116
TOTAL $2,178,600 $0 $0 $0 $0 $2,178,600 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $178,600 $0 $0 $0 $0 $178,600 Construction $2,000,000 $0 $0 $0 $0 $2,000,000 Preliminary Engineering $0 $0 $0 $0 $0 $0 Planning $0 $0 $0 $0 $0 $0 Administration $0 $0 $0 $0 $0 Activity TOTAL Comments: Create proper safety measures for pedestrians, lighting, proper drainage, with base work and build up of roadbed with roadway and sidewalk utility relocation. This will redirect flow of traffic for safety between US64 and Tribal Housing. Saving funds for construction $. TIGER funds requesting $1,600,000 submitted Thursday, April 28, 2016 9:37 AM. PE completed FY16. FY16 TTPSF awarded $315,000. TTP will funds for project $1,803,600. State: OK Construction Year: 2017 Length: 0.646 Miles County: Pawnee Type of Work: Reconstruction Location: 1st Street, City of Pawnee S5-T21N-R5E & S32-T22N-R5E Project Number: 228 Route Number: PC01 S10 Project Name: First Street Safety Project PROJECT INFORMATION Funding Source: TTP;TTPSF;Pawnee Nation (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017 Tribe: Pawnee Nation of Oklahoma Date: Consortium: Tribal Transportation Program Transportation Improvement Program $0.00 Tribe Code: B07812 2017 2018 2019 2020 2021 STIP Amount: 2,178,600 B078120318

Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $2,178,600 $0 $0 $0 $0 $2,178,600

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $178,600 $0 $0 $0 $0 $178,600

Construction $2,000,000 $0 $0 $0 $0 $2,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Create proper safety measures for pedestrians, lighting, proper drainage, with base work and build up of roadbed with

roadway and sidewalk utility relocation. This will redirect flow of traffic for safety between US64 and Tribal Housing. Saving

funds for construction $. TIGER funds requesting $1,600,000 submitted Thursday, April 28, 2016 9:37 AM. PE completed

FY16. FY16 TTPSF awarded $315,000. TTP will funds for project $1,803,600.

State: OK Construction Year: 2017

Length: 0.646 Miles County: Pawnee

Type of Work: Reconstruction

Location: 1st Street, City of Pawnee S5-T21N-R5E & S32-T22N-R5E

Project Number: 228Route Number: PC01 S10

Project Name: First Street Safety Project

PROJECT INFORMATION

Funding Source: TTP;TTPSF;Pawnee Nation (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Pawnee Nation of Oklahoma Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B07812

2017 2018 2019 2020 2021

STIP Amount:$2,178,600

B078120318

Page 2: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $52,000 $0 $0 $0 $0 $52,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $2,000 $0 $0 $0 $0 $2,000

Construction $48,000 $0 $0 $0 $0 $48,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $2,000 $0 $0 $0 $0 $2,000

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Base, grade, drain and reconstruct part of parkinglot due to ICDBG awaded to Pawnee Nation FY16 to building a new Aquatic

Center. Consturction expense is to cover part of the parkinglot. Majority of funds utalized on this project, including

engineering, is from ICDBG FY16 awared to Pawnee Nation. Planning to cover all preconstruction activies including NEPA.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pawnee

Type of Work: Reconstruction

Location: 32-T22N-R5E .7 E & .15 S from NW corner Pawnee Nation of Oklahoma complex, 808 Morris Rd

Project Number: 244Route Number: 6273 S10

Project Name: Pawnee Nation Aquatic Center

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Pawnee Nation of Oklahoma Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B07812

2017 2018 2019 2020 2021

STIP Amount: $52,000

B078120321

Page 3: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $220,000 $0 $0 $0 $0 $220,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $20,000 $0 $0 $0 $0 $20,000

Construction $167,750 $0 $0 $0 $0 $167,750

Preliminary Engineering $32,250 $0 $0 $0 $0 $32,250

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Joint venture with City of Pawnee utalizing SRTS FY11 awarded funds. PS&E will be developed as a 5 year plan for all

sidewalks within allowable area to be created or redone to address safety and ADA compliances. Traffic flow will also be

reviewed. Received Grant from ODOT in the amount of $200,000.00 for construction/engineering. TTP funds to project $20,000.

State: OK Construction Year: 2017

Length: 0.2 Miles County: Pawnee

Type of Work: Reconstruction

Location: 31-T22N-R5E Within athe area of Pawnee Public Schools Elementary and Middle

Project Number: 243Route Number: PC06 S20

Project Name: SRTS

PROJECT INFORMATION

Funding Source: TTP;SRTS grant (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Pawnee Nation of Oklahoma Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B07812

2017 2018 2019 2020 2021

STIP Amount: $220,000

B078120322

Page 4: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $50,000 $550,000 $0 $0 $600,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $50,000 $0 $0 $50,000

Construction $0 $0 $500,000 $0 $0 $500,000

Preliminary Engineering $0 $50,000 $0 $0 $0 $50,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Reconstuction of roadway with micro-seal, creation on curb and gutter, sidewalk, lights and entry sign. Cost is planning

estimate.

State: OK Construction Year: 2019

Length: 0.73 Miles County: Pawnee

Type of Work: Reconstruction

Location: NW corner S32-T22N-R5E extending .66m E then .73m SW

Project Number: 245Route Number: 6054 S10

Project Name: Morris Road Multi-Module Safety Project

PROJECT INFORMATION

Funding Source: TTP;TTPSF; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Pawnee Nation of Oklahoma Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B07812

2017 2018 2019 2020 2021

STIP Amount: $600,000

B078120323

Page 5: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $200,000 $0 $0 $200,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $185,000 $0 $0 $185,000

Preliminary Engineering $0 $0 $15,000 $0 $0 $15,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a new parking lot (corn to paving). CE performed by the Tribe.

State: OK Construction Year: 2019

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number:Route Number: 9325 Section 10

Project Name: Ball Field Parking

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $200,000

B088210000

Page 6: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $100,000 $0 $0 $0 $0 $100,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $100,000 $0 $0 $0 $0 $100,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a safety sidewalk along the west side of Gordon Cooper Street. Project was started in 2016, and will be

completed in 2017. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.72 Miles County: Pottawatomie

Type of Work: New Construction

Location: West side of Gordon Cooper Street

Project Number: 139Route Number: 8082 Section 10

Project Name: Gordon Cooper Road Sidewalks

PROJECT INFORMATION

Funding Source: TTP Safety (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 4/13/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $100,000

B088210001

Page 7: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $500,000 $0 $0 $0 $0 $500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $465,000 $0 $0 $0 $0 $465,000

Preliminary Engineering $35,000 $0 $0 $0 $0 $35,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a parking lot on compacted fill. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number:Route Number: 9349 Section 30

Project Name: Transit Parking Lot

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $500,000

B088210003

Page 8: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $0 $100,000 $300,000 $400,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $93,000 $300,000 $393,000

Preliminary Engineering $0 $0 $0 $7,000 $0 $7,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a new road (corn to paving). CE performed by the Tribe.

State: OK Construction Year: 2020

Length: 0.2 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number: 137Route Number: 9349 Section 20

Project Name: Transportation Road

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $400,000

B088210004

Page 9: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $75,000 $0 $0 $0 $75,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $70,000 $0 $0 $0 $70,000

Preliminary Engineering $0 $5,000 $0 $0 $0 $5,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a new road (farm land to pavement). CE performed by the Tribe.

State: OK Construction Year: 2018

Length: 0.2 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number:Route Number: 9349 Section 10

Project Name: Complex Road

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium: 5

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $75,000

B088210005

Page 10: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $250,000 $0 $0 $100,000 $0 $350,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $232,500 $0 $0 $93,000 $0 $325,500

Preliminary Engineering $17,500 $0 $0 $7,000 $0 $24,500

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construct a new parking lot on compacted fill. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number:Route Number: 9356 Section 10

Project Name: Iron Horse Complex Parking

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $350,000

B088210006

Page 11: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $125,000 $0 $0 $0 $125,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $116,250 $0 $0 $0 $116,250

Preliminary Engineering $0 $8,750 $0 $0 $0 $8,750

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction of a new parking lot (gravel to paving). CE performed by the Tribe.

State: OK Construction Year: 2018

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location:

Project Number:Route Number: 9297 Section10

Project Name: Danran Parking

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $125,000

B088210007

Page 12: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $150,000 $0 $0 $525,000 $875,000 $1,550,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $525,000 $875,000 $1,400,000

Preliminary Engineering $150,000 $0 $0 $0 $0 $150,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Widen from two lanes to four lanes. Project begins at South Gordon Cooper and then East for 3.0 miles. One mile of section

810, all of sections 830, 850, and 870. CE performed by the Tribe.

State: OK Construction Year: 2020

Length: 3 Miles County: Pottawatomie

Type of Work: Reconstruction

Location:

Project Number: 085Route Number: 8919 Section 830,850,87

Project Name: Hardesty Road (East)

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount:$1,550,000

B088210008

Page 13: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $250,000 $0 $0 $0 $0 $250,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $225,000 $0 $0 $0 $0 $225,000

Preliminary Engineering $25,000 $0 $0 $0 $0 $25,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Rehabilitation and Preservation of a 100 year old bridge. Bridge is on the historic preservation listing for the state. CE

performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pottawatomie

Type of Work: Reconstruction

Location:

Project Number: 149Route Number: 8702 Section 30

Project Name: Rainbow Arch Bridge

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $250,000

B088210009

Page 14: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $3,000,000 $2,000,000 $0 $0 $0 $5,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $3,000,000 $2,000,000 $0 $0 $0 $5,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Widening a two lane road to a four lane road. PE was performed in previous years. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 1.3 Miles County: Pottawatomie Pottawatomie

Type of Work: Road const. and widening

Location: -96.941 35.304

Project Number: CPN-084Route Number: Rt: 8919 Sec: 810

Project Name: Hardesty Road (West)

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount:$5,000,000

B088210010

Page 15: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $1,000,000 $0 $0 $0 $1,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $950,000 $0 $0 $0 $950,000

Preliminary Engineering $0 $50,000 $0 $0 $0 $50,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: One mile of gravel to paved road w/o bridge work. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 1 Miles County: Pottawatomie

Type of Work: Reconstruction

Location: -96.912 35.298

Project Number: CPN-125Route Number: Rt: 8806 Sec: 810

Project Name: Harrison Road

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount:$1,000,000

B088210322

Page 16: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $200,000 $350,000 $0 $550,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $185,000 $350,000 $0 $535,000

Preliminary Engineering $0 $0 $15,000 $0 $0 $15,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Reconstruction of existing road to support truck traffic. CE performed by the Tribe.

State: OK Construction Year: 2019

Length: 1 Miles County: Pottawatomie

Type of Work: Reconstruction

Location: -96.877 35.206

Project Number: CPN-003Route Number: Rt: 9175 810,820,830

Project Name: Brangus

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $550,000

B088210323

Page 17: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $800,000 $0 $0 $0 $0 $800,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $800,000 $0 $0 $0 $0 $800,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: New paved road. Will be a gravel road and farm land to pavement. All PE work was performed in previous years. CE

performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.5 Miles County: Pottawatomie

Type of Work: New Construction

Location: -96.928 35.309

Project Number: CPN-087Route Number: Rt: 8724 Sec: 10

Project Name: Ohio St. Extended

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $800,000

B088210324

Page 18: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $200,000 $0 $0 $0 $0 $200,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $200,000 $0 $0 $0 $0 $200,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Compacted dirt to paved parking lot. PE work was performed in previous years. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location: -96.923 35.301

Project Number: CPN-008Route Number: Rt: 9346 Section 10

Project Name: E & T Parking

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $200,000

B088210326

Page 19: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $200,000 $250,000 $0 $450,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $180,000 $250,000 $0 $430,000

Preliminary Engineering $0 $0 $20,000 $0 $0 $20,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Gravel area to paved roads. CE performed by the Tribe.

State: OK Construction Year: 2019

Length: 1.5 Miles County: Pottawatomie

Type of Work: New Construction

Location: -96.931 35.301

Project Number: CPN-006Route Number: Rt: 9173 Sec: 810 & 820

Project Name: RV Park-Main Roads

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $450,000

B088210327

Page 20: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $250,000 $1,250,000 $0 $0 $1,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $200,000 $1,250,000 $0 $0 $1,450,000

Preliminary Engineering $0 $50,000 $0 $0 $0 $50,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Paving and realignment to section line (gravel to paving). This is the one mile section running East to West located between

Brangus and South Rock Creek Road. CE performed by the Tribe.

State: OK Construction Year: 2018

Length: 1.03 Miles County: Pottawatomie

Type of Work: Reconstruction

Location: -96.824 35.319

Project Number: CPN-001Route Number: Rt: 474 Section 10

Project Name: River Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount:$1,500,000

B088210328

Page 21: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $250,000 $0 $0 $0 $0 $250,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $225,000 $0 $0 $0 $0 $225,000

Preliminary Engineering $25,000 $0 $0 $0 $0 $25,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construct new parking lot on compacted fill. CE performed by the Tribe.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Pottawatomie

Type of Work: New Construction

Location: -97.063 35.381

Project Number: CPN-009Route Number: Rt: 9339 Section10

Project Name: ICDBG Grant Parking Area (Daycare)

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $250,000

B088210330

Page 22: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $100,000 $250,000 $500,000 $0 $850,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $250,000 $500,000 $0 $750,000

Preliminary Engineering $0 $100,000 $0 $0 $0 $100,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construct new road from grass to paved. A portion will be an elevated roadway. CE performed by the Tribe.

