KGL 2nd Floor Ceiling Remov al
Yale Kline Geology Code Upgrades Project
New Hav en, CT
Turner Project # 201026
Updated Nov ember 6, 2020
What: KGL Lobby Ceilings – Addition of Multiple Access Doors
Where: Levels 1, 2, and 3 (See plan attached. Typical for all floors)
Start Date: 11/23/2020
Impact: Limited access near access points when work is in progress. Temporary access doors will be installed to
close ceiling at access points as necessary.
Contacts:
Vic Hoyecki – Project Superintendent – (203)943-2950
Pam Buonocore – KGL Operations Manager – (203)915-4651
Mark Veroneau – Yale Associate Project Manager – (475)241-2476
F
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
FKGL
GKGL
AKGL
MINERALOGY COLLECTION105
VPTEACHING
COLLECTION122B
VESTIBULE191G
TEACHING LAB120
COLL STOR113B
FAC OFF112
FAC OFF111
FAC OFF110
FAC OFF109
RESEARCH LAB113
RES LAB114
RES LAB108
PD OFF107
STOR107A
PD OFF106A
FAC OFF106B
OFF SV106
CORRIDOR190
ELEC190G
ELEC190H
W ASH RM190J
GSTU OFF115C
GSTU OFF115B
GSTU OFF115A
INT CORR115
FAC OFF117B CONF RM
117C
INT CORR117
PD OFF117A
MEN118
JAN190D
CLASSROOM116
OFF SV103
CLASSROOM119
TELCOM190N
STOR191B
TELCOM190F
ELEV190E
TOILET H/C191C
W OMEN H/C104
CONF RM102
CONF SV101
KITCH101A
ELEC190M
STAIR 1190S
STAIR 3191S
TEACH LAB122
CORRIDOR193
STAIR 2193S
ELEC193A
STAIR 5123S
CORRIDOR191
EXHIBIT191D
LECTURE123
RESLB SV126A
TELECOM192B
MAIL191E
STOR123B
RES LAB126
PD OFF125
INT CORR124A
FAC OFF124
CORRIDOR192
STOR123D
STOR123C
VESTIBULE191A
W ASH RM190K
STOR190L
AR
CH
ITE
CT
UR
AL
P
RO
JE
CT
LIM
IT L
INE
AR
CH
ITE
CT
UR
AL
P
RO
JE
CT
LIM
IT L
INE
A7.01K
M3
4KGL
6KGL
TO
RE
MA
IN
TO
RE
MA
IN
EAKGL
DAKGL
REFER TO YPM SHEET A2.13
SHAFT G
SHAFT F
SHAFT E
SHAFT A
SHAFT B
SHAFT D
A7.03K
M5
REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED
FOR FIRE PROTECTION SYSTEM INSTALLATION
A7.02K
M7
A7.04K
M7
ACP-2
+ 9' - 8" A.F.F.
GW B-2
+ 8' - 6" A.F.F.
DFS-1
+ 9' - 10" A.F.F.
815 SF
PLAZA191C
A6.02K
C7
ETR
+ 9' - 4" A.F.F.
ACP-2
+ 8' - 6" A.F.F.
COLLECTION STORAGE113C
GW B-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 10' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 9' - 8" A.F.F.
RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS
SURROUNDING CENTRAL STAIR
ETR
+ 9' - 10" A.F.F.
DEMO AND PATCH SIX (6)MIDDLE LIGHT FIXTURES
REMOVE AND REPLACE SEVEN (7) W ALL W ASH FIXTURES
A2.10K
L12
NEW CEILING
EXISTING CEILING TO REMAIN
ACP-2
+ 9' - 4" A.F.F.
RCP CEILING TYPE LEGEND:
RCP LEGEND:
- 2'X4' TROFFER LIGHT
- RECESSED DOW N LIGHT
- LINEAR PENDANT -DIRECT/INDIRECT
- 1'X4' TROFFER LIGHT
- DIRECTIONAL TASK LIGHT
- PROJECTION SCREEN
GW B-1ACOUSTIC GYPSUM PLASTER
GW B-2GW B CEILING
ACP-22' x 4' ACP LAY-IN CEILING
AREA OUTSIDE SCOPE OF W ORK
ACP-32' x 2' ACP LAY-IN CEILING
GW B-4KU404 2 HOUR RATED CEILING
DFS-1DIRECT-APPLIED FINISH SYSTEM
PLS-1PLASTER SKIM COAT ON BLUEBOARD
ETREXISTING CEILING TO REMAIN
ETR-1EXISTING CEILING, PNTD
EXISTING EXPOSED W AFFLE SLABS
- LINEAR PERIMETER COVE
14KGL
CKGL
EQ 4' - 0" EQ
EQ
4' -
0"
EQ
EXIT SIGN
EMERGENCY LIGHT FIXTURE
FIRE SPRINKLER HEAD
V.I.F.2' - 0"2' - 0"
2' -
0"
2' -
0"
2' -
0"
