Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
REQUIRED
ECOBOILER UC41000740
ECOBOILER UC101000741
ECOBOILER UC451000744
• 4,10,or45litreoptions• Portion dispense option
NAME0RDER CODE
POWER @ 230V
IMMEDIATE DRAW OFF
CUPS (180ml) PER HOUR
DIMENSIONS (D x W x H mm)
PLUMBING REQS
Ecoboiler UC41000740 2.4kW 4 L 133 395 x 135 x 585 3/4” BSP
Ecoboiler UC101000741 2.8kW 10 L 156 395 x 228 x 585 3/4” BSP
Ecoboiler UC451000744 5.6kW 45 L 311 495 x 420 x 667 3/4” BSP
BO
ILER
SFO
NTS NAME
ORDER CODEDIMENSIONS
(D x W x H mm)TAP TO COUNTER
(T mm)
Tubular Font1000584 114 x 50 x 303 156
Tubular Font with Drip Tray 1000585 175 x 125 x 303 140
NAMEORDER CODE
DIMENSIONS (D x W x H mm)
TAP TO COUNTER (T mm)
Über Font1000811 470 x 250 x 400 295
Low Profile Über Font1000811L 470 x 250 x 272 172
TUBULAR FONT1000584
TUBULAR FONT WITH DRIP TRAY1000585
DIMENSIONS
• Up to 3 fonts can be used on a single boiler (UC45 only)
• Quick and easy service for high volume environments
ÜBER FONT 2 BUTTON 1000811
DIMENSIONSDIMENSIONS (LOW PROFILE)
• Available in two heights
• Canbeusedwith1or2undercounterboilers
H
D
W
T
H
DW
TH
D
W
T
SEE TA
BLE FO
R
PR
OD
UC
T DIM
ENS
ION
S
PAC
KAG
ING
NAMEORDER CODE
PACKED WEIGHT
PACKAGING DIMENSIONS
(L x W x H mm)
QUANTITY PER
PALLET
Ecoboiler UC41000740 11kg
500x240x690
10
Ecoboiler UC101000741 12.5kg
500x240x690
10
Ecoboiler UC451000744 22kg
500x420x690
4
Tubular Font1000584 2.4kg
240x140x340
32
Tubular Font with Drip Tray 1000585 2.4kg
240x140x340
24
Über Font1000811 7kg
490x280x670
16
Low Profile Über Font 1000811L 7kg
490x280x670
16
ASS
OC
IATE
D P
ROD
UC
TS ( S
OLD
SEP
ARA
TELY
)
OR OR
TUBULAR & ÜBER FONTS WITH ECOBOILER UNDERCOUNTER WATER BOILERS
TUBULAR FONT WITH ECOBOILER UC4, UC10 & UC45
COUNTER CUT-OUT
TUBULAR FONT 1000584TUBULAR FONT WITH DRIP TRAY 1000585
ECOBOILER UC4 1000740
ECOBOILER UC10 1000741
ECOBOILER UC45 1000741
VENTILATION REQUIREMENTS 50mm/1.9”clearancerequiredateachsideandbackofmachineifinstalledinanenclosedcabinet.
ELECTRICAL INSTALLATION PROCEDUREWheninstallingthemachine,alwaysobservethelocalregulationsandstandards.ThestandardmachineissuppliedwithaUK3-pinplug.ForEUmodelsa2-pinCEE-7plugwillbesupplied.USmodelswillbesuppliedwiththesuitableplug.Asuitablemainspowersupplysocketshouldbeavailablewithineasyaccessoftheappliancesothatitcanbedisconnectedeasilyafterinstall.ThewiresfromthefontareterminatedinaMiniFitconnectorwhichwillplugintoasimilarMiniFitconnectormountedonthetoplidoftheundercounterboiler.
PLUMBING INSTALLATION PROCEDURE• Ensurethattheequipmentisinstalledaccordingtolocal
plumbing&waterregulations.
• Mainswaterpressurerequired(limits):14.5-145psi(100-1000kPa,0.1-1MPa).
• Requiresinlinewaterfilterwithinyourwaterspecifications.