State: OK Construction Year: 2019

Length: 0.6 Miles County: Pottawatomie

Type of Work: New paved road

Location: -97.063 35.381

Project Number: CPN-002Route Number: Rt: 8707 Sec: 10

Project Name: Grand Blvd to Blackberry

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $850,000

B088210331

Page 23: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $0 $0 $750,000 $750,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $0 $750,000 $750,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Gravel to paving. PE work will performed by the Pottawatomie County Commissioner. CE performed by the Tribe.

State: OK Construction Year: 2021

Length: 0.5 Miles County: Pottawatomie

Type of Work: Reconstruction

Location: -97.071 35.388

Project Number: CPN-005Route Number: Rt: 8929 Sec: 810

Project Name: Blackberry Paving

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $750,000

B088210332

Page 24: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $500,000 $500,000 $0 $0 $0 $1,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $400,000 $500,000 $0 $0 $0 $900,000

Preliminary Engineering $100,000 $0 $0 $0 $0 $100,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construct new parking lot (sod farm to paving). CE performed by the Tribe.

State: OK Construction Year: 2017

Length: Miles County: Pottawatomie

Type of Work: New Construction

Location: -97.062 35.384

Project Number: CPN-015Route Number: Rt: 8932 Sec: 10

Project Name: Truck Plaza @ Grand

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount:$1,000,000

B088210333

Page 25: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $0 $0 $100,000 $100,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $0 $100,000 $100,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: This will be an asphalt overlay on a 10 year old chip and seal road bed. PE will be performed by the Pottawatomie County

Commissioner. CE performed by the Tribe.

State: OK Construction Year: 2021

Length: 1 Miles County: Pottawatomie

Type of Work: Reconstruction

Location: -97.062 35.391

Project Number: CPN-126Route Number: Rt: 8930 Sec: 810, 820

Project Name: Westec Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Citizen Potawatomi Nation Date: 6/17/2014

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: B08821

2017 2018 2019 2020 2021

STIP Amount: $100,000

B088210334

Page 26: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $285,000 $2,500,000 $0 $0 $0 $2,785,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $2,500,000 $0 $0 $0 $2,500,000

Preliminary Engineering $285,000 $0 $0 $0 $0 $285,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments:

State: OK Construction Year: 2017

Length: 1.1 Miles County: Johnston

Type of Work: Reconstruction PC Curb and gutter

Location: 34°14'22.337"N 96°40'34.7"W (Begins at the US-377 intersection and ends at OK-78.)

Project Number:Route Number: Rt: 3142; Sec:010-020

Project Name: 6th Street

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$2,785,000

G039060350

Page 27: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $975,000 $0 $0 $0 $0 $975,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $975,000 $0 $0 $0 $0 $975,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE is completed. This is the total cost of the project.

State: OK Construction Year: 2016

Length: 0.54 Miles County: Pontotoc

Type of Work: Reconstructing Railroad Crossing

Location: 34°51'1"N 96°37'1"W (On CR 3590 approx. 1.0 miles south of CR 1480)

Project Number:Route Number: 2473 Sec. 010

Project Name: Homer Francis Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $975,000

G039060351

Page 28: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $1,250,000 $0 $0 $0 $0 $1,250,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $1,250,000 $0 $0 $0 $0 $1,250,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Project has been designed.

State: OK Construction Year: 2016

Length: 0.6 Miles County: Carter

Type of Work: Reconstruction of Roadway

Location: 34°12'4"N 97°8'26"W (On Maple Street beginning at the intersection of Chickasaw Blvd.)

Project Number:Route Number: 33B3 Sec. 010

Project Name: Health Center Drive

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$1,250,000

G039060352

Page 29: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $2,750,000 $0 $0 $0 $2,750,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $2,750,000 $0 $0 $0 $2,750,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed.

State: OK Construction Year: 2017

Length: 2.5 Miles County: Johnston

Type of Work: Reconstructing Road

Location: 34°12'24"N 96°32'35" (Approx. 2 miles south of Milburn off of OK-78 on Mansion Road)

Project Number:Route Number: 3147 Sec. 010

Project Name: Mansion Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$2,750,000

G039060354

Page 30: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $1,028,163 $0 $0 $0 $0 $1,028,163

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $1,028,163 $0 $0 $0 $0 $1,028,163

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed previously. Tribal funding is being allocated to fund the remaining cost of this project.

State: OK Construction Year: 2016

Length: 6.3 Miles County: Pontotoc/Coal

Type of Work: Reconstruction of Roadway

Location: 34°41'41"N 96°25'44"W (On CR 1600 beginning at the intersection of OK-48)

Project Number:Route Number: 2501 Sec. 010

Project Name: Tri-Country Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$1,028,163

G039060355

Page 31: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $4,500,000 $0 $0 $0 $0 $4,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $4,500,000 $0 $0 $0 $0 $4,500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed.

State: OK Construction Year: 2015

Length: 3 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°47'26"N 96°39'8" (On CR 3570 beginning at the intersection of Lonnie Abbot Blvd.)

Project Number:Route Number: 2417 Sec. 010, 020, 030,

Project Name: Country Club Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$4,500,000

G039060356

Page 32: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $1,000,000 $0 $0 $0 $1,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $1,000,000 $0 $0 $0 $1,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction underway

State: OK Construction Year: 2015

Length: 0.6 Miles County: Johnston

Type of Work: Reconstruction of Roadway

Location: 34°14'17"N 96°41'46"W (On Ray Branum Road beginning at the intersection of US-377)

Project Number:Route Number: 3125 Sec 010

Project Name: Tishomingo West

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2015

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2015 2016 2017 2018 2019

STIP Amount:$1,000,000

G039060357

Page 33: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $100,000 $0 $3,750,000 $0 $0 $3,850,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $100,000 $0 $3,750,000 $0 $0 $3,850,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed. Right-of-way and utility relocation is planned for 2016.

State: OK Construction Year: 2018

Length: 4 Miles County: Pontotoc

Type of Work: Reconstrction of Roadway

Location: 34°52'8"N 96°40'5"W (On CR 1480 beginning at the intersection of old OK-99/Main St.)

Project Number:Route Number: 2462 Sec. 010,020,030

Project Name: Francis Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$3,850,000

G039060358

Page 34: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $350,000 $3,000,000 $0 $0 $0 $3,350,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $350,000 $3,000,000 $0 $0 $0 $3,350,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed.

State: OK Construction Year: 2017

Length: 3 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°44'23"N 96°38'32"W (On CR 1570 beginning at the intersection of Ahloso Road)

Project Number:Route Number: 2484 Sec. 010

Project Name: Thomas Ranch Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$3,350,000

G039060359

Page 35: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $3,800,000 $0 $0 $0 $0 $3,800,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $3,800,000 $0 $0 $0 $0 $3,800,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: This project is in collaboration with the City of Ada. City is to provide complete PS&E. Along with additional funding.

State: OK Construction Year: 2015

Length: 1 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°45'10.066"N 96°40'12.41"W (Begins at the N. side OK-99 overpass and goes North to Cradduck Rd.)

Project Number:Route Number: 2468 Sec. 020, 030

Project Name: Kerr Lab Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$3,800,000

G039060360

Page 36: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $1,000,000 $0 $0 $0 $0 $1,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $1,000,000 $0 $0 $0 $0 $1,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PS&E has been completed. Joint project with the City of Ada, City provided PS&E

State: OK Construction Year: 2016

Length: 0.5 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°47'1"N 96°40'22"W (At the intersection of Chamber Loop and entrance going to HQ)

Project Number:Route Number: 2416 SEC. 010

Project Name: Chickasaw Highway/ 4th Street

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$1,000,000

G039060361

Page 37: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $160,000 $0 $1,500,000 $0 $0 $1,660,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $1,500,000 $0 $0 $1,500,000

Preliminary Engineering $160,000 $0 $0 $0 $0 $160,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Construction for this project is planned for 2018 we are currently planning to apply for TTP Bridge Replacement funds. TTP

funds will be used for the PE- $160,000 and TTPBP funds for construction.

State: OK Construction Year: 2018

Length: 0.6 Miles County: Pontotoc

Type of Work: Reconstruction of bridge and approaches

Location: 34°43'20"N 96°38'40"W (On CR 1580 0.6 miles W of OK-99/US-377)

Project Number:Route Number: 24G6 SEC. 040

Project Name: Bates Road Bridge

PROJECT INFORMATION

Funding Source: TTP and TTPBP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$1,660,000

G039060362

Page 38: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $100,000 $2,200,000 $0 $0 $0 $2,300,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $100,000 $2,200,000 $0 $0 $0 $2,300,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed.

State: OK Construction Year: 2016

Length: 1.7 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°46'54"N 96°37'45"W (On CR 1542 beginning at the intersection of OK-1)

Project Number:Route Number: 2446 Sec. 010-030

Project Name: Lazy Acres Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$2,300,000

G039060363

Page 39: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $150,000 $0 $0 $0 $0 $150,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $150,000 $0 $0 $0 $0 $150,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Cost analysis submitted to Bert McCauley, Program Manager, FHWA, 2013-14. $125,000 for the facility and $25,000 for testing

equipment purchase.

State: Ok Construction Year: 2016

Length: Miles County: Pontotoc

Type of Work: Construction of new material testing facility and testing equipment purchase

Location: Adjacent to current Maintenace Facility

Project Number:Route Number: Facility number is N/A

Project Name: Testing Facility and Equipment

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $150,000

G039060364

Page 40: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $225,000 $500,000 $0 $0 $0 $725,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $500,000 $0 $0 $0 $500,000

Preliminary Engineering $225,000 $0 $0 $0 $0 $225,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: This project is PC paving. Adjustment to the funding amounts will be made when the engineering estimates are available.

State: Ok Construction Year: 2017

Length: 0.1 Miles County: Carter

Type of Work: Reconstruction

Location: 34°12'0.254"N 97°8'26.003"W (Begin at Chicksaw & Locust and go east.)

Project Number:Route Number: Rt: 33F3, Sec:010

Project Name: Locust

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $725,000

G039060365

Page 41: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $200,000 $0 $0 $0 $200,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $200,000 $0 $0 $0 $200,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: This project is concurrent with the Thomas Ranch Road project. The PE has been completed already.

State: OK Construction Year: 2016

Length: 0.2 Miles County: Pontotoc

Type of Work: Reconstructing Intersection

Location: 34°44'17"N 96°38'6"W (Intersection of CR 3580 and CR 1570)

Project Number:Route Number: 2483 Sec. 010

Project Name: High Hill Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $200,000

G039060366

Page 42: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $700,000 $0 $0 $0 $0 $700,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $700,000 $0 $0 $0 $0 $700,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed. $700,000 is not the total cost for this project. The State of Oklahoma and Garvin County are the source

of funding for the remaining amount.

State: OK Construction Year: 2016

Length: 3 Miles County: Garvin

Type of Work: Reconstruction of Roadway

Location: 34° 42' 25.01" N 97° 14' 35.897"

Project Number:Route Number: Rt: 2361; Sec: 810-860

Project Name: Indian Meridian Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $700,000

G039060367

Page 43: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $500,000 $0 $0 $0 $0 $500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $500,000 $0 $0 $0 $0 $500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: MATCHING FUNDS ($500 K) Total project cost $1.8 million. Carter County/State of Oklahoma are leading this project. The

PE and the rest of construction is being done by these entites. PE is completed.

State: OK Construction Year: 2016

Length: 5.5 Miles County: Carter

Type of Work: Reconstruction of Roadway

Location: 34°6'26.55"N 96°59'8.759"W (Begins at US-70 ends at US-177)

Project Number:Route Number: Rt: 3312 Sec: 010-030

Project Name: Dickson Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount: $500,000

G039060368

Page 44: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $1,000,000 $0 $0 $1,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $1,000,000 $0 $0 $1,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE has been completed. The total cost is not $1,000,00 other funds are provided by Pontotoc County.

State: Construction Year: 2018

Length: 2.5 Miles County: Pontotoc

Type of Work: Reconstruction of Roadway

Location: 34°49'31"N 96°41'38"W

Project Number:Route Number: Rt: 2489 Sec:010-040

Project Name: DX Road

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: The Chickasaw Nation Date: 8/11/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G03906

2016 2017 2018 2019 2020

STIP Amount:$1,000,000

G039060370

Page 45: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $100,000 $1,500,000 $0 $0 $1,600,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $60,000 $0 $0 $60,000

Construction $0 $0 $1,440,000 $0 $0 $1,440,000

Preliminary Engineering $0 $100,000 $0 $0 $0 $100,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Using carryover funds and new allocation. Project scope decreased to cover estimated costs of PE/CE and available funds.

State: OK Construction Year: 2018

Length: 1.2 Miles County: Ottawa

Type of Work: Reconstruction

Location: Route 167 west .7 miles to Route 155 North on Rt 164 .5 miles

Project Number: TBDRoute Number: Route 167 Section 20

Project Name: Route 167

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: Miami Tribe of Oklahoma Date: 2/8/2016

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G04925

2016 2017 2018 2019 2020

STIP Amount:$1,600,000

G049250002

Page 46: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $17,000 $140,000 $0 $0 $157,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $10,000 $0 $0 $10,000

Construction $0 $0 $130,000 $0 $0 $130,000

Preliminary Engineering $0 $17,000 $0 $0 $0 $17,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments:

State: OK Construction Year: 2018

Length: 0.1 Miles County: Ottawa

Type of Work: Reconstruction

Location: Route 141 1 block South of Route 167

Project Number: TBDRoute Number: Rt 141 Section 150

Project Name: Route 141

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2016

Tribe: Miami Tribe of Oklahoma Date: 2/8/2016

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G04925

2016 2017 2018 2019 2020

STIP Amount: $157,000

G049250003

Page 47: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $1,500,000 $0 $0 $1,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $1,500,000 $0 $0 $1,500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Faifax Lake Road and bridges NBI# 03230 and 03066. County will be incurring all pre-construction costs. CE will be

administered in-house.

