Upload
mukesh-singh
View
10
Download
2
Tags:
Embed Size (px)
Citation preview
SAP Value Proposition for Tata Motors
Establishing SAP as a Competitive Differentiator at Tata Motors
October 15, 2010
DRAFT VERSION
SAP CONFIDENTIAL - Page 2 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Statement of Confidentiality and Exceptions
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
The furnishing of this document shall not be construed as an offer or as constituting a binding agreement on the part of SAP to enter into any relationship. SAP provides this document as guidance only to estimated costs and benefits of the predicted delivery project.
These materials are: (i) based upon external and assumptions that are subject to change; (ii) illustrations of potential performance and cost savings; (iii) not guaranties of future performance or cost savings; and (iv) provided solely for internal review and use by the subject Company. SAP AG and its affiliated companies ("SAP Group") make no representations or warranties of any kind with respect to these materials, and SAP Group shall not be liable for errors or omissions with respect to the materials.
SAP CONFIDENTIAL - Page 3 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
1. Engagement Objectives and Overview2. Executive Summary 3. Next Steps4. Appendix – Detailed Analysis
Agenda
SAP CONFIDENTIAL - Page 4 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Engagement Objectives and Scope
ObjectivesUnderstand Tata Motors business strategy, business processes, current business challenges, and resultant IT challengesBenchmark KPIs and Best Practices adoption level with global peers in the automotive industryIdentify value creation opportunities to address current pain points/process gapsRecommend IT roadmap to enable business strategy and goals for next 3-5 years
Interviews to Assess BusinessObjectives and Pain-points
Benchmarking Survey
Corporate Regional Office
Production Units Others
Scope Pune Jamshedpur Lucknow Pantnagar Sanand HVAL/HVTL FBV TMLD
Finance NA
Human Resources NA NA NA
Materials NA NA
CRM DMS NA NA NA NA NA NA NA NA NA
Supply Chain Mgt NA NA
Manufacturing Operations NA NA NA NA
Quality NA NA NA NA NA
Plant Maintenance NA NA NA NA NA
Planning
Engineering Research NA NA NA NA NA NA NA NA
Spares/Customer Service NA NA NA NA NA NA NA
Real Estate/Hospital Mgmt. NA NA NA NA NA NA NA NA NA
Business Intelligence
Information Technology
SAP CONFIDENTIAL - Page 5 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Engagement Progress
Executive Alignment & Kick Off
Business & IT Interviews
Team Analysis
Validation of
Findings
FinalPresentation
Alignment & scope determinationIdentify participantsConduct kick off call Position Benchmarking surveyPut up project management system
Understand current IT and resultant business challengesGather detailed pain pointsHigh level analysis of pain points Input on key value drivers
Identify relevant solutions to address pain pointsCreate solution roadmap for each manufacturing location, Regional Office and Corporate OfficeFinalize Benchmarking reports
Conduct 1-2 hour sessions with relevant stakeholdersValidate key pain points, value drivers, IT roadmap and business caseDiscuss results of benchmarking exercise
Present findingsto Tata Motors Business Unit HeadsAgree on next
steps to secure buy-in and execution of roadmap
TBDSep 28th – Oct 7th Oct 8th – 30th
Activities
Jul 20th – Oct 1stJun 9th – Jul 8th
Complete
We are here today
We are here today
Completed
SAP CONFIDENTIAL - Page 6 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Team Interviewed More than 200 Tata Motors ExecutivesTML Names & RolesCorporate P M Telang – MD, India Operations
C Ramakrishnan – CFORavi Pisharody – President, CVBUGirish Wagh – Head, Passenger Car OperationsR T Wasan – Head, International BusinessS N Ambardekar – SVP, Manufacturing Operations, CVBUB B Parekh – Chief, Strategic sourcingV B Somaiya - Head, TreasuryN S Kulkarni – Head, Corporate PlanningAbhijit Gajendragadkar – VP, Corporate FinanceJagdish Belwal – CIOSunil Pundlik – DGM, LawRamesh Kulal – DGM, Material ImportsS Sreeraman – DGM, Customer Care & DQCTCV M Kulkarni - Head, Vehicle Parts & Aggregates (CVBU)S G Jogalekar – GM, After Sales Business & Network Plng.Priya Giri –GM, Corporate Human ResourcesP Sunavantee Ursekar – AGM, Credit Control & ReceivablesRavindra Vasant Pethe – AGM, Shared Services
Regional Offices
Dipankar Tiwary – RM, PCBU West 1Girish K Janardan – RM, PCBU West 2Tapan Ghosh – RM, PCBU North 1Sandeep Kumar – RM, CVBU NorthAnand Totla – RM, PCBU North 2Gautam Mukherjee – RM, PCBU EastHabib Saleh – RM, CVBU EastSanjay Mishra – RM, CVBU SouthVijay Menon – RM, PCBU South 2
Subsidiaries/ Other Divisions
A B Lall – CEO, HVAL/HVTLV G Prasad – Head, FBVJawahar Seth – CFO, TMLD
TMLUnits Names & Roles
Pune R Bhaskar – Plant Head, CVBUVikram Sinha – Plant Head, PCBUSuhas P Kulkarni – AGM, Finance (PCBU)U K Mishra – Head, MaterialsAshok Kangude – Head, Customer Services (PCBU)Rajinder Kaul – Sr. GM, Auto ProjectsA K Ghose – Head, HR (PCBU)Prashant Ahir - Head - HR (CVBU)A S Prasad – GM, Auto Production (CVBU)K Chandrasekhar – GM, QA
Jamshedpur Satish B Borwankar – Plant HeadUttam Kr Biswas – Head, FinanceK Mohankumar – GM, Materials & ADDP K Sinha – Sr. GM, ManufacturingSushant K Routray - GM - HR & Productivity ServicesS K Dhawan – GM, TechnicalAkhilesh Kumar - GM - WT Factory
Lucknow Alok Saxena – Plant HeadAmitava Roy – Head, FinanceKumar Lalit – Head, HRMukesh Chandra – DGM, Manufacturing & EnvironmentTirbhuvan Kumar – AGM, Planning
Pantnagar P K Chobe/Atul P Renavikar – Plant HeadG S Nadgouda - DGM - Materials, ADD, Auto Matl and MPCK Venkata Krishna – AGM, FinanceSrinath S Sharma – DGM, ManufacturingS G Krishnan – Divisional Manager, HR
Sanand Arijit Bandopadhyay – Div. Mgr, Plant Business PlanningPrashant Saxena – GM, Small Car SourcingPriyadarshan Kshirsagar – DGM, Planning, SystemsRakesh Mital – DGM, Supply Chain
SAP CONFIDENTIAL - Page 7 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
1. Engagement Objectives and Overview2. Executive Summary 3. Next Steps4. Appendix – Detailed Analysis
Agenda
SAP CONFIDENTIAL - Page 8 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Tata Motors’ Recent Performance: Creating Building Blocks for Further Progress
Tata Motors has rapidly recovered from the industry downturn in 2008-09 and recorded growth of 34% in number of vehicles sold in the domestic market in India, representing a 25.5% share in the industry (improving from 24.4% share in the previous year)
Buoyant market demands, successful launch of new models based on market insights and improved operational efficiencies have been some of the key drivers behind this growth
Capability to network across global centres in product and technology development , ability to derisk its business by focusing on less cyclical segments, expanding capacity to offer cost advantage by leveraging economies of scale would help Tata Motors to strengthen its position as a viable automobile enterprise in the global industry
Stock performance over the past 5 yearsRevenue and Operating Income – standalone
20,891
27,470 28,73025,629
35,593
2,869 3,313 3,093 1,7534,179
2005-06 2006-07 2007-08 2008-09 2009-10
Revenue (in Rs crore) Operating Income (in Rs crore)
Operating Income = Revenue – Cost of Raw Materials & Manufacturing – Employee CostSource: Annual reports; SAP analysis
Tata Motors
BSE Sensex
SAP CONFIDENTIAL - Page 9 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Focus on volume and scaleIncrease reach through more touch pointsDrive more revenue through ownership lifecycleFocus on value added servicesFocus on international expansion
Focus on end-to-end supply chain Reduce complexityEfficient product innovation Enhance vendor collaborationWorld-class quality standardsTalent managementEfficient capital management
Business Priorities and IT Imperatives
Vision to be “Best in the manner in which we operate, best in the products we deliver…”
Business Priorities IT Imperatives
Continue Profitable Revenue Growth
Drive Operational Excellence
Leverage shared services
Transform SAP to a decision support
system
Optimize existing SAP landscape
Enable integrated end-to-end
process visibility
Source: Company Interviews, Company Reports, SAP Analysis
SAP CONFIDENTIAL - Page 10 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Tata Motors IT Journey
Benefits realized
• Established a robust and scalable platform for India operations• Basic transactional processes across functions automated• A shared services platform has also been created for IT and shared financial services• Ease of consolidation across units on account of single platform and common processes• Non-value-add activities have been lowered• With BW, first level visibility of information, data accuracy and faster access to information achieved • In partnership with SAP MaxAttention, utilization of existing functionalities and implementation issues around Warranty
Management, Service Parts Management have been resolved to a great extent• Platform established for optimizing performance in next phase of IT capability development• With ongoing Business Objects roll out, Tata Motors would further have,
Visibility into different parts of the business through reportingData accuracy and faster access to informationDashboard reporting tool to provide key analysis to management
Tata Motors has traditionally been an early adopter of new technologies, which has generated significant business value
1998-2008
Implemented SAP 3.1 H, upgraded to 4.6 C and ECC 6.0
2000’s
Developed Integrated CRM-
DMS system
2004-06
Implemented SAP SRM and
WM
2000’s Mid-2000 2009
Implemented MES solutions
PLM with Delmiaand Team Centre
SAP IS-Auto, Business Objects
Roll out
SAP CONFIDENTIAL - Page 11 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Business Application Landscape and Maturity Across Units/Locations
Struggling Meets Basic Needs Mature Not Applicable (NA)
While there are pockets of IT excellence, the current application maturity level would not support the aggressive future growth planned
Function / Location Corporate Regional Office Jamshedpur Pune Lucknow Pantnagar Sanand
Finance SAP SAP SAP SAP SAP SAP SAP
Human Resources Mgt SAP/Custom SAP/Custom SAP/Custom SAP/Custom SAP/Custom SAP/Custom SAP/Custom
Materials/ADD SAP NA SAP SAP SAP SAP SAP
