Company Profile
State-of-the-art quality and reliability in
Engineering, Procurement and
Construction
PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.
8/18/2019 Truba Company Profile
2/20
Missionl Produce and provide products and services that are of
high quality standards, timely, and cost efficient both
in terms of production and services
l Utilize technical abilities and technologies that are
appropriate and are dedicated towards providing
innovative solutions
l Understand needs, provide solutions to problems as
well as exceed client expectations
Vision To respond to the challenges of engineering
and power generation
Contents
Page 1. The World of Truba ManunggalPage 2. Message from The President Director
Page 4. Corporate Structure
Page 5. Some of Truba Manunggal’s SubsidiariesPage 6. Integrated EPC Services
Page 9. Power Generation
Page 11. Coal
Page 15. The People of Truba Manunggal
Page 14. Environment, Health and Safety
Page 17. Management Team
8/18/2019 Truba Company Profile
3/201 TRUBA ALAM MANUNGGAL ENGINEERING
The World of TRUBA MANUNGGAL
Coal
The Company provides EPC services through its subsidiaries,
PT Manunggal Infrasolusi. PT Manunggal Infrasolusi deals with
EPC work related projects to power infrastructure as well as
other industrial EPC such as the oil and gas sector. PT Manunggal
Infrasolusi operates two other companies under its management
in the form of PT Truba Jaya Engineering and PT Manunggal
Engineering. Over the years, through its subsidiaries, The Company
has constructed about 90% of PLN’s coal-fired and gas-fired
power plants, or roughly 15,000 MegaWatt capacity, including the
construction of some of the largest power plants in Indonesia for
the state-owned company PLN, such as:
- 2 x 660 MW CFPP (coal-fired power plant) Paiton, East Java- 3 x 600 MW CFPP Suralaya, West Java
- 2 x 660 MW CCFP Tanjung Jati B, Central Java
- 740 MW GTCC (gas-turbine combined cycle) Cilegon, West Java
- 1500 MW GTCC Gresik, East Java
Integrated Engineering, Procurement and Construction (EPC)
Domestic demand for electricity in Indonesia is still considered
largely unmet; particularly in areas outside Java. In addition, the
presence of adequate infrastructures and utilities such as electricity,
is one of the factors that induces favorable environment for
investments. In response to this need, the Government opened
up the power generating sector to private sector participation in a
bid to overcome the power supply shortage. Truba Manunggal has
responded positively to the Government’s call, and is well on its
way in constructing several power plants which it will subsequently
operate and maintain.
Power Generation
Indonesia holds significant amounts of coal reserves that could
meet the demand for energy fuel in Indonesia for many years to
come. This offers the opportunity for coal to serve as a much more
affordable source of energy. Truba Manunggal recognizes this
opportunity and set its sight on securing concessionaires with
proven coal reserves as well as obtaining the rights for exploratory
works.
Truba Manunggal is also engaged in industrial projects in and outside of Indonesia, including: Installation of gas turbine for
Arabian Bemco, Tank works for Qatar Petroleum, Gantry Cranes for Laem Chabang and Structural works for Siemens. Truba’s
industrial projects in Indonesia includes: NSO phase A field for Exxon Mobil, Nickel smelter plant for INCO, Aromatic plant for
Pertamina and Urea fertilizer storage for PT Pupuk Kaltim.
8/18/2019 Truba Company Profile
4/202 TRUBA ALAM MANUNGGAL ENGINEERING
Message from The President Director
8/18/2019 Truba Company Profile
5/203 TRUBA ALAM MANUNGGAL ENGINEERING
We have decades of expertise in the engineering,
procurement and construction of power plants, which
will soon provide a steady and sustainable stream
of revenues from our long-term Independent Power
Producer contracts.
Competitive Strength
Needless to say, our competitive strength lies in
such unique integration, enabling us to make highly
competitive bidding for prime power generating
projects, while ensuring our partners and shareholders
the prospects of a sustainable long-term growth.