State: OK Construction Year: 2019

Length: 4.6 Miles County: Osage

Type of Work: Replace Bridges & Overlay Roads

Location: approx 7 miles southeast of McCord on 80 mile road 1 mile East of George Braden Road

Project Number:Route Number: 4183 ALL

Project Name: Fairfax Lake Road & Bridges

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$1,500,000

G069300004

Page 48: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $3,700,000 $0 $0 $0 $0 $3,700,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $3,700,000 $0 $0 $0 $0 $3,700,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Estimate contract $3.7M. County will be incurring all preconstruction costs. CE will be administered in-house. All funding is

previous years' allocation.

State: OK Construction Year: 2016

Length: 2.9 Miles County: Osage

Type of Work: Reconstruction / Overlay / Utilities

Location: POB at Intersection of Kelly Ave. & Big Snake Rd then to Intersection of City View Rd & SH60

Project Number: ON-1012Route Number: 41FN-10, 414H-10

Project Name: Big Snake

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$3,700,000

G069300006

Page 49: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $4,000,000 $0 $0 $0 $4,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $4,000,000 $0 $0 $0 $4,000,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: $2,362,000 funding from previous years' allocation. $1,638,000 from 2017 TTP funds. Fully funded. Estimate contract

$4,000,000, county will be incurring all preconstruction costs. CE will be administered in-house.

State: OK Construction Year: 2018

Length: 1 Miles County: Osage

Type of Work: Reconstruction, Drainage Structures & Overlay

Location: City of Pawhuska, Oklahoma

Project Number: ON-1019Route Number: 41H#-20

Project Name: Pawhuska 21st Street

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$4,000,000

G069300008

Page 50: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $257,000 $0 $0 $0 $0 $257,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $250,000 $0 $0 $0 $0 $250,000

Preliminary Engineering $7,000 $0 $0 $0 $0 $7,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Campus beautification, add a walking/bike trail through the Campus once the Master Campus Plan has been executed. CE will

be administered in-house.

State: OK Construction Year: 2017

Length: 1 Miles County: Osage

Type of Work: New Construction

Location: Osage Nation Campus, Pawhuska, OK Lat 36.669327 Long -96.340431

Project Number: ON-1016Route Number: 41#M-40

Project Name: Osage Campus bike/walking trail

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $257,000

G069300009

Page 51: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $2,500,000 $0 $0 $2,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $2,500,000 $0 $0 $2,500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: NBI# 00329. County is assuming all preconstruction costs including engineering, ROW, and utilities. CE will be administered

in-house.

State: OK Construction Year: 2019

Length: Miles County: Osage

Type of Work: Bridge Replacement

Location: 0.2 miles south of Hwy 60 on Lynn Ave, Pawhuska, OK Lat 36.659250 Long -96.331753

Project Number:Route Number: 41F#-020

Project Name: Pawhuska Bird Creek Bridge No. 112A

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$2,500,000

G069300014

Page 52: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $1,250,000 $0 $0 $0 $1,250,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $1,250,000 $0 $0 $0 $1,250,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: * 41*E-20, 41+X, 41+W, 41*F - 30, and 41*D - 40. This is cooperative housing development project for Native Americans in

which the housing authority will be incurring all pre-construction costs. CE will be administered in-house.

State: OK Construction Year: 2018

Length: 0.5 Miles County: Osage

Type of Work: New Construction

Location: NE of 13th St and Stoneridge Ln intersection, Pawhuska, OK Lat 36.671055 Long -96.316619

Project Number:Route Number: * See comments

Project Name: Stone Ridge Estates

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$1,250,000

G069300017

Page 53: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $0 $270,000 $0 $270,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $0 $0 $0

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $270,000 $0 $270,000

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Project desired by County, programmed funds are for a feasibilty study shared between four agencies. No PE has been started,

County may elect to do entire PE.

State: OK Construction Year:

Length: 4.1 Miles County: Osage

Type of Work: New Construction

Location: NW Tulsa, Oklahoma & North of Sand Springs, Oklahoma

Project Number: ON-1031Route Number: 41+S

Project Name: N. Tulsa-Sand Springs Connector

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $0

G069300018

Page 54: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $1,920,000 $1,080,000 $0 $3,000,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $1,770,000 $1,080,000 $0 $2,850,000

Preliminary Engineering $0 $0 $150,000 $0 $0 $150,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: * 41#M-10, 41R*-40, and 41#W-10 Project will consist of reconstruction of existing roads and parking areas on the Osage

Nation campus. PE cost is for design of the roadway portions of the project. CE will be administered in-house.

State: OK Construction Year: 2019

Length: 2 Miles County: Osage

Type of Work: New Construction

Location: Osage Nation Campus, Pawhuska OK

Project Number:Route Number: * See comments

Project Name: Osage Campus Phase II

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$3,000,000

G069300019

Page 55: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $1,500,000 $0 $0 $0 $0 $1,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $1,500,000 $0 $0 $0 $0 $1,500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Co-op with Osage Nation Housing program and Osage Nation Tribal Development and Land Acquisition

Department. Preconstruction already completed by housing program. Construction started 2016 and will carry over into

2017. CE will be administered in-house. All funding is previous years' allocation.

State: OK Construction Year: 2016

Length: 0.9 Miles County: Osage

Type of Work: Reconstruction

Location: East from N 41st W Ave 0.33 miles N of 133rd St N Skiatook, OK

Project Number: ON-1048Route Number: 41+Y - 10,20, & 30

Project Name: Sky Lodge Estates

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$1,500,000

G069300021

Page 56: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $60,000 $0 $600,000 $0 $660,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $600,000 $0 $600,000

Preliminary Engineering $0 $60,000 $0 $0 $0 $60,000

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: Osage Nation owned property, industrial park drives and parking lots. CE will be administered in-house.

State: OK Construction Year: 2020

Length: 1.1 Miles County: Osage

Type of Work: Reconstruction

Location: SW of West 36th St N and N Osage Dr intersection, Tulsa, OK Lat 36.203380, Long -96.004192

Project Number:Route Number: 4122 - 10 thru 70

Project Name: Shelby Property

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $660,000

G069300026

Page 57: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $150,000 $0 $0 $0 $150,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $150,000 $0 $0 $0 $150,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: TTP funds will be used as the matching funds for a Federal Streetscape grant obtained by the City of Pawhuska. City is

responsible for all other costs including CE.

State: OK Construction Year: 2018

Length: 0.1 Miles County: Osage

Type of Work: Reconstruction

Location: Main Street and Kihekah Ave intersection area, Pawhuska, OK

Project Number:Route Number: 41AW-470 ,41#G-30

Project Name: Pawhuska Streetscape Phase II

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $150,000

G069300027

Page 58: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $0 $0 $0 $0 $1,300,000 $1,300,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $0 $0 $0 $0 $1,300,000 $1,300,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: The cost estimate for this project is $2,400,000. Osage County to provide $1,100,000 for engineering design, environmental

clearance, ROW acquisition, and utility relocations with the remainder of funds towards the cost to construct. The Osage

Nation will fund the balance of construction costs with TTP funds. CE will be administered in-house.

State: OK Construction Year: 2021

Length: 0.7 Miles County: Osage

Type of Work: New Construction

Location: N 52nd W. Ave in the vicinity of 133rd Street N, SW of Skiatook, OK

Project Number:Route Number: 41AP-110, & 120

Project Name: N 52nd W. Ave Intersection and Hominy Creek Bridge

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$1,300,000

G069300028

Page 59: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $400,000 $0 $0 $0 $0 $400,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $400,000 $0 $0 $0 $0 $400,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: PE completed utilizing Tribal funds. CE will be administered in-house. Status is "Official". Approved 7/28/2016 for

inclusion to the 2016 NTTFI. All funding is previous years' allocation.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Osage

Type of Work: New Construction

Location: Intersection of Patrick and Santa Fe Ave, Pawhuska, OK

Project Number:Route Number: 4143-10

Project Name: PRT Facility Road

PROJECT INFORMATION

Funding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date:

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $400,000

G069300030

Page 60: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $150,000 $0 $0 $0 $0 $150,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $150,000 $0 $0 $0 $0 $150,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: * 41AW-470, 41Q*-10, and 41#G-20 TTP funds will be used as the matching funds for a Federal Streetscape grant obtained by

the City of Pawhuska. The city is responsible for all other costs including CE. All funding is previous years' allocation.

State: OK Construction Year: 2017

Length: 0.1 Miles County: Osage

Type of Work: Reconstruction

Location: Main Street and Kihekah intersection area, Pawhuska, OK

Project Number: ON-1026Route Number: * See comments

Project Name: Pawhuska Street Scape Phase 1

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount: $150,000

G069300031

Page 61: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

TOTAL $3,500,000 $0 $0 $0 $0 $3,500,000

Maintenance $0 $0 $0 $0 $0 $0

Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0

Construction $3,500,000 $0 $0 $0 $0 $3,500,000

Preliminary Engineering $0 $0 $0 $0 $0 $0

Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0

Activity TOTAL

Comments: * 41H7-10, 41H8-10, 41H9-10,20, 41F1-20, 41I0-10, 41F2-20, 41I2-10, 41I3-10, and 41I1-10 Estimated contract $3.5M. City

of Skiatook is responsible for all pre-construction costs including the P.E. CE will be administered in-house. All funding is

previous years' allocation.

State: OK Construction Year: 2017

Length: 1 Miles County: Osage

Type of Work: Reconstruction

Location: City of Skiatook, Oklahoma

Project Number: ON-1028Route Number: * See comments

Project Name: Letha Louise

PROJECT INFORMATION

Funding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2017

Tribe: Osage Nation Date: 7/15/2015

Consortium:

Tribal Transportation Program

Transportation Improvement Program

$0.00

Tribe Code: G06930

2017 2018 2019 2020 2021

STIP Amount:$3,500,000

G069300032

Page 62: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 5E3

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 2

450,000 0 0 0 0 450,000

450,000 0 0 0 0 450,000

450,000

450,000 0 0 0 0 450,000

G07BRG03

G07BRG04

G07BRG05

150,000

150,000

150,000

0

0

0

0

0

0

0

0

0

150,000

150,000

150,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

Route 1577

Route 1330

Route 1298

Total

Total

Total

Phase

Phase

Phase

450,000 0 0 0

REPLACE

REPLACE

REPLACE

B

B

B

SD

SD

SD

40 - OklahomaState G07908 - Muscogee (Creek)

