• Complete a winterization to prevent system freeze
• Protect the client’s investment
• Provide feedback of system condition
Purpose:Purpose:
Optimum Results:Optimum Results:
• Complete winterization following Truly Noble Services, Inc. guidelines
• Submit photos, Preservation Services Report (PSR) and Winterization Form to document your work
Winterization StepsWinterization Steps• Turn main electrical
breaker to off position• Turn off main water
supply line• Remove water meter
(if allowed by local municipality) and cap/plug supply line
• Drain the Water Heater
• Turn all faucets to on position
• Attach compressor and blow air through lines to remove excess water
• Turn all faucets to off position
• Add anti-freeze to all drain lines, toilet bowls and tanks
Complete Your ReportComplete Your Report
Complete the Winterization Report
Answer all questions completely
Note any visible freeze damage
Remember to sign & date it
Indicate if the system held pressure or not in the Notes section.
Keys to Remember:Keys to Remember:
• Do not attempt to complete the winterization if there are any signs of freezing
• When blowing the lines, keep all valves & faucets closed a few moments to allow pressure to build up.
• Always zip-tie the main water shutoff.
• Be sure that all excess water is removed from toilet tanks & bowls before adding antifreeze.
• Photos must document each step of the process as provided on your work order.
Keys To Remember:Keys To Remember: