Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Equipment Manufacturer
350-1010
Turnabout
Equipment Manufacturer
350-1010
Turnabout
0.5 1.0
05'
Meters2.0 3.0
10'
43'-10"
[13.38M]
6'
[1.84M]
31'-7"
[9.63M]
6'-1"
[1.86M]
6'
[1.84M]
6'-8"
[2.03M]
6'-3"
[1.90M]
360° NUVO
SPIRAL
SLIDE
THE
HELIX
ACCESS
GATE
TWISTED
CLIMBER
ACCESSIBLE
DRIVE AWAY
PANEL (ground)
36" (915mm) RISE
VERTICAL 'S'
TUBE
GLIDE
SLIDE
ROCKBLOCKS
90° WALL
(84" to 60")
(2,13M to 1,53M)
POST
MOUNT
WHEEL
TRANSFER
STATION
W/ STEP
ROUND-ABOUT
W/ ACCESS
LADDER
LEG
LIFT
ROCKBLOCKS
60" (1,53M)
END WALL
ROCKBLOCKS
DECK ACCESS
SUPPORT
6'-2"
[1.89M]
6'-3"
[1.90M]
6'
[1.84M]
72"
1,83M
36"
0,92M
72"
1,83M
6'-1"
[1.86M]
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
TUR
NA
BO
UT
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1010H 1/4"=1'-0"
M. MERTZ
20-DEC-17
31'8" x 19'6" x 11'5"9,65M x 5,94M x 3,48M
43'10" x 31'7"13,38M x 9,63M
1,083 SqFt.100,61 SqM.
122 Ft.37,19M
8Ft.2,44M
35 5-12
17
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 6
3
6
4
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
0.5 1.0
05'
Meters2.0 3.0
10'
43'-10"
[13.38M]
6'
[1.84M]
31'-7"
[9.63M]
6'-1"
[1.86M]
6'
[1.84M]
6'-8"
[2.03M]
6'-3"
[1.90M]
6'-2"
[1.89M]
6'-3"
[1.90M]
5
6
10
13
9
7
18
15
17
20
21
14
1211
15
16
6'
[1.84M]
8
72"
1,83M
36"
0,92M
72"
1,83M
19
6'-1"
[1.86M]
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
TUR
NA
BO
UT
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1010H 1/4"=1'-0"
M. MERTZ
20-DEC-17
31'8" x 19'6" x 11'5"9,65M x 5,94M x 3,48M
43'10" x 31'7"13,38M x 9,63M
1,083 SqFt.100,61 SqM.
122 Ft.37,19M
8Ft.2,44M
35 5-12
17
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 6
3
6
4
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(136"
(148"
SHADE HAT POST FOOTING (DETAIL 5) INDICATES POST LENGTH)(210"
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
1
6
0
"
1
6
0
"
1
6
0
"
1
6
0
"
1
3
6
"
1
3
6
"
1
3
6
"
1
3
6
"
1
2
4
"
1
2
4
"
360° NUVO
SPIRAL
SLIDE
TWISTED
CLIMBER
36" (915mm) RISE
VERTICAL 'S'
TUBE
GLIDE
SLIDE
ROCKBLOCK
CONFIGURATION
TRANSFER
STATION
W/ STEP
ROUND-ABOUT
W/ ACCESS
LADDER
120" 36"36" 72" 36"36"
3"
51"
15"
14"
24"
36"
34"99"33"
4"
60"
9"
17"
9"
18"
19"
16"
16"
41"
32"
8"
90"
24"
18"
93"
106"
180"
156"
163"
226"
18"
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
TUR
NA
BO
UT
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1010H 1/4"=1'-0"
M. MERTZ
20-DEC-17
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
Posts
ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP
ZZCH0028 42 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0048 43 3.5in OD x 160in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZCH0616 24 SQUARE COATED DECK ASSEMBLY
ADA Items
ZZCH2008 15 TRANSFER STATION w/BARRIERS (36in DECK)
ZZUN2019 16 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2696 17 GLIDE SLIDE (72in DECK)
ZZCH3537 18 SLIDE- NUVO 360 SPIRAL SLIDE
Activity Panels
ZZCH4290 19 POST MOUNTED STEERING WHEEL
ZZCH4487 110 DRIVE AWAY HALF PANEL
Crawl Tubes
ZZCH5636 111 VERTICAL S ADVENTURE TUBE
Barriers
ZZCH4288 112 ACCESS GATE
Climbers
ZZCH7160 113 6ft TWISTED CLIMBER
ZZUN0167 114 ROCKBLOCKS DECK ACCESS SUPPORT (36in - 48in DECK)
