17
TROUBADOUR MERIDIAN WATER STUDIOS

TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

TROUBADOUR MERIDIAN WATER STUDIOS

Page 2: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

WE HAVE THE ANSWER TO LONDON ’S

SHORTAGE OF STUDIOS

Page 3: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning
Page 4: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Excellent transport

links. Within the M25

Fully flexible spaces with over 25,000 Sq Ft of

workshop space

Over 105,000 Sq Ft built by 2023

Introducing an exciting new purpose built studio complex ideal for TV and Film shoots.

The studios are located on a 155,073 ft2 plot in Enfield, North London, offering extensive space for workshops, offices, parking and load ins. The site offers excellent transport links being just off the North Circular and is in striking distance from all major London airports.

The soundproofed studios are fully flexible and adaptable with excellent weight bearing capabilities, making them ideal for hire within the film industry.

Troubadour Meridian Water Studios

Extensive parking available

Page 5: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Fully Flexible state-of-the-art space with excellent weight and load bearing capabilities.Adaptable seating system for live audiences.

On site furnished production offices and dressingrooms equipped with WC and shower facilities.

Dimensions 20,921 ft2 / 56 x 38.5m.Internal height 19m - Ground floor truss - meaning you can rig and hang at any point.

Large dock door for Artics access and good ground floor loading capabilities.

Insulation and sound proof properties available upon request.

Stage 1

Page 6: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Troubadour Stage 1 - Floor Plan

Rev Date Details

Issued for Approval

29-07-20Moxon Way, Moor Lane Trading EstateSherburn-in-Elmet, Leeds, LS25 6ES

Tel: +44 (0)800 078 7916Email: [email protected]

Client:

Title:

Sheet:

Paper Size: Drawn By: Filename:

Scale: Sheet Number: Version: Ver Date:

TROUBADOUR-ENFIELD-MEGA-V1.6G

Troubadour

EnfieldMega Structure

PLAN-GRID

V1.6G

A3

1:200

RR

-

General NotesBasis of DesignThis has been prepared from information supplied to us by, or on behalf of the thecontractor, who should check that his requirements have been correctly interpretedand that all loadings, dimensions, lift heights, bay sizes, erection / striking sequencesetc. are as required and practicable.

Imposed LoadsThe contractor is to ensure that the existing structure, it's fabric and / or the ground willsafely support the extra imposed loads; or supply new.Maximum calculated tie load: See notesMaximum calculated leg load: See notes

Loadings AllowedThe contractor must ensure that all loading(s) allowed for is sufficient.Live loads: See notes

Wind loading: As BSEN1991-1-4Maximum number of boarded levels:

Shoring WorkWe can not and will not pass comment on the structure being shored, as this involvesmatters beyond our control and knowledge. It is the contractors responsibility toensure that the existing structure will safely span between our supports, and can besafely shored in the way indicated.

FoundationsThe contractor must prepare all foundations prior to erection.

Temporary RoofsNo temporary roof can be made watertight.Loadings: Snow loading assessed using BS6399 Part 3, unless the contractor adoptsa snow management system.

MaterialsAll scaffolding materials forming this structure are to comply, and be constructed inaccordance with BS1139 and TG20:13 (current editions).

ModificationNo alteration is to be made to the structure detailed on this drawing without priorwritten permission from Acorn Events Structures Ltd.

PropertyThis drawing is confidential and the exclusive property of Acorn Events Structures Ltd.No unauthorized use, copy or disclosure is to be made, and is to be returned onrequest.

DimensionsWritten dimensions shall take precedence over scaled dimensions. The contractormust verify all site dimensions and notify of any discrepancies prior to erection.

PermitsThe contractor must obtain all permits and permissions prior to erection.

Construction Notes1) All ladder beams and/or unit beams are to be tied together at 1200 centres on topcord and 2400 centres on bottom chord, with the top chord plan braced, unless statedotherwise.2) Unless otherwise noted all lifts other than boarded platform levels are to beconstructed using load bearing couplers.3) All general construction is to be in accordance with TG20:13 unless notedotherwise.4) Main contractor to undertake all making good where necessary.5) Main contractor to provide and maintain adequate tie positions.6) No sheering, wind protection of fans to be added to this structure without priorwritten permission from Acorn Events Structures Ltd.

! DESIGN BASED RESIDUAL HAZARD !

