15
Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All TTA activities since TTA activities since GSC-15 GSC-15 Keun Hyeob LEE Keun Hyeob LEE TTA President TTA President Document No: GSC16-PLEN-27 Source: TTA Contact: Peter J. Kim GSC Session: PLENARY Agenda Item: 4.8

TTA activities since GSC-15

Embed Size (px)

DESCRIPTION

TTA activities since GSC-15. Keun Hyeob LEE TTA President. Highlight of Current Activities. Since GSC-15 E stablished 471 standards Sep. 2010 ~ Sep. 2011 Established 3 New Project Groups & 1 New PCG - PowerPoint PPT Presentation

Citation preview

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

TTA activities since GSC-15TTA activities since GSC-15

Keun Hyeob LEEKeun Hyeob LEE

TTA PresidentTTA President

Document No:

GSC16-PLEN-27

Source: TTA

Contact: Peter J. Kim

GSC Session:

PLENARY

Agenda Item:

4.8

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

2

Highlight of Current ActivitiesHighlight of Current Activities

• Since GSC-15– Established 471 standards

• Sep. 2010 ~ Sep. 2011

– Established 3 New Project Groups & 1 New PCG• PG: Magnetic Field Communication, Cyber Physical Systems,

Wireless Mobile Charging & Application

• Wireless Power Transmission PCG (Project Coordination Group)Total of 64 PGs (see Supplementary slide 2 for details) as of Sep. 2011

– Accredited 38 Domestic Standardization Fora

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

• Cloud Computing– Domestic Standardization based on IaaS

(Infrastructure as a Services) priority needs (2010~2012)

– SLA Quality parameter of Public Cloud Services in e-Government of Korea

• Standardization on Metering/Billing system

3

Highlight of Current ActivitiesHighlight of Current Activities

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

Highlight of Current ActivitiesHighlight of Current Activities• ICT and Climate Change

-Established 3 standards (i.e. Green data centers development best practices) and 6 Technical Reports (i.e. ICT&CC – Direct and indirect impacts) through joint effort among TTA, RRA and ICT&CC Forum

NGNNGN RFIDRFID

ITSITS etc.etc.ICT & CCICT & CC

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

• ICT and Climate Change– Hosted ITU-T SG5 (Seoul, Sep. 20-28, 2011)– Standardization on:

• Methodologies of Greenhouse gas’ environmental impacts

• Rare metals • Green data centers

development best practices

5

Highlight of Current ActivitiesHighlight of Current Activities

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

6

Highlight of Current ActivitiesHighlight of Current Activities• IMT-Advanced

– Approved LTE-Advanced and Wireless MAN-Advanced as TTA standards

– Submitted transposition references for Recommendation ITU-R M.[IMT.RSPEC] to WP5D(Sep. 2011)

• TTAT.3G-36.101(R10-10.3.0) etc..(same as 3GPP Rel.10 specifications (Aug. 26 2011))

• TTAE.IE-802.16m etc (same as IEEE 802.16 standards (16-2009, 16j, 16h, 16m) (Jun. 29 2011))

ITU-R M.1645 (Jun. 2003)

IMT-Advanced will encompassthe capabilities of previous systems

1 10 100 1000

Enhancement

Peak useful data rate (Mbit/s)

Mobility

High

Low

Newmobileaccess

New nomadic/localarea wireless access

EnhancedIMT-2000

IMT-2000

New capabilitiesof IMT-Advanced

Dashed line indicatesthat the exact datarates associated withIMT-Advancedare not yet determined

LTE-Adv.

IEEE802.16mWCDMAcdma2000

LTEM-WiMAX

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

7

Highlight of Current ActivitiesHighlight of Current Activities• Korean Public Alert System (KPAS)

– Public alert message over cellular is being provided only in 2G– No alert services in 3G networks such as WCDMA and HSPA– Provision of 800MHz band LTE commercial service by two

operators (SKT and LG U+) in Jul. 2011 – Developed standard based on CMAS and will be enforced by

NEMA (National Emergency Management Agency) by 2012

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

8

Highlight of Current ActivitiesHighlight of Current Activities• M2M

– Recognized M2M as one of 10 future ICT services by the Korean government (May 2010)

– Korea Telco’s(SKT, KT, LGU+) current market size is 1.75 mil. subscribers and potential demand for M2M by 2015 is estimated at 14.5 mil. subscribers

– Major business model is Customized service, Smart & Safety, Intelligent vehicle, Public SOC(Social Overhead Capital)

– Established TTA M2M PG(Dec. 2010) to standardize open M2M platform interface based on commercial mobile communication network

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

9

Highlight of Current ActivitiesHighlight of Current Activities• Wireless Charging

– Established TTA Wireless Charging and Application PG • Work scope : Standard roadmap, Power transfer interface, Control

mechanism

– Currently discussing Interface protocol and Evaluation Methodology of Wireless Power Transfer

No communication networkNo communication network

•Lack of mobility•Rechargeable toothbrush, mobile phone, etc

Peer-to-PeerPeer-to-Peer

Wired

• Limited convenience • 1:1 Charging

Wired ChargingWired Charging

Require communication networkRequire communication network

• Better convenience and mobility• Nonrecognition charging

Remote ChargingRemote Charging

Wireless

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

10

ChallengesChallenges

• Global partnership collaboration among SDOs in the areas of– Cloud Computing : Definition, Terminology, Reference

Architecture– Wireless Charging :

Common/Global frequency standardization

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

11

ChallengesChallenges

• Inter-sectoral collaboration between ICT industry and other vertical industries– M2M collaboration among Smart Grid, ITS, u-Health

and Home-automation industry.– Wireless Charging collaboration among auto

manufacturers

Testing of Wireless Charging Bus at Seoul Grand Amusement Park

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

12

Next Steps / ActionsNext Steps / Actions

• Develop “Requirements of Cloud computing services” and “Reference model for Privacy of Cloud computing services” by Dec. 2011

• M2M Global initiative activities in the M2M area

• Further development of Wireless Mobile Charging roadmap and standards

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

13

Supplementary SlidesSupplementary Slides

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-27

14

1. TTA Standards at a glace1. TTA Standards at a glace

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-272. TTA Standardization Committee 2. TTA Standardization Committee

(as of Sep. 2011)* Newly Established in 2011

15

Technical Committees (TC))

Technical Committees (TC))

Project Groups (PG)Project Groups (PG)

Technical Assembly (TA)Technical Assembly (TA)Technical Assembly (TA)Technical Assembly (TA)

Coordination Committee (CC)Coordination Committee (CC)

Future Internet, NGN, IPTV, etc.Telecommunication(TC2)

WGsWGs

NGN Evolution, etc

Magnetic Field Comm.* , LBS, etc.Radio Communication

(TC3)

ZigBee/WPAN, etc

u-Health, Multimedia, etc.IT Application (TC4)Grid Accounting, etc

Cloud Computing, Cyber Security, etc.Information Security

(TC5)

Cyber Physical Systems*, etc.Infra Software (TC6) Mobile Web, etc.

Wireless Mobile Charging & Application*, etc.

Mobile Communication (TC7)

Radio Access, etc

3D TV, DMB, Digital TV, etc.Broadcasting (TC8) DMB, etc

20

17

11

3

23

5

1515

8

13

5

8

9

6

Project CoordinationGroup (PCG)*

Project CoordinationGroup (PCG)*

ICT & CC, etc 3

64 79

Strategy PlanningCommittee (SPC)

Strategy PlanningCommittee (SPC)