12
IM Properties Blythe Valley Park, Plot F5 Tree Protection Plan and Arboricultural Method Statement March 2017

Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

Embed Size (px)

Citation preview

Page 1: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

IM Properties

Blythe Valley Park, Plot F5

Tree Protection Plan and Arboricultural Method Statement

March 2017

Page 2: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74 2RH Company No. 07128076. [T] 01509 672772 [F] 01509 674565 [E] [email protected] [W] www.fpcr.co.uk This report is the property of FPCR Environment and Design Ltd and is issued on the condition it is not reproduced, retained or disclosed to any unauthorised person, either wholly or in part without the written consent of FPCR Environment and Design Ltd. Ordnance Survey material is used with permission of The Controller of HMSO, Crown copyright 100018896.

Rev Issue Status Prepared / Date Approved/Date

- Draft HR / 06.03.17 TJR / 06.03.17

- Final HR / 10.03.17 TJR / 10.03.17

Page 3: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 1

CONTENTS

1.0 INTRODUCTION .................................................................................................................. 2

2.0 PLANS .................................................................................................................................. 2

3.0 ARBORICULTURAL METHOD STATEMENT...................................................................... 3

4.0 TREE PROTECTION METHODOLOGY .............................................................................. 4

5.0 INDUCTION AND SITE BRIEFING ...................................................................................... 6

6.0 INDIVIDUAL RESPONSIBILITIES AND KEY PERSONNEL ............................................... 6

7.0 PROCEDURES FOR VARIATION OR INCIDENT ............................................................... 7

8.0 MONITORING OF TREES DURING AND POST CONSTRUCTION................................... 7

TABLES

Table 1: Timeline of Key Protection Measures

PLANS

Tree Protection Plan (drawing no. 1871-AMS-02)

APPENDICES

Appendix A: Protective Fencing Standard

Appendix B: Protective Fencing Signs

Page 4: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 2

1.0 INTRODUCTION

1.1 This Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) have been prepared by FPCR Environment and Design Limited on behalf of IM Properties. It sets out details of the methods by which retained trees will be protected during construction work; identifying those construction operations that are potentially injurious to trees and their rooting areas and describing working procedures that will reduce the risk of harm.

1.2 The site is in Blythe Valley Park, Birmingham and is Plot F5, situated to the North of the current commercial park (hereafter referred to as ‘the site’) and is centered on Ordnance Survey Grid Reference SP 139 753.

1.3 The AMS and TPP have been requested by IM Properties to accompany the current reserved matters application for the development of a single commercial building with accompanying car parking provision, drainage infrastructure and green landscaping on Plot F5. This AMS will discharge condition 19 pursuant to planning permission reference PL/2016/00863/MAOOT in so far as it relates to this ‘phase’.

1.4 The document sets out the details of any proposed works that would potentially affect trees and provides the working methodology and specifications for the means of protection for those trees during construction of the site. Compliance with this method statement, once approved by the Local Authority’s Arboricultural Officer, will be a requirement of all relevant contracts associated with delivery of the development proposals.

1.5 An Arboricultural Assessment was also prepared by FPCR dated June 2016, submitted as part of the hybrid planning application, which should be read in conjunction with the AMS. A site specific Ecological Appraisal and Arboricultural Assessment (March 2017) has also been prepared and submitted in support of the reserved matters application. Tree reference numbers given within the AMS are as per those in the Arboricultural Assessment.

1.6 The AMS has demonstrated that the construction operations can be undertaken with minimal risk of any adverse impact to the retained trees.

2.0 PLANS

2.1 The AMS has been based upon the following plans:

• Proposed Plot F5 Site Plan (drawing no. 8460 P-101)

• Topographical Plan

2.2 The various tree protection measures have been detailed in the Tree Protection Plan (drawing no. 1871-A-03 F5). The plan shows the proposed layout and drainage arrangements in relation to the retained trees allowing the identification of constraints and position of protection measures to ensure the retained trees are sufficiently protected from any foreseeable damage.

Page 5: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 3

3.0 ARBORICULTURAL METHOD STATEMENT

Background Information and Site Context

3.1 Much of the area associated with Plot F5 consisted of over grown grassland with Boundary groups of trees to south and west. Recent works to clear outgrown vegetation has been carried out to the north of the site leaving several individual trees in this area.

3.2 The majority of the trees are adjacent to the application boundary, however their calculated Root Protection Areas extend into the proposed development area.

3.3 In considering the construction works and foreseeable impacts arising to the retained trees, judgements have needed to be taken from an arboricultural perspective to apply and implement the most effective methods by which to protect the trees roots both directly from physical damage and indirectly by minimising disturbance to the soil environment and roots that are likely to be present, whilst allowing construction to progress.

3.4 Where possible therefore, it has been attempted in the measures set out in this AMS to retain much of the existing ground conditions as possible and to protect roots and their rooting environment to ultimately improve their future co-existence with the new development.

Particulars of the Method Statement

3.5 This section identifies where the various construction elements required may potentially risk harming retained trees and their rooting environment, and describes the methods by which works will be carried out in order to minimise that harm of foreseeable potential impacts to facilitate the proposed layout. The AMS also details the various components in respect of tree work requirements, tree protection measures and details for practical application of such measures.