Design based hazards actively eliminated wherepossible in the design process. Where hazardscannot be eliminated, this symbol on the drawingwith an attached note means.1: Design based hazards exist within this proposal.2: Action is required by the person supervising thework to manage the design hazards duringconstruction.In accordance with THE SCAFFOLD CONTRACTORSProcedures. The PERSON SUPERVISING theconstruction MUST CONTACT the design officeBEFORE WORK COMMENCES for CLARIFICATIONof the identified hazards.

! PROPOSAL APPROVAL !CUSTOMER TO:

A- Approve layout prior to any erection.B- Ensure structure is capable of withstanding

all loads imposed from scaffold.

2072 41442072 4144 2072 41442072 4144 2072 41442072 4144 2072 41442072 4144 2072

58016

2072

2572

2572

2572

2572

2572

2572

2572

2072

2072

2572

2572

2572

2572

2572

2572

2572

4281738673

6216

55944

6216 6216 6216 6216 6216 6216 6216

4144 2072

6216

16000 10000 16000

7000

7000

7000

7000

Rev Date Details

Issued for Approval

26-08-20Moxon Way, Moor Lane Trading EstateSherburn-in-Elmet, Leeds, LS25 6ES

Tel: +44 (0)800 078 7916Email: [email protected]

Client:

Title:

Sheet:

Paper Size: Drawn By: Filename:

Scale: Sheet Number: Version: Ver Date:

TROUBADOUR-ENFIELD-MEGA-V1.6G

Troubadour

EnfieldMega Structure

CROSS-SECTION

V1.6G

A3

1:150

IP

-

General NotesBasis of DesignThis has been prepared from information supplied to us by, or on behalf of the thecontractor, who should check that his requirements have been correctly interpretedand that all loadings, dimensions, lift heights, bay sizes, erection / striking sequencesetc. are as required and practicable.

Imposed LoadsThe contractor is to ensure that the existing structure, it's fabric and / or the ground willsafely support the extra imposed loads; or supply new.Maximum calculated tie load: See notesMaximum calculated leg load: See notes

Loadings AllowedThe contractor must ensure that all loading(s) allowed for is sufficient.Live loads: See notes

Wind loading: As BSEN1991-1-4Maximum number of boarded levels:

Shoring WorkWe can not and will not pass comment on the structure being shored, as this involvesmatters beyond our control and knowledge. It is the contractors responsibility toensure that the existing structure will safely span between our supports, and can besafely shored in the way indicated.

FoundationsThe contractor must prepare all foundations prior to erection.

Temporary RoofsNo temporary roof can be made watertight.Loadings: Snow loading assessed using BS6399 Part 3, unless the contractor adoptsa snow management system.

MaterialsAll scaffolding materials forming this structure are to comply, and be constructed inaccordance with BS1139 and TG20:13 (current editions).

ModificationNo alteration is to be made to the structure detailed on this drawing without priorwritten permission from Acorn Events Structures Ltd.

PropertyThis drawing is confidential and the exclusive property of Acorn Events Structures Ltd.No unauthorized use, copy or disclosure is to be made, and is to be returned onrequest.

DimensionsWritten dimensions shall take precedence over scaled dimensions. The contractormust verify all site dimensions and notify of any discrepancies prior to erection.

PermitsThe contractor must obtain all permits and permissions prior to erection.

Construction Notes1) All ladder beams and/or unit beams are to be tied together at 1200 centres on topcord and 2400 centres on bottom chord, with the top chord plan braced, unless statedotherwise.2) Unless otherwise noted all lifts other than boarded platform levels are to beconstructed using load bearing couplers.3) All general construction is to be in accordance with TG20:13 unless notedotherwise.4) Main contractor to undertake all making good where necessary.5) Main contractor to provide and maintain adequate tie positions.6) No sheering, wind protection of fans to be added to this structure without priorwritten permission from Acorn Events Structures Ltd.

! DESIGN BASED RESIDUAL HAZARD !

Design based hazards actively eliminated wherepossible in the design process. Where hazardscannot be eliminated, this symbol on the drawingwith an attached note means.1: Design based hazards exist within this proposal.2: Action is required by the person supervising thework to manage the design hazards duringconstruction.In accordance with THE SCAFFOLD CONTRACTORSProcedures. The PERSON SUPERVISING theconstruction MUST CONTACT the design officeBEFORE WORK COMMENCES for CLARIFICATIONof the identified hazards.

