  • Agenda

    1. Resource Management in China Mobile

    2. Converging E2E Resource View

    3. Practice of TMF Frameworx

    4. Q&A

  • Challenges

    Service Fulfillment Lack of solution to support service provisioning under the converged

    network environment

    Lack of the E2E view for available/used resource information in service

    provisioning

    Resource Data Maintenance Lack of information management for cross domain and multi-

    technologies resources

    Lack of an efficient method to confirm the accuracy of the resource data

    Information Sharing Lack of a unified entry to guarantee the consistency of the resource

    information

    Lack of a unified resource database to sharing the information to other

    systems

  • Target

    Rebuilding and standardizing resource

    lifecycle process flow

    Full-technology resource dispatching and

    data maintaining flow

    Rebuilding and standardizing SF process flow

    Building the correlation between customer,

    service and network resources

    Pre-sale supporting

    Resource dispatching, activating

    Network should be Visible, Controllable, Analyzable, Traceable --- Dr. Liu Aili, VP of China Mobile

    Efficient and Flexible Service Fulfillment

    Lifecycle Management

    Data collecting, comprising and discovering

    Providing resource view to other system

    Information sharing interface/bus

    Building unified resource model of full-technology network

    Building a converged resource database Building E2E resource view Enhancing resource configuration capability

    Converged Network Management

    Flexible Data Sharing

  • Main Capability

    Integrated Resource Management System Data Shared Service

    System Management

    Resource Inventory Management

    Resource Application

    Resource Bulk Change Lock Cfg

    Query Business Query

    Resource Alarm Analysis Fulfillment Fault

    Inventory Rule Cfg

    SLA Fulfillment Cfg

    Alarm

    Customer View Network View Business View

    Topology View

    GIS App Spatial View e-Map

    Resource Planning Solution Plan Planning Cfg

    Business Model Mgt Solution Design

    Capacity Query

    Resource Provision Request Assign

    Provision Archive

    Business Entity Mgt Catalog Provision

    Template Instance

    Region Mgt Location Site

    Coverage Room

    Lifecycle Mgt Lifecycle Fault Tracking

    Asset Mgt Asset Card Asset Sync

    Asset Mgt Equipment Link

    GIS Code

    Networking Mgt Transmission Data

    Access Wireless

    Topology Mgt Network Customer

    Region Specialty

    Statistics Analysis Reporting Query

    Customized Criteria

    Model Mgt Modeling Publish

    Rule Import/Export

    Naming Mgt Rule Service

    Configuration Batch Change

    System Mgt Log RBAC

    User Dictionary

    Data Quality Mgt Fault-tolerant Verification

    Service Fulfillment Shard Entity

    Service Query Shared Info

    Data Loader NMS Entering

    Asset Info Sync

    Import/Export Import Export

    Managed Resource Scope

    Implemented Deferred Ongoing

    GSM, TD-SCDMA, PON, Core, IP, Transmission, TD-LTE (on-going), Device, Rack, Shelf, Slot, Card, Port, IP Address, VPN,

  • Portal View, Task-driven Full-technology E2E resource view, Shared topology

    Main Capability

    Workspace End-to-End Resource View

    Organizing data display as a staff CV Information Attribute Configurable

    Resource CV management

    Automation of data collecting Visualized configuration UI

    Data Collecting

  • GIS Presale-Supporting Data Configuring

    Process Flow Monitor E2E Resource View

    Main Capabilities (Service Fulfillment Supporting)

  • Case Study (One Branch of China Mobile)

    It stored 140M resource entries, and more than 30K orders of enterprise customer service

    The IRMS supported to share more than 100 types of resource information between 17 systems

    0

    20

    40

    60

    Service provisioning efficiency improving

    0

    20

    40

    Network cut over efficiency improving

    circuit number per min

    66%

    98.41%

    0%

    25%

    50%

    75%

    100%

    Data accuracy increase

    48.3h 25.5h

    Before After

    1.1entry/min

    48.3h 33entries/min

    Before After Mar. Sept.

