4
KGL 2nd Floor Ceiling Remov al Yale Kline Geology Code Upgrades Project New Haven, CT Turner Project # 201026 Updated Nov ember 6, 2020 What: KGL Lobby Ceilings – Addition of M ultiple Access Doors W here: Levels 1, 2, and 3 (See plan attached. Typical for all floors) Start Date: 11/23/2020 Impact: Limited access near access points when work is in progress. Temporary access doors will be installed to close ceiling at access points as necessary. Contacts: Vic Hoyecki – Project Superintendent – (203)943-2950 Pam Buonocore – KGL Operations M anager – (203)915-4651 M ark Veroneau – Yale Associate Project M anager – (475)241-2476

Turner Project # 201026 Updated November 6, 2020

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Turner Project # 201026 Updated November 6, 2020

KGL 2nd Floor Ceiling Remov al

Yale Kline Geology Code Upgrades Project

New Hav en, CT

Turner Project # 201026

Updated Nov ember 6, 2020

What: KGL Lobby Ceilings – Addition of Multiple Access Doors

Where: Levels 1, 2, and 3 (See plan attached. Typical for all floors)

Start Date: 11/23/2020

Impact: Limited access near access points when work is in progress. Temporary access doors will be installed to

close ceiling at access points as necessary.

Contacts:

Vic Hoyecki – Project Superintendent – (203)943-2950

Pam Buonocore – KGL Operations Manager – (203)915-4651

Mark Veroneau – Yale Associate Project Manager – (475)241-2476

Page 2: Turner Project # 201026 Updated November 6, 2020

F

16KGL

14KGL

12KGL

10KGL

8KGL

7KGL

5KGL

3KGL

2KGL

1KGL

BKGL

CKGL

DKGL

EKGL

FKGL

GKGL

AKGL

MINERALOGY COLLECTION105

VPTEACHING

COLLECTION122B

VESTIBULE191G

TEACHING LAB120

COLL STOR113B

FAC OFF112

FAC OFF111

FAC OFF110

FAC OFF109

RESEARCH LAB113

RES LAB114

RES LAB108

PD OFF107

STOR107A

PD OFF106A

FAC OFF106B

OFF SV106

CORRIDOR190

ELEC190G

ELEC190H

W ASH RM190J

GSTU OFF115C

GSTU OFF115B

GSTU OFF115A

INT CORR115

FAC OFF117B CONF RM

117C

INT CORR117

PD OFF117A

MEN118

JAN190D

CLASSROOM116

OFF SV103

CLASSROOM119

TELCOM190N

STOR191B

TELCOM190F

ELEV190E

TOILET H/C191C

W OMEN H/C104

CONF RM102

CONF SV101

KITCH101A

ELEC190M

STAIR 1190S

STAIR 3191S

TEACH LAB122

CORRIDOR193

STAIR 2193S

ELEC193A

STAIR 5123S

CORRIDOR191

EXHIBIT191D

LECTURE123

RESLB SV126A

TELECOM192B

MAIL191E

STOR123B

RES LAB126

PD OFF125

INT CORR124A

FAC OFF124

CORRIDOR192

STOR123D

STOR123C

VESTIBULE191A

W ASH RM190K

STOR190L

AR

CH

ITE

CT

UR

AL

P

RO

JE

CT

LIM

IT L

INE

AR

CH

ITE

CT

UR

AL

P

RO

JE

CT

LIM

IT L

INE

A7.01K

M3

4KGL

6KGL

TO

RE

MA

IN

TO

RE

MA

IN

EAKGL

DAKGL

REFER TO YPM SHEET A2.13

SHAFT G

SHAFT F

SHAFT E

SHAFT A

SHAFT B

SHAFT D

A7.03K

M5

REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED

FOR FIRE PROTECTION SYSTEM INSTALLATION

A7.02K

M7

A7.04K

M7

ACP-2

+ 9' - 8" A.F.F.

GW B-2

+ 8' - 6" A.F.F.

DFS-1

+ 9' - 10" A.F.F.

815 SF

PLAZA191C

A6.02K

C7

ETR

+ 9' - 4" A.F.F.

ACP-2

+ 8' - 6" A.F.F.

COLLECTION STORAGE113C

GW B-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 10' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 9' - 8" A.F.F.

RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS

SURROUNDING CENTRAL STAIR

ETR

+ 9' - 10" A.F.F.

