7/21/2019 Trial Record
http://slidepdf.com/reader/full/trial-record 1/2
Start
Date
End
Date
Event Scre
w
Spee
d
rpm
Results Comments
3.8.15 3.8.15 Cold spread test 460
590
780
Filmed from inside furnace
4.8.15 Boiler started on nat Gas7.8.15 11.8.1
5
Boiler on nat gas na!le to "re on !iomass due to #$% pro!lem &o steam e'port
11.8.1
5
Boiler !urning !iomass #'porting steam
1(.8.1
5
%neumatic spreader trial start 450 )ump !rea*er tripping a!o+e 450 and unit running ,ot -rial a!andoned for t,e da
13.8.1
5
/nline Cleaning on site for "lming of
furnace
-rial resumed feed rate increased
-rial "lming continued at reduced
scre speed
900
350
)umps of !iomass o!ser+ed going into furnace and collecting at
$# side of furnace. )ump !rea*er tripped due to /2)
/perating temperature it,in design
14.8.1
5
/nline Cleaning on site trial resumed
1000
1(001450
600
Biomass disc,arging into furnace it, no issues lumps present
Biomass ,itting !ac* all of furnace at increased speeds a!o+e
Feed maintained
/2) issue recti"ed
15.8.1
5
17.8.1
5
%neumatic $preader !loc*age 450 nternal ap position sl ipped result ing in o!struction !loc*age Bloc*age cleared and ap position "'ed
17.8.1
5
18.8.1
5
-rial resumed and unit o!ser+ed for
!loc*age
300 &o furt,er !loc*ages
18.8.1
5
(1.8.1
5
&ormal operation resumed and same
load as mec,anical spreaders
450 Biomass feeding it, no issues
(1.8.1
5
)ump !rea*er tested at ,ig,er scre
speeds
750
900
1050
&o furt,er issues it, lump !rea*er
(1.8.1
5
(4.8.1
5
ee*end operation 450 &o operational issues
(4.8.15
/nline cleaning on site09.45 furnace "lmed prior to trial.
10.35 furnace "lmed prior to trial
10.45 11.55 furnace "lmed for trial
14.15 furnace "lmed
450
450
1050
450
$ corner uidisation poor. ind!o' pressure increased from
615mm 650mm G
$lig,t uidisation impro+ement
ncreased scre speed
)umps o!ser+ed falling into centre of !ed
na!le to o!tain clear image of !ed
$cre returned to normal speed(5.8.1
5
:u!li' on site
;oles drilled on side of %neumatic
450 nternal surfaces of spreader clean. )umps of !iomass o!ser+ed
7/21/2019 Trial Record
http://slidepdf.com/reader/full/trial-record 2/2
spreader for endoscope insertion
(7.8.1
5
/nline cleaning on site
10.3011.00 furnace "lmed
14.3015.00 furnace "lmed
750
450
ind!o' 700mmG for (4 ,ours prior to trial
$pread pattern o!ser+ed lumps o!ser+ed
Concentrated on mec,anical spreader and good spreading
o!ser+ed
Biomass a+aila!ilit lo limiting
scre speed