during use

    Critical defects:

    Is a deviation from delivery requirements which results the product not

    being received and/or distributed by Customers stores

    Results hazardous or unsafe conditions when using the product

    In case of 1 occurrence of critical defect the entire lot has to be

    rejected

    If the number of rejected units exceed the acceptance level (for major andminor defects) the entire lot will be rejected.

    A 100% re-inspection will follow to sort out all defects observed.

    If a garment has more major faults, it is counted as one rejected unit.

  • 7/30/2019 TVM QA Procedures

    6/146

    5. Wash Tests Procedure withAutomatic Home WashingMachine (Miele, Siemens, Bosch, etc.)

    1. Samples must be always turned INSIDE OUT

    2. Washing machine must be FULLY LOADED (app 5 kg clothes)

    3. If no samples enough, MAKE WEIGHTS (50x50cm White Cotton

    fabric swatches) must be loaded with the samples, until full load

    achieved

    4. Half plastic glass PERSIL washing powder must be put in the relevant

    chamber of the washing machine drawer

    5. Machine set according to care label washing instructions

    . Temperature in majority of the cases 40 C Degrees. Normal washing cycle in majority of the cases, which is app 1 hour

    6.After washing, samples to be line dried (not tumble dried)

    7. After drying samples to be checked for appearance after wash:

    . Fabric: Twisting, Shrinking, Color Fastness

    . Print: coming off, cracking, fading, glitter coming off, sticking, etc.

    . Sticker: coming off, bubbling, breaking, wrinkling, color fading

    . Embroidery: thread coming off, color fastness

    . Rhine Stones: coming off, fading

    . Rivets: coming off, sharp edges

    . Badges: thread coming off, color fastness, fading, fraying

    . Labels: color fastness, fraying

    . All further embellishments: appearance after wash

  • 7/30/2019 TVM QA Procedures

    7/14

    Appendixes

    www.tvmania.de

  • 7/30/2019 TVM QA Procedures

    8/148

    Appendix 1 Invitation form for in-line/nal inspection sent bysuppliers to TVM QA

    Appendix 2 Blank in-line/nal inspection form printed fromPO System for the relevant PO

  • 7/30/2019 TVM QA Procedures

    9/149

    Appendix 3 TVM AQL Inspection Standard

    Appendix 4 Measurement chart completed with actualmeasurement data

  • 7/30/2019 TVM QA Procedures

    10/1410

    Appendix 5 TVM internal wash test report attached toinspection report in PO System

  • 7/30/2019 TVM QA Procedures

    11/1411

    Appendix 6 Weigh measurement report attached to inspectionreport in PO System

  • 7/30/2019 TVM QA Procedures

    12/1412

    Appendix 7 In-line inspection report entered into PO System

    Appendix 8 Final inspection report entered into PO System

  • 7/30/2019 TVM QA Procedures

    13/1413

    Appendix 9.1 Photos of defects, measurements attached toTVM Inspection report in PO System

  • 7/30/2019 TVM QA Procedures

    14/14

    Appendix 9.2 Photos of packed garments, carton marking,measurements attached to TVM Inspectionreport in PO System