Truba Manunggal’s strength lies within our high quality
and experienced workforce, as well as our vertically
integrated line of business.
We believe that, despite today’s challenging conditions
on the global economic front, Truba Manunggal has
excellent long-term growth prospects on the strength of
our strategic integration of the EPC, IPP and Coal Mining
businesses.
As an integrated EPC, IPP and Coal Mining operations,
our three core businesses complement and support one
another.
Sidarta Sidik
President Director
8/18/2019 Truba Company Profile
6/204 TRUBA ALAM MANUNGGAL ENGINEERING
PT Truba Alam Manunggal Engineering Tbk.
Corporate Structure
PT Maxima Infrastruktur
(Coal Mining & Trading)
TAME Turnkey(Labuan) Pte. Ltd.
Grenzone Pte. Ltd.
PT Truba Segihan Utama
(Stock Piling)
Manunggal Beijing
International Trade Co. Ltd.
TAME T.C. Pte. Ltd.
TAME Investments
Pte. Ltd.
PT Manunggal Infrasolusi
(Power Plant/Industrial)
PT Truba Jaya Engineering
(Construction)
PT Manunggal Engineering
(Engineering & Procurement)
PT Suar Alam Engineering(Engineering & Procurement)
PT Manunggal Power
(Power Plant)
PT Manunggal Multi Energi
(Coal Mining)
PT Equator Manunggal
Power
PT Bangka Manunggal
Power
PT Ranyza Energi
PT Central Daya Energi
PT Menamas Mitra Energi
8/18/2019 Truba Company Profile
7/205 TRUBA ALAM MANUNGGAL ENGINEERING
Independent Power Producer (IPP)PT MANUNGGAL POWER
Coal Mining and TradingPT MAXIMA INFRASTRUKTUR
Engineering Procurement
Construction (EPC)PT MANUNGGAL INFRASOLUSI
Some of Truba Manunggal’s Subsidiaries
l PT Manunggal Engineering
l PT Truba Jaya Engineering
l PT Suar Alam Engineering
l PT Menamas Mitra Energi (MME)
l PT Central Daya Energi (CDE)
l PT Ranyza Energi
l PT Banyuasing Power Energi
l PT Bangka Manunggal Power
l PT Equator Manunggal Power
l PT Manunggal Multi Energi
l PT Truba Segihan Utama
l Maxima Coal Pte Ltd
8/18/2019 Truba Company Profile
8/206 TRUBA ALAM MANUNGGAL ENGINEERING
IntegratedEPC Services
8/18/2019 Truba Company Profile
9/207 TRUBA ALAM MANUNGGAL ENGINEERING
Truba Manunggal views its EPC services as an integral
part of a one-stop solution for the development and
commissioning of electricity power plants, transmission
and other industrial works.
To achieve this, the Company has established wholly-
owned subsidiaries, namely PT Manunggal Infrasolusi.
EPC (Manunggal Infrasolusi) which is engaged in powerplant and industrial EPC.
The three subsidiaries of Manunggal Infrasolusi are
PT Truba Jaya Engineering (TJE), which is engaged
primarily in construction activities, and PT Manunggal
Engineering and PT Suar Alam Engineering, both of
which are engaged in engineering and procurement
activities.
TJE has implemented a number of installations that
include power plants, machinery for industrial as well
as the oil and gas sector. Whereas ME and SUE provide
technical assistance for power plant construction
projects, through feasibility study, detail engineering, as
well as procurement of machinery and equipment. All
three companies crucially support the Company in its
venture to operate in an integrated manner.
With over 30 years experience in EPC, we are one of
Indonesia’s leading EPC contractors for a wide variety of
power and industrial plants. We estimate that, through
TJE, we have built more than 90% of the coal-fired
and gas-fired power plants in Indonesia, with unitcapacities ranging from 25 MW to 660 MW and a total
installed capacity of more than 15,000 MW. We have
also successfully completed a large number of industrial
plant EPC projects, including cement plants, fertilizer
plants, chemical and petro-chemical plants, oil and
gas processing facilities and pulp and paper plants. In
addition to our existing EPC capabilities, we are also
currently expanding into the construction of renewable
energy power plants.