101 - Muskogee

107 - Okfuskee

037 - Creek

Name

Name

Name

County

County

County

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

5E3Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 450,000

FIRST PAGE FOR CSTIPG07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

0

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

14-JAN-16FHWA Approved Date

Page 63: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 13

584,923 592,734 599,674 602,554 606,658 2,986,543

2,986,543

584,923 592,734 599,674 602,554 606,658 2,986,543

G0401171

G0401181

G0401A01

G0401A11

G0402141

584,923

0

0

0

0

0

0

599,674

0

0

0

0

0

602,554

0

0

0

0

0

606,658

584,923

592,734

599,674

602,554

606,658

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

321,813 263,110

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

336,564 263,110

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

344,554 258,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

343,437 263,221

0 0

321,813 263,110

0 0

372,734 220,000

0 0

336,564 263,110

0 0

344,554 258,000

0 0

343,437 263,221

0 0

Pow Wow Grounds Roads

Quapaw Admin Lot 1 and 2

Downstream Casino parking lots

Downstream Casino Service Road

Three State Monument Road

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

584,923 592,734 599,674 602,554

RECONS

RECONS

RECONS

RECONS

RECONS

R

R

O

R

R

7

7

7

7

7

40 - OklahomaState G04920 - Quapaw

115 - Ottawa

115 - Ottawa

115 - Ottawa

115 - Ottawa

115 - Ottawa

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 584,923

FIRST PAGE FOR CSTIPG04920 - THE QUAPAW TRIBE OF INDIANSEntity Name

606,658

0 0 0 0

372,734 220,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

592,734

0

0

0

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

28-JUL-16FHWA Approved Date

Page 64: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 13

132,935 132,935 132,935 132,935 132,935 664,675

664,675

132,935 132,935 132,935 132,935 132,935 664,675

G04A1201

132,935 132,935 132,935 132,935 664,675

CONSPECEZ

73,914 59,021

0 0

110,935 0

22,000 0

130,935 0 0

2,000

132,935 0 0 0

581,654 59,021 22,000

2,000

Waste Valley

TotalPhase

132,935 132,935 132,935 132,935

RECONS

R

7

40 - OklahomaState G04921 - Eastern Shawnee Tribe

115 - OttawaNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 132,935

FIRST PAGE FOR CSTIPG04921 - EASTERN SHAWNEE TRIBEEntity Name

132,935

132,935 0 0 0

132,935Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

28-JUN-16FHWA Approved Date

Page 65: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 4 of 13

329,856 307,312 308,000 308,000 308,000 1,561,168

1,561,168

329,856 307,312 308,000 308,000 308,000 1,561,168

G0401702

G0451405 162,856

167,000

308,000

0

15,000

293,000

308,000

0

793,856

767,312

CONSPECEZ

CONSPECEZ

111,856 29,000 11,000 11,000

160,000 0

5,000 2,000

265,000 19,000 14,000 10,000

0 0 0 0

0 10,000

0 5,000

249,000 29,000 10,000

5,000

265,000 19,000 14,000 10,000

0 0 0 0

641,856 77,000 39,000 36,000

676,312 69,000 15,000

7,000

Wyandotte Road Ph 1 Part C

WYANDOTTE RD PHASE 2 PART B

Total

Total

Phase

Phase

329,856 307,312 308,000 308,000

RECONS

RECONS

R

R

7

7

40 - OklahomaState G04924 - Wyandotte

115 - Ottawa

115 - Ottawa

Name

Name

County

County

Project Type

Project Type

Work Type

Work Type

PCAS

PCAS

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 329,856

FIRST PAGE FOR CSTIPG04924 - WYANDOTTE NATIONEntity Name

308,000

0 0 0 0

267,312 40,000

0 0

0

307,312

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16FHWA Approved Date

Page 66: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 5 of 13

60,872 56,000 56,000 56,000 0 228,872

228,872

60,872 56,000 56,000 56,000 0 228,872

G0719091

G0719101 13,000

47,872

0

56,000

0

56,000

0

0

13,000

215,872

PECONS

CEZ

CONSPECEZ

0 0

13,000 0

41,000 6,872

0 0

0 0 0 0

56,000 0 0 0

0 0 0 0

46,000 0

10,000 0

0 0 0 0

0 0 0 0

0 0

13,000 0

199,000 6,872

10,000 0

Office Complex Parking

Community Building Parking Lot

Total

Total

Phase

Phase

60,872 56,000 56,000 56,000

NEWCON

NEWCON

O

O

8

8

40 - OklahomaState G07902 - Kialegee Tribal Town

063 - Hughes

063 - Hughes

Name

Name

County

County

Project Type

Project Type

Work Type

Work Type

PCAS

PCAS

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 60,872

FIRST PAGE FOR CSTIPG07902 - Kialegee Tribal TownEntity Name

0

0 0 0 0

56,000 0 0 0

0

56,000

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

06-JUN-16FHWA Approved Date

Page 67: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 6 of 13

G0710701

G0710702

G0711221

G0712061

G0713181

G07131E1

0

475,000

0

0

1,253,309

0

0

2,080,000

0

0

0

0

2,898,309

0

0

0

0

2,030,000

0

0

0

3,580,000

0

0

2,898,309

2,555,000

1,950,000

3,580,000

1,253,309

2,030,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

405,000 0

70,000 0

0 0 0 0

0 0 0 0

1,183,309 0

70,000 0

0 0 0 0

0 0 0 0

2,000,000 0

80,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,818,309 0 0

80,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,000,000 0

30,000 0

0 0 0 0

0 0 0 0

0 0 0 0

3,500,000 0

80,000 0

0 0 0 0

0 0 0 0

2,818,309 0 0

80,000

2,405,000 0

150,000 0

1,900,000 0

50,000 0

3,500,000 0

80,000 0

1,183,309 0

70,000 0

2,000,000 0

30,000 0

Rock Store Road

Iron Post Road

Garnett Road

Iron Post Road North

Greenleaf Church Road

Micawber Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

RECONS

RECONS

RECONS

OVRLAY

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G07908 - Muscogee (Creek)

111 - Okmulgee

037 - Creek

143 - Tulsa

037 - Creek

107 - Okfuskee

107 - Okfuskee

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,503,309

FIRST PAGE FOR CSTIPG07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

0 0 0 0

0 0 0 0

1,900,000 0

50,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

1,950,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16FHWA Approved Date

Page 68: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 7 of 13

G07132E1

G07135E1

G0713771

G07142D1

G0714352

G0714431

0

250,000

1,800,000

180,000

0

860,000

2,609,663

0

0

0

0

0

2,030,000

0

0

0

0

0

0

0

0

0

3,409,309

0

4,639,663

250,000

1,800,000

180,000

3,409,309

860,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

220,000 0

30,000 0

1,720,000 0

80,000 0

150,000 30,000

0 0

0 0 0 0

800,000 0

60,000 0

2,549,663 0

60,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,000,000 0

30,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,309,309 0

100,000 0

0 0 0 0

4,549,663 0

90,000 0

220,000 0

30,000 0

1,720,000 0

80,000 0

150,000 30,000

0 0

3,309,309 0

100,000 0

800,000 0

60,000 0

Mason School Road

Okemah Community Center Parking

Kbar Road

Beggs Walking Trail

Twin Hills Rd (Phase II)

Duck Creek Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

OVRLAY

NEWCON

RECONS

WALKWY

RECONS

RECONS

R

O

R

O

R

R

7

7

7

7

7

7

40 - OklahomaState G07908 - Muscogee (Creek)

107 - Okfuskee

107 - Okfuskee

107 - Okfuskee

111 - Okmulgee

111 - Okmulgee

111 - Okmulgee

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,503,309

G07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 69: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 8 of 13

G0714451

G0718152

G0718271

G0719271

G0740104

G0760906

0

760,000

0

0

500,000

600,000

0

0

2,298,646

0

500,000

0

0

0

0

0

500,000

0

0

0

0

0

500,000

0

2,580,000

760,000

2,298,646

2,458,309

2,500,000

600,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

0 0 0 0

700,000 0

60,000 0

0 0 0 0

0 0 0 0

0 0

500,000 0

525,000 0

75,000 0

0 0 0 0

0 0 0 0

2,238,646 0

60,000 0

0 0 0 0

0 0

500,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

500,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

500,000 0

0 0 0 0

2,500,000 0

80,000 0

700,000 0

60,000 0

2,238,646 0

60,000 0

2,378,309 0

80,000 0

0 0

2,500,000 0

525,000 0

75,000 0

Newtown Church Road

Graves Creek Church Road

Ryals Road

Salt Creek Church Road

MCN Transit Authority

Oneta Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

RECONS

TRANSIT

RECONS

R

R

R

R

O

R

7

7

7

7

T3

7

40 - OklahomaState G07908 - Muscogee (Creek)

111 - Okmulgee

091 - Mcintosh

091 - Mcintosh

063 - Hughes

107 - Okfuskee

145 - Wagoner

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,503,309

G07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

2,500,000 0

80,000 0

0 0 0 0

0 0 0 0

2,378,309 0

80,000 0

0 0

500,000 0

0 0 0 0

2,580,000

0

0

2,458,309

500,000

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 70: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 9 of 13

8,503,309 8,503,309 8,503,309 8,473,309 8,504,309 42,487,545

42,487,545

8,503,309 8,503,309 8,503,309 8,473,309 8,504,309 42,487,545

G07ADMN1

G07FAC02

G07M2002

G07MNT01

G07PLAN2

G07T1501

465,000

300,000

280,000

500,000

50,000

230,000

465,000

0

0

500,000

50,000

0

465,000

0

0

500,000

50,000

0

465,000

0

0

500,000

50,000

0

2,325,000

300,000

280,000

2,500,000

250,000

230,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

0 0 0

465,000

0 0

300,000 0

280,000 0 0 0

0 0 0

500,000

50,000 0 0 0

210,000 0

20,000 0

0 0 0

465,000

0 0 0 0

0 0 0 0

0 0 0

500,000

50,000 0 0 0

0 0 0 0

0 0 0

465,000

0 0 0 0

0 0 0 0

0 0 0

500,000

50,000 0 0 0

0 0 0 0

0 0 0

465,000

0 0 0 0

0 0 0 0

0 0 0

500,000

50,000 0 0 0

0 0 0 0

0 0 0

2,325,000

0 0

300,000 0

280,000 0 0 0

0 0 0

2,500,000

250,000 0 0 0

210,000 0

20,000 0

TTP - MCN Trans. Administration

MCN Transit - Facility Bldg 2

Little Quasarty Rd & Bearden South Rd

MCN Road Maintenance

TTP - MGMT & Project Planning

EUFAULA WALKING TRAIL

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

8,503,309 8,503,309 8,503,309 8,473,309

PLANING

TRANSIT

RECONS

REHAB

PLANING

WALKWY

O

O

R

R

O

O

P10

T2

7

S1

P10

7

40 - OklahomaState G07908 - Muscogee (Creek)

111 - Okmulgee

111 - Okmulgee

133 - Seminole

111 - Okmulgee

111 - Okmulgee

091 - Mcintosh

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,503,309

G07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

8,504,309

0 0 0

465,000

0 0 0 0

0 0 0 0

0 0 0

500,000

50,000 0 0 0

0 0 0 0

465,000

0

0

500,000

50,000

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 71: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 10 of 13

G0910908

G0917411

G0917831

G0919221

G0926A71

G0928032

53,000

198,930

0

0

0

2,796,000

0

0

0

0

0

0

0

0

0

2,500,000

1,500,000

0

0

0

0

1,000,000

300,000

0

53,000

1,498,930

1,350,000

3,500,000

1,800,000

2,796,000

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0

53,000 0

198,930 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,700,000 38,000 58,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,500,000 0 0 0

1,500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000,000 0 0 0

300,000 0 0 0

0 0 0 0

0 0

53,000 0

1,498,930 0 0 0

1,350,000 0 0 0

3,500,000 0 0 0

1,800,000 0 0 0

2,700,000 38,000 58,000

0

REICHERT-SUMMERFIELD ROAD

McCurtain School Parking Lot

VFW S of Stigler (E1230)

Gerty Road

Frank Chambers Road

Conser Road, Phase I

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

NEWCON

RECONS

RECONS

OVRLAY

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

079 - Le Flore

061 - Haskell

061 - Haskell

063 - Hughes

121 - Pittsburg

127 - Pushmataha

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,902,930

FIRST PAGE FOR CSTIPG09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

1,300,000 0 0 0

1,350,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

1,300,000

1,350,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16FHWA Approved Date

Page 72: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 11 of 13

G0928033

G0929051

G0929263

G0929A51

G0930291

G0930292

1,996,000

0

1,180,000

1,360,000

80,000

350,000

0

2,500,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,996,000

2,500,000

1,180,000

1,360,000

80,000

4,050,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

1,900,000 38,000 58,000

0

0 0 0 0

1,000,000 100,000 80,000

0

1,200,000 80,000 80,000

0

80,000 0 0 0

300,000 50,000

0 0

0 0 0 0

2,500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,900,000 38,000 58,000

0

2,500,000 0 0 0

1,000,000 100,000 80,000

0

1,200,000 80,000 80,000

0

80,000 0 0 0

4,000,000 50,000

0 0

Conser Road, Phase II

Miller/Jumbo Road

Council House Grounds

Choctaw DayCare/Headstart Parking Lo

Old Hwy 43/Goss Road Phase I

Old Hwy 43/Goss Road Phase II

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

OVRLAY

RECONS

RECONS

RECONS

RECONS

RECONS

R

R

R

O

R

R

7

7

7

F3

7

7

40 - OklahomaState G09907 - Choctaw Nation

127 - Pushmataha

127 - Pushmataha

127 - Pushmataha

127 - Pushmataha

005 - Atoka

005 - Atoka

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,902,930

G09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,700,000 0 0 0

0

0

0

0

0

3,700,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 73: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 12 of 13

G0940031

G0940101

G0940391

G0944504

G0973607

G0982708

0

0

0

54,000

24,000

28,000

3,000,000

0

0

0

0

0

0

2,000,000

2,000,000

0

0

0

0

2,500,000

0

0

0

0

3,000,000

4,500,000

2,000,000

54,000

24,000

28,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0

54,000 0

9,000 0

15,000 0

27,000 0

1,000 0

3,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,000,000 0 0 0

2,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,000,000 0 0 0

4,500,000 0 0 0

2,000,000 0 0 0

0 0

54,000 0

9,000 0

15,000 0

27,000 0

1,000 0

Buffalo Road

Old Hwy (D4615/D4622)

IRR 4039 (N4010 Rd)

Handsford/Joe Homer Road

ORCHARD RD, PHASE II

PEEVY ROAD

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

OVRLAY

RECONS

NEWCON

RECONS

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

089 - Mccurtain

089 - Mccurtain

089 - Mccurtain

127 - Pushmataha

013 - Bryan

061 - Haskell

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,902,930

G09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 74: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 13 of 13

18,514,825 18,147,290 18,304,918 17,777,798 16,556,902 89,301,733

8,902,930 8,555,000 8,705,000 8,205,000 7,005,000 41,372,930

41,372,930

8,902,930 8,555,000 8,705,000 8,205,000 7,005,000 41,372,930

G0992409

G09M2602

G09M3902

G09PLAN1

G09TRAN1

578,000

0

0

5,000

200,000

0

3,000,000

0

5,000

200,000

0

0

0

5,000

200,000

0

0

3,000,000

5,000

200,000

2,578,000

3,000,000

3,000,000

25,000

1,000,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

PECONS

CEZ

500,000 78,000

0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

0 0

200,000 0

0 0 0 0

3,000,000 0 0 0

0 0 0 0

0 0 0

5,000

0 0

200,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

0 0

200,000 0

0 0 0 0

0 0 0 0

3,000,000 0 0 0

0 0 0

5,000

0 0

200,000 0

2,500,000 78,000

0 0

3,000,000 0 0 0

3,000,000 0 0 0

0 0 0

25,000

0 0

1,000,000 0

DIVIDE LOOP

Tannehill Road

Cotton/Woodruff Road

TTP - DS Planning

CN Transity Authority

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

8,902,930 8,555,000 8,705,000 8,205,000

RECONS

RECONS

RECONS

PLANING

TRANSIT

R

R

R

O

O

7

7

7

P10

T3

40 - OklahomaState G09907 - Choctaw Nation

127 - Pushmataha

121 - Pittsburg

023 - Choctaw

013 - Bryan

013 - Bryan

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 8,902,930

G09907 - THE CHOCTAW NATIONEntity Name

7,005,000

2,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

0 0

200,000 0

2,000,000

0

0

5,000

200,000

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16

Page 75: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 3

450,000 0 0 0 0 450,000

450,000

450,000 0 0 0 0 450,000

G07BRG03

G07BRG04

G07BRG05

150,000

150,000

150,000

0

0

0

0

0

0

0

0

0

150,000

150,000

150,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

Route 1577

Route 1330

Route 1298

Total

Total

Total

Phase

Phase

Phase

450,000 0 0 0

REPLACE

REPLACE

REPLACE

B

B

B

SD

SD

SD

40 - OklahomaState G07908 - Muscogee (Creek)