DEMO AND PATCH SIX (6)MIDDLE LIGHT FIXTURES

REMOVE AND REPLACE SEVEN (7) W ALL W ASH FIXTURES

A2.10K

L12

NEW CEILING

EXISTING CEILING TO REMAIN

ACP-2

+ 9' - 4" A.F.F.

RCP CEILING TYPE LEGEND:

RCP LEGEND:

- 2'X4' TROFFER LIGHT

- RECESSED DOW N LIGHT

- LINEAR PENDANT -DIRECT/INDIRECT

- 1'X4' TROFFER LIGHT

- DIRECTIONAL TASK LIGHT

- PROJECTION SCREEN

GW B-1ACOUSTIC GYPSUM PLASTER

GW B-2GW B CEILING

ACP-22' x 4' ACP LAY-IN CEILING

AREA OUTSIDE SCOPE OF W ORK

ACP-32' x 2' ACP LAY-IN CEILING

GW B-4KU404 2 HOUR RATED CEILING

DFS-1DIRECT-APPLIED FINISH SYSTEM

PLS-1PLASTER SKIM COAT ON BLUEBOARD

ETREXISTING CEILING TO REMAIN

ETR-1EXISTING CEILING, PNTD

EXISTING EXPOSED W AFFLE SLABS

- LINEAR PERIMETER COVE

14KGL

CKGL

EQ 4' - 0" EQ

EQ

4' -

0"

EQ

EXIT SIGN

EMERGENCY LIGHT FIXTURE

FIRE SPRINKLER HEAD

V.I.F.2' - 0"2' - 0"

2' -

0"

2' -

0"

2' -

0"

N KEYPLAN

ESC

ADDITION

PEABODY

KGL

LOADING

PROJECT NAME

ISSUE/REVISION

Central Campus

New Haven, CT 065202 Whitney AvenueOffice of Facilities

Yale University

BUILDING NAME & ADDRESS

PROJECT NUMBER

DRAW ING TITLE

SCALE DRAW N BY

CAD FILENAME DATE

DRAW ING NUMBER

Telephone 860.767.0175

860.767.8719Facsimile

Post Office Box 955

Centerbrook, Connecticut 06409-0955

Architects and Planners, LLP

C E N T E R B R O O K

67 Main Street

LAY E

VXUL TE ATIRE S

Code Consultant

Structural Engineer

Mechanical, Electrical, & Plumbing Engineer

GILZANZ MURRAY STEFICEK LLP

ARUP

PHILIP R. SHERMAN, P.E

Acoustic and Audio Visual Consultant

CAVANAUGH TOCCI ASSOCIATES Inc.

Civil Engineer

LANGAN ENGINEERING

Building Envelope Consultant

LEAVITT ASSOCIATES Inc.

Lighting Designer

CBBLD Inc.

Landscape Architects

JAMES CORNER FIELD OPERATIONS

Specification W riter

KALIN ASSOCIATES Inc.

PHASE

M

L

J

K

A

B

C

D

E

F

G

H

4321 8765 1211109 1413

As indicated

6/1

1/2

020 6

:41:0

5 P

MC

:\R

evit L

ocal F

iles\1

674 Y

ale

KG

L A

18 C

entr

al_

para

dis

.rvt

Yale Kline GeologyLaboratory Code

Upgrades

17081006

YALE KLINE GEOLOGY LABORATORY

210 W HITNEY AVE, NEW HAVEN, CT 06511

A2.10K

ECS

6/12/202017081006 A2.10K

FIRST FLOOR RCP

BID DOCUMENTS

1/8" = 1'-0"M1

1st FLOOR REFLECTED CEILING PLAN

GENERAL NOTES - CEILING PLAN

1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING

2 PROVIDE PAINTED MRGWB IN WET AREAS.

3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.

4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.

5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.

6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.

NOTE:

NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPfp W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.

1/4" = 1'-0"L12

TYPICAL PARTIAL CORRIDOR CEILING TILE LAYOUT

NO. DATE REVISION

017

KGL 1st Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code UpgradesProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH

Typical 2' by 2' access door cut inceiling for MEP work. Actuallocations to be determined in thefield as needed.