• Themachineissuppliedwitha3/4“BSPconnection.
• Turnonthewatertoflushanyimpurities,dustetcfromtheinlethoseandwaterpipe.Allowseverallitresthrough.Especiallyfornewinstallations.Connectthehosetotheinletvalveoftheboiler.Makesureasealingwasherisfitted.
• Turnonwaterandcheckforleaks.
• Iffontdoesnotofferaventconnection(TubularFontonly)thenonnoaccountmustVent/Overflowbe
connecteddirecttoadrain,ifconnectedtoadrainyouMUSTuseaTundishorEnsureanairbreakfailuretodothiswillresultinboilercontamination.
• Thisequipmentmustbeinstalledwithadequatebackflowprotectiontocomplywithallapplicablefederal,stateandlocalcodes.
OPERATING BOILER FOR THE FIRST TIME• Checkthatallinstallationprocedureshavebeen
carriedout.
• Ensurewatervalveison.
• Plugboilerappropriateelectricalsupplyandpresspowerbuttononthefrontofthemachinemarked‘Power’.
• The“poweron”lightwillglowgreenandthemachinewillfilltoasafelevel,abovetheelements,beforeheating.
• The“Ready/Status”lightwillcycletworedflasheswhilethemachineisfillingtothesafelevel.
• Whilstthemachineisabovethesafelevelandfilling,the“Ready/Status”lightwillremainblank.
• The“Ready/Status”lightwillglowgreenwhenthemachineisbothfullanduptonormaloperatingtemperature.
• Theboilerisnowreadyforuse.
• Thefontissimplyactivatedbypressingthebuttononthetopofthefont.
NOTE:Becausetheboileriselectronicallycontrollednoprimingisnecessary.Theelementcannotswitchonuntilasafelevelofwaterisreached.
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
* Hosing should be trimmed to ensure continuous drop from font to boiler
23”/
585m
m
>27.
6”/7
00m
m
15.5”/395mm2”/50mm
11.9
”/30
3mm
4.5”/114mm Ø 1.3”/32mm
Water Power
Vent
Boiler Connections to Font
6.3”/161mm
min 5.1”/130mm
6.1”/156mm
23”/
585m
m
15.5”/395mm2”/50mm
11.9
”/30
3mm
* Hosing should be trimmed to ensure continuous drop from font to boiler
4.5”/114mm Ø 1.3”/32mm
Boiler Connections to Font
Water Power Vent
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
>27
.6”/
700m
m
min 5.1”/130mm*
6.1”
/15
6mm
TUBULAR FONT WITH ECOBOILER UNDERCOUNTER WATER BOILERS
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
* Hosing should be trimmed to ensure continuous drop from font to boiler
23”/
585m
m
>27.
6”/7
00m
m
15.5”/395mm2”/50mm
11.9
”/30
3mm
4.5”/114mm Ø 1.3”/32mm
Water Power
Vent
Boiler Connections to Font
6.3”/161mm
min 5.1”/130mm
6.1”/156mm 5.
5”/1
40m
m
* Required for ventilation if the machine is installed
in an enclosed cabinet.
26.2
”/66
7mm
19.4”/495mm2”/50mm
11.9
”/303
mm
* Hosing should be trimmed to ensure continuous drop from font to boiler
4.5”/114mm
6.3”/161mm
Ø 1.3”/32mm
Boiler Connections to Font
Dispense 1
Font #1 Connection
Vent
Dispense 22”/50mm*
2”/50mm
min
5.1
”/13
0mm
6.1”/156mm 5.
5”/1
40m
m
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
* Hosing should be trimmed to ensure continuous drop from font to boiler
23”/
585m
m
>27.
6”/7
00m
m
15.5”/395mm2”/50mm
11.9
”/30
3mm
4.5”/114mm Ø 1.3”/32mm
Water Power
Vent
Boiler Connections to Font
6.3”/161mm
min 5.1”/130mm
6.1”/156mm 5.
