12
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

Embed Size (px)

DESCRIPTION

TRIO-CINEMA 3 UCB, 8/10/2010 S-Band Radio S-Band Radio:Emheiser Transmitter EDTC-01E1A102-C0 Ready to order once pigtail length is determined (a current Mech and EE task) Max length 10.5”, current estimate 9.4”. RG316 Coaxial to be used for this and UHF Helium Receiver.

Citation preview

Page 1: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 1 UCB, 8/10/2010

CINEMA Project UpdateThomas Immel

UCB/SSLSpace Sciences Laboratory

University of California, Berkeley

Page 2: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 2 UCB, 8/10/2010

Summer 2010 Highlights

Core Flight Software CompleteMechanical Design Approaching CompletionAvionics Stack Moved for Harness @ MICD v14Solar Panel Design and Test CompleteAttitude Control System Demonstrated w/SimulinkPower Systems Tested and CharacterizedIIF Specification Complete – IIF Spec v2.2IIB Layout Complete – Ready for FabricationMagnetometer ICD and Tech Report Revised

Page 3: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 3 UCB, 8/10/2010

S-Band Radio

S-Band Radio:Emheiser TransmitterEDTC-01E1A102-C0

Ready to order once pigtail length is determined (a current Mech and EE task) Max length 10.5”, current estimate 9.4”.

RG316 Coaxial to be used for this and UHF Helium Receiver.

Page 4: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 4 UCB, 8/10/2010

Avionics Stack from Bottom Up

Flight Processor not ordered. 2nd dev unit purchased at SSL, 3 total dev units for UCB CINEMA.Flight Clyde EPS thoroughly tested by Nestor Vargas and FSW team.

•Charge current calibration•Max. Power Point Tracking•Battery discharge power cutoff : Found to be instantaneous

Flight Battery delivered, cold stored.Flight UHF Helium Radio Receiver powered up. Testing procedures under development, but help is needed here.

Page 5: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 5 UCB, 8/10/2010

Instrument Interface Board v2.0

Final revision of IIB from John Diaz replaces Nanonics 65 pin connector with 2 (2x17) floppy drive connectors. This has implications for harnessing that are not completely appreciated at the moment, but it is a much easier connector to work with. We’re ready to send this board out for quotes. Parts list needs to be checked twice. Layout done in

DipTrace

Page 6: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 6 UCB, 8/10/2010

KHU has also developed a test IIB board. Layout is quite different, but based upon the same schematic and so should be electrically compatible with UPR IIB. Incompatible with MICD due to large test connector.

Layout done in Allegro

Instrument Interface Board v2.0

Page 7: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 7 UCB, 8/10/2010

MAGIC

MAGIC Experiment Test Unit (ETU) delivery end of August. Test board w/PC104 connector and single-axis magnetometer. Other axes provided with test connections for test voltages.

Delivery in 4-6 weeks. Preparation for its arrival should include:1)Initial FPGA programming2) Test harness preparation3) Development of testing procedures, CPDs

Page 8: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 8 UCB, 8/10/2010

CHANGES

1) FPGA MAG interface simplified. dsPIC Flight Software will command all reads of MAGIC ADC.

2) Change to an application-specific integrated circuit (ASIC) necessitates major changes in STEIN electronics. Until that is clarified, STEIN FPGA and electronics work is halted.

3) Development of alternative to GSEOS is now supported at UCB. Presentation and demonstration on Thursday.

Page 9: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 9 UCB, 8/10/2010

What are our top priorities?

Develop UHF radio test procedures.Develop IIB/FPGA code.Produce the first set of IIBs.Produce 10 flight solar panels.Develop the Ground Support Software and Equipment.Prepare to receive the MAGIC ETU.Determine performance of sun sensors.

Page 10: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 10 UCB, 8/10/2010

What are our top risks?

Known Unknowns:Fail to develop Ground Support SoftwareUnexpected glitches with ADC reading of MAGICTest of S-Band transmitter likely lengthy and difficult.Difficulty with ACSHarness innerconnect to SBAND, HELIUM, IIB, MAGIC, HVPS, STEIN will be difficult, same with all solar panels and radio connections.

Unknown Unknowns:Communication with eventual STEIN via new GSE (as if GSEOS would be easier)?Performance of IIB?What will break when we shake?

Page 11: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 11 UCB, 8/10/2010

What are our top strengths?

Page 12: TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 12 UCB, 8/10/2010