! PROPOSAL APPROVAL !CUSTOMER TO:

A- Approve layout prior to any erection.B- Ensure structure is capable of withstanding

all loads imposed from scaffold.

RevDateDetails

Issued for Approval

26-08-20Moxon Way, Moor Lane Trading Estate

Sherburn-in-Elmet, Leeds, LS25 6ESTel: +44 (0)800 078 7916

Email: [email protected]

Client:

Title:

Sheet:

Paper Size:Drawn By:Filename:

Scale:Sheet Number:Version:Ver Date:

TROUBADOUR-ENFIELD-MEGA-V1.6G

Troubadour

EnfieldMega Structure

CROSS-SECTION

V1.6G

A3

1:150

IP

-

General NotesBasis of DesignThis has been prepared from information supplied to us by, or on behalf of the thecontractor, who should check that his requirements have been correctly interpretedand that all loadings, dimensions, lift heights, bay sizes, erection / striking sequencesetc. are as required and practicable.

Imposed LoadsThe contractor is to ensure that the existing structure, it's fabric and / or the ground willsafely support the extra imposed loads; or supply new.Maximum calculated tie load: See notesMaximum calculated leg load: See notes

Loadings AllowedThe contractor must ensure that all loading(s) allowed for is sufficient.Live loads: See notes

Wind loading: As BSEN1991-1-4Maximum number of boarded levels:

Shoring WorkWe can not and will not pass comment on the structure being shored, as this involvesmatters beyond our control and knowledge. It is the contractors responsibility toensure that the existing structure will safely span between our supports, and can besafely shored in the way indicated.

FoundationsThe contractor must prepare all foundations prior to erection.

Temporary RoofsNo temporary roof can be made watertight.Loadings: Snow loading assessed using BS6399 Part 3, unless the contractor adoptsa snow management system.

MaterialsAll scaffolding materials forming this structure are to comply, and be constructed inaccordance with BS1139 and TG20:13 (current editions).

ModificationNo alteration is to be made to the structure detailed on this drawing without priorwritten permission from Acorn Events Structures Ltd.

PropertyThis drawing is confidential and the exclusive property of Acorn Events Structures Ltd.No unauthorized use, copy or disclosure is to be made, and is to be returned onrequest.

DimensionsWritten dimensions shall take precedence over scaled dimensions. The contractormust verify all site dimensions and notify of any discrepancies prior to erection.

PermitsThe contractor must obtain all permits and permissions prior to erection.

Construction Notes1) All ladder beams and/or unit beams are to be tied together at 1200 centres on topcord and 2400 centres on bottom chord, with the top chord plan braced, unless statedotherwise.2) Unless otherwise noted all lifts other than boarded platform levels are to beconstructed using load bearing couplers.3) All general construction is to be in accordance with TG20:13 unless notedotherwise.4) Main contractor to undertake all making good where necessary.5) Main contractor to provide and maintain adequate tie positions.6) No sheering, wind protection of fans to be added to this structure without priorwritten permission from Acorn Events Structures Ltd.

! DESIGN BASED RESIDUAL HAZARD !

Design based hazards actively eliminated wherepossible in the design process. Where hazardscannot be eliminated, this symbol on the drawingwith an attached note means.1: Design based hazards exist within this proposal.2: Action is required by the person supervising thework to manage the design hazards duringconstruction.In accordance with THE SCAFFOLD CONTRACTORSProcedures. The PERSON SUPERVISING theconstruction MUST CONTACT the design officeBEFORE WORK COMMENCES for CLARIFICATIONof the identified hazards.

! PROPOSAL APPROVAL !CUSTOMER TO:

A- Approve layout prior to any erection.B- Ensure structure is capable of withstanding

all loads imposed from scaffold.

Page 7: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Fully Flexible state-of-the-art space with excellent weight and load bearing capabilities.Adaptable seating system for live audiences.

On site furnished production offices and dressingrooms equipped with WC and shower facilities.

Dimensions 11,216 ft2 / 43 x 24mInternal height 17m - Ground floor truss - meaning you can rig and hang at any point.

Highly effective insulation and sound proof properties. Fitted with removable acoustic black drapes.

Large dock door for Artics access and good ground floor loading capabilities.

