7
TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

Embed Size (px)

DESCRIPTION

TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003. TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003. Monitor the environmental parameters (RH%, T°C) in the course of Air Curing in tobacco (hobo loggers). - PowerPoint PPT Presentation

Citation preview

Page 1: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

TSNAs IN AIR CURED TOBACCO TASK FORCE

CURING COLLABORATIVE STUDY 2003

Page 2: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

2

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY 2003

• Monitor the environmental parameters (RH%, T°C) in the course of Air Curing in tobacco (hobo loggers).

• To establish the relationships between curing conditions and TSNAs conc. In Air Cured Tobacco.

OBJECTIVES

Page 3: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

3

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY 2003

• Use preferably a high NN line of Burley or DAC Tobacco

• Carry out study in 5-10 different curing barns.

• Place hobo-loggers at a representative point in the barn and outside the barn.

• Record dates, observations at curing phases.

• Take a representative sample of upper-middle leaves around the hobo-logger for TSNA, NO2

-, NN and grade

PROTOCOL

Page 4: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

4

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY: preleminary data

Code Grower Tobacco Transplant Topping

JTI-1Leaf Tobacco Research Center Japan

Burley Kitakami 1

April, 16June, 30 1 Leaf removed

August, 7 primed

JTI-2

Leaf Tobacco Research Center Morioka-Japan

Burley Burley 21

April, 22July, 3 1 leaf removed

August, 19 primed

US-1

U.S. Smokeless Tobacco Tennessee

D.A.C. TR Madole

May, 20August, 11 15 leaves

Sept, 11 stalk cut

ANITTA-1 Dutreuil 1Burley BB16A

May, 22 July,26 August, 29 stalk cut

ANITTA-2 Dutreuil 2Burley BB16A

May, 22 July,26 August, 22 stalk cut

Harvest

Page 5: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

5

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY: preleminary data

Code Grower Tobacco Transplant Topping

ANITTA-3 Escup 1Burley BB16A

May, 29 End of July August, 13 stalk cut

ANITTA-4 Escup 2Burley BB16A

May, 29 End of July August, 20 stalk cut

ANITTA-5 Escup 3Burley BB16A

April, 22 End of July August, 22 stalk cut

ANITTA-6 Beaudoin 1Burley BB16A

April, 16 July,18 August,13 stalk cut

ANITTA-7 Beaudoin 2Burley BB16A

April, 16 July,18 August, 22 stalk cut

Harvest

Page 6: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

6

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY: preleminary data

CodeType and Dimensions

(m)Roof Wall

%Side openings

Spacing equipments H EOY EOB EOC

JTI-1

Plastic shed L:9 W:4,5 H:3,3then conventional L:7,2 W:4,5 H:6,3

VinylSteel

VinylSteel

30%12%

145l / m3

204l / m3

--

Aug 7 primed

Aug 13 Aug 18 sept-05

JTI-2

Plastic shed L:18 W:4,5 H:3,3then conventional L:27 W:10 H:5,6

VinylSteel

VinylSteel

30%10%

145l / m3

204l / m3

Heater(oil)heater(oil)

Aug 19 primed

Aug 25 sept 5 sept 24

US-1Conventional L:40 W:13 h:10

metal wood 0,15

6,7 pl/m3

or 100,5 l>/m3

-

FR-1 Plastic shed Plastic Plactic 60% 30 pl/m² Heater (gaz) Aug 29 Sep 4 Sep 22

Curing PhasesThe Barn

Page 7: TSNAs IN AIR CURED TOBACCO TASK FORCE CURING COLLABORATIVE STUDY 2003

7

TSNAs IN AIR CURED TOBACCO TASK FORCECURING COLLABORATIVE STUDY 2003: preleminary data

CodeType and

Dimensions (m)Roof Wall

%Side openings

Spacing equipments H EOY EOB EOC

FR-2 Plastic shed Plastic Plastic 60% 30 pl/m² Heater (gaz) Aug 20 Sep 4 Sep 22

FR-3 Conv. 1 tier Fibrocement Plastic 50% 27 pl/m² Aug 20 Aug 30 Sep 15

FR-4 Conv. 2 tier tile Plastic 20% 27 pl/m² Aug 13 Aug 30 Sep 15

FR-5 Conv. 1 tier Metal sheet Plastic 50% 27 pl/m² Aug 20 Aug 30 Sep 15

FR-6 Plastic shed Plastic Plastic 60% 33 pl/m² Heater (gaz) Aug 13 Aug 20 Sep 10

FR-7 Plastic shed Plastic Plastic 60% 33 pl/m² Heater (gaz) Aug 22 Aug 30 Sep 20

Curing PhasesThe Barn