Upload
austen-bradford
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
TSXV – PAV TSXV – PAV PACIFIC ARC RESOURCES LTD.
QUEBEC - IRON ORE
VISION STATEMENT
Pacific Arc is a mineral exploration company focused on exploring, developing and building an iron ore titanium mining company. It’s initial focus will be in unlocking the potential of the Red Pine Lake Project located in Quebec, Canada. The property is well situated with road access, hydro power and water.
TSXV – PAV TSXV – PAV
PROPERTY DESCRIPTION
Red Pine Lake Iron Ore & Titanium Lake Property, Quebec, Canada
- Property consists of 57 claims, comprising approximately 2,982 hectares.
- Located in southern Quebec in the regional municipalities of Saint-Adèle and St-Hippolyte, Wexford and Chertsey Townships – 60 km north of Montreal
- Easy road access, power and water
- Historical drilling indicates > 60 million tonnes of approx. 27% Fe and > 17% TiO2
only to a depth of 100m; still open at depth
- Historical drilling primarily isolated in the southern portion of property; stillopen to the north
- Historical beneficiation / metallurgical testing of iron using magnetic cobbing averaging > 68% Fe
TSXV – PAV TSXV – PAV
MAP OF QUEBEC
TSXV – PAV TSXV – PAV
RESIDUAL MAGNETIC FIELD MAP
Ground and Aeromagsurvey performed in 2009/2010 confirmsa 7km magnetic richiron ore trend.
TSXV – PAV TSXV – PAV
DRILLING PROGRAM
Phase 1 Program designed to:
- Confirm historical data from drilling in the southern portion
- Extend ore below 100m
- Drill to a depth of 350m
- Extend ore body north along 7 kmmagnetic trend
- 3,500 – 4,000 metres of NQ drilling
- 15 – 20 holes
- Q1 – Q2 2011
TSXV – PAV TSXV – PAV
COMPARABLES
Name Trading Symbol
Market Capital Resource
Consolidated Thompson Iron Mines Ltd.
CLM $ 4.2 billion 640 mt of 29.76% indicated Bloom Lake935 mt of 29.72% indicated Lamelee (drilled down to over 500 metres)
Champion Minerals Inc. CHM $ 231 million 500 mt of 28% inferred(drilled down to over 500 metres)
Oceanic Iron Ore Corp. FEO $ 128.3 million 430 mt indicated 36.8% in historical test (Roberts Lake property)510 mt indicated 22.1% in historical test (Morgan Lake property)590 mt indicated 35.7% in historical test (Hope property)
Fancamp Exploration Ltd. FNC $ 33.6 million none17.5% of CHM Black Dan and East property
Alderon Resource Corp. ADV $ 277 million estimated 1100 - 500 mt 28% - 32%
Labrador Iron Mines Limited
LIM $5.3 billion Estimated 125 mt of 56%
Pacific Arc Resources Ltd. PAV $ 6 million 60 mt of approx 27% possible (drilled down to only 100 metres)
TSXV – PAV TSXV – PAV
CAPITAL STRUCTURE
Issued & Outstanding (February 2011) 15,140,000
Options 1,200,000
Warrants 3,460,000
Fully Diluted 19,800,000
- 52 Week Low/High Range $0.185 / $0.50
- Working Capital ($1,000,000) / Debt (none)
- Ownership, Directors & Officers @ 27%
TSXV – PAV TSXV – PAV
DIRECTORS AND OFFICERS
Harry Chew, CGA, BBA President, Chief Executive Officer and Director
Jerry A. Minni, CGA Chief Financial Officer, Secretary and Director
Sonny Chew, BA Econ Director
Gerald G. Carlson, Phd PEng Director
Contact Info:1518 – 1030 West Georgia St.Vancouver BC V6E 2Y3P: 604.689.2646 F: 604.689.1289E: [email protected] URL: http://www.pacific-arc.com
TSXV – PAV TSXV – PAV
DISCLAIMER
Certain statements and figures contained herein are or may be “forward-looking statements” or “forward-looking information”
(collectively “FOFI”) under applicable securities laws. Such FOFI, including, without limitation, statements concerning future
production estimates and forecasts regarding future commodity supply and pricing, involve known and unknown risks, uncertainties
and other factors which may cause the actual company and industry results or performance to be materially different than the future
results, performance or achievements implied by such FOFI. These factors and risks includes without limitations, assumptions and
risks associated with manufacturing, development, marketing and sales, access to sufficient capital, currency fluctuations, government
regulations and approvals and other known and unknown risks and uncertainties.
Please be cautioned that these factors and risks are difficult to predict and the assumptions used in the preparation of the FOFI
contained herein, although considered accurate by Pacific Arc Resources Ltd.’s management at the time of preparation, may prove to
be incorrect. Please be further cautioned that the above list of risks and factors is not exhaustive and there is no representation made
by Pacific Arc Resources Ltd. that actual results will be the same in whole or in part as set out in the FOFI.
Readers are cautioned not to place undue reliance FOFI as it is inherently uncertain. The FOFI contained herein is made as at the date
set out above, and Pacific Arc Resources Ltd. does not undertake any obligation to update or revise any of the included FOFI, whether
as a result of new information, future events or otherwise. All FOFI contained herein is expressly qualified by the above cautionary
statements.
TSXV – PAV TSXV – PAV