Page 3: Turner Project # 201026 Updated November 6, 2020

R.C.P. = 8' - 0"

16KGL

14KGL

12KGL

10KGL

8KGL

7KGL

5KGL

3KGL

2KGL

1KGL

BKGL

CKGL

DKGL

EKGL

FKGL

GKGL

AKGL

VERTEBRATEPALEONTOLOGY

COLLECTION218

CORRIDOR293C

JOUR OFF217

FAC OFF216

FAC OFF214

FAC OFF211

FAC OFF210

RES LAB209

RES LB SV219A

RES LB SV219B

RES LAB219

ELEC290G

ELEC290H

INACTIVE290J

RES LAB215 INSTA LAB

213

STAIR 1290S

INACTIVE290K

KITCH290L

ELEC290M

CORRIDOR290

RES LAB219C

VEST219D

PD OFF220

RES LAB223

JAN291D

MEN225

OFFICE227

PD OFF221B

RES LAB221

RES LAB221A

TELECOM290F

CONF RM208A

FAC OFF208

FAC OFF207

RES LAB206

RES LAB205

OFFICE204

OFFICE203

OFFICE202

OFFICE201

STOR206A

TELECOM290N

EXHIBIT291B

SEMINAR226

EXHIBIT291C

COMP/ TCH228

ATRIUM CORRIDOR291

STAIR 3291S

GSTU OFF230

GSTU OFF231

GSTU OFF229

CORRIDOR292

GSTU OFF232

GSTU OFF233

GSTU OFF235

GSTU OFF234

CORRIDOR293

GSTU OFF237

EXHIBIT291E

LOUNGE258

W OMEN258A

STAIR 2292S

ELEC292A

GSTU OFF239

GSTU OFF238

GSTU OFF240

GSTU OFF241

GSTU OFF242

GSTU OFF243

GSTU OFF244

LOUNGE257

EXHIBIT291F

TELECOM293B

GSTU OFF246

GSTU OFF245

GSTU OFF247

STU OFF254

CORRIDOR294

GSTU OFF252

GSTU OFF253

GSTU OFF256

GSTU OFF248

GSTU OFF250

GSTU OFF249

GSTU OFF251

ELEV290E

A7.01K

H7

4KGL

6KGL

EAKGL

DAKGL

REFER TO YPM SHEET A2.21

SHAFT G

SHAFT F

SHAFT E

SHAFT A

SHAFT B

SHAFT D

A7.06K

M7

ACP-2

+ 9' - 8" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

ACP-2

+ 8' - 0" A.F.F.

A2.10K

L12

REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED FOR FIRE PROTECTION SYSTEM INSTALLATION

RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS

SURROUNDING CENTRAL STAIR

RCP CEILING TYPE LEGEND:

RCP LEGEND:

- 2'X4' TROFFER LIGHT

- RECESSED DOW N LIGHT

- LINEAR PENDANT -DIRECT/INDIRECT

- 1'X4' TROFFER LIGHT

- DIRECTIONAL TASK LIGHT

- PROJECTION SCREEN

GW B-1ACOUSTIC GYPSUM PLASTER

GW B-2GW B CEILING

ACP-22' x 4' ACP LAY-IN CEILING

AREA OUTSIDE SCOPE OF W ORK

ACP-32' x 2' ACP LAY-IN CEILING

GW B-4KU404 2 HOUR RATED CEILING

DFS-1DIRECT-APPLIED FINISH SYSTEM

PLS-1PLASTER SKIM COAT ON BLUEBOARD

ETREXISTING CEILING TO REMAIN

ETR-1EXISTING CEILING, PNTD

EXISTING EXPOSED W AFFLE SLABS

- LINEAR PERIMETER COVE

N KEYPLAN

ESC

ADDITION

PEABODY

KGL

LOADING

PROJECT NAME

ISSUE/REVISION

Central Campus

New Haven, CT 065202 Whitney AvenueOffice of Facilities

Yale University

BUILDING NAME & ADDRESS

PROJECT NUMBER

DRAW ING TITLE

SCALE DRAW N BY

CAD FILENAME DATE

DRAW ING NUMBER

Telephone 860.767.0175

860.767.8719Facsimile

Post Office Box 955

Centerbrook, Connecticut 06409-0955

Architects and Planners, LLP

C E N T E R B R O O K

67 Main Street

LAY E

VXUL TE ATIRE S

Code Consultant

Structural Engineer

Mechanical, Electrical, & Plumbing Engineer

GILZANZ MURRAY STEFICEK LLP

ARUP

PHILIP R. SHERMAN, P.E

Acoustic and Audio Visual Consultant

CAVANAUGH TOCCI ASSOCIATES Inc.