Stage 2

Page 8: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Troubadour Stage 2- Floor Plan

Page 9: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Fully Flexible state-of-the-art space with excellent weight and load bearing capabilities.Adaptable seating system for live audiences.

On site furnished production offices and dressingrooms equipped with WC and shower facilities.

Dimensions 8,213 ft2 / 35 x 21m.Internal height 14m - Ground floor truss - meaning you can rig and hang at any point.

Highly effective insulation and sound proof properties. Fitted with removable acoustic black drapes.

Large dock door for Artics access and good ground floor loading capabilities.

Stage 3

Page 10: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Troubadour Stage 3 - Floor Plan

Page 11: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

ProductionHub

Large, modern and versatile open plan offices with canal views.

Stylish shared cafe and dinning space to unwind and relax.

Fully equipped private meeting room available to book in advance.

Page 12: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Production Hub Elevations & Plans

NOTES:REVISIONS:CLIENT

JOB

TITLE

SCALE

JOB NO.

REVISIONS

DATE

© COPYRIGHT HAWKES 2020

DRAWN BY

CHECKED BY

1014

OH

1:100 @ A3

Ground Floor Plan

Enfield Theatre

Troubadour Theatres LTD

06/09/2020

OH

HawkesPHONE: 07921 866561 [email protected] 41b FOXBERRY ROAD, LONDON SE4 2SR

All drawings within this package are the copyright of Hawkes . They may not be copied or disclosed to any third party for any purpose except as authorised in writing by Hawkes.Do not scale from these drawings. Figured dimensions only are to be used. All critical dimensions are to be checked on site before work proceeds. If in doubt ask.All drawings are to be read in conjunction with all other relevant consultants and/or specialists drawings or documents.Inconsistencies, errors and omissions found within or between Hawkes documents (and also in relation to other consultants/specialists documents) are to be notified immediately to Hawkes.

DRWG. NO.

SK - SketchA - ApprovalT - TenderC - Construction

BSTATUS: B100

01. Drawings indicate design intent only. The executive architect/contractor & relevant consultants & /or sub-contractors to ensure all current building regulations, standards, & other statutory requirements, codes of practice and landlord requirements are implemented with design development & construction.

02. All dimensions to be checked on site. The executive architect/contractor is to produce full set out drawings prior to construction for Hawkes approval.

03. Read in conjunction with Finishes, Joinery, Fixtures and Prototype Schedules if supplied, which supersedes any notes contained within this drawing. Any discrepancies to be reported immediately prior to finishes being applied.

04. Contractor to supply control samples of all finishes prior to procurement/construction for Hawkes approval.

05. Executive architect/Contractor to ensure all materials are fit for purpose and comply to regulation, and ensure all finishes achieve any requirements in terms of fire regulations and surface spread of flame.

06. Refer to Lighting Designers info for all lighting layouts & specifications.

07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & specifications.

08. The executive architect/contractor is to satisfy themselves with regards to the structural stability of all design intent information.

09. Executive architect/contractor to confirm that any installation/construction is suitable for existing floor and wall loadings prior to construction .

10. The executive architect/contractor is to agree any variations with the architect/client prior to construction or procurement of any materials/manufacture.

11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be produced for Hawkes approval.

2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072500500

36224

500

2072

2072

2072

500

7216

1572

2572

1572

1572 1572

6216

8110 646 10215 6463645 36458110

Meeting Room

Servery

Unisex toilet

AccessibleWC

Utility/ Cleaners

20ft container with 2 sink feeds and provision for coffee machine, inclucding power and water. Internal specification to be completed by Troubadour Theaters LTD

Entrance door to be specified byAcorn

Fire escape door Fire escape door

Window, forspecification seeAcorn drawings

Window, forspecification seeAcorn drawings

Window, forspecification seeAcorn drawings

B Plan flip 16.11.20

NOTES:REVISIONS:CLIENT

JOB

TITLE

SCALE

JOB NO.