101 - Muskogee

107 - Okfuskee

037 - Creek

Name

Name

Name

County

County

County

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 450,000

FIRST PAGE FOR CSTIPG07908 - THE MUSCOGEE (CREEK) NATIONEntity Name

0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

0

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

30-MAR-16FHWA Approved Date

Page 76: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:58 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 3

600,000 0 0 0 0 600,000

150,000 0 0 0 0 150,000

150,000

150,000 0 0 0 0 150,000

G09BRG01

150,000 0 0 0 150,000

PECONS

CEZ

150,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

Conser Road Bridge

TotalPhase

150,000 0 0 0

REPLACE

B

SD

40 - OklahomaState G09907 - Choctaw Nation

079 - Le FloreNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 150,000

FIRST PAGE FOR CSTIPG09907 - THE CHOCTAW NATIONEntity Name

0

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

10-MAY-16FHWA Approved Date

Page 77: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:54 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 31E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 2

270,000 0 0 0 0 270,000

270,000 0 0 0 0 270,000

270,000

270,000 0 0 0 0 270,000

G0713271

270,000 0 0 0 270,000

CONSPECEZ

270,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

270,000 0 0 0

Community Bldg Parking Lot

TotalPhase

270,000 0 0 0

NEWCON

O

8

40 - OklahomaState G07903 - Thlopthlocco Tribal Town

107 - OkfuskeeNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 270,000

FIRST PAGE FOR CSTIPG07903 - Thlopthlocco Tribal TownEntity Name

0

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

05-JUL-16FHWA Approved Date

Page 78: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 8

25,000

904,039

0

0

110,500

940,000

0

0

1,050,000

0

1,050,000

0

0

1,050,000

0

25,000

3,114,539

1,990,000

G0401851

G0401131

G0473507

G0401221

25,000

0

904,039

0

0

0

0

1,050,000

0

1,050,000

0

0

0

1,050,000

0

0

25,000

2,100,000

1,014,539

1,990,000

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0

25,000 0

0 0 0 0

904,039 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,050,000 0 0 0

0 0 0 0

1,050,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,050,000 0 0 0

0 0 0 0

0 0 0 0

0 0

25,000 0

2,100,000 0 0 0

1,014,539 0 0 0

1,990,000 0 0 0

EW110 Road

Seneca Road

Cayuga Road (SYCAMORE S./SENECA C

S580 Rd (Clinic Road)

Total

Total

Total

Total

Phase

Phase

Phase

Phase

OVRLAY

RECONS

RECONS

RECONS

R

R

R

R

7

7

7

7

40 - OklahomaState G04922 - Ottawa Tribe

G04923 - Seneca - Cayuga

G04926 - Peoria

115 - Ottawa

115 - Ottawa

115 - Ottawa

115 - Ottawa

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location

Location

Location

Covers that part of the reservation within the current state.

Covers that part of the reservation within the current state.

Covers that part of the reservation within the current state.

Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

Location Subtotal

Location Subtotal

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 1,049,039

FIRST PAGE FOR CSTIPG04900 - MIAMI CONSORTIUMEntity Name

0 0 0 0

0 0 0 0

110,500 0 0 0

940,000 0 0 0

0

0

110,500

940,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

23-DEC-15FHWA Approved Date

Page 79: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 8

1,049,039 1,050,500 1,050,000 1,050,000 1,050,000 5,249,539

5,249,539

120,000 0 0 0 0 120,000

G0440904

120,000 0 0 0 120,000

PECONS

CEZ

100,000 0

20,000 0

0 0 0 0

0 0 0 0

0 0 0 0

100,000 0

20,000 0

STATE LINE RD

TotalPhase

1,049,039 1,050,500 1,050,000 1,050,000

RECONS

R

7

40 - OklahomaState G04927 - Modoc

115 - OttawaNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 1,049,039

G04900 - MIAMI CONSORTIUMEntity Name

1,050,000

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

23-DEC-15

Page 80: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 4 of 8

G0910908

G0917011

G0917411

G0917831

G0919221

G0926A71

20,000

1,000,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2,500,000

1,500,000

0

0

0

0

1,000,000

300,000

20,000

1,000,000

750,000

1,350,000

3,500,000

1,800,000

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0

20,000 0

1,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,500,000 0 0 0

1,500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000,000 0 0 0

300,000 0 0 0

0 0

20,000 0

1,000,000 0 0 0

750,000 0 0 0

1,350,000 0 0 0

3,500,000 0 0 0

1,800,000 0 0 0

REICHERT-SUMMERFIELD ROAD

N. Perry Road

McCurtain School Parking Lot

VFW S of Stigler (E1230)

Gerty Road

Frank Chambers Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

NEWCON

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

079 - Le Flore

061 - Haskell

061 - Haskell

061 - Haskell

063 - Hughes

121 - Pittsburg

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 9,421,603

FIRST PAGE FOR CSTIPG09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

0 0 0 0

750,000 0 0 0

1,350,000 0 0 0

0 0 0 0

0 0 0 0

0

0

750,000

1,350,000

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

10-JUN-16FHWA Approved Date

Page 81: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 5 of 8

G0927081

G0928032

G0928033

G0929051

G0929571

G0930291

200,000

1,591,603

60,000

0

50,000

50,000

0

0

2,000,000

300,000

0

0

0

0

0

2,300,000

0

0

0

0

0

0

0

0

200,000

2,966,603

3,560,000

2,600,000

50,000

50,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

100,000 0

100,000 0

1,531,603 50,000 10,000

0

0 50,000 10,000

0

0 0 0 0

50,000 0 0 0

50,000 0 0 0

0 0 0 0

0 0 0 0

2,000,000 0 0 0

300,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,300,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

100,000 0

100,000 0

2,906,603 50,000 10,000

0

3,500,000 50,000 10,000

0

2,600,000 0 0 0

50,000 0 0 0

50,000 0 0 0

Cravens Road

Conser Road, Phase I

Conser Road, Phase II

Miller/Jumbo Road

Ethel Road

Old Hwy 43/Goss Road Phase I

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

OVRLAY

OVRLAY

RECONS

OVRLAY

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

077 - Latimer

127 - Pushmataha

127 - Pushmataha

127 - Pushmataha

127 - Pushmataha

005 - Atoka

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 9,421,603

G09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

1,375,000 0 0 0

1,500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

1,375,000

1,500,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

10-JUN-16

Page 82: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 6 of 8

G0930292

G0930308

G0939251

G0940031

G0940101

G0940391

350,000

620,000

1,120,000

0

0

0

0

0

0

3,000,000

0

0

0

0

0

0

0

2,000,000

0

0

0

0

4,500,000

0

4,050,000

620,000

1,120,000

3,000,000

4,500,000

2,000,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

300,000 50,000

0 0

500,000 0

120,000 0

1,000,000 0

120,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

4,500,000 0 0 0

0 0 0 0

4,000,000 50,000

0 0

500,000 0

120,000 0

1,000,000 0

120,000 0

3,000,000 0 0 0

4,500,000 0 0 0

2,000,000 0 0 0

Old Hwy 43/Goss Road Phase II

Voca Road

Rock Plant/Speer Road

Buffalo Road

Old Hwy (D4615/D4622)

IRR 4039 (N4010 Rd)

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

OVRLAY

RECONS

NEWCON

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

005 - Atoka

005 - Atoka

023 - Choctaw

089 - Mccurtain

089 - Mccurtain

089 - Mccurtain

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 9,421,603

G09907 - THE CHOCTAW NATIONEntity Name

3,700,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,700,000

0

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

10-JUN-16

Page 83: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 7 of 8

G0940531

G0944504

G0973607

G0982708

G0992409

G09M2602

1,200,000

20,000

100,000

100,000

340,000

0

0

0

0

0

0

3,000,000

0

0

0

0

0

0

0

0

0

0

0

0

1,200,000

20,000

100,000

100,000

1,740,000

3,000,000

CONSPECEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

1,000,000 0

200,000 0

0 0

20,000 0

30,000 0

70,000 0

30,000 0

70,000 0

310,000 30,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000,000 0

200,000 0

0 0

20,000 0

30,000 0

70,000 0

30,000 0

70,000 0

1,710,000 30,000

0 0

3,000,000 0 0 0

Bethel Cutoff and Battiest School Parking

Handsford/Joe Homer Road

ORCHARD RD, PHASE II

PEEVY ROAD

DIVIDE LOOP

Tannehill Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

RECONS

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState G09907 - Choctaw Nation

089 - Mccurtain

127 - Pushmataha

013 - Bryan

061 - Haskell

127 - Pushmataha

121 - Pittsburg

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 9,421,603

G09907 - THE CHOCTAW NATIONEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,400,000 0 0 0

0 0 0 0

0

0

0

0

1,400,000

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

10-JUN-16

Page 84: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 01:56 PM

REPORT FILTERS:

Location = G-**-***

program_class_code = 61E

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 8 of 8

10,470,642 11,325,500 9,550,000 9,550,000 10,050,000 50,946,142

9,421,603 10,275,000 8,500,000 8,500,000 9,000,000 45,696,603

45,696,603

9,421,603 10,275,000 8,500,000 8,500,000 9,000,000 45,696,603

G09M3902

G09M4004

G09MNT01

G09TRAN1

0

700,000

1,700,000

200,000

0

0

0

200,000

0

0

0

200,000

3,000,000

0

0

200,000

3,000,000

700,000

1,700,000

1,000,000

CONSPECEZ

CONSPECEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

500,000 0

200,000 0

0 0 0

1,700,000

0 0

200,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

200,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

200,000 0

3,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0

200,000 0

3,000,000 0 0 0

500,000 0

200,000 0

0 0 0

1,700,000

0 0

1,000,000 0

Cotton/Woodruff Road

McCurtain County School Parking Lots

CN Road Maintenance

CN Transity Authority

Total

Total

Total

Total

Phase

Phase

Phase

Phase

9,421,603 10,275,000 8,500,000 8,500,000

RECONS

OVRLAY

REHAB

TRANSIT

R

O

R

O

7

7

S1

T3

40 - OklahomaState G09907 - Choctaw Nation

023 - Choctaw

089 - Mccurtain

013 - Bryan

013 - Bryan

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

61EProgram Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 9,421,603

G09907 - THE CHOCTAW NATIONEntity Name

9,000,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0

200,000 0

0

0

0

200,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

10-JUN-16

Page 85: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 10 of 36

B050601P

B0507011

B0507012

B0507013

B0507014

B051001M

140,415

25,000

0

0

0

100,000

100,000

100,000

10,000

825,000

111,000

100,000

100,000

0

151,000

460,000

410,000

100,000

100,000

0

0

0

0

0

540,415

135,000

186,000

2,105,000

546,000

400,000

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

140,415 0 0 0

0 25,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

100,000

100,000 0 0 0

100,000 0 0 0

0 10,000

0 0

809,000 15,000

1,000 0

100,000 10,000

1,000 0

0 0 0

100,000

100,000 0 0 0

0 0 0 0

150,000 0

1,000 0

450,000 0

10,000 0

400,000 0

10,000 0

0 0 0

100,000

100,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

540,415 0 0 0

100,000 35,000

0 0

150,000 35,000

1,000 0

2,059,000 25,000 21,000

0

500,000 35,000 11,000

0

0 0 0

400,000

LONG RANGE PLANNING

CANTON SMOKE SHOP PARKING

CLINTON ACCESS ROAD

BLACK KETTLE PHASE III

RED MOON CELEBRATION GROUNDS

Road Maintenance

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

RECONS

RECONS

RECONS

RECONS

REHAB

R

R

R

R

R

O

P9

7

7

7

7

3

40 - OklahomaState B05801 - Cheyenne And Arapaho

017 - Canadian

011 - Blaine

039 - Custer

017 - Canadian

039 - Custer

017 - Canadian

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,025,440

FIRST PAGE FOR CSTIPB05801 - CHEYENNE AND ARAPAHO TRIBESEntity Name

100,000 0 0 0

0 10,000

0 0

0 25,000

0 0

800,000 10,000 10,000

0

0 25,000

0 0

0 0 0

100,000

100,000

10,000

25,000

820,000

25,000

100,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

19-JUL-16FHWA Approved Date

Page 86: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 11 of 36

B0510300

B0512011

B0512012

B0512013

B0512014

B0512015

410,025

10,000

410,000

0

0

310,000

121,000

0

0

510,000

0

100,000

0

410,000

0

0

400,000

0

0

0

0

0

0

0

1,106,025

420,000

620,000

510,000

400,000

570,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

373,038 10,000 26,987

0

0 10,000

0 0

400,000 0

10,000 0

0 0 0 0

0 0 0 0

300,000 0

10,000 0

110,000 1,000

10,000 0

0 0 0 0

0 0 0 0

500,000 0

10,000 0

0 0 0 0

100,000 0 0 0

0 0 0 0

400,000 0

10,000 0

0 0 0 0

0 0 0 0

400,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,033,038 16,000 56,987

0

400,000 10,000 10,000

0

600,000 0

20,000 0

500,000 0

10,000 0

400,000 0 0 0

550,000 0

20,000 0

WATONGA CLINIC ROAD

Fonda Community Road

EW0640 Road Realignment

Concho Road North Improvement

EW0950 Road Improvement

Canton Head Start Center

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

RECONS

RECONS

NEWCON

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState B05801 - Cheyenne And Arapaho