The Company’s procurement services includes access
to raw materials and construction equipment, building
materials, and imported goods needed for construction,
mechanical or electrical works.
The Company is an integrated Engineering, Procurement, and
Construction (EPC) services include the construction of power plants
and industrial plants.
Overseas Project – Truba Arabia
Truba Arabia is a Joint Venture between PT Truba
Jaya Engineering (TJE), a wholly owned subsidiary of
“Truba Manunggal”, and Arabian Bemco Contracting
Co. (BEMCO) a leading EPC contractor in Saudi Arabia. Truba Arabia started operation in 2002 to serve Electrical
and Mechanical installation of the power generation
industry, oil & gas and industrial plants projects in
Saudi Arabia and the Middle East region. Truba Arabia
has a dedicated team of professional and highly skilled
workforce of over 1,000 personnel. The company has
already been contracted to install more than 40 gas &
steam turbines in Saudi Arabia
with a combined generating capacity of 4,000 MW.
Truba Arabia’s Quality and Safety is built upon TJE’s
system that is internationally certified - ISO 9000:2000,OHSAS and ASME. TJE provides support to Truba Arabia
by mobilizing experienced key project supervision
personnel and provides technical assistance in all
aspects of the management of projects.
Certification
Truba Manunggal, through TJE, is accredited by the
American Society of Mechanical Engineering (ASME) for
the design and assembly of power boilers. TJE has also
obtained the International certifications in the form of
ISO 9001 (Quality Management System) from Llyod’s, ISO
14001 (Environmental Management System) and AHSAS
18001 (Occupational Management) from Sucofindo
International. These certifications testify the Company’s
strength in human resources; the skills and experiences
of the Company’s personnel and ability to meet vigorous
standards of quality control.
Completed EPC Projects
Power Plants
PLTU Unit 1 & 2 (2x65MW) Banjarmasin Mitsui 1998Co-Generation 300MW Duri Utara Stone & Webster 1999
GTPP 2x50MW Pemaron Wasamitra 2003 Turbin Gas 6x143MW Muara Tawar Samsung 2003Cilegon CC 740MW Cilegon Mitsubishi 2004PLTU 2x300MW Cilacap Cengda 2004PLTU Unit 3 & 4 (2x100MW) Tarahan JEL 2005PLTU Tanjung Jati B (2x660MW) Jepara JEL 1997
(Jurong Engineering Ltd.)PLTU Unit 3 & 4 (2x100MW) Tarahan JEL 2005
Project Name Location Client Commencement Date
8/18/2019 Truba Company Profile
10/208 TRUBA ALAM MANUNGGAL ENGINEERING
EPC projects under construction
PowerPLTU 2 (2x300 MW) Coal Fired Steam Power Plant Banten, West Java Chengda Engineering Corp. Mar 07PLTU Pelabuhan Ratu 3x300 MW West Java Shanghai Electric Corporation Nov 07 PT Maxima InfrastrukturMuara Karang Gas Power Plant Project West Java Mitsubishi Corporation Sep 07 (Repowering) 720 MWPLTU Indramayu 3x330 MW West Java China National Electric Nov 07 Equipment Corporation (CNEEC)PLTU 1 Banten Suralaya Unit 8, 1x600 - 700 MW West Java China National Technical Jan 08 Import & Export CorporationCFSPP Paiton 1x660 MW, Central Java East Java Beijing Electric Power May 08 Constructio Company (BEPCC)CP - Bharai Power Plant (2x30 MW) CFSPP Sumatra Manunggal Engineering Jul 08PLTU Tanjung Jati - B (3&4), CFPP 2x660 MW Central Java Balance of Plant Sumitomo Corp. Erection Div. Jan 10