Sales & Marketing Siebel Siebel NA NA NA NA NA
Supply Chain Management Manual Manual Manual Manual Manual Manual SAP
Manufacturing Operations NA NA SAP/Custom SAP/MES/Custom SAP/Custom SAP/MES SAP/MES
Quality NA NA SAP SAP SAP SAP SAP
Plant Maintenance NA NA SAP SAP SAP SAP SAP
PlanningSAP/Hyperion NA SAP SAP SAP SAP SAP
Engineering ResearchNA NA Team Centre Team Centre Team Centre Team Centre Team Centre
Customer Service SAP/Siebel NA NA NA NA NA NA
Business Intelligence SAP SAP SAP SAP SAP SAP SAP
SAP CONFIDENTIAL - Page 12 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Significant Opportunity to Improve Best Practice Adoption Compared to Global Peers
Function CoverageBest Practice Adoption Gap Peer Coverage1
Key IT Enablement Areas (based on Importance vs. Coverage Gaps identified internally) Average Q1W.r.t. Avg. W.r.t. Q1
Human Capital Management 1.8 0.7 2.2 2.5 4.0
Enable analysis of workforce data, implementation of corporate strategies and what-if analysisAutomate analysis and reporting of time and attendance KPIs Integrate compensation planning system with sales-processing and financial systems
Supply Chain Planning 2.5 0.1 1.8 2.6 4.3
Provide a supply chain performance KPI dashboard and exception-based reporting for enterprise wide and individual supply chainsCollaborate with contract manufacturers and component suppliers on the PO which includes BOM and its componentsIntegrate all supply chain processes (planning, warehousing, transportation
Finance 2.9 NA 1.4 2.7 4.3
Enable G/L Accounting system to handle multiple currencies and accounting standards (e.g. US GAAP, IFRS)Automate budget and forecast simulationsAllow users to access standardized input forms/templates at the beginning of the planning cycle
Manufacturing 3.0 NA 1.2 2.8 4.2
Automate monitoring and analysis of KPI performance across labor, assets and plantsAllow production personnel to identify and respond to root causes of problems when KPIs fall outside acceptable parameters
Supplier Relationship Management
3.1 NA 1.1 2.6 4.2
Enable suppliers to self-register via supplier portalFacilitate order collaboration through a supplier portal for order acknowledgementsImplement supplier managed inventory and collaborative replenishment
Small/No Gap (less than equal to 0) Moderate Gap (0-1.5)Significant Gap (> 1.5)Best Practice Adoption Gap:
Note 1: Color commentary based on peer Group comprising of companies in the automotive sector
SAP CONFIDENTIAL - Page 13 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Enabling Tata Motors’ Business Transformation
Enable Integrated and End-to-End Process Visibility
Optimize the Current SAP Landscape at Tata Motors
Transform SAP to a Decision Support System
Leverage Shared Services
Establish SAP as a
Competitive Differentiator
SAP CONFIDENTIAL - Page 14 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Enabling Tata Motors’ Business Transformation
Enable Integrated End-to-End Process Visibility
Optimize the Current SAP Landscape at Tata Motors
Transform SAP to a Decision Support System
Leverage Shared Services
Establish SAP as a
Competitive Differentiator
SAP CONFIDENTIAL - Page 15 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Optimize the Current SAP Landscape (1/3)
Business Function SAP Module Pain Points Suggested Improvements
Human Resources
Self Services De-centralized web based self service solutions across TML
Enhance HR with centralized ESS/ Performance Management Solutions
Personnel Management
Recruitment is cumbersome due to high reliance on paper based processes
Adopt E-Recruiting
Training and Development
Lack of enterprise wide learning repository/ system
Implement E-Learning and a robust knowledge management solution
Project Management
Project Systems
Lack of a structured project management process leading to project delays and cost overruns
Leverage expert consulting to address issues in budget consumption and drive user adoption of SAP-PS for project management
Fixed assetsManual paper based system for Asset Capitalization
Streamline process with SAP Interactive forms from Adobe and SAP BPM
Procurement SAP SRM
Only basic procurement activities are carried out in SAP i.e. Purchase Requisition, Purchase Orders, Goods Receipt etc
Expand the coverage of SRM to include supplier performance management, RFx management and extended supplier collaboration
SAP CONFIDENTIAL - Page 16 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Business Function SAP Module Pain Points Suggested Improvements
Plant Maintenance Plant Maintenance
Difficulty in analyzing breakdowns due to lack of data points
Drive maturity of PM across all plants for maintenance optimization
Advanced analytics such as MTTF and MTBF are cumbersome to perform
Automate data collection and report generation wherever possible
Production Planning
MRP Schedule lines are generated manually Fix issues in BOM and drive user adoption of MRP across plants
ECMMBOM -EBOM synch issues leading to inventory obsolescence
Address PLM-ERP integration issues to ensure EBOM and MBOM synchronization
Sequenced Manufacturing
Production sequence manually generated Automate line sequencing through IS-Auto
Shared Services
VirsaRole based access limited to SD, MM & FI only; need to extend it to other areas too
GRC Access control will enable online validation of roles
Open TextInvoice verification process needs to be automated
OCR can be enabled through open text
KNOAPerformance management is being done manually
Drive end user performance improvement through KNOA
InfrastructureBW
Reduced responsiveness due to long lead times in report generation
Hardware needs to be augmented both at the plant and area offices
SAP Login Long login times due to system performance
Optimize the Current SAP Landscape (2/3)
SAP CONFIDENTIAL - Page 17 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Optimize the Current SAP Landscape (3/3)
Business Function SAP Module Pain Points Suggested Improvements
International Business
Production PlanningTracking of the customer order status (production stages) is difficultThere is limited flexibility to address the challenges of having higher varieties
Configure Make to Order scenario for International businessExplore the possibility of using variant configuration
VMS
Distributors are unable to track ordersThere is no interface with the distributors system and there is no visibility in the stock of the distributors
Implement SAP Vehicle Management System (VMS) that can serve as a central tool for managing, procuring, sales/distribution and tracking of vehicles with interfaces to distributors’ system
Reporting and Dashboards
Collecting, gathering, analyzing and reporting is a big challenge
SAP Business Objects can enable tracking of KPIs and publish required dashboards
HVAL/HVTL
Training & Development
SAP processes are not being fully used Conduct training sessions specifically for HVAL/HVTLCreate bluebook for SAP transactions
SAPThere are many processes that are not being used and some process have not been configured
Conduct system audit and configure processes if required
Production
Unable to view vendor stock at various stages of productionUnable to view the status of the shop floor on the desktop
Use SNC to get the production stage information at the vendorsUse MII to create shop floor dashboards
FBV Production
Tracking of Fully built vehicles till it reaches the customer is not happeningDiversion by RSO of unique models is challengingProduction loss at plant mounting because of scheduling challenges
SAP event management can be implemented to track the vehiclesStreamline the MTO/Allocation process for FBV requirements Explore the possibility of using finite capacity planning with SCM solution
SAP CONFIDENTIAL - Page 18 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Ongoing
Rea
lizin
g Va
lue
Optimize Current SAP Landscape
Existing Capability to be Implemented
Optimize Current Implementation
Real-time Visibility & Analytics: Roll out of Business Objects across the enterprise and build dashboards and simulate business scenarios
Leverage costing capabilities in SAP to address new material costing and pricing decisionsEnable Employee Performance Mgmt throughout the enterprise
Phase 0: Standardize
Leverage SAP Max Attention to address existing IS-Auto implementation related challengesAddress MASOP process with SAP consultingExtend Kanban across unitsEnhance asset management capabilitiesAddress existing issues in project planning and executionStreamline integration between PLM systems and ERP: Enable workflows across business functions and processes
SAP CONFIDENTIAL - Page 19 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Enabling Tata Motors’ Business Transformation
Enable Integrated End-to-End Process Visibility
Optimize the Current SAP Landscape at Tata Motors
Transform SAP to a Decision Support System
Leverage Shared Services
Establish SAP as a
Competitive Differentiator
SAP CONFIDENTIAL - Page 20 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Integrated End-to-End Process Visibility (1/4)
Key Area Existing Issues Root Causes SAP Recommendations Organizational Requirements
Customer Examples
Supplier Collaboration
Longer than optimalnew product development time
Limited vendor collaboration in the design phase
Early supplier involvement in NPD facilitated by a TML collaboration platform
Suppliers to be included as stakeholders in NPD process
Volkswagen
Shanghai GM
YAPP Automotive
Harman/ Becker
Limited or no visibility into supplier inventory and production
Lack of a collaboration platform that provides visibility
Implement a seamless supply network collaboration platform
Set up a centralized supply chain team to manage operations with addition of visibility clauses in supplier contracts
Limited or no insight into supplier performance across locations
Lack of a enterprise wide supplier performance framework
Implement supplier performance management functionality in SAP SRM to monitor and optimize supplier performance
Institute a supplier performance framework across Tata Motors (PCBU and CVBU)
Inefficiencies in line scheduling due to lack of aggregate visibility
No visibility into aggregate supplies from other TML plants and into stock levels at 3PL warehouses
Extend supply network collaboration framework to sister plants and 3PL warehouse
Set up a centralized supply chainmanagement team