011 - Blaine

043 - Dewey

011 - Blaine

017 - Canadian

017 - Canadian

011 - Blaine

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,025,440

B05801 - CHEYENNE AND ARAPAHO TRIBESEntity Name

550,000 5,000

20,000 0

0 0 0 0

200,000 0

10,000 0

0 0 0 0

0 0 0 0

150,000 0

10,000 0

575,000

0

210,000

0

0

160,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

19-JUL-16

Page 87: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 12 of 36

2,025,440 2,025,000 1,977,000 2,031,000 100,000 8,158,440

8,158,440

2,025,440 2,025,000 1,977,000 2,031,000 100,000 8,158,440

B0512016

620,000 0 0 0 620,000

CONSPECEZ

620,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

620,000 0 0 0

Memorial Road

TotalPhase

2,025,440 2,025,000 1,977,000 2,031,000

OVRLAY

R

7

40 - OklahomaState B05801 - Cheyenne And Arapaho

017 - CanadianNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,025,440

B05801 - CHEYENNE AND ARAPAHO TRIBESEntity Name

100,000

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

19-JUL-16

Page 88: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 14 of 36

151,805 155,000 150,000 150,000 0 606,805

581,509

146,509 155,000 140,000 140,000 0 581,509

B0607032

B061003M

B0614031

B0614032

B0614033

13,156

10,000

100,000

23,353

0

20,000

10,000

0

110,000

0

10,000

10,000

0

0

120,000

0

0

0

0

0

63,156

40,000

120,000

133,353

225,000

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0

13,156

0 0 0

10,000

100,000 0 0 0

0 23,353

0 0

0 0 0 0

0 0 0

20,000

0 0 0

10,000

0 0 0 0

110,000 0 0 0

0 0 0 0

0 0 0

10,000

0 0 0

10,000

0 0 0 0

0 0 0 0

120,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

63,156

0 0 0

40,000

120,000 0 0 0

110,000 23,353

0 0

220,000 5,000

0 0

Fort Sill Apache Long Range Planning

Fort Sill Apache Road Maintenance

Cedarside Subdivision, Route No. 8341

Jeff Street Route No. 8322

Fort Sill Apache Parking Lot at Route No.

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

146,509 155,000 140,000 140,000

PLANING

REHAB

OVRLAY

OVRLAY

NEWCON

O

O

R

R

R

P9

3

6

6

8

40 - OklahomaState B06803 - Fort Sill Apache Tribe

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 151,805

B06803 - FORT SILL APACHE TRIBEEntity Name

0

0 0 0

20,000

0 0 0

10,000

20,000 0 0 0

0 0 0 0

100,000 5,000

0 0

20,000

10,000

20,000

0

105,000

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

15-APR-16

Page 89: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 15 of 36

B0604014

B0606045

B0610041

B061004M

B0613041

B0613042

10,000

22,038

10,000

59,146

305,000

50,000

0

80,000

20,000

10,000

0

200,000

0

50,000

20,000

10,000

200,000

202,000

0

0

20,000

0

0

0

20,000

207,206

280,000

89,146

515,000

562,000

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

0 0

10,000 0

22,038 0 0 0

0 10,000

0 0

0 0 0

59,146

250,000 50,000

5,000 0

0 50,000

0 0

0 0 0 0

80,000 0 0 0

10,000 0

10,000 0

0 0 0

10,000

0 0 0 0

200,000 0 0 0

0 0 0 0

50,000 0 0 0

10,000 0

10,000 0

0 0 0

10,000

200,000 0 0 0

200,000 0

2,000 0

0 0 0 0

0 0 0 0

10,000 0

10,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

20,000 0

207,206 0 0 0

230,000 10,000 40,000

0

0 0 0

89,146

450,000 55,000 10,000

0

500,000 55,000

7,000 0

RADIO TOWER ROAD

LONG RANGE PLAN

Route 6811 (Thompson Road)