    Service Provisioning Cut cover Data Collection

    Enterprise customer : 1923 orders

    / month

    Home customer : 7308 orders /

    month

    Service Area : 18 cities

    Order Number : 24k

    MTTR : shorter to 1/28

    LSTP cut over efficiency : increase

    30 times

    Network domains : 5

    Equipment vendors : 9

  • Agenda

    1. Resource Management in China Mobile

    2. Converging E2E Resource View

    3. Practice of TMF Frameworx

    4. Q&A

  • Why E2E Resource View ?

    ?

    ?

    ?

    ?

    Relationship between customer, product, and resource?

    Real network is invisible

    Impact-analysis on cross-domain network?

    Lack of tools on Visible data consistency

    checking 1 2

    3 4

  • Case 1: Resource Relation Management

    Circuit

    Transmission Circuit

    Optical Circuit

    Outside Plant

    Device

    Port

    Site

  • Case 2: Network Resource Association

    Wireless BSC BSC Circuit

    Transmission Circuit Outside Plant

  • Case 3: Enterprise Leased Line

    Customer Product

    Outside Plant Resource

  • Case 4: Pre-sale Support

    Customer location input

    Detail Info

    Access type selection

    1. Customer location input 2. Choose SDH/PON/PDH/Fiber/ 3. List all available device/fiber 4. List all available port/bandwidth

  • Case 5: Problem location & Impact Analysis

    1 2

    3

    Problem logic optical circuit location OTDR distance information input

    Nearest manhole located 4 Impact Analysis

  • Fundamental of E2E Resource View

    Combining inside and outside plant resources Unified model

    Inside Plant

    Logic Data Physical Data

    Service Model

    Service Information FrameLineup

    Equipment

    container/slot/

    card/port

    Outside plant Interface

    Pipe segment Pole segment

    ODFDDF

    Equipment

    Shelves Jumping

    Equipment

    Terminal Logic Fiber Circuit

    Optical circuit

    Manhole Pole

    Customer

    Customer

    Equipment

    Standard

    Address

    Customer

    Name

    Customer site

    Association Association Association

    Optical Segment

    Circuit

    Outside plant

    Spatial Inside Resource

  • Agenda

    1. Resource Management in China Mobile

    2. Converging E2E Resource View

    3. Practice of TMF Frameworx

    4. Q&A

  • Integrated Resource Management SystemData Shared Service

    System Management

    Resource Inventory Management

    Resource Application

    Resource Bulk ChangeLock Cfg

    Query Business Query

    Resource Alarm AnalysisFulfillment Fault

    Inventory Rule Cfg

    SLAFulfillment Cfg

    Alarm

    Customer ViewNetwork View Business View

    Topology View

    GIS AppSpatial View e-Map

    Resource PlanningSolution Plan Planning Cfg

    Business Model MgtSolution Design

    Capacity Query

    Resource ProvisionRequest Assign

    Provision Archive

    Business Entity MgtCatalog Provision

    Template Instance

    Region MgtLocation Site

    Coverage Room

    Lifecycle MgtLifecycle Fault Tracking

    Asset MgtAsset Card Asset Sync

    Asset MgtEquipment Link

    GIS Code

    Networking MgtTransmission Data

    Access Wireless

    Topology MgtNetwork Customer

    Region Specialty

    Statistics AnalysisReporting Query

    Customized Criteria

    Model MgtModeling Publish

    Rule Import/Export

    Naming MgtRule Service

    Configuration Batch Change

    System MgtLog RBAC

    User Dictionary

    Data Quality MgtFault-tolerant Verification

    Service FulfillmentShard Entity

    Service QueryShared Info

    Data LoaderNMS Entering

    Asset InfoSync

    Import/ExportImport Export

    Implemented DeferredOngoing

    Data Share

    Resource Application

    Resource Inventory Management

    System Management

    Utilization of Business Process Framework

    China Mobile constructed Integrated Resource Management System referring the Business Process Framework.