SAP CONFIDENTIAL - Page 21 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Integrated End-to-End Process Visibility (2/4)
Key Area Existing Issues Root Causes SAP Recommendations OrganizationalRequirements
Customer Examples
Demand Planning
Manual demand planning process resulting in low forecast accuracy
Lack of a robust demand planning solution to generate scientific forecasts
Leverage the robust demand planning capabilities in SCM to improve forecast accuracy
Forecastingprocess needs to be collaborative across Tata Motors
BMWSales teams have no visibility into ATP leading to lost orders and missed sales
Lack of active collaboration between SHQ and the Plants
Leverage the collaborative forecasting and ATP functionalities in SCM
One common collaborative framework for sales and manufacturing
Manufacturing
Parts shortages at line leading to downtime
Lack of an early warning systems on material/parts shortage
Station wise inventory consumption in real time as vehicle passes through the station and advanced broadcast of material shortage
Ensure seamlessintegration between MES and SAP
Daimler
Robert Bosch
Witte Auto-motive
QingduaJinhuaIndustry Group
Challenges in rolled out vehicle tracking at plant and storage yard leading to dispatch delays
No vehicle tracking solution in place at plants and storage yard
Implement RFID enabled vehicle tracking within plant and storage yard
NA
Higher than optimal re-work levels in the assembly lines
Static paper driven instructions at stations leading to wrong part fitment/rework
Introduction of dynamic model specific pictorial work instructions at assembly stations with MES
Ensure integration between SAP PP& PLM/DMS withMES System
SAP CONFIDENTIAL - Page 22 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Area Existing Issues Root Causes SAP Recommendations
Organizational Requirements
Customer Examples
Sourcing
Multiple contracts for the same item across different plants
Lack of centralized contracting process
Centralized supply contracts for common components with deliveries across plants
Centralized sourcing process for common components across Tata Motors
Hero Honda
M&M
BOSCH
International Business (IB)
Tracking of order, vehicle and spares status a key pain area for international business
No international business specific business processes in current system
Map and integrate all processes of IB on a common platform and implement Vehicle Management System to manage vehicle movement
Detailedbusiness process study for IB to be carried out
GM
Quality
Quality management in Tata Motors is a resource intensive manual process which needs to be improved
Quality data not captured at the station but at the end of the line
Automated data collection by interfacing to PLC/SCADA and logging of defects in MES and ERP
High number of warranty claims settled due to product quality issues and lack of feedback loop for corrective action
Delayed communication of quality issues from dealerships to units
Capture defects information through DMS and provide seamless information to plant through portal
Ensure integration between ERP and DMS
Integrated End-to-End Process Visibility (3/4)
SAP CONFIDENTIAL - Page 23 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Area Existing Issues Root Causes SAP Recommendations Organizational Requirements
Customer Examples
Spare Parts
Complexity in planning and distributing spare parts due to propagation of models, variants and part revisions
Current system does not support service parts management processes, i.e. cross docking etc
Implement Service Parts Planning to address the unique business requirements of spare parts division
Bajaj Auto
Ford
Finance
Spreadsheet based planning leading to high manual effort
Lack of a robust online planning tool
Increase ease of planning through SAP Business planning IVECO
Subros
YAPP Auto-motive
Inability to accurately forecast price fluctuations of Raw Materials and simulate business impact
Lack of a simulation and analytics engine
Leverage SAP business objects/PCM to simulate scenarios
Web based and disparate balance scorecard systems used across Tata Motors
No centralized solution to manage strategic initiatives
Implement SAP Strategy Management for a single strategy management tool
Transportation Management
Transport planning for distribution of vehicles is a manual process
Lack of transportation optimizing engine available
Explore usage of transport planning engine along with event management
Transpor-tationplanning team under TMLD Harman/
BeckerMilk run planning and 3PL collaboration is a key area of concern
Lack of an online collaboration platform
Leverage supply network collaboration capabilities to integrate 3PL vendors into TML
Integrated End-to-End Process Visibility (4/4)
SAP CONFIDENTIAL - Page 24 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Driving RFID-Based Kanban Process Example: Daimler AG
Daimler AG is one of the world’s most successful automotive companies based in Stuttgart, Germany and is one of the biggest producers of premium cars and the world's biggest manufacturer of commercial vehicles with a global reach
Became the first automotive manufacturer to combine kanban with RFID technologyCarried out a 3-month feasibility study to establish replenishment control for transmission productionSubsequently went live with the RFID-based transport process
SAP software automatically posts the movements of the 750 different types of materials between supermarket and assembly areaAs material level falls below the minimum inventory level, system automatically informs the third-party suppliers and orders replenishmentsMinimized the number of time-consuming inventories in the supermarket and assembly line and mapped inventory in the system to reflect the organizational and physical realityReduced time required to perform identification and eliminated process weaknessesRFID technology also helped to track premium and high-security parts
What Daimler did
Benefits Achieved
Project Background• In its production facilities and
warehouses, countless parts are moved resulting in a constant shift in inventory levels
• Its supply-to-production operations were earlier controlled by a manual kanban process
• However, it was extremely difficult for production and logistics to determine the current inventory levels
• Regular inventories and time –consuming manual counts were necessary
SAP CONFIDENTIAL - Page 25 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Lean Manufacturing Process with RFID Data Capture Example: Robert Bosch
Robert Bosch GmbH, with more than 300 subsidiaries and regional companies in over 60 countries, is a leading global supplier of automotive and industrial technology, consumer goods and building technology
Chose SAP Auto-ID Enterprise which provides tight integration along with all desired functionalitiesProvides scalability to use the solution extensively throughout the companyPilot projects carried out in Homburg and Bamberg plants
At Homburg plant, replenishment is achieved through the automatic capture of production information by RFID gatesBased on information of when and where intermediate goods are required, just in time delivery from warehouse takes place reducing the need for costly buffer inventories Replenishment route is easier to plan simplifying the planning processAt Bamberg, mapping of the production progress is quickly and accurately achieved making the entire production process transparent and easier to planAchieved substantial annual savings through laboursavings and process improvements
Implemen-tation
background
Benefits Achieved
Project Background• Robert Bosch wanted to
boost productivity in its already lean manufacturing plants by using RFID
• The objective of RFID in production logistics processes were:
Reduction of efforts for production confirmations and material requisition
Leveled material replenishment to production using kanban
Reduction of replenishment time at staging
SAP CONFIDENTIAL - Page 26 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Streamlined Transparent Procurement Process Example: Harman/Becker
Harman Becker Automotive Systems, Inc. designs and manufactures audio and infotainment systems for the automotive original equipment manufacturers and is based in Karlsbad, Germany with 6,700 employees
Implemented SAP Supply Network Collaboration applicationAlso went for SAP NetWeaver XI application integration tool for optimal integration with SAP backend softwareAutomatic transfer of master data from back end was achieved
Reduced stock levels and operating overheadBusiness partners have access to transparent data in electronic formBased on scheduling agreement releases suppliers create Advance Shipping NotificationSupplier-managed inventory function that is used to replenish stock and gives suppliers freedom to decide their own stocking strategyAuto alerts are generated if stock levels deviate from agreed limits or if suppliers issues ASN for incorrect quantity or when back log occursPossible to deploy a worldwide centralized supplier platform
What Harman/ Becker did
Benefits Achieved
Project Background• Delivering complex goods to
customers worldwide, which consists of numerous individual parts required efficient procurement processes
• Earlier processes had disparate procedures and integration gaps
• Data exchange with suppliers was through conventional EDI
• Processes offered zero transparency and were a dangerous source of errors
SAP CONFIDENTIAL - Page 27 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Enabling Tata Motors’ Business Transformation
Enable Integrated End-to-End Process Visibility
Optimize the Current SAP Landscape at Tata Motors
Establish SAP as a
Competitive Differentiator
Transform SAP to a Decision Support System
Leverage Shared Services
SAP CONFIDENTIAL - Page 28 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Transform SAP to a Decision Support System (1/2)
Key Area Existing Issues Business Examples SAP Recommendations
Organization Pre-requisites
Dashboards
Lack of management dashboards for business and functional heads renders decision making difficult
Production units need dashboards to monitor key performance parameters like production level, line availability, machine efficiency, accident rates etc. for better visibility into operations
Implement MII to get real time shop floor performance .