Mechanical Erection PT Jurong Engineering Lestari Feb 10 Installation of CW Pipe Sumitomo Corp. Erection Div. Feb 09 Mechanical Erecrion of Boiler & Auxillary Equipment PT Jurong Engineering Lestari Oct 09 Steel Structure Erection & Field Painting of MES-TSW Jont Operation Jun 09 Turbine & Control Building (Mitsui Eng. & Shipbuilding Co. Ltd.)PLTU Paiton Unit 3 Expansion Project, Paiton East Java Taehei Dengyo Kaisha Ltd. Nov 09
Oil and Gas and other Industries
LNG Tangguh - Mechanical work Papua JGC/KBRI Jul 06 TEL MUSI - Maintenance work Sumatra PT Tanjung Enim Lestari Apr 08RAPP - Maintenance work Sumatra PT RAPP/PT IKPP Oct 08Oil and Gas EPC - Duri Sumatra Chevron Pacific Indonesia Feb 08Oil and Gas EPC - Duri Sumatra Chevron Pacific Indonesia Mar 08GIIC Pellet Plant Mechanical & Bahrain Kobe Steel Ltd. Nov 07 Erection Work Plus Steel Structure Supply and Works
Completed EPC Projects
Paper FactoriesMusi Pulp Mill Tanjung Enim Klockner 1998
Mechanical and Construction Work PM 2 Pekanbaru Pectech Sep 07 Tank Foundation work, piping, Aerial pool Pekanbaru Pectech Sep 07Area Maintenance IKPP/RAPP Pekanbaru IKPP/ RAPP Apr 07Power installation in Kiln Evaporator Pekanbaru Pectech Aug 07
Oil and Gas
Area-10 Pipe Line Duri Caltex 1999Oil Tank Rehabilitation Mesaid Qatar Qatar-Petro 2001Oil Production Area OSEIL Seram Daewoo 2001Area-10 Hook-Up & POP Duri Caltex 2002Suban Gas Suban Hyundai 2002Booster Compression Lhouksukon Tri Patra 2002Depot Terminal BBM Cikampek Pertamina 2002DSF-11 Duri Caltex 2003Oil Area maintenance Minas Caltex 2003FPM Duri Tri Patra 2005FPM Minas Tri Patra 2005LNG Tangguh Tanah Merah Japan Gas 2006
Corporation (JGC) TrackKellogg Brown & Root (KBR)
FPM—Maintenance and Construction work Duri Tripatra—Flour Dec 07
Civil Work and Ground Work Kulin Tripatra—Flour Dec 07Fertilizers FactoriesUBS-3 and conveyor system Bontang Chengda 2000UBS-5 and conveyor system Bontang Kalimantan Industrial 2005
Estate (KIE)
Chemical Factories Styrene Monomer (SM-2 exp) Merak Mitsubishi 1998RFCC Taoyuan Taiwan Lucky Gold (LG) 2000
Engineering
Cement PlantKerteh Olefin Plant Malaysia JEL 2000Cement Factories
SteelCibinong Cibinong Semen Cibinong 2003Steel Processing and MiningIndominco Coal Bontang Mitsubishi 1998Inco-Dryer Unit 2 (Gas Cleaning) Soroako Beca 1998Up-grade Coal Port Kertapatih PT Bukit Asam (Persero) 2001
(PTBA)Construction work and Soroako Inco Dec 07
Gas Cleaner Installation
Pipe and Tank ConstructionMinas Tank GS-6 Riau Siemens 1998
Tank Renovation TK-220 Dumai Elnusa 2000
Oil Tank OSEIL Bula Daewoo 2001Depot Tank BBM Cikampek Pertamina 2002Civil and Architectural Work Bridge Expansion Lukut-Ukui Perawang IKPP 2002Heavy Equipment Work Container Crane Tg.Mas Semarang IHI 1998Container Crane ESCO Thailand JEL 1998Container Crane P.Panamac Jakarta Barata 1999Container Crane Makasar Makasar Noell Indonesia 2000RTG Crane 35 ton Panjang Pelindo II 2001
Transmission and Substation Work Transmission and Power Tower Cilegon Mitsubishi 2004Spilicing Fiber Optic Line 4 Soroako Inco 2004
Project Name Location Client Commencement Date
8/18/2019 Truba Company Profile
11/209 TRUBA ALAM MANUNGGAL ENGINEERING
Power Generation
8/18/2019 Truba Company Profile
12/2010 TRUBA ALAM MANUNGGAL ENGINEERING
Electricity power in Indonesia is currently in short supply.