REVISIONS

DATE

© COPYRIGHT HAWKES 2020

DRAWN BY

CHECKED BY

1014

OH

1:100 @ A3

Internal Elevations C-D

Enfield Theatre

Troubadour Theatres LTD

06/09/2020

OH

PHONE: 07921 866561 [email protected] 41b FOXBERRY ROAD, LONDON SE4 2SRAll drawings within this package are the copyright of Hawkes . They may not be copied or disclosed to any third party for any purpose except as authorised in writing by Hawkes.Do not scale from these drawings. Figured dimensions only are to be used. All critical dimensions are to be checked on site before work proceeds. If in doubt ask.All drawings are to be read in conjunction with all other relevant consultants and/or specialists drawings or documents.Inconsistencies, errors and omissions found within or between Hawkes documents (and also in relation to other consultants/specialists documents) are to be notified immediately to Hawkes.

DRWG. NO.

SK - SketchA - ApprovalT - TenderC - Construction

TSTATUS:

T

202

01. Drawings indicate design intent only. The executive architect/contractor & relevant consultants & /or sub-contractors to ensure all current building regulations, standards, & other statutory requirements, codes of practice and landlord requirements are implemented with design development & construction.

02. All dimensions to be checked on site. The executive architect/contractor is to produce full set out drawings prior to construction for Hawkes approval.

03. Read in conjunction with Finishes, Joinery, Fixtures and Prototype Schedules if supplied, which supersedes any notes contained within this drawing. Any discrepancies to be reported immediately prior to finishes being applied.

04. Contractor to supply control samples of all finishes prior to procurement/construction for Hawkes approval.

05. Executive architect/Contractor to ensure all materials are fit for purpose and comply to regulation, and ensure all finishes achieve any requirements in terms of fire regulations and surface spread of flame.

06. Refer to Lighting Designers info for all lighting layouts & specifications.

07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & specifications.

08. The executive architect/contractor is to satisfy themselves with regards to the structural stability of all design intent information.

09. Executive architect/contractor to confirm that any installation/construction is suitable for existing floor and wall loadings prior to construction .

10. The executive architect/contractor is to agree any variations with the architect/client prior to construction or procurement of any materials/manufacture.

11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be produced for Hawkes approval.

2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072

7982

2000

2000

2000

2000

36740+2000

WC

Elevation CScale: 1:100

1

2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072500500

36224

500

2072

2072

2072

500

7216

1572

2572

1572

1572 1572

Site PlanScale: 1:200

3

7000

Gro

und

Floo

r

Elevation DScale: 1:100

2

C

A

BD

Gold paintedstaircase with

contrasting nosing

Datum painted to matchRAL 5005; Suggested,

Dulux Sapphire Spring 3Hanging lights with redbraided cabling

Walls to be painted to matchRAL Cool Grey 1C

suggested; Dulux Pearl grey

Steel Mesh panelwith shelf, Clear

laquered

Wall & ceiling painted tomatch RAL 1788 C

Clear finished oak 2''square battens on

splitbatten

Datum and square 2''battens painted tomatch RAL 1788 C, similar to 'Flame Red'

leather as supplied for furniture

Bass finish board fixed tocontainer

Clear finished oak 2''square battens on

splitbatten

Datum and doorpainted to match

RAL 1788 C,similar to 'FlameRed' leather as

supplied forfurniture

Datum and door paintedto match RAL 5005;Suggested, DuluxSapphire Spring 3

NOTES:REVISIONS:CLIENT

JOB

TITLE

SCALE

JOB NO.

REVISIONS

DATE

© COPYRIGHT HAWKES 2020

DRAWN BY

CHECKED BY

1014

OH

1:100 @ A3

Internal Elevations A-B

Enfield Theatre

Troubadour Theatres LTD

06/09/2020

OH

PHONE: 07921 866561 [email protected] 41b FOXBERRY ROAD, LONDON SE4 2SRAll drawings within this package are the copyright of Hawkes . They may not be copied or disclosed to any third party for any purpose except as authorised in writing by Hawkes.Do not scale from these drawings. Figured dimensions only are to be used. All critical dimensions are to be checked on site before work proceeds. If in doubt ask.All drawings are to be read in conjunction with all other relevant consultants and/or specialists drawings or documents.Inconsistencies, errors and omissions found within or between Hawkes documents (and also in relation to other consultants/specialists documents) are to be notified immediately to Hawkes.

DRWG. NO.

SK - SketchA - ApprovalT - TenderC - Construction

TSTATUS:

T

201

01. Drawings indicate design intent only. The executive architect/contractor & relevant consultants & /or sub-contractors to ensure all current building regulations, standards, & other statutory requirements, codes of practice and landlord requirements are implemented with design development & construction.