Civil Engineer

LANGAN ENGINEERING

Building Envelope Consultant

LEAVITT ASSOCIATES Inc.

Lighting Designer

CBBLD Inc.

Landscape Architects

JAMES CORNER FIELD OPERATIONS

Specification W riter

KALIN ASSOCIATES Inc.

PHASE

M

L

J

K

A

B

C

D

E

F

G

H

4321 8765 1211109 1413

1/8" = 1'-0"

6/1

1/2

020 6

:41:1

7 P

MC

:\R

evit L

ocal F

iles\1

674 Y

ale

KG

L A

18 C

entr

al_

para

dis

.rvt

Yale Kline GeologyLaboratory Code

Upgrades

17081006

YALE KLINE GEOLOGY LABORATORY

210 W HITNEY AVE, NEW HAVEN, CT 06511

A2.20K

ECS

6/12/202017081006 A2.20K

SECOND FLOOR RCP

BID DOCUMENTS

1/8" = 1'-0"M1

2nd FLOOR REFLECTED CEILING PLAN

GENERAL NOTES - CEILING PLAN

1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING

2 PROVIDE PAINTED MRGWB IN WET AREAS.

3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.

4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.

5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.

6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.

NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPFP W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.

NO. DATE REVISION

018

KGL 2nd Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code Upgrades ProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH

Typical 2' by 2' access doorcut in ceiling for MEP work.Actual locations to bedetermined in the field asneeded.

Page 4: Turner Project # 201026 Updated November 6, 2020

SD

SD

SD

SD

SD

SD

16KGL

14KGL

12KGL

10KGL

8KGL

7KGL

5KGL

3KGL

2KGL

1KGL

BKGL

CKGL

DKGL

EKGL

FKGL

GKGL

AKGL

INSSTR LAB321B

STOR331CB

STOR321CA

INSTR LAB321C

PREP RM321D

DARK RM321E

OFFICE321A

RESLB SV321

RES LAB322

RES LAB322B

RES LAB325A

RES LAB325

OFFICE327B

RES LAB327A

RESLB SV327

PREP RM327C

W OMEN330A

RES LAB332A

RES LAB332B

RES LAB332D

RES LAB334A

RESLB SV333

RESLB SV332C

RESLB SV332

JAN329

RES LAB SV334

RES LAB334C

CORRIDOR392

STAIR 2392S

FAC OFF336

VISIT OFF337

OFFICE339

RES LAB342

RESLB SV392D

RESLB SV392E

TELCOM392F

EXHIBIT391F

RESLB SV392G

STOR392H

RES LAB340

MEN346

STAIR 3391S

CORRIDOR391

CORRIDOR390

PD OFF318

RES LAB317

STAIR 1390S

ELEC390M

PD OFF311A

STOR311

RESCI OFF308

KITCH307

TELECOM390N

CIRCUL328A

STUDY328

ELEV390E

TELECOM390F

PD OFF326

RES LAB324

CONST TMP324A

RESCI OFF323

ELEC390G

ELEC390H

INACTIVE390J

E FAC OFF320

FAC OFF319

FAC OFF316

RES LAB315

RES LAB315A

INACTIVE390K

RES LAB313

RES LAB312B

RES LAB312

FAC OFF310

FAC OFF309

PD OFF306

FAC OFF305

OFFICE304

OFFICE303

OFFICE302

OFFICE301

FAC OFF345

RES LAB344

RES LAB343

ELEC392A

STOR392C

EXHIBIT391E

EXHIBIT391B

FAC OFF314

OFF SV390L

COPY311B

EXHIBIT391C

4KGL

6KGL

A6.02K

C11

EAKGL

DAKGL

SHAFT G

SHAFT F

SHAFT E

SHAFT A

SHAFT B

SHAFT D

ACP-2

+ 8' - 0" A.F.F.CORRIDOR

390

ACP-2

+ 8' - 0" A.F.F.

