TRT Leak Repair. Anatoli Romaniouk, 22.05.2013. EC leak tests. Side C. Side A. Location of the pipes with leaks. B3 OUT F 13 1155 mm Ch. 9 Leak 2 l/h. EC Side C. B5 OUT F 9 910 mm Ch. 11 Leak 0.3l/h. A6 OUT F 20 1526 mm Ch. 6 Leak huge. B3 Bracket. А4 Bracket. B5 Bracket. - PowerPoint PPT Presentation
Citation preview
TRT Leak Repair
Anatoli Romaniouk, 22.05.2013 1
EC leak tests
Side C
Side A
2
Location of the pipes with leaks
А6 PPF1 connectorА4 Bracket
А2 Detectorside
А1 PPF1 connector
B3 Bracket
EC Side C
3
B5 Bracket
А3 Bracket
A2 OUTF 28
2099 mmCh. 2
Leak 0.3 l/h
A3 OUTF 26
1963 mmCh. 3
Leak 0.3 l/h
A4 OUTF 24
1814 mmCh. 4Leak huge
A6 OUTF 20
1526 mmCh. 6Leak huge
A1 OUTF 1
2388 mmCh. 1Leak 17l/h
B5 OUTF 9
910 mmCh. 11
Leak 0.3l/h
B3 OUTF 13
1155 mmCh. 9
Leak 2 l/h
EC Side C: Endoscope studyPipes were cut and were studied with endoscope from inside
4
A1 crack along the pipe (PPF1 connector)
5
A4 PPF1 bracket.
Detector connector
7
This pipe should be repaired
To go inside we need to open
some accesses
Repair should be done also here
(PPF1 area)
8
9
Example how pipes installed on the calorimeter flange
10
EC wheel type A connectivity
Electronics
Gas manifold
Gas
Straws/radiator
Electronics
Gas manifold
Gas
Straws/radiator
Gas IN
Gas OUTPEEK pipes shown in pink
Places of stress
EC: on detector connection
12
PEEK pipe termination
Most probable location of leaks
Repair at the detector level
NutPEEK pipe
Most probable places of leaks
Insert
Steel pipe
Polyurethane joint
Connector
Removable steel road
14
Example how pipes installed on the calorimeter flange
15
Repair status
TRT Wheel Repair and tests CommentsA1
A2 Done, OK Leak fixed
A3 Done, OK Leak fixed
A4 Done, failed Large, Repair is OK but leak in the other place
A5 Done, OK No leak before
A6 Done, partially failed Leak reduced but still large. Repair is OK but there is still leak in the other place
B1 Done, OK No leak before
B2 Done OK No leak before
B3 Done, failed Leak still at the level of 2.5 l/h (can be controlled)
B4 Done OK Leak was small, now no remarkable leak
B5 Done, failed Leak still at the level of 0.25 l/h (can be controlled)
B6
B7
B8
16
Next steps:
•Today - try to go outside of the tube ( A4 and A6) and see what can be done at the place of connection.
•End of the week - Close C side (if no additional repair can be made) and start working with side A.
•When side A will be available to start preparatory work?