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
As indicated
6/1
1/2
020 6
:41:0
5 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
A2.10K
ECS
6/12/202017081006 A2.10K
FIRST FLOOR RCP
BID DOCUMENTS
1/8" = 1'-0"M1
1st FLOOR REFLECTED CEILING PLAN
GENERAL NOTES - CEILING PLAN
1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING
2 PROVIDE PAINTED MRGWB IN WET AREAS.
3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.
4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.
5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.
6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.
NOTE:
NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPfp W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.
1/4" = 1'-0"L12
TYPICAL PARTIAL CORRIDOR CEILING TILE LAYOUT
NO. DATE REVISION
017
KGL 1st Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code UpgradesProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH
Typical 2' by 2' access door cut inceiling for MEP work. Actuallocations to be determined in thefield as needed.
R.C.P. = 8' - 0"
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
FKGL
GKGL
AKGL
VERTEBRATEPALEONTOLOGY
COLLECTION218
CORRIDOR293C
JOUR OFF217
FAC OFF216
FAC OFF214
FAC OFF211
FAC OFF210
RES LAB209
RES LB SV219A
RES LB SV219B
RES LAB219
ELEC290G
ELEC290H
INACTIVE290J
RES LAB215 INSTA LAB
213
STAIR 1290S
INACTIVE290K
KITCH290L
ELEC290M
CORRIDOR290
RES LAB219C
VEST219D
PD OFF220
RES LAB223
JAN291D
MEN225
OFFICE227
PD OFF221B
RES LAB221
RES LAB221A
TELECOM290F
CONF RM208A
FAC OFF208
FAC OFF207
RES LAB206
RES LAB205
OFFICE204
OFFICE203
OFFICE202
OFFICE201
STOR206A
TELECOM290N
EXHIBIT291B
SEMINAR226
EXHIBIT291C
COMP/ TCH228
ATRIUM CORRIDOR291
STAIR 3291S
GSTU OFF230
GSTU OFF231
GSTU OFF229
CORRIDOR292
GSTU OFF232
GSTU OFF233
GSTU OFF235
GSTU OFF234
CORRIDOR293
GSTU OFF237
EXHIBIT291E
LOUNGE258
W OMEN258A
STAIR 2292S
ELEC292A
GSTU OFF239
GSTU OFF238
GSTU OFF240
GSTU OFF241
GSTU OFF242
GSTU OFF243
GSTU OFF244
LOUNGE257
EXHIBIT291F
TELECOM293B
GSTU OFF246
GSTU OFF245
GSTU OFF247
STU OFF254
CORRIDOR294
GSTU OFF252
GSTU OFF253
GSTU OFF256
GSTU OFF248
GSTU OFF250
GSTU OFF249
GSTU OFF251
ELEV290E
A7.01K
H7
4KGL
6KGL
EAKGL
DAKGL
REFER TO YPM SHEET A2.21
SHAFT G
SHAFT F
SHAFT E
SHAFT A
SHAFT B
SHAFT D
A7.06K
M7
ACP-2
+ 9' - 8" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
ACP-2
+ 8' - 0" A.F.F.
A2.10K
L12
REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED FOR FIRE PROTECTION SYSTEM INSTALLATION
RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS
SURROUNDING CENTRAL STAIR
RCP CEILING TYPE LEGEND:
RCP LEGEND:
- 2'X4' TROFFER LIGHT
- RECESSED DOW N LIGHT
- LINEAR PENDANT -DIRECT/INDIRECT
- 1'X4' TROFFER LIGHT
- DIRECTIONAL TASK LIGHT
- PROJECTION SCREEN
GW B-1ACOUSTIC GYPSUM PLASTER
GW B-2GW B CEILING
ACP-22' x 4' ACP LAY-IN CEILING
AREA OUTSIDE SCOPE OF W ORK
ACP-32' x 2' ACP LAY-IN CEILING
GW B-4KU404 2 HOUR RATED CEILING
DFS-1DIRECT-APPLIED FINISH SYSTEM
PLS-1PLASTER SKIM COAT ON BLUEBOARD
ETREXISTING CEILING TO REMAIN
ETR-1EXISTING CEILING, PNTD
EXISTING EXPOSED W AFFLE SLABS
- LINEAR PERIMETER COVE
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
1/8" = 1'-0"
6/1
1/2
020 6
:41:1
7 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
A2.20K
ECS
6/12/202017081006 A2.20K
SECOND FLOOR RCP
BID DOCUMENTS
1/8" = 1'-0"M1
2nd FLOOR REFLECTED CEILING PLAN
GENERAL NOTES - CEILING PLAN
1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING
2 PROVIDE PAINTED MRGWB IN WET AREAS.
3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.