5”/1
40m
m
ÜBER FONT WITH ECOBOILER UC4, UC10 & UC45
COUNTER CUT-OUT
ÜBER FONT 1000811
ECOBOILER UC4 1000740
ECOBOILER UC10 1000741
ECOBOILER UC45 1000741
VENTILATION REQUIREMENTS 50mm/1.9” clearance required at each side and back of machine if installed in an enclosed cabinet.
ELECTRICAL INSTALLATION PROCEDUREWhen installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install. The wires from the font are terminated in a Mini Fit connector which will plug into a similar Mini Fit connector mounted on the top lid of the undercounter boiler.
PLUMBING INSTALLATION PROCEDURE• Ensure that the equipment is installed according to local
plumbing & water regulations.
• Mains water pressure required (limits): 14.5 - 145psi (100 - 1000kPa, 0.1 - 1MPa).
• Requires inline water filter within your water specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through. Especially for new installations. Connect the hose to the inlet valve of the boiler. Make sure a sealing washer is fitted.
• Turn on water and check for leaks.
• If font does not offer a vent connection (Tubular Font only) then on no account must Vent/Overflow be
connected direct to a drain, if connected to a drain you MUST use a Tundish or Ensure an air break failure to do this will result in boiler contamination.
• This equipment must be installed with adequate backflow protection to comply with all applicable federal, state and local codes.
OPERATING BOILER FOR THE FIRST TIME• Check that all installation procedures have been
carried out.
• Ensure water valve is on.
• Plug boiler appropriate electrical supply and press power button on the front of the machine marked ‘Power’.
• The “power on” light will glow green and the machine will fill to a safe level, above the elements, before heating.
• The “Ready/Status” light will cycle two red flashes while the machine is filling to the safe level.
• Whilst the machine is above the safe level and filling, the “Ready/Status” light will remain blank.
• The “Ready/Status” light will glow green when the machine is both full and up to normal operating temperature.
• The boiler is now ready for use.
• The font is simply activated by pressing the button on the top of the font.
NOTE: Because the boiler is electronically controlled no priming is necessary. The element cannot switch on until a safe level of water is reached.
23”/
585m
m
15.5”/395mm2”/50mm
11.9
”/30
3mm
* Hosing should be trimmed to ensure continuous drop from font to boiler
4.5”/114mm Ø 1.3”/32mm
Boiler Connections to Font
Water Power Vent
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
>27
.6”/
700m
m
min 5.1”/130mm*
6.1”
/15
6mm
23”/
585m
m
>27.
6”/7
00m
m
15.5”/395mm2”/50mm
15.7
”/40
0mm
11.6”/295mm
18.5”/470mm
Front of Font
14.6”/370mm
6.5”/165mm
Water Power
Vent
Boiler Connections to Font
min 5.1”/130mm*
* Hosing should be trimmed to ensure continuous drop from font to boiler
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
23”/
585m
m
>27
.6”/
700m
m
15.5”/395mm2”/50mm
15.7
”/40
0mm
11.6
”/29
5mm
18.5”/470mm
Front of Font
14.6”/370mm
6.5”
/165
mm
Boiler Connections to Font
Water Power Vent
min 5.1”/130mm*
* Hosing should be trimmed to ensure continuous drop from font to boiler
2”/50mm*
2”/50mm
* Required for ventilation if the machine is installed
in an enclosed cabinet.
Front of Font
14.6”/370mm
6.5”/165mm
Boiler Connections to Font
Dispense 1
Font #1 Connection
Vent
Dispense 2
Font #2 Connection
19.4”/495mm2”/50mm
26.2
”/66
7mm
min
5.1
”/13
0mm
15.7
”/40
0mm
11.6”/295mm
* Hosing should be trimmed to ensure continuous drop from font to boiler
18.5”/470mm
23”/
585m
m
>27.
6”/7
00m
m
15.5”/395mm2”/50mm
15.7
”/40
0mm
11.6”/295mm
18.5”/470mm
Front of Font
14.6”/370mm
6.5”/165mm
Water Power
Vent
Boiler Connections to Font
min 5.1”/130mm*
* Hosing should be trimmed to ensure continuous drop from font to boiler
ÜBER FONT WITH ECOBOILER UNDERCOUNTER WATER BOILERS