  • Utilization of Information Framework

    1 SID Information Model -> CMCC Network Resource Infrastructure Model

    2 CMCC Network Resource Infrastructure Model -> Core Model of Specialty

    3 Core Model of Specialty -> Extended Model of Specialty

    Unification

    Stability

    Scalability

    /

    CompoundResource

    ResourceCollection

    ResourceElement

    SubNetwork

    0..n

    0..1

    0..n

    0..1

    LayerNetwork

    0..n

    1

    0..n

    1

    Pipe

    Location

    DeviceInterface

    Network

    0..n

    0..1

    0..n

    0..1

    LogicalDevice

    NetworkNode

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..1

    0..n

    0..1

    0..n

    Hardware

    0..n

    0..1

    0..n

    0..1

    PhysicalDevice

    0..1

    0..n

    0..1

    0..n

    0..n

    0..1

    0..n

    0..1

    GSM

    GSM

    1

    1..n

    1

    1..n

    BSC

    BTS

    BSC

    Infrastructure Model Wireless Resource Model

  • CompoundResource

    Location

    PhysicalResources

    LogicalResource

    ResourceFacingService

    Utilization of Information Framework

    CMCC Infrastructure of Network Resource Model

    0..n

    0..n

    0..n

    0..n

    1

    0..n

    1

    0..n

    GSM

    0..n

    0..1

    0..n

    0..1

    1

    2..n

    1

    2..n

    PCU

    BSC

    0..n

    0..n

    0..n

    0..n

    BTS

    0..n0..1 0..n0..1

    0..1

    1..n

    0..1

    1..n

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n0..1 0..n0..1

    /

    0..1

    0..n

    0..1

    0..n

    BSC

    0..1

    0..n

    0..1

    0..n0..n

    0..1

    0..n

    0..1

    BTS

    0..1

    0..n

    0..1

    0..n

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n 0..n0..n 0..n0..n 0..10..n 0..1

    0..n

    0..1

    0..n

    0..1

    GSM

    0..n

    0..1

    0..n

    0..1

    0..10..n 0..10..n

    0..1 0..n0..1 0..n

    NodeB

    0..n

    0..n

    0..n

    0..n

    0..1

    0..n

    0..1

    0..n

    TD

    0..n

    0..1

    0..n

    0..1

    1

    2..n

    1

    2..n

    RNC

    0..1

    0..n

    0..1

    0..n

    NodeB

    0..1

    0..n

    0..1

    0..n

    RNC

    0..1

    0..1

    0..1

    0..1

    BBURRU 0..1

    0..n

    0..1

    0..n

    0..n

    0..n

    0..n

    0..n

    NodeB

    0..n

    0..1

    0..n

    0..1

    0..n0..1 0..n0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    0..1

    0..n

    1..n

    1..n

    1..n

    1..n

    0..10..n 0..10..n

    0..n

    0..1

    0..n

    0..1

    0..10..n 0..10..n

    0..1

    0..n

    0..1

    0..n

    0..10..n 0..10..n

    TD0..1

    0..n

    0..1

    0..n

    0..10..n 0..10..n

    0..1 0..n0..1 0..n

    GSM Networks Model TD Networks Model

    Shared Information Model

    The core models have 14 specialty technology packages, More than 200 classes,4000 attributes,600 relationships

  • In the future

    Participation and contribution of TMF standards Proposal on converged network inventory management requirements Standardization of interface between inventory system and other systems For example, the topology information sharing

    Enhance the resource data auto-collected capabilities of equipments north interface E.g. Rack, shelf, slot, card , port, etc

  • Agenda

    1System Overview

    2E2E Resource View

    3TM Forum Frameworx

    4Q&A

  • Thanks

    Q & A