Business needs to define KPIs to be tracked through dashboards
Dashboards also required for purchase, quality, supply chain and human resources functions
Expand Business Objects roll out t to all core functions of Tata Motors
NA
Business Simulation
Inability to run business simulations and what-if analysis that could aid business decisions
Simulation tools are required to assess the impact on vehicle price , components price for price increase in base raw materials like steel, rubber etc.
Adopt robust analytics capabilities in Profitability & Cost Management and Business Objects for business simulations and what-if analysis
NA
Data Capture
Delayed data entry into the system results in post-facto reports and data analysis and does not support pro-active /fast decision making
Scrap data, tool cost from various shop floors are available only by the month end which impedes immediate corrective action
Implement robust data capture systems at the shop floor and link them to the ERP for seamless information flow
Up-skill workersto leverage technology and drive data entry discipline at shop floor
SAP CONFIDENTIAL - Page 29 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Transform SAP to a Decision Support System (2/2)
Key Area Existing Issues Business Examples SAP Recommendations Organization Pre-requisites
Reporting
Standard reporting functionality less than desirable. On the fly report generation is cumbersome and custom reports are dependent on availability of IT support
For FBV, Daily Production Reports are produced manually which requires 2 hrs effort
Extend Business Objects implementation across businesses and functions and empower business users to create reports
Roll out of business intelligence platform across the units and training of business users
Manual report creation is a time consuming and error prone process which reduces productivity and time spent on analysis
Many key reports are generated manually like:- Inventory valuation and Inventory level in terms of no. of days- Carbon foot print reporting- Dealer incentive reports
Data Quality
Data accuracy is often compromised due to manual entries leading to reduced business user confidence on system generated report/analysis
Variation in system generated and manually prepared report on spares sales order, payment status and pending order status
Leverage advanced reporting capabilities in Business Objects to generate user and business specific reports on portal and dashboards, reduce manual intervention and improve data quality
Data, info cubes needs to be updated on the system on a regular and timely basis
Inventory level shown in system and in reality are different leading to reliance on manual method for inventory reconciliation
Design business process to ensure consumption happens as per BOM
SAP CONFIDENTIAL - Page 30 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Plant Production Batch
Oct-2008 – Sep-2009
Dealer
5350 ALLConcord Motors (India)
2.5 Cr
Total Credit No. of Claims
749
Model
ALL
No. of Chassis Covered
392
Sub model
ALL
Decision Support Example: Warranty Analysis
SAP CONFIDENTIAL - Page 31 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Decision Support Example: Vendor Dashboard
31
SAP CONFIDENTIAL - Page 32 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Decision Support Example: Manufacturing Analytics (Utility View)
SAP CONFIDENTIAL - Page 33 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Enabling Tata Motors’ Business Transformation
Enable Integrated End-to-End Process Visibility
Optimize the Current SAP Landscape at Tata Motors
Establish SAP as a
Competitive Differentiator
Transform SAP to a Decision Support System
Leverage Shared Services
SAP CONFIDENTIAL - Page 34 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Shared Services at TML:The Current Initiative and Road Ahead
A common platform enables cross-functional and geographical synergies across Tata Motors
Enterprise IT strategyIT Landscape ownership, maintenance and supportIT support to business across TML
Strategic Finance-Treasury
Accounts PayableAccounts ReceivableBudget management
Personnel AdministrationPayrollRecruitmentPerformance ManagementEnterprise Learning
Requisition ProcessingCatalog ManagementPurchase Order ProcessingContract Management
Travel ManagementEnterprise Asset ManagementReal estate management
Information Technology
Finance
Human Resources
Operational Procurement
You are here today
The existing shared services framework needs to be expanded to support growth and drive value
Facility and Admin
The Next Steps
SAP CONFIDENTIAL - Page 35 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Establishing Harmonized Business Processes Example: M&M Project Harmony
Mahindra Group is a US 6.7 billion industrial house and the market leader in multi-utility vehicles with over 100,000 people and several state-of-the-art facilities in India and overseas
Key executives from group companies and SAP Business Transformation Consulting Group identified common processes that caters to the need and among the best practices in the industryVery strong change management initiative was run within the organizationProject went live on 3rd April 2010 in a big bang fashion with Harmony!