The problem is more acute in areas outside Java where
infrastructure development has lagged behind those in
Java.
The enactment of regional autonomy laws has meant
that Indonesian provinces have to generate their own
revenues by stimulating local industries and businesses.
But with the prevailing power shortage, neither business
nor investments can be expected to take roots, much
less grow.
The Government is fully aware of the power crisis
situation. Hence, the Government of Indonesia has
embarked on an accelerated program to construct new
power plant that will produce about 10,000 MW ofelectricity from coal-fired power plants. The program is
termed the 10,000 MW Fastrack program that is slated
to be completed within 3 years, beginning construction
in 2007. The move by the government to utilize coal
as fuel for power generation is due to the abundant
coal reserves that Indonesia has, which would provide
a cheap solution for power generation to an emerging
country like Indonesia. This program is open for private
sector participation.
Responding to this opportunity, the Company positions
itself to undertake not only the EPC for power plants,
but to build, own and operate these power plants as the
so-called Independent Power Producer (IPP).
As an IPP, the Company will supply electricity to PT PLN
(Persero) as well as to private industries, regulated by
terms and conditions agreed upon by the Company and
the purchaser through a Power Purchase Agreement
(PPA).
Truba Manunggal IPP projects will focus outside of Java
Island. Allowing the Company to step in to provide
the unmet needs coming from more than 20 millions
consumers.
More than three decades of hands-on expertise in the engineering,
procurement and construction of major power plants in Indonesia have
made Truba Manunggal a front-runner in the unfolding market for the
so-called Independent Power Producer.
The Company’s key competitive advantages are:
1. Long and extensive experience and role as EPC
contractor for power, will allow effective control over
quality standards and construction management.
2. Construction of the IPP are mainly undertaken by the
Company itself, minimizing execution and
construction risk.
3. Access to semi-captive coal supply.
4. IPP sites located in areas that will ensure access to
water catchments as well as ease of logistics.
“At present, the Company is operating 3 power plants
with total capacity of 170 MW, which consist of:
1. 130 MW CDE Diesel in Lampung
2. 20 MW Tanjung Batu, East Kalimantan
3. 20 MW Karang Joang, East Kalimantan
“Truba Manunggal currently has 4 Power Purchase
Agreement (PPA) with PLN and 1PPA with a private
company, with total generating capacity of 414 MW:
1. 2x12MW Bangka, Bangka Island
2. 2x30MW Pontianak, West Kalimantan
3. 2x30MW CP Bahari, Lampung
4. 2x135MW Kuala Tanjung, North Sumatera
8/18/2019 Truba Company Profile
13/2011 TRUBA ALAM MANUNGGAL ENGINEERING
Coal
8/18/2019 Truba Company Profile
14/2012 TRUBA ALAM MANUNGGAL ENGINEERING
The Company is also in the business of operating coal
mines and the trading of coal. These activities are carried
out in line with efforts to provide fuels needed to power
coal-fired power plants that are currently being build in
Indonesia as well as potential foreign market.
Positive business prospects
To address the power crisis that Indonesia is in, the
Government of Indonesia put into plan of building
10,000 MW of coal-fired power plants. The decision
to use coal as fuel for power is mainly due to the fact
that coal is presently the cheapest form of fossil fuel. In
addition to that Indonesia is blessed with the abundant
coal reserves, which would be of strategic importance
for the Government of Indonesia.
The fact that Indonesia is also considered as anemerging market, the demand of power would kept on
increasing, because it not only need to meet the pent up
demand, but to add more affordable power capacity to
fuel the economic growth of the country.