02. All dimensions to be checked on site. The executive architect/contractor is to produce full set out drawings prior to construction for Hawkes approval.

03. Read in conjunction with Finishes, Joinery, Fixtures and Prototype Schedules if supplied, which supersedes any notes contained within this drawing. Any discrepancies to be reported immediately prior to finishes being applied.

04. Contractor to supply control samples of all finishes prior to procurement/construction for Hawkes approval.

05. Executive architect/Contractor to ensure all materials are fit for purpose and comply to regulation, and ensure all finishes achieve any requirements in terms of fire regulations and surface spread of flame.

06. Refer to Lighting Designers info for all lighting layouts & specifications.

07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & specifications.

08. The executive architect/contractor is to satisfy themselves with regards to the structural stability of all design intent information.

09. Executive architect/contractor to confirm that any installation/construction is suitable for existing floor and wall loadings prior to construction .

10. The executive architect/contractor is to agree any variations with the architect/client prior to construction or procurement of any materials/manufacture.

11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be produced for Hawkes approval.

2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072

8482

2000

2000

2000

2000

36740

Fire Escape

Elevation AScale: 1:100

1

2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072 2072500500

36224

500

2072

2072

2072

500

7216

1572

2572

1572

1572 1572

Site PlanScale: 1:200

3

Gold paintedstaircase with

contrasting nosing

A

6216

7000

Elevation BScale: 1:100

2

C

A

BD

Container to be oainted tomatch RAL 7016, suggested

Dulux Charcoal Drift

Datum painted to match RAL5005; Suggested, Dulux

Sapphire Spring 3

Hanging lights with redbraided cabling Walls to be painted to match

RAL Cool Grey 1Csuggested; Dulux Pearl grey

Steel Mesh panel withshelf, Clear laquered

Walls & ceiling painted tomatch RAL 1788 C

WindowA1 Framed

theatrical /filmposters.

1572

2572

1572

2

NOTES:REVISIONS:CLIENT

JOB

TITLE

SCALE

JOB NO.

REVISIONS

DATE

© COPYRIGHT HAWKES 2020

DRAWN BY

CHECKED BY

1014

OH

1:100 @ A3

First Floor Plan M&E Plan

Enfield Theatre

Troubadour Theatres LTD

06/09/2020

OH

HawkesPHONE: 07921 866561 [email protected] 41b FOXBERRY ROAD, LONDON SE4 2SR

All drawings within this package are the copyright of Hawkes . They may not be copied or disclosed to any third party for any purpose except as authorised in writing by Hawkes.Do not scale from these drawings. Figured dimensions only are to be used. All critical dimensions are to be checked on site before work proceeds. If in doubt ask.All drawings are to be read in conjunction with all other relevant consultants and/or specialists drawings or documents.Inconsistencies, errors and omissions found within or between Hawkes documents (and also in relation to other consultants/specialists documents) are to be notified immediately to Hawkes.

DRWG. NO.

SK - SketchA - ApprovalT - TenderC - Construction

BSTATUS: B105

01. Drawings indicate design intent only. The executive architect/contractor & relevant consultants & /or sub-contractors to ensure all current building regulations, standards, & other statutory requirements, codes of practice and landlord requirements are implemented with design development & construction.

02. All dimensions to be checked on site. The executive architect/contractor is to produce full set out drawings prior to construction for Hawkes approval.

03. Read in conjunction with Finishes, Joinery, Fixtures and Prototype Schedules if supplied, which supersedes any notes contained within this drawing. Any discrepancies to be reported immediately prior to finishes being applied.

04. Contractor to supply control samples of all finishes prior to procurement/construction for Hawkes approval.

05. Executive architect/Contractor to ensure all materials are fit for purpose and comply to regulation, and ensure all finishes achieve any requirements in terms of fire regulations and surface spread of flame.

06. Refer to Lighting Designers info for all lighting layouts & specifications.

07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & specifications.

08. The executive architect/contractor is to satisfy themselves with regards to the structural stability of all design intent information.

09. Executive architect/contractor to confirm that any installation/construction is suitable for existing floor and wall loadings prior to construction .

10. The executive architect/contractor is to agree any variations with the architect/client prior to construction or procurement of any materials/manufacture.

11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be produced for Hawkes approval.