ZZUN0178 215 ROCKBLOCKS END SUPPORT (60in WALL)
ZZUN8360 116 ROCKBLOCKS END WALL (60in)
ZZUN8370 117 ROCKBLOCKS 90 DEGREE WALL (84in TO 60in) RIGHT
ZZUN8417 118 THE HELIX (60in & 84in WALL)
Overhead Events
ZZCH5770 119 LEG LIFT
ZZCH5970 120 OVERHEAD EVENT ACCESS LADDER (36in DECK)
ZZCH6966 121 10ft ROUNDABOUT HORIZONTAL LADDER
Additional Tool & Maintenance Kits
ZZUN1471 122 INSTALLER HARDWARE KIT
ZZUN9930 123 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 124 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 125 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 350-1010H - Bill Of Material
Turnabout
Ref.No. Quantity
Thursday, January 07, 2021 Page of1 1 Playworld.com
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
2 77.82 108 0 2.00 0.25 0
CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP
4 174.04 234 0 4.00 0.50 0
CertifiedZZCH00483 3.5in OD x 160in STEEL POST W/ RIVETED CAP
4 200.84 272 0 4.00 0.50 0
CertifiedZZCH06164 SQUARE COATED DECK ASSEMBLY 2 109.72 348 6 2.00 0.00 0
CertifiedZZCH20085 TRANSFER STATION w/BARRIERS (36in DECK)
1 180.00 385 2 2.00 0.09 0
CertifiedZZUN20196 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH26967 GLIDE SLIDE (72in DECK) 1 151.63 653 2 1.50 0.03 1
CertifiedZZCH35378 SLIDE- NUVO 360 SPIRAL SLIDE 1 650.00 1,417 2 6.00 0.15 1
CertifiedZZCH42909 POST MOUNTED STEERING WHEEL 1 7.83 44 1 0.25 0.00 1
CertifiedZZCH448710 DRIVE AWAY HALF PANEL 1 45.93 1,271 2 1.50 0.00 1
CertifiedZZCH563611 VERTICAL S ADVENTURE TUBE 1 132.02 1,056 3 3.00 0.00 1
CertifiedZZCH428812 ACCESS GATE 1 17.34 65 0 0.50 0.00 0
CertifiedZZCH716013 6ft TWISTED CLIMBER 1 117.65 241 2 2.00 0.60 1
CertifiedZZUN016714 ROCKBLOCKS DECK ACCESS SUPPORT (36in - 48in DECK)
1 43.86 70 1 1.00 0.13 1
CertifiedZZUN017815 ROCKBLOCKS END SUPPORT (60in WALL)2 61.24 91 0 2.00 0.26 0
CertifiedZZUN836016 ROCKBLOCKS END WALL (60in) 1 76.13 405 2 1.00 0.13 1
CertifiedZZUN837017 ROCKBLOCKS 90 DEGREE WALL (84in TO 60in) RIGHT
1 108.96 843 4 0.50 0.00 1
CertifiedZZUN841718 THE HELIX (60in & 84in WALL) 1 73.35 101 2 0.75 0.00 1
CertifiedZZCH577019 LEG LIFT 1 6.76 30 1 0.50 0.00 1
CertifiedZZCH597020 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 25.12 71 1 1.50 0.06 0
CertifiedZZCH696621 10ft ROUNDABOUT HORIZONTAL LADDER1 139.10 298 3 1.00 0.00 1
N/AZZUN147122 INSTALLER HARDWARE KIT 1 57
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1010H - Compliance and Technical Data
Turnabout
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Thursday, January 07, 2021 Page of1 3 Playworld.com
N/AZZUN993023 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067824 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID25 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1010H - Compliance and Technical Data
Turnabout
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
277 574 8,221 35 38.08 2.742,435.21 12Totals:
8 Metric Tons258 Kg125 Kg1,095.84 Kg 2.08 m3
Thursday, January 07, 2021 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1010H - Compliance and Technical Data
Turnabout
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1010H, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Thursday, January 07, 2021 Page of3 3 Playworld.com