14
Pfizer Asia Pacific Pte Ltd Trigeneration Facility At Pfizer

Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

  • Upload
    lamthu

  • View
    232

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

Pfizer Asia Pacific Pte Ltd

Trigeneration Facility

At Pfizer

Page 2: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

2

Pfizer Asia Pacific Pte Ltd

Base Case (Pre Project) Steam / Power / Chilled Water Requirements

Configuration Of Trigeneration Plant

Overall Energy Efficiency Of Trigeneration Plant

Fuel And Electricity Savings

CO2 Emission Reduction

Challenges

Presentation Outline

Page 3: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

3

Pfizer Asia Pacific Pte Ltd

US$470 million Multi-purpose Active Pharmaceuticals Ingredient (API) manufacturing facility

Occupy 40 acres at Tuas Biomedical Park

24 hrs x 7 days operations with employment of ~260 people

Pfizer Asia Pacific Pte Ltd

Page 4: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

4

Pfizer Asia Pacific Pte Ltd

Site Aerial Plan

WWTP

SRU

INCINERATOR

Pfizer Global ManufacturingSingapore API plant

Page 5: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

5

Pfizer Asia Pacific Pte Ltd

Base case

Before Trigeneration, the average utilities usage of Pfizer facility :

Electricity ~ 6.5 MWSteam demand ~ 8T/hrChilled Water ~ 2500 RT/hr

Energy usage for Pfizer Singapore API facility is expecting to increase in near future due to higher production output & plant expansion

Page 6: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

6

Pfizer Asia Pacific Pte Ltd

Trigeneration Plant Configuration

Trigeneration ConceptSingle integrated system comprises of Gas Fired Turbine, Waste Heat Boiler & Absorption Chiller

Based on Pfizer’s energy demand profile, the Trigeneration plant design:

1 x 5.0 MW rated Gas Turbine Generator1 x 14 T/H rated Waste Heat BoilerTwo stage 1300RT rated Absorption Chiller

Page 7: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

7

Pfizer Asia Pacific Pte Ltd

Typical Energy Usage Profile

G

High PressureNatural Gas (20 bar)

8 T/h Steam(Process)

10-11°C6°C

Steam/Hot water Absorption

Chiller

P P

P P

1000 RT CWHeat RecoverySteam Generator

Cooling Tower

By pass Exhaust

4.6MW Electricity

11 T/hr, 8 bar Steam 3 T/h

Boiler Feed Water

Gas Turbine Generator

Trigeneration Plant Configuration

Page 8: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

8

Pfizer Asia Pacific Pte Ltd

100%100%

~15%

~52%

85% 45%

100%

15~20%

~3%

80~85%

Boiler Power Boiler & Power

CONVENTIONAL SYSTEM

TRIGENERATIO

N

Gas SupplierGas Supplier

System Efficiency System Efficiency

Fuel Input

Efficiency Losses

65%WeightedAverage

NGNG

ElectricityElectricity

NGNG

How Trigen Improves Energy Efficiency

Page 9: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

9

Pfizer Asia Pacific Pte Ltd

Fuel and Electricity Saving

Pfizer total energy cost (Electricity & Natural Gas) is reduced by ~US$587K/yr due to:

Better fuel utilization and improve plant energy efficiency (achieved ~ 83% efficiency with heat rate of 12.9 mmBtu/MW @ 4.6 MWh output )Reduce electricity consumption due to absorption chilling

Page 10: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

10

Pfizer Asia Pacific Pte Ltd

% 17

Ton/yr 5,976 Annual CO2 Reduction fromTrigeneration

T/mth2,434 Total CO2 Emission per month (Trigeneration)

T/mth389 CO2 Emission per month (Power Station)

kg/kWh0.45CO2 Emission (Average Power Station)

MW1.2

Power from the Power Station (less 0.7MW from Absorption Chiller)

Power from Power StationT/mth2,045

CO2 Emission per month (TriGeneration)

kg/kWh0.229CO2 EmissionMW12.4

TriGen Output (Electricity + Steam)

T/h11Steam generated from TrigenMW4.6Power generated

Trigeneration System

Other Benefits

T/Mth2,932 Total CO2 Emission per month (Conventional)

T/mth2106 CO2 Emission per month (Power Station)

kg/kWh0.45CO2 Emission (Average Power Station)

MW6.5Power from the Power Station Power from Power Station

T/mth826CO2 Emission per month (Boiler)

kg/kWh0.19CO2 EmissionmmBtu/mth15,120

NG Used (boiler @85% efficiency)

T/h8Steam OutputBar8Steam Pressure

Package Boiler

Conventional System

CO2 reduction estimated 6000 T/yr or 17%

Page 11: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

11

Pfizer Asia Pacific Pte Ltd

Challenges

Rigorous regulatory requirements by regulatory bodies e.g.

New power meters installationOnline metering data and status of breaker to EMA every 30 secContracted capacity subject to Capped or Summation scheme requirementNew interlock and inter-tripping requirement

Fully utilize all the heat energy to be cost effectiveExpertise to operate and maintain the system (partner with Tuas Power Ltd)Gas Supply Reliability

Page 12: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

12

Pfizer Asia Pacific Pte Ltd

Page 13: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

13

Pfizer Asia Pacific Pte Ltd

Thank You Welcome Welcome any any

comments comments and and

questionsquestions

Page 14: Trigeneration Facility At Pfizer - · PDF fileBase case Before Trigeneration, ... Pfizer Asia Pacific Pte Ltd Trigeneration Plant ... Case Study of Trigeneration Project in Pfizer.ppt

14

Pfizer Asia Pacific Pte Ltd

Energy Efficiency Estimation

-69,000mmBty/yrAdditional Steam capacity from Trigen = 3T

14%Energy efficiency improvement519,935602,465mmBtu/yrTotal Energy required per year499,320mmBtu/yrEnergy (NG) consumed by Trigeneration per Year

4.6MWElectricity generated by Trigen

Energy from Trigeneration184,000mmBtu/yrEnergy consumed by Steam Boiler per Year

85%%Boiler Efficiency118Ton/hrSteam generation

Energy Required At Existing Boiler89,615418,465mmBtu/yrEnergy (NG) consumed by Power Station per Year

2.6714.44MWEnergy consumed by Power Station Generation45%45%%Average Grid Power Generation Efficiency 1.26.5MWElectricity Demand from Grid

Energy Required At Power Station

With

Trigeneration

Conventional

SystemUNITSBASE CASE