A2.20K

M1

REPLACE EXISTING PLASTER CEILING TO EXTENT REQUIRED FOR FIRE PROTECTION SYSTEM INSTALLATION

RELAMP RECESSED LIGHTING IN ATRIUM CORRIDORS

SURROUNDING CENTRAL STAIR

RCP CEILING TYPE LEGEND:

RCP LEGEND:

- 2'X4' TROFFER LIGHT

- RECESSED DOW N LIGHT

- LINEAR PENDANT -DIRECT/INDIRECT

- 1'X4' TROFFER LIGHT

- DIRECTIONAL TASK LIGHT

- PROJECTION SCREEN

GW B-1ACOUSTIC GYPSUM PLASTER

GW B-2GW B CEILING

ACP-22' x 4' ACP LAY-IN CEILING

AREA OUTSIDE SCOPE OF W ORK

ACP-32' x 2' ACP LAY-IN CEILING

GW B-4KU404 2 HOUR RATED CEILING

DFS-1DIRECT-APPLIED FINISH SYSTEM

PLS-1PLASTER SKIM COAT ON BLUEBOARD

ETREXISTING CEILING TO REMAIN

ETR-1EXISTING CEILING, PNTD

EXISTING EXPOSED W AFFLE SLABS

- LINEAR PERIMETER COVE

N KEYPLAN

ESC

ADDITION

PEABODY

KGL

LOADING

PROJECT NAME

ISSUE/REVISION

Central Campus

New Haven, CT 065202 Whitney AvenueOffice of Facilities

Yale University

BUILDING NAME & ADDRESS

PROJECT NUMBER

DRAW ING TITLE

SCALE DRAW N BY

CAD FILENAME DATE

DRAW ING NUMBER

Telephone 860.767.0175

860.767.8719Facsimile

Post Office Box 955

Centerbrook, Connecticut 06409-0955

Architects and Planners, LLP

C E N T E R B R O O K

67 Main Street

LAY E

VXUL TE ATIRE S

Code Consultant

Structural Engineer

Mechanical, Electrical, & Plumbing Engineer

GILZANZ MURRAY STEFICEK LLP

ARUP

PHILIP R. SHERMAN, P.E

Acoustic and Audio Visual Consultant

CAVANAUGH TOCCI ASSOCIATES Inc.

Civil Engineer

LANGAN ENGINEERING

Building Envelope Consultant

LEAVITT ASSOCIATES Inc.

Lighting Designer

CBBLD Inc.

Landscape Architects

JAMES CORNER FIELD OPERATIONS

Specification W riter

KALIN ASSOCIATES Inc.

PHASE

M

L

J

K

A

B

C

D

E

F

G

H

4321 8765 1211109 1413

1/8" = 1'-0"

6/1

1/2

020 6

:41:2

8 P

MC

:\R

evit L

ocal F

iles\1

674 Y

ale

KG

L A

18 C

entr

al_

para

dis

.rvt

Yale Kline GeologyLaboratory Code

Upgrades

17081006

YALE KLINE GEOLOGY LABORATORY

210 W HITNEY AVE, NEW HAVEN, CT 06511

A2.30K

ECS

6/12/202017081006 A2.30K

THIRD FLOOR RCP

BID DOCUMENTS

1/8" = 1'-0"M1

3rd FLOOR REFLECTED CEILING PLAN

GENERAL NOTES - CEILING PLAN

1. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING

2 PROVIDE PAINTED MRGWB IN WET AREAS.

3. FULL COORDINATION OF SHOP DRAWINGS BETWEEN TRADES MUST BE SUBMITTED ANDAPPROVED PRIOR TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES BEINGINSTALLED.

4. WHERE THERE IS A CONFLICT BETWEEN THE REFLECTED CEILING PLAN AND LOCATION OFFIXTURES AND DEVICES IN MECHANICAL, ELECTRICAL AND PLUMBING DRAWING, THEARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN.

5. CENTER CEILING GRIDS IN ROOMS UNLESS OTHERWISE NOTED OR INDICATED. PLACE LIGHTFUTURES AND OTHER ELECTRICAL, HVAC AND FIRE PROTECTION DEVICES AS SHOWN.

6. DO NOT USE LESS THAN 1/3 OF CEILING TILE WITHOUT APPROVAL OF THE ARCHITECT.

NEW CEILINGS THROUGHOUT CORRIDORS TO FACILITATE ABOVE CEILING MEPfp W ORK. REPLACE SUSPENDED GRIDS AND ACP IN CORRIDORS. FIXTURES AND DEVICES ARE TO REMAIN UNLESS OTHERW ISE NOTED.

NO. DATE REVISION

019

KGL 3rd Floor Lobby Ceiling Access Location WorkYale Kline Geology Laboratory Code UpgradesProjectNew Haven, CTTurner Project No. 201026Data Date: November 6, 2020By: VJH

Typical 2' by 2' accessdoor cut in ceiling forMEP work. Actuallocations to bedetermined in the fieldas needed.