This situation provides positive and ample growth
opportunities for the coal industry for the next decades
to come. In terms of the composition of energy sources
currently utilized by power plants in Indonesia (which
includes coal, gas, geothermal, water, and oil) coal
comprise as the largest type used and its composition is
expected to increase from 43% in 2006 to become 54%
by 2015.
With potentially strong businesses in both EPC and IPP, it makes
strategic sense for Truba Manunggal to secure its own supply of coal.
Securing this, will shape us into a fully integrated, coal-fired power plant
developer, operator and maintenance company.
The Company projects that the domestic consumption
of coal is expected to increase to as much as 30 to 40
million tons per year with the 10,000 MW coal-fired
power plants coming on-stream. The Company intends
to best utilize market opportunities in line with its
businesses in the ownership of power plants, and
integrated supplier of energy required by power plants.
Securing Coal Sources and Supply
At present, Truba Manunggal owns 2 exploitation
licences which includes Manunggal Multi Energi (MME)
at Muara Enim regency, South Sumatra, and Panimax Inti
Mining (PIM) at Tanah Bumbu, Kalimantan.
The Company plans to start producing from its coal
reserves, which at present estimate has about 140
million tons.
8/18/2019 Truba Company Profile
15/2013 TRUBA ALAM MANUNGGAL ENGINEERING
As a result, human resources counseling and
development within the Company are both carefully
planned and continuously implemented to ensure
that each employee contributes their best to
the Company’s performance. In addition to this,
management’s policy on human resources seek to,
among others, fulfill and move in accordance withGovernment prescribed labor regulations and norms
such as its participation in the Labor Social Guarantee
(Jaminan Sosial Tenaga Kerja) or JAMSOSTEK scheme.
In terms of improving work quality and productivity,
the Company provides opportunities for its employees’
access to education and training as a means of
refreshment from work as well as to enhance one’s skill
sets. In implementing this, a program is developed
involving employees to identify skill sets that would
be needed to enhance the effectiveness of Truba’s
people in achieving Company’s goal, which in
return developed Truba’s people into a high quality
workforce. This program could include the typical
internal or external update seminars, workshop and
courses, but also scholarship for advanced studies.
Corporate Values
PT Truba Alam Manunggal Engineering Tbk. builds strong relationship with its stakeholders based on 10 (ten) core
values, divided into 2 (two) categories, namely external and internal values.
Human resources are considered to be a vital element of the Companyfor they are partners needed to achieve success for every business and
activity.
In addition to this, the Company seeks to promote
positive core values to all of its employees such
as integrity, transparency, cooperation, creativity,
determination, and providing the utmost in terms of
service.
Regular training and employee recruitment arecarefully planned and implemented in line with the
current and future professional needs of the intended
trainee. The Company’s recruitment program is based
on a Business Plan that was mutually agreed upon
by all operational managers and which takes into
account, among others, the candidate’s qualifications.
At the same time, the Company strives to instill a safe
and healthy working environment, implement external
benchmarking to enhance employee creativity,
ability and productivity, as well as improve work
efficiency and HR placements so as to ensure that
the right people are in the right place. Subsequently,
the Company intends to place its employees with
its strategic partners in a number of joint venture
projects, with particular emphasis on Engineering, in
order to enhance the Company’s competitiveness.
Internal Values1. Competence, continuously advance the quality
of skills, proficiencies, and mental attitude foreffectiveness of work.
2. Efficiency, the determination to always do the right
thing, always seeks the chances of improvement and
efficiency, always creative and innovative in order
to create added value for customers with a proper
and competitive price.
3. Integrity, firmness in holding the principle of truth
and corporate value in business activity which is
presented in consistency of words and behavior.
4. Teamwork, sharing capabilities and skill sets, based
on mutual respect, to achieve goals effectively.
5. Responsibility, a fully integrated approach to Health,
Safety and Environmental (HSE) management inoffices, on site and at client’s locations, in every
place we provide our expertise ensuring HSE is top
priority in all of our activities.