2

2

2

2

2

2

4

4

4

4

4

4

4

4

4

4

4

4

2 2

2

4

2

+2000

+2000 +2000 +2000 +2000 +2000

Double socket CAT 5 outlet

13A Twin switched socket outlet mounted 150mm above FFL

13A Fused spur mounted 150mm above FFL

22

+2000

Power:

Spot light

Large pendant, from above WCT bar

Hanging bulb on red cord from WCT

Lights:

22

32A single phase socket

+2000Fused spur 2200mm off FFL for electrical heaters

Emergence Exit Light

Page 13: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Troubadour Meridian Water Studios - Offices

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

BOH2 - 1 BOH2 - 2 BOH2 - 3 BOH2 - 4 BOH2 - 5 BOH2 - 6

BOH2 - 7 BOH2 - 8 BOH2 - 9 BOH2 - 10 BOH2 - 11 BOH2 - 12

BOH2 - 13 BOH2 - 14 BOH2 - 15 BOH2 - 16 BOH2 - 17 BOH2 - 18

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

DO NOT SCALE FROM DRAWING

IF IN DOUBT ASK

Product Ref.

Drg No.

TitleIss. Date Mod No. Wharfside Container Park Irlam Wharf Road Irlam Manchester M44 5FZ Tel: 08450 500 330 Tel: 0161 775 3217 Web: www.universal-containers.com

Scale

Unit

Sheet Number

Drawn

Checked

Approved

Date

QMSF21 Iss2

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

DE

VIA

TIO

N F

RO

M T

HIS

DR

AW

ING

RE

QU

IRE

S W

RIT

TEN

AU

THO

RIS

ATI

ON

PR

IOR

TO

IMP

LEM

EN

TATI

ON

THIS

DR

AW

ING

IS T

HE

PR

OP

ER

TY O

F U

NIV

ER

SA

L C

ON

TAIN

ER

SE

RV

ICE

S L

TD. A

ND

MU

ST

NO

T B

E P

AS

SE

D T

O T

HIR

D P

AR

TIE

S W

ITH

OU

T P

ER

MIS

SIO

N

U N I V E R S A LCONTAINER SERVICES LTD

BOH2 Containers - Version 6###

###

###

##########

####20ft Container Conversion

BOH2 - Overall Viewmm

All Internal Doors are 30inch wideunless noted otherwise

Ground Floor

First Floor

Second Floor

External Stairs required this side to access First floorSee View A drawing for detail

External Stairs required this side toaccess Second floor

View A

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

East Offices West Offices

Page 14: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Previous Industry Clients

Page 15: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Phase 1:January 2021

• Stage 1: 20,921 Sq. Ft.

• Stage 2: 11,216 Sq. Ft.

• Stage 3: 8,213 Sq. Ft.

• Work Shops x 5.

• Offices & Dressing

Rooms

Phase 2:January 2023

• Stage 4: 40,000 Sq. Ft.

• Stage 5: 20,000 Sq. Ft.

• Stage 6: 20,000 Sq. Ft.

• Work Shops x 2.

• Offices 3,500 Sq. Ft.

Troubadour Meridian Water Studios will consist of a complex of 5 purpose built studios including, office and storage facilities. The project will be broken into 2 phases:

Troubadour Meridian Water Studios Full Scheme

Page 16: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

Troubadour Meridian Water Studios - Site Plan

6m

6m

WorkshopOne

PropStoreOneSTAGE ONE

STAGE TWO

STAGE THREE

Substation

MeridianWater StudiosPHASE ONE

S

D

R

rev

1.1000@A3

09 july 2020

MWS1_

Block-Plan

003 _Block-Plan

PRE PLANNING

0844 815 4865

28/07/2020GG

01/08/2020HH

02/08/2020II

0 10 20 30 40 50

Substation

1

2

3

GATEA

GATEC

GATEB

3

2

1 Backlot West Offices

Backlot Hub

Backlot East Officesinc Security Office

Security/Entrance

Troubadour Meridian Water Studios - Site Plan (Phase 1)

Security / Entrance

West Offices

Production Hub

East Offices

Page 17: TROUBADOUR MERIDIAN WATER STUDIOS Pack/201216... · rooms equipped with WC and shower facilities. Dimensions 20,921 ft2 / 56 x 38.5m. Internal height 19m - Ground floor truss - meaning

For further information or to arrangea viewing please contact:

E: [email protected]

We look forward to hearing from you.