Road Maintenance

Travel Plaza Access

East Washita Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

PLANING

REHAB

REHAB

NEWCON

RECONS

R

R

R

O

R

R

7

P10

6

3

7

7

40 - OklahomaState B06804 - Wichita & Affiliated Tribes

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 606,184

FIRST PAGE FOR CSTIPB06804 - WICHITA AND AFFILIATED TRIBESEntity Name

0 0

10,000 0

55,168 0 0 0

200,000 0

10,000 0

0 0 0

10,000

0 5,000 5,000

0

100,000 5,000 5,000

0

10,000

55,168

210,000

10,000

10,000

110,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

15-APR-16FHWA Approved Date

Page 90: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 16 of 36

606,184 645,168 612,000 612,366 20,000 2,495,718

2,495,718

606,184 645,168 612,000 612,366 20,000 2,495,718

B0614041

B0614042

B0614043

B0614044

50,000

50,000

0

50,000

102,000

200,000

0

0

0

0

130,366

0

0

0

0

0

267,000

325,000

130,366

100,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 50,000

0 0

0 50,000

0 0

0 0 0 0

0 50,000

0 0

100,000 0

2,000 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

80,366 50,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 60,000

7,000 0

275,000 50,000

0 0

80,366 50,000

0 0

50,000 50,000

0 0

Lamar Road

Chickasha Lake Road

Beartrack Road

Casino Event Center Access Road

Total

Total

Total

Total

Phase

Phase

Phase

Phase

606,184 645,168 612,000 612,366

RECONS

RECONS

RECONS

NEWCON

R

R

R

R

7

7

7

7

40 - OklahomaState B06804 - Wichita & Affiliated Tribes

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 606,184

B06804 - WICHITA AND AFFILIATED TRIBESEntity Name

20,000

100,000 10,000

5,000 0

75,000 0 0 0

0 0 0 0

50,000 0 0 0

115,000

75,000

0

50,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

15-APR-16

Page 91: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 17 of 36

B0607084

B0607085

B0609081

B0609086

B0609088

B061008M

0

0

120,000

10,000

270,000

163,057

10,000

46,000

120,000

129,982

105,000

60,000

121,000

201,000

10,000

300,000

0

60,000

101,000

0

0

290,000

0

0

232,000

248,000

485,000

729,982

735,000

343,057

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

0 0 0 0

0 0 0 0

100,000 20,000

0 0

0 10,000

0 0

255,000 15,000

0 0

0 0 0

163,057

5,000 5,000

0 0

35,000 10,000

1,000 0

100,000 10,000 10,000

0

0 129,000

0 982

100,000 0

5,000 0

0 0 0

60,000

100,000 20,000

1,000 0

200,000 0

1,000 0

0 0

10,000 0

300,000 0 0 0

0 0 0 0

0 0 0

60,000

100,000 0

1,000 0

0 0 0 0

0 0 0 0

290,000 0 0 0

0 0 0 0

0 0 0 0

205,000 25,000

2,000 0

235,000 11,000

2,000 0

400,000 55,000 30,000

0

590,000 139,000

0 982

705,000 20,000 10,000

0

0 0 0

343,057

B949

B950

Comanche Estates

Cyril Bypass Road

Lee Blvd near Indiahoma

Comanche Road Maintenance

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

BRIDGE

BRIDGE

RECONS

RECONS

RECONS

REHAB

B

B

R

R

R

O

B16

B16

7

7

7

3

40 - OklahomaState B06808 - Comanche Nation

031 - Comanche

031 - Comanche

031 - Comanche

015 - Caddo

031 - Comanche

031 - Comanche

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,102,367

FIRST PAGE FOR CSTIPB06808 - Comanche NationEntity Name

0 0 0 0

0 1,000

0 0

200,000 25,000 10,000

0

0 0 0 0

350,000 5,000 5,000

0

0 0 0

60,000

0

1,000

235,000

0

360,000

60,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

16-MAY-16FHWA Approved Date

Page 92: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 18 of 36

B0611081

B0611083

B0613081

B0613082

B0616081

B0616082

0

335,000

560,000

50,000

0

100,000

0

5,000

10,000

520,000

0

500,000

400,000

0

0

320,000

0

0

1,052,745

0

0

0

0

0

1,452,745

455,000

640,000

1,130,000

500,000

600,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

300,000 30,000

5,000 0

500,000 50,000 10,000

0

0 50,000

0 0

0 0 0 0

0 100,000

0 0

0 0 0 0

0 0

5,000 0

0 0

10,000 0

500,000 0

20,000 0

0 0 0 0

500,000 0 0 0

400,000 0 0 0

0 0 0 0

0 0 0 0

300,000 0

20,000 0

0 0 0 0

0 0 0 0

990,000 2,745

10,000 50,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,390,000 2,745

10,000 50,000

400,000 40,000 15,000

0

550,000 60,000 30,000

0

1,000,000 70,000 60,000

0

500,000 0 0 0

500,000 100,000

0 0

Fletcher Road

EW147 Road Caddo County

EPA Road at Tribal headquarters

Martinez Road

Route 7128

Route 7000 Madiche Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

OVRLAY

NEWCON

RECONS

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

40 - OklahomaState B06808 - Comanche Nation

031 - Comanche

015 - Caddo

031 - Comanche

015 - Caddo

031 - Comanche

031 - Comanche

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,102,367

B06808 - Comanche NationEntity Name

0 0 0 0

100,000 10,000

5,000 0

50,000 10,000 10,000

0

200,000 20,000 20,000

0

500,000 0 0 0

0 0 0 0

0

115,000

70,000

240,000

500,000

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

16-MAY-16

Page 93: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 19 of 36

2,102,367 2,141,000 2,005,982 2,012,000 1,843,745 10,105,094

10,105,094

2,102,367 2,141,000 2,005,982 2,012,000 1,843,745 10,105,094

B0616083

B0616084

B0616085

B0630100

45,000

0

74,310

375,000

400,000

0

100,000

0

0

500,000

100,000

0

0

400,000

0

0

680,000

900,000

374,310

600,000

CONSPECEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

0 15,000 30,000

0

0 0 0 0

0 0 0

74,310

345,000 0

30,000 0

400,000 0 0 0

0 0 0 0

0 0 0

100,000

0 0 0 0

0 0 0 0

400,000 100,000

0 0

0 0 0

100,000

0 0 0 0

0 0 0 0

400,000 0 0 0

0 0 0 0

0 0 0 0

600,000 20,000 60,000

0

800,000 100,000

0 0

0 0 0

374,310

470,000 0

130,000 0

Route 7195 in Walters

Route 7211

Program Management

COMANCHE BINGO RD PHASE 2

Total

Total

Total

Total

Phase

Phase

Phase

Phase

2,102,367 2,141,000 2,005,982 2,012,000

RECONS

RECONS

PLANING

NEWCON

R

R

O

R

7

7

P9

7

40 - OklahomaState B06808 - Comanche Nation

033 - Cotton

033 - Cotton

031 - Comanche

031 - Comanche

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,102,367

B06808 - Comanche NationEntity Name

1,843,745

200,000 5,000

30,000 0

0 0 0 0

0 0 0

100,000

125,000 0

100,000 0

235,000

0

100,000

225,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

16-MAY-16

Page 94: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 20 of 36

B0604069

B061009M

B0610200

B0611091

B0612091

B0612092

91,000

20,000

0

20,000

286,719

79,866

3,000

10,000

0

20,000

630,000

151,000

0

20,000

0

20,000

0

551,000

0

0

370,000

0

0

0

99,000

70,000

370,000

80,000

1,306,719

956,866

CONSPECEZ

PECONS

CEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

90,000 0

1,000 0

0 0 0

20,000

0 0 0 0

0 0 0

20,000

238,000 43,719

5,000 0

0 79,866

0 0

0 0

3,000 0

0 0 0

10,000

0 0 0 0

0 0 0

20,000

600,000 0

30,000 0

150,000 0

1,000 0

0 0 0 0

0 0 0

20,000

0 0 0 0

0 0 0

20,000

0 0 0 0

550,000 0

1,000 0

0 0 0 0

0 0 0 0

360,000 0

10,000 0

0 0 0 0

0 0 0 0

0 0 0 0

90,000 0

9,000 0

0 0 0

70,000

360,000 0

10,000 0

0 0 0

80,000

1,188,000 53,719 65,000

0

850,000 99,866

7,000 0

HATCHETVILL RD PH III

Apache Road Maintenance

B926 CADDO COUNTY

Apache Program Management

Hatchetvill Road Phase IV

Food Warehouse Access Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

BRIDGE

PLANING

RECONS

RECONS

R

O

B

O

R

R

7

3

SD

P10

7

7

40 - OklahomaState B06809 - Apache Tribe

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 812,049

FIRST PAGE FOR CSTIPB06809 - APACHE TRIBE OF OKLAHOMAEntity Name

0 0

5,000 0

0 0 0

20,000

0 0 0 0

0 0 0

20,000

350,000 10,000 30,000

0

150,000 20,000

5,000 0

5,000

20,000

0

20,000

390,000

175,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

25-AUG-16FHWA Approved Date

Page 95: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 21 of 36

B0612093

B0612094

B06609B1

B06609B2

B06609B3

B06609B4

50,000

54,464

30,000

30,000

30,000

30,000

0

0

0

0

0

0

200,000

0

0

0

0

0

0

0

0

0

0

0

250,000

64,464

60,000

60,000

60,000

60,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 50,000

0 0

54,464 0 0 0

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 50,000

0 0

54,464 0

10,000 0

60,000 0 0 0

60,000 0 0 0

60,000 0 0 0

60,000 0 0 0

Redbone Road

Cyril Bridge

NBI 09118

NBI 08481

NBI 07821

NBI 09123

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REPLACE

BRIDGE

BRIDGE

BRIDGE

BRIDGE

R

B

B

B

B

B

7

SD

SD

SD

SD

SD

40 - OklahomaState B06809 - Apache Tribe

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 812,049

B06809 - APACHE TRIBE OF OKLAHOMAEntity Name

0 0 0 0

0 0

10,000 0

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

0

10,000

30,000

30,000

30,000

30,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

25-AUG-16

Page 96: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 22 of 36

812,049 830,000 814,000 791,000 370,000 3,617,049

3,617,049

812,049 830,000 814,000 791,000 370,000 3,617,049

B06609B5

B06609B6

B06609B7

30,000

30,000

30,000

0

0

0

0

0

0

0

0

0

60,000

60,000

60,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

60,000 0 0 0

60,000 0 0 0

60,000 0 0 0

NBI 07827

NBI 29966

NBI 08877

Total

Total

Total

Phase

Phase

Phase

812,049 830,000 814,000 791,000

BRIDGE

BRIDGE

BRIDGE

B

B

B

SD

SD

SD

40 - OklahomaState B06809 - Apache Tribe

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

County

County

County

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 812,049

B06809 - APACHE TRIBE OF OKLAHOMAEntity Name

370,000

30,000 0 0 0

30,000 0 0 0

30,000 0 0 0

30,000

30,000

30,000

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

25-AUG-16

Page 97: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 23 of 36

B0705050

B0710102

B0710105

B0710106

B0710107

B0710108

45,791

0

0

0

0

0

50,000

1,000

1,000

1,000

1,000

1,000

50,000

1,000

1,000

1,000

1,000

1,000

50,000

1,000

1,000

1,000

1,000

1,000

245,791

4,000

4,000

4,000

4,000

4,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

45,791 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

50,000 0 0 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

50,000 0 0 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

50,000 0 0 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

245,791 0 0 0

0 0

4,000 0

0 0

4,000 0

0 0

4,000 0

0 0

4,000 0

0 0

4,000 0

KAW NATION TRIBAL 20 YEAR PLAN

Bois D Arc creek/Canteen RD #25131

BITTER CREEK #03033

CHILACCO CREEK #09407

LITTLE BEAVER CREEK #01005

BRIDGE #02366

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

O

B

B

B

B

B

P9

SD

SD

SD

SD

SD

40 - OklahomaState B07810 - Kaw Nation

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 1,535,094

FIRST PAGE FOR CSTIPB07810 - Kaw NationEntity Name

50,000 0 0 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

50,000

1,000

1,000

1,000

1,000

1,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16FHWA Approved Date

Page 98: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 24 of 36

B0710109

B071010M

B0712102

B0712103

B0713104

B0713105

0

150,000

410,000

20,000

0

804,303

1,000

100,000

0

0

0

0

1,000

50,000

0

5,000

170,000

0

1,000

51,000

0

800,000

0

0

4,000

451,000

510,000

1,225,000

170,000

1,004,303

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

0 0 0

150,000

400,000 10,000

0 0

10,000 10,000

0 0

0 0 0 0

804,303 0 0 0

0 0

1,000 0

0 0 0

100,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

1,000 0

0 0 0

50,000

0 0 0 0

0 5,000

0 0

170,000 0 0 0

0 0 0 0

0 0

1,000 0

0 0

1,000 50,000

0 0 0 0

800,000 0 0 0

0 0 0 0

0 0 0 0

0 0

4,000 0

0 0

1,000 450,000

500,000 10,000

0 0

1,210,000 15,000

0 0

170,000 0 0 0

1,004,303 0 0 0

DRY CREEK #07270

Kaw Nation Road maintenance

Newkirk Cemetery Road

44th Street Reconstruction Project

Church Road reconstruction project

Brake Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REPLACE

REHAB

RECONS

RECONS

RECONS

RECONS

B

O

R

R

R

R

SD

P1

7

7

7

7

40 - OklahomaState B07810 - Kaw Nation

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 1,535,094

B07810 - Kaw NationEntity Name

0 0

1,000 0

0 0 0

100,000

100,000 0 0 0

400,000 0 0 0

0 0 0 0

200,000 0 0 0

1,000

100,000

100,000

400,000

0

200,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16

Page 99: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 25 of 36

1,535,094 1,656,000 1,466,000 1,481,000 907,000 7,045,094

7,045,094

1,535,094 1,656,000 1,466,000 1,481,000 907,000 7,045,094

B0716101

B0716102

B0716103

B0716104

105,000

0

0

0

300,000

200,000

0

810,000

0

0

300,000

900,000

0

0

0

0

1,205,000

200,000

300,000

1,710,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

100,000 5,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

300,000 0 0 0

200,000 0 0 0

0 0 0 0

800,000 10,000

0 0

0 0 0 0

0 0 0 0

300,000 0 0 0

900,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,200,000 5,000

0 0

200,000 0 0 0

300,000 0 0 0

1,700,000 10,000

0 0

Washunga Bay Overlay

River Road Overlay

Trader's Bend Overlay

Brake Road Phase II

Total

Total

Total

Total

Phase

Phase

Phase

Phase

1,535,094 1,656,000 1,466,000 1,481,000

OVRLAY

OVRLAY

OVRLAY

RECONS

R

R

R

R

7

7

7

8

40 - OklahomaState B07810 - Kaw Nation

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 1,535,094

B07810 - Kaw NationEntity Name

907,000

800,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

800,000

0

0

0

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16

Page 100: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 26 of 36

B0704031

B0710112

B071011M

B0716111

B0716112

B0716113

49,000

0

20,000

0

130,000

133,099

0

303,000

10,000

0

0

0

0

453,000

10,000

0

0

0

0

2,000

0

140,000

0

0

54,000

865,000

50,000

140,000

130,000

133,099

CONSPECEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

44,000 0

5,000 0

0 0 0 0

0 0 0

20,000

0 0 0 0

100,000 30,000

0 0

133,099 0 0 0

0 0 0 0

300,000 1,000 2,000

0

0 0 0

10,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

450,000 1,000 2,000

0

0 0 0

10,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

2,000 0

0 0 0 0

100,000 40,000

0 0

0 0 0 0

0 0 0 0

44,000 0

10,000 0

850,000 7,000 8,000

0

0 0 0

50,000

100,000 40,000

0 0

100,000 30,000

0 0

133,099 0 0 0

POW WOW GROUND/WELLNESS CENTE

Tribal Complex Access Road

Road Maintenance

WIC Parking Area

Head Start Building Access

Right turn lane on Highway 177

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

REHAB

RECONS

RECONS

RECONS

R

R

O

R

R

R

7

7

3

7

7

7

40 - OklahomaState B07811 - Otoe-Missouria Tribe

103 - Noble

103 - Noble

103 - Noble

103 - Noble

103 - Noble

103 - Noble

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 542,099

FIRST PAGE FOR CSTIPB07811 - OTOE-MISSOURIA TRIBEEntity Name

0 0

5,000 0

100,000 5,000 2,000

0

0 0 0

10,000

0 0 0 0

0 0 0 0

0 0 0 0

5,000

107,000

10,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16FHWA Approved Date

Page 101: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 27 of 36

542,099 492,000 503,000 533,000 142,000 2,212,099

2,212,099

542,099 492,000 503,000 533,000 142,000 2,212,099

B0716114

B0741202

B07611B1

B07611B2

B07611B3

B07611B4

0

10,000

50,000

50,000

50,000

50,000

120,000

70,000

0

0

0

0

0

70,000

0

0

0

0

0

0

0

0

0

0

220,000

220,000

100,000

100,000

100,000

100,000

CONSPECEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

10,000 0 0 0

50,000 0 0 0

50,000 0 0 0

50,000 0 0 0

50,000 0 0 0

120,000 0 0 0

70,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

70,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

220,000 0 0 0

220,000 0 0 0

100,000 0 0 0

100,000 0 0 0

100,000 0 0 0

100,000 0 0 0

Wellness Center parking

OTOE-MISSOURIA PROGRAM MANAGEM

NBI 11536

NBI 02801

NBI 12682

NBI 12493

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

542,099 492,000 503,000 533,000

NEWCON

PLANING

BRIDGE

BRIDGE

BRIDGE

BRIDGE

R

R

B

B

B

B

7

P10

SD

SD

SD

SD

40 - OklahomaState B07811 - Otoe-Missouria Tribe

103 - Noble

103 - Noble

103 - Noble

103 - Noble

103 - Noble

103 - Noble

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 542,099

B07811 - OTOE-MISSOURIA TRIBEEntity Name

142,000

100,000 0 0 0

70,000 0 0 0

50,000 0 0 0

50,000 0 0 0

50,000 0 0 0

50,000 0 0 0

100,000

70,000

50,000

50,000

50,000

50,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16

Page 102: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 28 of 36

B0705145

B0710141

B0710144

B071014M

B0712141

B0716141

100,000

40,000

5,000

93,614

0

310,000

60,000

301,000

1,000

10,000

0

0

100,000

31,000

1,000

10,000

135,534

0

0

0

1,000

10,000

510,000

0

360,000

783,000

9,000

133,614

645,534

315,000

PECONS

CEZ

CONSPECEZ

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

100,000 0 0 0

0 40,000

0 0

0 0

5,000 0

0 0 0

93,614

0 0 0 0

300,000 0

10,000 0

60,000 0 0 0

300,000 0

1,000 0

0 0

1,000 0

0 0 0

10,000

0 0 0 0

0 0 0 0

100,000 0 0 0

30,000 0

1,000 0

0 0

1,000 0

0 0 0

10,000

130,000 0

5,534 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

1,000 0

0 0 0

10,000

500,000 0

10,000 0

0 0 0 0

360,000 0 0 0

730,000 50,000

3,000 0

0 0

9,000 0

0 0 0

133,614

630,000 0

15,534 0

300,000 0

15,000 0

20 YEAR PLAN

Casino access Road

COWBOY HILL #12385

Tonkawa Road Maintenance

Route 60 turn lane improvements

Hotel Parking Area

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

RECONS

REPLACE

REHAB

SAFETY

NEWCON

R

R

B

O

R

R

P9

7

SD

3

7

8

40 - OklahomaState B07814 - Tonkawa Tribe

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 548,614

FIRST PAGE FOR CSTIPB07814 - Tonkawa TribeEntity Name

100,000 0 0 0

400,000 10,000

1,000 0

0 0

1,000 0

0 0 0

10,000

0 0 0 0

0 0

5,000 0

100,000

411,000

1,000

10,000

0

5,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

08-JUN-16FHWA Approved Date

Page 103: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 29 of 36

548,614 527,000 582,000 587,534 521,000 2,766,148

2,766,148

548,614 527,000 582,000 587,534 521,000 2,766,148

B0716142

0 210,000 310,000 0 520,000

CONSPECEZ

0 0 0 0

200,000 0

10,000 0

300,000 0

10,000 0

0 0 0 0

500,000 0

20,000 0

New Parking Facility

TotalPhase

548,614 527,000 582,000 587,534

RECONS

R

8

40 - OklahomaState B07814 - Tonkawa Tribe

071 - KayNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 548,614

B07814 - Tonkawa TribeEntity Name

521,000

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

08-JUN-16

Page 104: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 30 of 36

B0805222

B0809222

B0809223

B0810221

B0810224

B081022M

71,506

0

20,000

710,000

60,000

10,000

100,000

155,000

10,000

10,000

60,000

10,000

100,000

205,000

100,000

20,000

60,000

10,000

100,000

0

700,000

0

0

0

471,506

425,000

840,000

1,300,000

240,000

40,000

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

PECONS

CEZ

71,506 0 0 0

0 0 0 0

0 20,000

0 0

650,000 60,000

0 0

50,000 0

10,000 0

0 0 0

10,000

100,000 0 0 0

150,000 0

5,000 0

0 10,000

0 0

0 0

10,000 0

50,000 0

10,000 0

0 0 0

10,000

100,000 0 0 0

200,000 0

5,000 0

100,000 0 0 0

10,000 0

10,000 0

50,000 0

10,000 0

0 0 0

10,000

100,000 0 0 0

0 0 0 0

700,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

471,506 0 0 0

400,000 10,000 15,000

0

800,000 40,000

0 0

1,210,000 60,000 30,000

0

200,000 0

40,000 0

0 0 0

40,000

Iowa Tribe (OK) Program Management

Route 8840

Route 8869

US 177 Hwy Intersections Safety

8777

Iowa Tribe (OK) Road Maintenance

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

RECONS

RECONS

RECONS

REHAB

REHAB

R

R

R

R

R

O

P9

7

7

Z1

6

3

40 - OklahomaState B08822 - Iowa Tribe (Ok)