External Values1. Dedication, passion in giving our best to provide
effective solutions.2. Competitive pricing, delivering products and
services which have high quality standard with cost
effective and always accomplished on the right time
as our promise.
3. Respect for Client’s need, performing transparency,
accountability, and responsibility which related to
the result.
4. Professionalism, Always striving to give high quality
standard of products and services,
5. Balance, live in harmony with related elements, such
as: environment, people and community as well as
improving the living standards of local communities
and protecting the global environment and strive togain the trust of our client’s and society.
The People of
TRUBA MANUNGGAL
8/18/2019 Truba Company Profile
16/2014 TRUBA ALAM MANUNGGAL ENGINEERING
8/18/2019 Truba Company Profile
17/2015 TRUBA ALAM MANUNGGAL ENGINEERING
The Company seeks to prioritize occupational health and safety and
environmental conservation in every aspect of its activities. In addition
to this, the Company also aspires to be a socially responsible organiza-
tion by seeking to improve the welfare of the community where we
operate as well as implement environmental-friendly practices that
would contribute to the global community.
Environment, Health
and Safety
8/18/2019 Truba Company Profile
18/2016 TRUBA ALAM MANUNGGAL ENGINEERING
Occupational Health and Safety
In its quest to ensure occupational health and safety,
the Company implements an onsite inspection of the
workplace of the work methods and impending issues as
well as job safety analysis. This process eventually results
in a Standard Operating Procedure (SOP) that is referred
to as the Work Safety Instruction (WSI). The instruction
incorporates work systems that must be implemented
by every employee to avoid work-related accidents.
In this respect, the Company’s subsidiary, Truba Jaya
Engineering (TJE), has successfully been certified by the
National Council on Occupational Safety and Health
Administration (OSHA) of the US. The certification
internationally recognizes that the Company’s business
activities are deemed to be both occupationally healthy
and safe. In addition to the OSHA certification, TJE alsosecured the OHSAS 18001 (for Occupational Health and
Safety Management System-Requirements).
Environmental Conservation
In addition to the OSHA and OHSAS, TJE was also
internationally recognized for its effort in environmental
conservation through the ISO 14001. The Company
seriously seeks and implements efforts to conserve the
environment and protect the ecosystem that reside with
it, so as to ensure that the Environment is sustainably
and continuously perform its natural functions as well
benefits to the inhabitants. To reduce its environmental
footprint, Truba Manunggal put into service a very
efficient waste recycling facility that is operated to
ensure that it is stringently in accordance with the waste
recycling system.
Social Responsibility
As a responsible corporate citizen, the Company is
committed to take active role in the effort to improve
the general welfare of communities where the Company
is operating, as well as striving to be an environmentally
friendly in its activity, which in the long run would
benefit every one of us.
Presently the Company is revisiting its CSR program, to
enhance and focus the program to be as effective as
possible as well as in line with the Company’s vision and
values.
As power plants are known to have significant impact on environmental andcommunity well-being, Truba Manunggal takes its Corporate Social Responsibilities
(CSR) seriously. The Company has developed a comprehensive policy guideline andmanual for the undertaking of CSR activities in the communities surrounding its
operations.
In the past, Indonesia has, as we all know, experienced
number of natural disasters that have taken its toll on
numerous lives. In response to these natural disasters,
Truba Manunggal had proactively formed special teams
to directly provide vital assistance and support. The
assistance extended by the Company are in the form of
cash, medicines, clothes, blankets, food and water, as
well as providing medical team to assist in the disaster
affected areas.
Other forms of social-related assistance provided bythe Company include a blood donation program that is
routinely implemented once every three months. Blood
donation does not merely seek to extend vital medical
support to its recipients but it also has positive health
benefits for the donor as well.
In terms of education and religion, the Company extends
a scholarship program to children from less fortunate
families to ensure that their education continues and
strive to achieve success. The Company also builds
religious facilities, particularly within the vicinity of its
projects. The construction of the religious facilities are to
provide the local community as well as our employees to
ease access to conduct their prayers.
