TSR Form

Embed Size (px)

Citation preview

  • 8/11/2019 TSR Form

    1/3

    User Information

    9/24/14 Other User Information

    OEM -

    Custom

    OEM - Driver F

    If no, please kindly include PLC (prefer Rockwell) to convert Modbus to 4-20mA signal in scope of supply.

    Conditions of Service

    Units

    gpm

    psi g

    psi gftftftdeg F

    cPpsi a

    Fluid Characteristics

    Auto-Ignite Yes NoYes No Hazardous Yes No

    supply for wireless monitoringsystem for cooling watersystem

    Speed-RPM

    Clients would like us to design the network to receive Flow and vibration from their cooling wa

    NPSHA

    Temperature

    Problem / Reliability History / Comments:

    Purpose of this Request

    NPSHR

    Technical Services Request Form

    FOR LUBE OIL SYSTEM UPGRADES PLEASE INCLUDE PHOTOGRAPHS OF EXISTING SYSTEM

    Requestor

    Sales EngineerEnd User / Site

    Sales RegionIndustryServiceSize / Type of Pump

    Serial Number(s)

    Seal Type / Flush Plan(s)Driver Type / HP

    INCLUDE MAINTENANCE SUMMARY & MEAN TIME BETWEEN REPAIR (MTBR) RECORDS IF APPLICABLE

    1. Provide proposal to install wireless network cover cooling water system and advise the range our system can be cover in their plant.2. They have existing flow transmitter 4 point as attached specification. Please kindly advise if we can trap signal from existing transmitter.

    3. Propose 2 units of new vibration wireless transmitter to install at the NDE side of motor of cooling water pump.

    5. They plan to install the receiver on the roof of control room and wire to inside

    7. DCS needs 4-20mA signal from receiver, please help advise if our signal from receiver is 4-20mA.

    4. IEC62591 standard is preferred design standard. Please kindly advise our product deviation over this standard.

    6. Power supply for all installed equipment should be battery not solar cell energy.

    Educational Services - CustomerThis request is for >>>>>>> Type of Service >>>>> Budget/Estimate

    PTTGC/I1

    Chemical

    Niti Yuangyim

    Today's Date Asia PacificRequired Response Date

    Future (if ApplicaAs Shipped Current

    Suction Pressure -Rated

    Discharge Pressure -Rated

    Life Cycle Cost Information (LCC)

    Concentration (% by Wt) Max. Particle Size (mils)

    Suspended Solids

    Type Corrosives (H2S, Chlorides)

    Vapor Pressure at PT

    Fluid

    TDH-Rated

    Viscosity

    Flow-Rated

    Specific Gravity:

  • 8/11/2019 TSR Form

    2/3

    Requests Sales Regions Industry Service Type

    Select Request Type Select Region Select Industry Select Type of ServicComponent Technology Group Canada - Eastern Chemical Firm Price QuoteDecoking Equipment Upgrade Canada - Western General Industry Budget/EstimateEbulating Equipment Upgrade Mid-West Nuclear - Non Safety Pay JobEducational Services - CustomeNorth East Nuclear - Safety QRC SupportEngr Analysis South East Oil & Gas Sales AssistMaterial Upgrade West Coast Power Mechanical Seal Upgrade Asia Pacific Water PIE Services Europe/Africa

    Power Frame Retrofit Latin AmericaPump Hydraulic Rerate Middle EastPump Mechanical UpgradeSystem AssessmentTechnical InformationTurn Key Services

  • 8/11/2019 TSR Form

    3/3