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 871,506

FIRST PAGE FOR CSTIPB08822 - IOWA TRIBE OF OKLAHOMAEntity Name

100,000 0 0 0

50,000 10,000

5,000 0

0 10,000

0 0

550,000 0

10,000 0

50,000 0

10,000 0

0 0 0

10,000

100,000

65,000

10,000

560,000

60,000

10,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16FHWA Approved Date

Page 105: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 31 of 36

B0816111

B0816112

B0816113

B0816114

B0816115

B0816116

0

0

0

0

0

0

250,000

250,000

0

0

0

0

0

0

250,000

200,000

0

0

0

0

0

0

250,000

200,000

250,000

270,000

250,000

200,000

250,000

200,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

250,000 0 0 0

250,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

250,000 0 0 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

250,000 0 0 0

200,000 0 0 0

250,000 0 0 0

250,000 20,000

0 0

250,000 0 0 0

200,000 0 0 0

250,000 0 0 0

200,000 0 0 0

MINI MART PARKING LOT

TRIBAL HQ PARKING LOT

TRIBAL POLICE-FIRE PARK LOT

TRIBAL COMPLEX ENTRANCE RD

COUNTY RD NS3340

Reconstruction of RT 8777 & 0482

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

TRANSIT

TRANSIT

TRANSIT

RECONS

RECONS

RECONS

R

R

R

R

R

R

F3

F3

F3

7

6

6

40 - OklahomaState B08822 - Iowa Tribe (Ok)

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 871,506

B08822 - IOWA TRIBE OF OKLAHOMAEntity Name

0 0 0 0

0 20,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

20,000

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16

Page 106: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 32 of 36

871,506 825,000 845,000 945,000 2,000,000 5,486,506

5,486,506

871,506 825,000 845,000 945,000 2,000,000 5,486,506

B0816117

B0816118 0

0

0

0

0

0

500,000

250,000

500,000

250,000

CONSPECEZ

CONSPECEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

500,000 0 0 0

250,000 0 0 0

500,000 0 0 0

250,000 0 0 0

Reconstruction of RT. 8777 NS3350

Reconstruction of RT. 8777 EW760

Total

Total

Phase

Phase

871,506 825,000 845,000 945,000

RECONS

RECONS

R

R

6

6

40 - OklahomaState B08822 - Iowa Tribe (Ok)

081 - Lincoln

081 - Lincoln

Name

Name

County

County

Project Type

Project Type

Work Type

Work Type

PCAS

PCAS

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 871,506

B08822 - IOWA TRIBE OF OKLAHOMAEntity Name

2,000,000

0 0 0 0

0 0 0 0

0

0

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

29-AUG-16

Page 107: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 33 of 36

B0805232

B0810233

B081023M

B0813231

B0814231

B0815321

19,235

38,162

10,000

155,000

400,000

0

50,000

0

100,000

0

200,000

250,000

50,000

0

50,000

0

0

0

0

205,000

100,000

0

0

0

169,235

243,162

310,000

210,000

875,000

250,000

PECONS

CEZ

CONSPECEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

19,235 0 0 0

0 38,162

0 0

0 0 0

10,000

150,000 0

5,000 0

350,000 50,000

0 0

0 0 0 0

50,000 0 0 0

0 0 0 0

0 0 0

100,000

0 0 0 0

200,000 0 0 0

200,000 50,000

0 0

50,000 0 0 0

0 0 0 0

0 0 0

50,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0

5,000 0

0 0 0

100,000

0 0 0 0

0 0 0 0

0 0 0 0

169,235 0 0 0

200,000 38,162

5,000 0

0 0 0

310,000

200,000 0

10,000 0

825,000 50,000

0 0

200,000 50,000

0 0

Kickapoo (OK) TTP Program Mgmt

Install Safety Turn Lanes

Kickapoo (OK) Road Maintenance

Oak Road

Trailer Home Area on New Land

Casino Shawnee Access Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

RECONS

REHAB

OVRLAY

RECONS

RECONS

R

R

O

R

R

R

P9

7

3

7

7

7

40 - OklahomaState B08823 - Kickapoo Tribe

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 682,397

FIRST PAGE FOR CSTIPB08823 - KICKAPOO TRIBE OF OKLAHOMAEntity Name

50,000 0 0 0

0 0 0 0

0 0 0

50,000

50,000 0

5,000 0

275,000 0 0 0

0 0 0 0

50,000

0

50,000

55,000

275,000

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

22-AUG-16FHWA Approved Date

Page 108: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 34 of 36

682,397 630,000 630,000 650,000 505,000 3,097,397

3,097,397

682,397 630,000 630,000 650,000 505,000 3,097,397

B0815322

B0815323

B0815324

B0816321

0

30,000

30,000

0

30,000

0

0

0

200,000

250,000

100,000

0

0

0

200,000

0

230,000

280,000

330,000

200,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

0 30,000

0 0

0 30,000

0 0

0 0 0 0

0 30,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

250,000 0 0 0

100,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

0 0 0 0

200,000 30,000

0 0

250,000 30,000

0 0

300,000 30,000

0 0

200,000 0 0 0

Casino-Shawnee Back entrance Road

Friends Church Road

Hazel Dell Road

Triple X Road

Total

Total

Total

Total

Phase

Phase

Phase

Phase

682,397 630,000 630,000 650,000

RECONS

RECONS

REHAB

RECONS

R

R

R

R

7

7

7

7

40 - OklahomaState B08823 - Kickapoo Tribe

081 - Lincoln

081 - Lincoln

125 - Pottawatomie

109 - Oklahoma

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 682,397

B08823 - KICKAPOO TRIBE OF OKLAHOMAEntity Name

505,000

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

0

0

0

200,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

22-AUG-16

Page 109: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 35 of 36

B0805243

B081024M

B0813241

B0813242

B0813243

B0813244

100,000

160,031

550,000

550,000

150,000

30,000

100,000

100,000

0

200,000

0

0

200,000

100,000

0

0

0

0

200,000

0

0

0

0

0

700,000

460,031

660,000

1,775,000

310,000

260,000

PECONS

CEZ

PECONS

CEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0

100,000

0 0 0

160,031

500,000 50,000

0 0

500,000 50,000

0 0

100,000 50,000

0 0

0 30,000

0 0

0 0 0

100,000

0 0 0

100,000

0 0 0 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0

200,000

0 0 0

100,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

200,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

700,000

0 0 0

460,031

600,000 60,000

0 0

1,700,000 75,000

0 0

250,000 60,000

0 0

200,000 60,000

0 0

LONG RANGE PLAN

Road Maintenance

Stroud Road

South Schlegel Road

Tribal Complex Parking Improvements

Elders Building Parking Improvements

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

REHAB

RECONS

RECONS

RECONS

RECONS

O

O

R

R

R

R

P9

3

7

7

7

7

40 - OklahomaState B08824 - Sac & Fox Nation (Ok)

081 - Lincoln

081 - Lincoln

081 - Lincoln

119 - Payne

081 - Lincoln

081 - Lincoln

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,056,134

FIRST PAGE FOR CSTIPB08824 - SAC & FOX NATION (OK)Entity Name

0 0 0

100,000

0 0 0

100,000

100,000 10,000

0 0

1,000,000 25,000

0 0

150,000 10,000

0 0

200,000 30,000

0 0

100,000

100,000

110,000

1,025,000

160,000

230,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

15-APR-16FHWA Approved Date

Page 110: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 36 of 36

13,186,602 13,081,168 12,790,982 12,830,900 7,518,187 59,407,839

2,056,134 1,995,000 2,000,000 1,860,000 200,000 8,111,134

8,111,134

2,056,134 1,995,000 2,000,000 1,860,000 200,000 8,111,134

B0813245

B0813246

B0813248

B0814241

B0816241

50,000

0

350,000

116,103

0

500,000

700,000

0

0

400,000

0

560,000

0

0

1,000,000

0

0

0

0

0

570,000

1,310,000

450,000

216,103

1,400,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 50,000

0 0

0 0 0 0

300,000 50,000

0 0

0 116,103

0 0

0 0 0 0

500,000 0 0 0

700,000 0 0 0

0 0 0 0

0 0 0 0

400,000 0 0 0

0 0 0 0

560,000 0 0 0

0 0 0 0

0 0 0 0

1,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

500,000 70,000

0 0

1,260,000 50,000

0 0

400,000 50,000

0 0

100,000 116,103

0 0

1,400,000 0 0 0

RV Park Road Reconstruction

USDA and Community Building Reconstr

County Road EW 75

Mobile Home Park Road

Black Hawk Health Center Parking

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

2,056,134 1,995,000 2,000,000 1,860,000

RECONS

RECONS

RECONS

RECONS

NEWCON

R

R

R

R

R

7

7

7

7

7

40 - OklahomaState B08824 - Sac & Fox Nation (Ok)

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

081 - Lincoln

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,056,134

B08824 - SAC & FOX NATION (OK)Entity Name

200,000

0 20,000

0 0

0 50,000

0 0

100,000 0 0 0

100,000 0 0 0

0 0 0 0

20,000

50,000

100,000

100,000

0

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

15-APR-16

Page 111: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 7

B06609B1

B06609B2

B06609B3

B06609B4

B06609B5

B06609B6

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

150,000

150,000

150,000

150,000

150,000

150,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

NBI 09118

NBI 08481

NBI 07821

NBI 09123

NBI 07827

NBI 29966

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

B

B

B

B

B

B

SD

SD

SD

SD

SD

SD

40 - OklahomaState B06809 - Apache Tribe

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

015 - Caddo

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 0

FIRST PAGE FOR CSTIPB06809 - APACHE TRIBE OF OKLAHOMAEntity Name

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000

150,000

150,000

150,000

150,000

150,000

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

12-APR-16FHWA Approved Date

Page 112: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 7

0 1,050,000 0 0 0 1,050,000

1,050,000

0 1,050,000 0 0 0 1,050,000

B06609B7

0 0 0 0 150,000

CONSPECEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

NBI 08877

TotalPhase

0 1,050,000 0 0

REPLACE

B

SD

40 - OklahomaState B06809 - Apache Tribe

015 - CaddoNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 0

B06809 - APACHE TRIBE OF OKLAHOMAEntity Name

0

150,000 0 0 0

150,000Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

12-APR-16

Page 113: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 4 of 7

B071601B

B071602B

B071603B

B071604B

B071605B

B071606B

0

200,000

200,000

200,000

200,000

200,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

500,000

200,000

200,000

200,000

200,000

200,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

500,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

03033

11633

14688

17985

07357

11876

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

B

B

B

B

B

B

SD

SD

SD

SD

SD

SD

40 - OklahomaState B07810 - Kaw Nation

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,400,000

FIRST PAGE FOR CSTIPB07810 - Kaw NationEntity Name

500,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

500,000

0

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

06-JUN-16FHWA Approved Date

Page 114: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 5 of 7

B071607B

B071608B

B071609B

B071610B

B071611B

B071612B

200,000

200,000

200,000

200,000

200,000

200,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

200,000

200,000

200,000

200,000

200,000

200,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

200,000 0 0 0

15022

08568

11874

15652

11529

11880

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

REPLACE

B

B

B

B

B

B

SD

SD

SD

SD

SD

SD

40 - OklahomaState B07810 - Kaw Nation

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

071 - Kay

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,400,000

B07810 - Kaw NationEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

0

0

0

0

0

Total

Total

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

06-JUN-16

Page 115: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 6 of 7

2,400,000 500,000 0 0 0 2,900,000

2,900,000

2,400,000 500,000 0 0 0 2,900,000

B071613B

200,000 0 0 0 200,000

CONSPECEZ

200,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

200,000 0 0 0

24364

TotalPhase

2,400,000 500,000 0 0

REPLACE

B

SD

40 - OklahomaState B07810 - Kaw Nation

071 - KayNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 2,400,000

B07810 - Kaw NationEntity Name

0

0 0 0 0 0Total

FY 2016 ($) FY 2017 ($) FY 2018 ($) FY 2019 ($) FY 2020 ($)

06-JUN-16

Page 116: Tribal Transportation Program Transportation …...TOTAL $220,000 $0 $0 $0 $0 $220,000 Maintenance $0 $0 $0 $0 $0 $0 Transit $0 $0 $0 $0 $0 $0 Construction Engineering $20,000 $0 $0

Indian Reservation Roads ProgramsFederal Lands Highway

25-NOV-2016 10:24 AM

REPORT FILTERS:

Location = B-**-***

program_class_code = 6K4

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 7 of 7

2,400,000 2,150,000 0 0 0 4,550,000

0 600,000 0 0 0 600,000

600,000

0 600,000 0 0 0 600,000

B07611B1

B07611B2

B07611B3

B07611B4

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

150,000

150,000

150,000

150,000

CONSPECEZ

CONSPECEZ

CONSPECEZ

CONSPECEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

NBI 11536

NBI 2801

NBI 12682

NBI 12493

Total

Total

Total

Total

Phase

Phase

Phase

Phase

0 600,000 0 0

REPLACE

REPLACE

REPLACE

REPLACE

B

B

B

B

SD

SD

SD

SD

40 - OklahomaState B07811 - Otoe-Missouria Tribe

103 - Noble

103 - Noble

103 - Noble

103 - Noble

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

6K4Program Class CodeCSTIP Type Fiscal YearTIP 2016

Funding Amount 0

FIRST PAGE FOR CSTIPB07811 - OTOE-MISSOURIA TRIBEEntity Name

0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000 0 0 0

150,000

150,000

150,000

150,000

Total

Total

Total

Total

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2017 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

12-APR-16FHWA Approved Date