Unified processes and common IT platform creates foundation for leveraging shared services benefitsImproved effectiveness due to reduction of administrative costsGroup procurement benefits (through common master data, common processes and volume buying)Uniform One Mahindra experience for group employeesGroup wide talent management processSeamless, error-free inter unit transactions and processes
Migrating to Success
Strategic and Operational
Benefits
Project Background• Value Engineering study
identified opportunities to bring in synergy in common processes across 40+ businesses in varied industry
• Group agreement to harmonize 44 common business processes across HR, Finance & Accounts and Procurement
• Processes benchmarked against the world’s best
• Project Harmony initiated with 400+ strong project team, involved with 14,000+ users across 400+ locations
SAP CONFIDENTIAL - Page 36 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Considerations Behind Proposed SAP Roadmap
Process Improvement Initiatives Identified Overall Degree of Pain
Business Impact1
Feasibility and Effort2
Supplier Collaboration Enable seamless supplier interaction High High Medium
Supply Chain VisibilityIntegrated Demand and Supply planningService Parts ManagementIS-Auto roll out across plants
High High Medium
Manufacturing Excellence
RFID enabled chassis and vehicle trackingRFID enabled Kanban and MESShop floor optimization
High High Medium
Business Analytics Roll out of Business Objects across the enterprise and build dashboards and simulate business scenarios High High High
People Development Employee and Manager Self ServiceTraining, Knowledge repository Medium Medium High
Financial Excellence
Organizational Planning & BudgetingAutomate cost audit, cost calculation & profitability analysisEnterprise wise strategy managementInvoice management
Medium Medium High
Compliance Process Controls, Enterprise Risk Management Medium Medium High
Sustainability Carbon emissionEnergy management Medium Medium Medium
IT Testing and Performance optimization solutions Medium Medium High
Maximizing End user performance
Empower field force through enterprise mobility solutionsOffline forms for data capture High Medium High
1 Business Impact = f(Cost Savings, Efficiencies, Strategic Benefits, Competitive Advantage, Compliance, TCO Impact)2 Feasibility and Effort = f(Technology Risk, Business Risk, Organizational Readiness, Effort required)
SAP CONFIDENTIAL - Page 37 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
To be implemented by: Now – Year 1
Rea
lizin
g Va
lue
Proposed IT Roadmap to Establish SAP as a Competitive Differentiator
To be implemented by: Year 1-2 To be implemented by: Year 2- 3
Manufacturing Excellence: RFID enabled kanban and MESIntegrated Demand and Supply Planning PlatformShop-floor Optimization: Automate for visibility and controlEmpower field force: Enterprise mobility solutionsAutomate data capture: Offline forms for data captureEnterprise Knowledge Management: Training, Knowledge Repository
Standardize Enterprise Processes : IS-Auto rollout across plantsOptimize Profitability and Cost Management : Automate cost audit, cost calculation and profitability analysisCarbon Emission and Energy ManagementEnterprise-wide Strategy ManagementGovernance, Risk & Compliance (Clause-49 requirement): Process Controls, Enterprise Risk Management
Phase 0: Standardize
Track and Trace: RFID enabled chassis and vehicle tracking
Supplier Collaboration: Enable seamless supplier interaction
Service Parts ManagementOrganizational Planning & BudgetingEmployee & Manager Self Service: Automate key admin processes for managers and employees
System Optimization: Testing and performance optimization solutions
Invoice ManagementE-RecruitmentEnvironment, Health & SafetyOptimize existing SAP
Extend Analytics across the Enterprise & Maximize End User Performance
Phase 1: Optimize
Phase 2: Transform
SAP CONFIDENTIAL - Page 38 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Value Creation Potential of Proposed Roadmap (1/2)
Process Value DriversBenefit Estimates
Customer Value ReferencesPotential Likely
Supplier Collaboration & Supply Chain Visibility
15-20% reduction in inventory levels2-6% less spend on indirect material, stores and spares and imports 0.5-1% less spend on direct materials0.5% less maverick spend/ expedition30-40% buyer efficiency5-6% reduction in logistics cost5-10% reduction in premium freights cost3-4% reduction in warehouse management cost5-7.5% improvement in sales revenue30-40% productivity improvement of supply chain and sales staff
Hero Honda: Reduced inventory carrying cost by 10%BOSCH: Improved planned productivity by 20%, reduced inventory by 17%Viper Motorcycle: Achieved 17% improvement in procurement marginsVolkswagen: 30% lower supply chain costs, safety-stock fell from 60 to 5 daysDaimler: Mapped inventory in the system to reflect the organizational and physical realityToyota: Lowered time to confirm orders from 2 days to 2 hoursBehr: Reduced premium freight component
Mfg. Excellence
1-1.5% lower manufacturing overheads0.5-1% higher throughput from improved asset utilization5-8% lower cost of quality and wastage5-8% lower energy cost5-10% reduced repair and maintenance cost30-40% higher shop-floor and maintenance workmen efficiency
Witte Automotive: Better reactivity through real-time monitoring of the production processDaimler: Improved quality through tracking & reduced time required to perform identification and eliminated process weaknessesViper Motorcycle: Improved productivity of production by 27%Qingdao Jinhua Industry Group: Reduced cost of production operations by 5-8%
Rs. 1,265 Cr Rs. 480 CrTotal Annual Benefits:
306 Cr753 Cr
70 Cr204 Cr
Note: Directional analysis based on SAP experience from more than 3,000 value engineering engagements, data from TML Annual Report and inputs received during VE interviews
Improvement Potential
Conservative Estimate
174 Cr 115 Cr
One-Time BenefitOne-time Benefits: 174 Cr 115 Cr
SAP CONFIDENTIAL - Page 39 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Value Creation Potential of Proposed Roadmap (2/2)
Note: Directional analysis based on SAP experience from more than 3,000 value engineering engagements, data from TML Annual Report and inputs received during VE interviews
Process Value DriversBenefit Estimates
Customer Value ReferencesPotential Likely
Better Decision Making through Analytics
25-30% less time spent on data gathering2-4% increased revenue through better insights at various operational level
Hyundai: Efficient strategy management through real-time data and improved data precisionContinental Automotive System: Improved and efficient reporting to facilitate better-informed business decisions
Robust Business Planning & Forecasting
2.5-5% improvement in sales revenue due to better forecasting0.25-0.50% improvement in operating margin due to better insights into costs30-40% improved productivity of planning staff
SI Corporation: Improved forecast accuracy to double in certain divisionsIVECO: Shortened world wide financial closing cycle to 1 week
People Development
5-10% reduced cost on training anddevelopment10-15% reduced hiring cost20-30% reduced time spent by staff/ managers on employee administration
Nissan: Eliminated paper-based forms and processes and improved productivity by 35%Kongsberg Automotive: Reduced expenses for workforce education by 30-50% and increased accessibility to education documentation by 80%
Compliance, EH&S and IT
3-4% reduction in IT infrastructure and support cost10-15% lower application development and integration costs10-15% reduction in EH&S and compliance related costs
Hella KGaA Hueck & Co: Effectively manage its environmental protection and industrial safety processesM&M: Improved system performance and business users satisfaction towards IT
15 Cr25 Cr
59 Cr226 Cr
14 Cr24 Cr
16 Cr33 Cr
Rs. 1,265 Cr Rs. 480 CrTotal Annual Benefits:One-Time BenefitOne-time Benefits: 174 Cr 115 Cr
Improvement Potential
Conservative Estimate
SAP CONFIDENTIAL - Page 40 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Executing the Roadmap: Critical Success Factors
C-level mandate is critical for ensuring project successOngoing leadership through steering committee participation & communicationBusiness Head participation for every change initiative
Executive Sponsorship & Involvement
Respective functions need to assign their best business resources to the projectEach major project should be treated as a business transformation initiative rather than an IT-driven project
Business Ownership
Leverage inbuilt best practices and standard processes embedded in the systems to shorten process standardization exercise Avoid customizations unless business critical. Business leaders to decide on criticality.
Process Standardization
Significant focus on change management and communication is required to ensure the success of such a transformational project
Change Management
Support Value Realization through a value management frameworkHelp establish a Value Management Office
Value Management
Criticality of Success Factor
SAP CONFIDENTIAL - Page 41 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
1. Engagement Objectives and Overview2. Executive Summary 3. Next Steps4. Appendix – Detailed Analysis
Agenda
SAP CONFIDENTIAL - Page 42 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Next Steps
Review of VE presentation with Jagdish: Completed
Review of VE presentation and agreement on the next steps with CR: Oct 15
Investment proposal: Oct 22
Presentation of Engagement Findings to the CVBU and PCBU Business Heads: Oct 18-29
Presentation to the Management Committee: Nov 9
Presentations to the CVBU and PCBU steering committee: Nov 2nd week
Finalization of commercials: Nov 20
Execute ELA: Nov 30
SAP CONFIDENTIAL - Page 43 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
1. Engagement Objectives and Overview2. Executive Summary 3. Next Steps4. Appendix – Detailed Analysis
Agenda
SAP CONFIDENTIAL - Page 44 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Business Application Maturity Assessment: Methodology Followed
Parameters defined for assessing business application maturity:
Whether the application meets the business functionality requirements
Level of automation of basic transactional processes
Whether data quality is consistent and accurate
Whether the application supports business analytics requirements
Ability to generate report from the application as & when required
Reliability and scaleability of the application
User friendliness of the application
Based on feedback during interviews and respective BPO’s assessment (function wise and unit wise), rating of 1 (worst) to 5 (best) given for each parameters for 12 identified business functions across all units, RO and Corporate Office
Maturity assessment defined as:
Mature (Green) if average functional rating is between 4-5
Yellow (Meets basic needs) if average functional rating is > 2 and < 4
Red (Struggling) if average functional rating is between 1-2
SAP CONFIDENTIAL - Page 45 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Mahindra & Mahindra: Project Harmony Details
SAP CONFIDENTIAL - Page 46 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Proposed Shared Services Value Framework for Tata Motors:
From Mono-functional to Global Shared Services
MultifunctionalShared Services
Global Shared
Services Management
Mono-functional Shared Services
F&A HR IT Procure-ment Facility
Drive Efficiency
Drive Effectiveness
CompetitiveAdvantage
Evolve towards a lean Organization Scale with future growthQuick integration of future M&As
Reduce cost of running shared servicesIncrease productivity and market share
Reduce cost of doing businessImprove key financial KPIs with consolidation and harmonization
Global shared services for TML and JLR will enable Tata Motor’s strategic direction and support scale across geographies
Best practice companies aim to cut SG&A costs by 10 to 20% with shared servicesShared services provides transparency to improve cash flowImproves quality and accountability with guaranteed service levels
Multifunctional shared services provides an additional decrease in administration costsAnd a more holistic, flawless end-to-end experiences for customers, partners & employees
Impact of Shared Service Centers
Phase-1
Phase-2
Phase-3
Business Value
SAP CONFIDENTIAL - Page 47 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
I. Reduced Inventory Levels (One-Time) Customer Example:
1. Hero Honda reduced inventory carrying costs by 10%
2. Robert Boschreduced component inventories by 17%
3. YAPP Automotive Parts Co. reduced raw material inventory for significant parts from 60 days to 30 days
4. Robert Boschreduced inventory by 17%, improved planner productivity by 20%
5. Viper Motorcycle Company reduced inventory levels by 18%
6. Qingdao JinhuaIndustry Group reduced inventory by 13%
7. SI Corporation reduced finished goods inventory by 60%
8. Subros achieved reduction in raw material and finished goods inventory by 60% and 75% respectively
Tata Motors Pain Points:1. Real time inventory status is not available from the system and inventory reporting involves a lot of manual effort2. Little or no visibility into supplier inventory/production3. Higher inventory levels due to asynchronous JIT sequencing
Value Drivers:1. Gain visibility into supplier inventory/production 2. Optimize inventory levels with synchronous JIT sequencing3. Optimization of line scheduling through visibility of aggregates supply and 3PL warehouse inventories4. Improve efficiencies in line through RFID enabled kanban and kitting
Description Value SourcePotential LikelyInventory balance of Raw Materials & Components, Stores and Spares, Consumable tools (Rs Cr)
995 995 Annual Report & Client Discussion
Expected reduction in inventory 15% 20%
1.SAP customers have experienced reductions in inventory of 20-40%2. Based on discussion with Tata Motors executives at various production units
One-time cash flow (Rs Cr) 149 199 Calculation
II. Reduced Inventory Carrying CostsDescription
ValueSourceConservative Likely
Inventory carrying cost percentage 12% 12%
Benchmarking Data (Inventory carrying cost is primarily cost of capital along with other costs like inventory obsolescence, shrinkage, expiry, storage etc.