Going forward Truba Manunggal will focus its CSR
activities on education. The Company strongly believes
in contributing to the “enlightenment of the Nation”.
Hence, presently the Company is developing programs
to achieve this goal.
8/18/2019 Truba Company Profile
19/20
Management Team
Sidarta Sidik
President DirectorPresident Director, hold a Master of Science from Stanford University, California, USA and a Bachelor of
Science from University of Washington, USA. Prior to 2001, Mr. Sidik had worked for several companies in
Indonesia such as PT NTT Indonesia, Artha Graha Group as well as in overseas NTT Group-Japan and ATKearney, Inc-USA. He currently also serves as President Commisioners in PT Truba Jaya Engineering
Shi Hong Chao
Director
Director, received a Bachelor’s Degree and a Master’s Degree in Thermal Power Engineering fromShanghai Jiaotong University and an MBA from China-Europe International Business School. Apart from
serving as a Director, Mr. Shi also serves as President Director of ME since November 2006. During the
period of June 1996 up to October 2006, he worked for CHEC and his latest position was OperationDirector in charge of business operations
Andre Purnawan
DirectorDirector, recieved his Master of Business in Administration (MBA), majoring in Finance and Marketing
in 1988, from Indiana University, Indiana USA. Since 2006, aside from being appointed as a Director at
PT Truba Alam Manunggal Engineering, he was also appointed as Commisioners both at PT Manunggal
Engineering and PT Truba Jaya Engineering. During his career days from 1995 to 2006, he also served asDirector for the Sinar Mas Group.
FX. Agus Edyono, S.Ip
Unaffiliated DirectorUnaffiliated Director, has a military background and his last active post was Colonel. During his militarycareer he served in East Timor, the Middle East, Morocco, Cambodia and Australia. Before his military
career, Mr. Edyono was part of the operational staff of PT Brajamusti Citra Nusantara and operational staff
of PT Usaha Kita Makmur Bersama. Mr Edyono holds a Bachelor’s Degree in State Administration, fromUniversitas Terbuka, Bandung, 1996
Julius Edi WibowoDirectorIndonesian citizen Received his Master of Science in Electrical Engineering majoring in wirelesscommunication in 1995 from Delft University of Technology – Delft, The Netherland. Upon his graduation,
Mr. Wibowo also served as researcher at Rheinisch-Westfälische Technische Hochschule (RWTH) Aachen,
Germany. Currently serves as Director of Truba Manunggal. Previously worked for several companiesincluding Booz-Allen & Hamilton Inc. and Deputy Director of Business Strategic & Planning in Truba
Manunggal.
Board of Directors
Richard HarjaniPresident CommissionerPresident Commisioner, received his Master’s degree in 1994. Prior to his current position, he served as
Chief Executive Officer at PT Sulawesi Agro Utama, from February to December 2007. From 1994 to 2006,Mr. Harjani also served as Chief Operating Officer at PT Rimo Catur Lestari.
Siswanto
Independent CommissionerAn independent Commisioner with a military background, he last held the rank of Brigadier General of
the Army. During his military career, Siswanto served in a number of important positions, including in
the UN Mission at Cambodia, lecturer at the Army Command Staff School in Bandung, and a staff at the
Planning Bureau, Army Head Quarters. Currently, he also serves as Comisioner or Director at several othermajor corporations.
Board of Commissioner
8/18/2019 Truba Company Profile
20/20
Corporate Data
Name of Company
PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.
Line of Bussines
Integrated Electricity Power, Engineering, Procurement
and Construction Provider.
Head Office
Wisma BRI II, 30th-31st Floor
Jl. Jend. Sudirman Kav. 44-46Jakarta 10210, Indonesia
Phone : (62-21) 5793 2255
Fax : (62-21) 5793 2334
Website: www.truba-manunggal.com
Corporate Secretary
Gamala V. Katoppo
E-mail : [email protected]