4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.
5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.
6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.
NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPFP W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.
NO. DATE REVISION
018
KGL 2nd Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code Upgrades ProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH
Typical 2' by 2' access doorcut in ceiling for MEP work.Actual locations to bedetermined in the field asneeded.
SD
SD
SD
SD
SD
SD
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
FKGL
GKGL
AKGL
INSSTR LAB321B
STOR331CB
STOR321CA
INSTR LAB321C
PREP RM321D
DARK RM321E
OFFICE321A
RESLB SV321
RES LAB322
RES LAB322B
RES LAB325A
RES LAB325
OFFICE327B
RES LAB327A
RESLB SV327
PREP RM327C
W OMEN330A
RES LAB332A
RES LAB332B
RES LAB332D
RES LAB334A
RESLB SV333
RESLB SV332C
RESLB SV332
JAN329
RES LAB SV334
RES LAB334C
CORRIDOR392
STAIR 2392S
FAC OFF336
VISIT OFF337
OFFICE339
RES LAB342
RESLB SV392D
RESLB SV392E
TELCOM392F
EXHIBIT391F
RESLB SV392G
STOR392H
RES LAB340
MEN346
STAIR 3391S
CORRIDOR391
CORRIDOR390
PD OFF318
RES LAB317
STAIR 1390S
ELEC390M
PD OFF311A
STOR311
RESCI OFF308
KITCH307
TELECOM390N
CIRCUL328A
STUDY328
ELEV390E
TELECOM390F
PD OFF326
RES LAB324
CONST TMP324A
RESCI OFF323
ELEC390G
ELEC390H
INACTIVE390J
E FAC OFF320
FAC OFF319
FAC OFF316
RES LAB315
RES LAB315A
INACTIVE390K
RES LAB313
RES LAB312B
RES LAB312
FAC OFF310
FAC OFF309
PD OFF306
FAC OFF305
OFFICE304
OFFICE303
OFFICE302
OFFICE301
FAC OFF345
RES LAB344
RES LAB343
ELEC392A
STOR392C
EXHIBIT391E
EXHIBIT391B
FAC OFF314
OFF SV390L
COPY311B
EXHIBIT391C
4KGL
6KGL
A6.02K
C11
EAKGL
DAKGL
SHAFT G
SHAFT F
SHAFT E
SHAFT A
SHAFT B
SHAFT D
ACP-2
+ 8' - 0" A.F.F.CORRIDOR
390
ACP-2
+ 8' - 0" A.F.F.
A2.20K
M1
REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED FOR FIRE PROTECTION SYSTEM INSTALLATION
RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS
SURROUNDING CENTRAL STAIR
RCP CEILING TYPE LEGEND:
RCP LEGEND:
- 2'X4' TROFFER LIGHT
- RECESSED DOW N LIGHT
- LINEAR PENDANT -DIRECT/INDIRECT
- 1'X4' TROFFER LIGHT
- DIRECTIONAL TASK LIGHT
- PROJECTION SCREEN
GW B-1ACOUSTIC GYPSUM PLASTER
GW B-2GW B CEILING
ACP-22' x 4' ACP LAY-IN CEILING
AREA OUTSIDE SCOPE OF W ORK
ACP-32' x 2' ACP LAY-IN CEILING
GW B-4KU404 2 HOUR RATED CEILING
DFS-1DIRECT-APPLIED FINISH SYSTEM
PLS-1PLASTER SKIM COAT ON BLUEBOARD
ETREXISTING CEILING TO REMAIN
ETR-1EXISTING CEILING, PNTD
EXISTING EXPOSED W AFFLE SLABS
- LINEAR PERIMETER COVE
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
1/8" = 1'-0"
6/1
1/2
020 6
:41:2
8 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
A2.30K
ECS
6/12/202017081006 A2.30K
THIRD FLOOR RCP
BID DOCUMENTS
1/8" = 1'-0"M1
3rd FLOOR REFLECTED CEILING PLAN
GENERAL NOTES - CEILING PLAN
1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING
2 PROVIDE PAINTED MRGWB IN WET AREAS.
3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.
4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.
5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.
6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.
NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPfp W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.
NO. DATE REVISION
019
KGL 3rd Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code UpgradesProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH
Typical 2' by 2' accessdoor cut in ceiling forMEP work. Actuallocations to bedetermined in the fieldas needed.