Expected reduction in expenses (Rs Cr) 18 24 Calculation
Baseline/Assumptions: Data inputs from Tata Motors
Value Drivers: How SAP solutions can address the pain
Improvement Range: Based on SAP benchmarking & customer experiences
Process/IT Pains:Based on discussions with Tata Motors Business and IT teams
Customer Examples:Customer benefits as per published studies
Benefit Estimation Methodology – An Example
SAP CONFIDENTIAL - Page 48 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (1/6)
Business Process Key Metrics Customer Proof Points
Customer Relationship Management
Order processing timeCustomer service level (%)On-time delivery (%)Customer service productivity Compliant resolution time
Improved accuracy of deliveries – from 98% to 100%Faster, more efficient order processing, cutting 3 days off previous manual order processing time
Increased first-call resolution rate from 36% to 95%
5% to 25% service level improvement for customers of Caterpillar Logistics Services15% to 30% reduction in customers’ inventory25% to 30% improvement in customers’ warehouse management productivity
Improved discount and incentive spend by 12%Lowered time to confirm orders from 2 days to 2 hoursRaised market awareness by 15%Increased sales order acceptance rate by 20%
Reduced average complaint resolution time from 6 to 2.8 daysEnabled call center to handle 50% more calls per monthImproved dealer data accuracy from 40% to 90%
SAP CONFIDENTIAL - Page 49 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (2/6)
Business Process Key Metrics Proof Points
Supplier Relationship Management
Procurement function productivityPO errors (%)Supplier lead time% maverick spendAnnual savings (%)RM inventory turns
Reduced inventory carrying cost by 10%
Mahindra and Mahindra improved productivity of procurement function significantly
Viper Motorcycle Company improved procurement staff productivity by 12%Achieved 17% improvement in procurement margins
Increased procurement efficiency for direct services and materials by more than 4%
Reduced component inventories by 17%Improved planned productivity by 20%
Reduced lead time for components from 60 days to 40 days
Reduced strategic sourcing costs by 10%
Reduced raw material inventory for significant parts from 60 days to 30 days
Reduced errors in purchase orders by more than 50%
Standardized procurement processes worldwideReduced holding cost and operating overheadStreamlined system monitoring and maintenance
Gain transparency for purchasing processReduce non adding value tasksImprove and consolidate processes group-wide
SAP CONFIDENTIAL - Page 50 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (3/6)
Business Process Key Metrics Proof Points
Supply Chain Management
Inventory turnsInventory obsolescence cost Forecast accuracy (%) Order fill rate (%)Order fulfillment lead timeStock-out (%)Supply chain planning productivityTransportation cost (% of revenue)Warehouse cost (% of revenue)
Viper Motorcycle Company reduced inventory levels by 18%
Improvement in order fill rate by 12%
Qingdao Jinhua Industry Group reduced inventory by 13%
Reduced finished goods inventory by 60%Improved the “perfect” order rate from 78% to 91%Improved forecast accuracy to double in certain divisionsReduced total company backorders by 83%
25% to 50% improvement in warehouse productivity5% to 10% improvement in fill rates15% to 25% reduction in inventory
40% improvement in forecasting accuracy35% to 40% improvement in spare parts availability
Improved on-time delivery to OEMs from 95% to 100%Reduction in raw material and finished goods inventory by 60% and 75% respectively
Reduced warehouse maintenance and investment costsMore efficient use of resources as a result of automation
* R&D Effectiveness = Annual revenue / Annual R&D spend
SAP CONFIDENTIAL - Page 51 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (4/6)
Business Process Key Metrics Proof Points
Manufacturing Manufacturing lead timeOn-time delivery Inventory turnsCustomer reject rate (parts per million)Capacity utilizationScrap cost (% of manufacturing cost)Overall Equipment EffectivenessManufacturing FTEs ProductivityManufacturing cost (% of revenue)
Viper Motorcycle Company improved productivity of productionby 27%
Reduced lead time for production to a maximum of 10 days
Qingdao Jinhua Industry Group reduced the cost of each production operation by 5% – 8% Increased productivity by 16%Reduced product shortages by 70%
Improvement in product quality levels by 50%Reduction in inventory by 50% (projected)
Minimized the number of time consuming inventories in the super market and assembly lineImproved quality through tracking and mapped inventory in the systemReduced time required to perform identification
Reduced buffer inventoriesReduced number of loops required to supply a production line
Increased transparency through role-based KPIsBetter reactivity through real-time monitoring of the production processIncreased productivity through plant utilizationReduced manual effort through automated machine data acquisitionReduced error risk and less defective goods
Business Intelligence Reporting and analytics productivityTime to create business reports
Improved the quality, detail, and efficiency of reporting
SAP CONFIDENTIAL - Page 52 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (5/6)
Business Process Key Metrics Proof Points
IT Integration and Support
IT staff productivityIT spend (% of revenue)
Adeep Locks increased transparency within the company by integrating the data system
Lowered total cost of ownership of electronic data interchange environment by 30%
Reduction in total cost of ownership by 20% (Projected)
40% reduction in IT development costs30% reduction in implementation costs20% reduction in ongoing maintenance costs
Reduced IT running costs by 30%
Improved system performance (CPU utilization up by 50%, Dialog response time reduced by 40%) Improved business users’ satisfaction toward IT
Human Capital Management
HR function productivityEmployee self-service (% of transactions)Payroll errors (%)HR function cost (% of revenue)
Improved productivity of certain business processes by 25%Improved payroll processing time by 35%Eliminated paper-based forms and processes
Reduced expenses for workforce education by 30 – 50%Increased global accessibility to education documentation by 80% Decreased time needed for installing educational instructions by 50%
SAP CONFIDENTIAL - Page 53 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Customers’ Proof Points in Automotive Industry (6/6)
Financial Management Time-to-close booksTime-to-conduct auditFinance function productivityDays sales outstanding
75% reduction in effort to close books
Reduced financial closing time from 10 days to 1 day
Reduced time needed to conduct month-end closing from 3 days to 1 day
50% reduction in time required for monthly closings and 25% shorter year-end closing
Shortened worldwide financial closing cycle to 1 week
Time to close books reduced by 75%Days receivables outstanding reduced by 56%Invoice error rate reduced from 2% to 0.001%Time for payroll processing reduced by 70%
Business Process Key Metrics Proof Points
Product Lifecycle Management
Time-to-marketCost to introduce new product (% of new product revenue)R&D effectiveness*
Lowered cost of process for introducing new products by 30%50% reduction in lead time to move information and document distribution into development projects
Volkswagen achieved significant savings by eliminating redundant dataUp-to-date BOM data and easy identification of required components
SAP CONFIDENTIAL - Page 54 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Driving Customer Value: Selected Automotive Sales & Service References
Improved discount and incentive spend by 12%
Lowered time to confirm orders from 2 days to 2 hours
Raised market awareness by 15%
Reduced average complaint resolution time from 6 to 2.8 days
Enabled call center to handle 50% more calls per month
Reduced the cost of marketing campaigns
25% to 50% improvement in warehouse productivity.
