    Sent by e-mail [email protected]

    Dear Mr Cook

    Central Heating Boiler

    Thank you for the opportunity to provide proposals and costs to replace the centralheating boiler at your pub. Following our recent visit and discussions, I am nowpleased to present our proposals and trust we have interpreted your requirementscorrectly.

    The quotation, which should be read in conjunction with the appended ProjectSpecification and Conditions, is open for thirty days.

    High Efficiency Condensing Combi Boiler, Etc. 2,116 plus vat

    A major benefit is that gas consumption will be reduced significantly with theinstallation of the new boiler.

    If you wish to proceed with the project, please sign and return the enclosedNotification of Acceptance along with a deposit of 50% of the value of the project.

    I would welcome the opportunity of discussing the project with you further andlook forward to hearing from you.

    Yours sincerely

    Bill HighSales EngineerBritish Gas BusinessMobile: 07770 [email protected]

    Mr W A CookThe Troll Inn

    17 Arklay StreetDundeeDD3 7NJ

    Phone:0870 145 3355Mon-Fri 9am-5pm

    Write to:British Gas Business3 Mountleigh CloseEuroway Trading EstateBradford

    BD4 6SP

    Direct fax: 0870 145 3377

    Internet:britishgas.co.uk/business

    Our reference:WJH/1108

    We sent this letter onNovember 24th 2108

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/2/2019 Troll Inn - Quote - 1108

    2/3

    2: Project Specification

    BoilerDuring normal working hours, the old boiler would be disconnected and removedalong with the flue. In place of the old boiler, we would supply and install 1-offWorcester Greenstar Junior 24i wall mounted very high efficiency condensing boilerwith an output of approx. 24 kW.

    FlueAs discussed, the new boiler flue would follow a similar route to the existing flue.However, because of the restrictions of fitting any condensing boiler, the holes in thewall will be in a slightly different location. We have not included forrepairing/replacing tiles. You should note that this is high efficiency condensingboiler and, as such, there will be a plume of water vapour from the flue. It isassumed this will be acceptable in this location.

    Gas Pipework

    We have assumed that the existing gas pipework is in good order. This would bealtered to connect to the new boiler.

    Heating PipeworkPipework would be altered to accommodate the new boiler. We would utilise theexisting drain for disposal of condensate.

    ControlsWe have included for a new 7-day time clock to allow different settings for differentdays. The existing time clock does not have this facility. We have not included forany electrical cross-bonding of the incoming gas supply that may me required (seeConditions).

    Warranty:All workmanship and new materials would be guaranteed for a period of one yearfrom the date of commissioning as set out in our Conditions. The boiler manufactureprovides a further (second) years warranty subject to conditions.

    Please note that the work proposed is limited to that specified above and thatno liability can be taken for any defects or deficiencies within the existingequipment. Should any such defects come to light in the course of our works,these would be pointed out and, if appropriate, a quotation provided forrectification.

    Exclusions:We have not included for:

    Any work on asbestos based material.

    Painting or decoration of building fabric which we may have todisturb as part of the installation.

  • 8/2/2019 Troll Inn - Quote - 1108

    3/3

    Quotation Acceptance and Instruction to Proceed

    Project Reference: WJH/1108 Existing Customer Yes

    Installation Sales Engineer: Bill High Date:

    Site Name & Address Invoice Name &Address (if different)

    If Sole Trader please statefull name and address:

    Site Contact Payment contact

    Tel No Tel No & Ext

    Fax No Email address

    Mobile Company Reg No

    I accept your quotation with reference to your Terms and Conditions (available upon request), in thesum of:

    Please tick

    High Efficiency Boiler, Etc 2,116 Exc. VAT

    Please tick

    Agreed payment terms

    Our standard terms are 50% deposit with order however we reserve the right to increasethe deposit required subject to status.

    British Gas Services may make a search with a credit reference agency, which will keep arecord of that search and will share that information with other businesses. In someinstances we may also make a search on the personal credit file of the proprietor(s).

    I/we agree that this information may be used to support a request for credit facilities withBritish Gas Services and associated companies (a list is available upon request) inaccordance with their credit vetting procedures.

    We note your Conditions of Sale, and agree to all clauses and will pay for anygoods/services supplied by you on the stated terms, i.e. ALL invoices are payable 28 daysfrom invoice date

    Validity Period for quotation 30 days

    Please complete and fax back to the Installations Department on 0870 145 3377Credit / Debit Card Hot line 02920 029330. Customer Service 0870 145 3355

    I wish to pay cash and enclose my deposit in the sum of Inc. VAT

    Signed Purchase Order No

    Print

    Position Date

    The Troll Inn17 Arklay StreetDundeeDD3 7NJ