15% to 25% reduction in inventory.
20% to 30% reduction in support cost.
Implemented common processes and workflow across multiple brands and all functions
Reduced IT running costs by 30%
More than 50% reduction in purchase-order errors.
SAP CONFIDENTIAL - Page 55 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
SAP Driving Customer Value: Selected Automotive Supplier References
Increased revenue by nearly 80% due to acquisitions and international expansion
Increased inventory turnover with order-driven planning
20% improvement in planner productivity
17% reduction in inventory
Reduced space requirements
Reduced lead times for information and document distribution into development projects by 50%
Calculated ROI after 1½ years, based on implementation duration of 2 years
Only 1 staff member required for maintenance
Quick, simultaneous , remote access for multiple users
Significantly reduced inventory by using material requirements planning functionality
Reduced premium freight through visibility into parts inventory
SAP Value Proposition for Tata MotorsEnabling TML’s Strategy
Jamshedpur Unit
Pune Unit
Lucknow Unit
Pantnagar Unit
Sanand Unit
SAP CONFIDENTIAL - Page 57 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Jamshedpur Unit: Profile and Key Requirements
Source: TCL Website, Discussion with Haldia plant personnel
Key requirement at Jamshedpur include better decision support, better process configuration for HVAL/HVTL, project traceability and control and better usage of plant maintenance module
Profile
• First unit of TML set up in 1945
• Consists of 4 major divisions - Truck Factory, Engine Factory, Cab & Cowl Factories
• Axle and Engine plants hived off into independent subsidiaries HVAL &HVTL
• Advanced facilities for manufacturing long members
• In house Foundry and Forge division
• Present capacity of 480 vehicles per day
• 5,800 permanent employees
Processes configuration for HVAL/HVTL does not meet business requirements and needs to be benchmarked with Tata Motors
Disparate human resource systems leads to high manual effort in various HR activities with duplicate data entry
Project traceability and controlling is a key challenge with high level of manual effort in budget control and monitoring
Preventive maintenance is a weak area and impacts machine usage
Production scheduling for world truck operations need to be based on stock rather than expected arrival of material
Decision support system with dashboards and auto alerts, exception reporting
Key IT Requirements
User training on SAP features to improve awareness and adherence
Automatic data capture at all assembly lines is a requirement for QA Department
Supplier collaboration for inventory visibility and vendor performance evaluation capacity is necessary
SAP CONFIDENTIAL - Page 58 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Current IT Landscape
Enterprise Management Enterprise Asset
Management
Management Accounting
FinancialAccounting
Governance, Risk & Control
Financial Supply Chain Management
Business Analytics
Product Lifecycle Management
Product Data Management
ProjectPlanning
Collaborative Project
Management
Engineering Change
Management
Quality Assurance/
Control
Master Data Management
CRM: Marketing Sales, Service Sales Forecasting Marketing Management
Dealer Business Management & Warranty
Mgmt
Business Support Corporate Performance Management
Human Resources
ESS/MSS Knowledge Management
Real Estate & Hospital
ManagementProject Management
Supply Chain Master Production Schedule
Transportation Planning &Execution
Material Requirements
Planning
Warehouse & Storage
Sales & Operations Planning
Sourcing and Procurement
Inbound Logistics
SupplierManaged Inventory
Supplier Collaboration
Supplier Inventory Visibility
Operational Procurement
QualityManufacturingModel Mix
Planning and Sequencing
Shop Floor Interface to Planning & Execution
Manufacturing Visibility & Costing
Lean Manufacturing
Environment, Health and Safety
Strategic Sourcing
Manufacturing Execution
SAP Non-SAP Manual
Supply Chain Visibility
Process Engineering
Quality
Sales Order Processing
Sales Analytics
SAP CONFIDENTIAL - Page 59 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (1/11)
Business Area
Current Situation Way Forward
Materials/ADD
Optimizing existing systemSub-contracting process needs to be streamlined
Retro payment of vendors to be streamlined Impact of price changes to be incorporated in the system automatically
Freight elements should be captured in system
MRP run currently not being done in SAPMaterial transfer process for ERC from Pantnagar not fully establishedAmortization of dies not possibleCapture of revisions data in Purchase orders required
Standard costing template required for ADD for zero based costing
SAP to provide expert consulting after process study. Sub-contract line rejections to be accounted in SAP with suitable workaround. Issue of bulk material to sub-contractor needs to be studied in detail.Process to be studied in detail The BOM at a high level need to be maintained with reference to the base raw material like steel and further pricing model can be built in SAP BPC/ PCM. A detailed BOM with Base Raw Material and Overhead to be maintained in SAP ERP. Product Costing to be done with this in the system. BI simulation capabilities to be used.Explore functionalities of Transportation Management/include conditions in P.O.s, STOs.Existing SAP processes to be enabledClean/fine tune master data and phased roll out of MRPStreamline and introduce the process in SAP either with the activity rate or quantity based overheadECM process to be formulated and implemented in SAP to enable MRP to give exception list on the changes made. The changes to PO need to be manual keeping in view the existing contracts with vendorsExplore base planning object/unit costing functionality
SAP CONFIDENTIAL - Page 60 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (2/11)
Business Area
Current Situation Way Forward
Materials/ADD
Business improvement needs • Visibility of stock at vendor end not available• Vendor capacity mapping not available• Tracking of of materials and trucks required within and outside the
plant• Category wise spend performance data is not available• Material procurement planning is a challenge because of fluctuating
demand• Transport planning of supplier materials is necessary• Need for acknowledgement scanning at stores• System for identification of parts required at stores• Category wise (sheet metal, plastic, rubber) spend performance data
and inventory data not available from the system
Implement supply network collaboration solutions
Implement SAP Yard Management and Auto-ID Enterprise
Implement SAP Spend Performance ManagementImplement advanced planning tools like APO
Implement Transportation Planning SolutionsBarcode driven acknowledgementImplement RFID or Barcode based tagging solutionLeverage spend performance management to address this requirement
SAP CONFIDENTIAL - Page 61 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (3/11)
Process Current Situation Way Forward
Manufacturing
Optimizing existing systemKanban is not being done through systemMaintenance process needs to be streamlinedPast equipment history, cost of maintenance is not available in the system
Business improvement needsTracking of chassis through the production line and in yardChassis scanning capability to match the chassis number with the one in invoice at the time of dispatchProper production sequencing system to be availableMulti tiered stock capture required-i.e. ready to use at assembly line, available at aggregate factories and on aggregate assembly lines Shortage SMS alerts to be sent to all concerned agencies as soon as chassis is droppedAll scanned aggregates and VC should be matched while bookingProvision to enable a VC search by providing some VC attributes like engine, gear box etc.Schedules to be given to vendors based on dropping plans at various assembly linesAttendance verification system through retina scan requiredNeed facility to capture chassis number at the time of punching the serial numberEquipment level BOM required for World Truck vehicles Need for visual display boards at assembly lineProvision for MTO scenario to be made availableNeed for a comprehensive solution to manage carbon footprint
Implement Kanban in SAP
Review processes and conduct enhanced user awareness / training
Ensure increased usage and adoption of SAP Plant Maintenance functions. Develop BI reports out of SAP PM
Enable RFID enabled chassis tracking and yard management
Implement the PPDS capabilities of APO
RFID enabled linkages of VC to aggregates
Enable real time supplier collaboration through supply network collaboration
Implement IS Auto
SAP PI for integration of advanced attendance systems to SAP – Whether SAP Payroll is being used for Worker Payroll?
Enhance SAP to have the business process of MTO mapped.
Implement SAP Sustainability Solutions
SAP CONFIDENTIAL - Page 62 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (4/11)
Business Area Current Situation Way Forward
Projects Planning
Optimizing existing system
Approved projects cannot be tracked in the current system
Lack of control of budgets allocation across different heads (e.g. allocation under materials can get utilisedunder labour head)
No control on budgets if cost escalation takes place
Assets that cannot be forecasted and are procured against revenue budgets cannot be capitalised leading to lack of asset traceability, spare parts procurement etc.
Monitoring of Bank Guarantee status is done manually
Capability to amend POs with proper authorization required
System should support detailed PO description to describe the project
Project timelines should be tracked in SAP system
Provision for entering monthly plan in the system is lacking leading to manual MIS creation
Vendors not able to correlate the payments received with corresponding invoice numbers
Lack of visibility to users on payment status against POs raised
Online asset verification capability not available and hence dependent on asset list shared by Shared Services team
SAP to provide expert consulting after process study
To enhance the current Investment management with Projects and as well explore advanced planning solutions like Business Planning
Explore the possibility of using different WBS Elements for material / labour. Alternatively explore the possibility of Funds management
Implement active availability control/ ensure process compliance.
Enhance user acceptance of process through user awareness/ training and better adoption
Collabra / development to be done
Ensure that proper processes are followed i.e PO has WBS Account Assignment. Purchase Order amendment are subject to PO releases
Explore the possibility of using Purchase Order text field/ description/ text field in Projects
Implement PS Comprehensively with networks.
Better user training/ awareness / SRM
Better user training/ awareness
Enable viewing of asset history/ asset master data and reports. Enhanced user awareness
Implement Business Planning
Implement Business Planning / Advanced analytics with SAP Business Objects
SAP CONFIDENTIAL - Page 63 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (5/11)
Business Area Current Situation Way Forward
Finance
Optimizing existing system
• VFJ sales accounting process needs to be streamlined
ERC Accounting is excel based and needs to be automated
Accounting of imported items needs to be streamlined
Activity rate computation is difficult
Expenses incurred on new projects beyond DR3 stage needs to be capitalized
Enhanced user awareness / training to adhere to the defined process
Integrate Team Center with SAP and explore the possibility of using Internal Order/ Projects to account expenses of ERC (BPM can be explored)
Business Area Current Situation Way Forward
Real Estate Management
Optimizing existing system
Residential accommodation allotment process is fully manual
Current system does not support maintenance of notice records (e.g. violation notice, quarter not vacated etc)
Lack of visibility into the status of application and user complaints pertaining to quarters
Employee attendance during allotment lottery and vacancy list update is manual
Services data, i.e. maintenance, electricity are not maintained in the system
HOPE system has 2 unique IDs for each employee
HOPE system does not have the provision to upload the photograph of employees
SAP to provide expert consulting after process study
Existing SAP processes to be activated
SAP CONFIDENTIAL - Page 64 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (6/11)
Business Area Current Situation Way Forward
Quality
Optimizing existing system
Lack of archiving and retrieval solution for quality reports of parts being passed
Mismatch in price between BW and ECC leads to warranty related problems causing reversals
Business improvement needs
• More categories of defect codes need to be added in CRM
• Current complaint analysis system is a standalone PC based
• Automated data capturing required at each of the gates
• Unable to identify the suppliers of parts that have failed leading to sub-optimal share of business
Implement SAP Archiving solutions with Opentext.
Needs to be explored further with data consistency checks
Build out a comprehensive defect/damage codes catalogue in ERP
Leverage Business Objects to run complaint analytics
Existing SAP Processes to be used
Implement SAP MII to enable automatic capture of data/ Existing SAP Solutions
Institute a robust vendor performance management program on SAP SRM which captures product defects and delayed deliveries
Implement SAP GRC – Process Control
SAP CONFIDENTIAL - Page 65 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (7/11)
Business Area
Current Situation Way Forward
HR
Optimizing existing system
Lack of process standardization reducing effectiveness of PD
ERP integration to PMS is asynchronous and requires manual effort
A comprehensive training management is required with self service capabilities
Lack of integration between PP and HR leading to manual effort
Integration of RE module with HR is lacking
Employee skill mapping not maintained in SAP
Seamless update of relevant process with EC lacking
Estimate sheet has not been captured in the routing
Candidate data upload involves duplication of work and is error prone
Stand alone web based ward registration in the hospital leading to manual entries in SAP
Employee dependents data not available in SAP
Manual assessment of manpower based on production schedules
Lack of required controls in HR system*
Government reporting needs to be supported
Business improvement needs
Integrated approach required for e-learning
Standardize processes and implement SAP PD module.
Implement SAP PMS to provide online real-time interaction and data availability
Persons can be assigned to Work Center and Activity Type and further skill matrix can be maintained in the system
Extend ESS to appropriate levels in the organization
Capture employee skill data in SAP HR with the relevant infotype
Leverage Adobe forms to automate data capture and synchronization with SAP
Implement a comprehensive e-learning solution with administered content, courses and programs
SAP CONFIDENTIAL - Page 66 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (8/11)
Business Area Current Situation Way Forward
HVAL/HVTL
Optimizing existing system
Cash journal not being used in HVAL/HVTL
Service entry sheets are not getting printed
Production Planning and Control is outside SAP
Asset Master data does not match with physical assets
Production schedules from Tata Motors is received offline
HVAL/HVTL business processes needs to be benchmarked with TML
Lack of visibility into vendor stock and production status
Pricing panel activities –i.e. evaluation of RFQs etc are done offline
Productivity calculation is outside the SAP system
Ageing reports are not available from the system
Project System module is not being effectively used
Time tracking system of Tata Motors is not implemented
ERC should be created as a plant for testing and prototyping
Production scheduling is possible for an equipment in the system which is currently under maintenance
Business improvement needs
Overall Equipment Effectiveness needs to be measured
Shop floor status is required to be visible on the desktop of production managers
Adopt production planning in SAP ERP
Implement a portal driven schedule line communication from TML
Roll out BPM at TML and at HVAL/HTL to harmonize processes
Gain real time visibility by leveraging SAP SRM to drive the sourcing process
Drive adoption of plant maintenance module for equipment performance measurement
Implement MII to get real time shop floor data
SAP CONFIDENTIAL - Page 67 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (9/11)
Business Area Current Situation Way Forward
World Truck Operations
Business improvement needs
Lack of visibility into orders in the supply chain
Need to support remote trouble shooting to cut down on service time
Need linkages of part s and chassis number to ensure traceability and handle recalls
Need for a production scheduling system which enables scheduling on the basis of stock availability
Automated quality related data capturing and resolution mechanism required at each of the gates
Implement supply network collaboration to get real time visibility into order status
Serialized part management in ERP supplanted with MES
Implement PPDS in SAP APO to cater to the advanced scheduling requirements
Business Area Current Situation Way Forward
Internal Audit
Optimizing existing system
History of previous audits carried out are not available in the system
Provision for capturing audit comments and their follow up actions are not available in the system
Business improvement needs
• Need for a disaster management system
SAP to provide expert consulting after process study
Implement SAP GRC Process Control
Existing SAP processes to be activated
SAP CONFIDENTIAL - Page 68 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (10/11)
Business Area Current Situation Way Forward
IT Process Improvement
Optimizing existing system
BPOs need to have visibility into all the BRDs raised
Best practices sharing across plants needs to be facilitated
Strengthen local IT support to increase effectiveness
Cumbersome SAP access requisitioning process
Performance issues with BW system leading to long wait periods
System speed needs to be enhanced, particularly during month ends
Low user awareness on capabilities of SAP
Business improvement needs
• Need for a disaster management system
SAP to provide expert consulting after process study
Develop a collaboration forum to share best practices across the organization
Upgrade Virsa to GRC for ease of us and standardized workflows
Existing SAP processes to be activated
Implement performance optimization solutions for better system response
Improve awareness through structured info sessions, creation of knowledge repositories and enabling e-learning
SAP CONFIDENTIAL - Page 69 For Internal Use Only - This page is from the VE Study prepared for Tata Motors and subject to the terms, conditions and assumptions contained in the VE Study. Information contained herein is not a guaranty of future results, performance or cost savings.
Key Pain Points and Solution Enablers (11/11)
Business Area Current Situation Way Forward
Business Reporting/ Analytics
No system to support measurement and tracking of KPIs online*
No real time dashboards available to business heads to support decision making
Support for user specific reports is not very robust in the existing system.
Price movement for parts across locations
Parts for which inspection has been switched off
Scrap generation report across shops needs to be available at the end of the day
Break up of warranty incurrence details
Supplementary bill payment and deduction reports
No system support to simulate what-if scenarios like warranty provisioning in case of change of spare parts prices
Exception reports are currently not available from the system
Integrate all pertinent modules of SAP, i.e. HR, PP etc with the Analytics platform ( SAP BI/BO) to gain visibility into the required performance parameters
Roll out the analytics platform across the enterprise to provide business leaders with decision support information directly
SAP to study the reporting requirements in detail
Leverage analytics capability in BI to create what if queries in versatile dashboards
SAP to study the requirement in detail