3.6 Refer to the Tree Protection Plan (drawing no. 1871-A-03(F5)).

3.7 For each of the activities a brief description of the particular operation is given and following which, the methodology as to how the operation will be undertaken is given to best avoid damaging the trees rooting systems.

3.8 Tree work requirements have also been included where it has been required to undertake “Facilitation Pruning” in accordance with BS 5837 (2012).

3.9 Covered by this section also are details of all other tree protection measures to be adhered to for the retained trees across the remainder of the site, timeline for intended construction / tree protection works and monitoring / site supervision.

3.10 The details set out a working methodology for practical implementation of the protection measures, while being flexible to allow any necessary amendments to protection systems as the project evolves, as far as possible using current best practice within the arboricultural industry. The end result of the various considerations relating to tree protection has been to provide

Page 6: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 4

practical yet effective means of protecting retained trees within close proximity to the development.

Underground Utility Services

3.11 There has currently been no confirmation of any existing service lines running close to or within rooting areas of existing trees.

3.12 All underground services, where their position would be within RPA’s, will be hand dug and using hand operated tools only; in accordance with NJUG (National Joint Utilities Guidelines) Volume 4 – Guidelines for the Planning, Installation and Maintenance of Utility Apparatus in Proximity to Trees – November 2007.

3.13 Where there would be need to excavate within RPA’s this will be carried out under supervision by the Project Arboriculturalist. Providing any trenching is dug by hand and if any roots encountered are treated appropriately as in accordance with clause 7.2 of BS 5837 (2012) there should be no adverse impact on the trees.

4.0 TREE PROTECTION METHODOLOGY

4.1 Tree Protection Fencing will be installed prior to the commencement of any site activity, at the appropriate stage, including the installation of the construction compound, site offices, topsoil stripping or material storage unless specified elsewhere such as use of the existing fencing and site hording serving as Tree Protection Fencing.

4.2 Fencing will be installed, as detailed in the Tree Protection Plan (1871-AMS-02), this will form a CONSTRUCTION EXCLUSION ZONE to prevent access of construction machinery, plant or other operatives beyond the areas identified unless required to carry out approved operations such as excavation of drainage pipe.

4.3 The fencing being proposed is strong and suitable for the location, type and proximity of construction activity. Barriers will remain rigid and in place for the duration of the development and not removed until construction work on the site has been completed, or otherwise specified for temporary periods.

4.4 The fencing and construction exclusion zones will be clearly marked using appropriate signage an example of which has been included as Appendix B. Protection will be in the form of Heras fence panels and hoarding, examples of both are shown in Appendix A.

4.5 Once the barriers have been completely installed the site manager should contact the project arboriculturist so that a visit can be made and written confirmation that the barriers have been installed in the correct position, to the required standard, can be given.

Site Rules for Tree Protection

4.6 This section details non-specific precautionary measures for tree protection and will be applied at all times.

Page 7: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 5

4.7 All the retained trees will be adequately protected during all construction works. Measures to protect these trees will follow the best practice principles set out in BS5837: Trees in Relation to Construction Recommendations (2012). These have been broadly summarised below.

4.8 No materials or soils are to be stored within the RPAs of the retained trees.

4.9 The tree protection fencing will be positioned as per the Tree Protection Plan and described in this AMS around the extent of the RPA to create an exclusion zone to all construction activity accordingly.

4.10 Oil, bitumen, cement or other material that is potentially injurious to trees will not be stacked or discharged within 10m of a tree stem, even if the outside of the Tree Protection Fencing distance. No concrete mixing will be done within 10m of a tree. Allowance will be made for the slope of ground to prevent materials running towards the tree.

4.11 Wide or tall loads etc. should not come into contact with retained trees. The banksman should supervise transit of vehicles where they are in close proximity to retained trees to ensure that damage to trees does not occur.

4.12 No fires will be lit where flames are anticipated to extend to within 5m of tree foliage, branches or trunk, taking into consideration wind direction and size of fire.

4.13 Notice boards, telephone cables or other services will not be attached to any part of a retained tree.

4.14 No roots will be left uncovered if exposed during the removal of existing surface materials. They will be covered over as soon as possible to minimise the risk of drying out and dying.

Other Works within Root Protection Areas

4.15 Should any other works be necessary within the RPA of retained trees (other than those described above), this will need to be discussed with the Project Arboriculturalist and with prior agreement from the Local Planning Authority.

Removal of Protective Fencing

4.16 Following the completion of all construction works and in agreement with the Project Arboriculturalist the tree protection fencing will be removed carefully as to avoid causing root disturbance. This operation can be carried out prior to soft landscaping works such as new planting, mulching, grass sowing etc.

Page 8: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 6

Table 1: Timeline of Tree Protection Measures

Works required Action Approximate Timetable

Tree Protection Fencing Erect fencing as detailed above to the specification shown in Appendix B and as per the positions shown by the Tree Protection Plan. Fencing will be marked out by the appointed Site Contractor and approved by the LPA Tree Officer / Project Arboriculturalist.

Prior to storage of materials, commencement any site activity

Approval of fencing by Project Arboriculturalist

Written confirmation from Project Arboriculturalist that fencing has been positioned and erected satisfactorily.

Immediately following completion of fencing installation and prior to commencement of works

Commence Various Work On Site

Removal of Tree Protection Fencing

As detailed within section 5 Following the completion of all construction works and in agreement with the Project Arboriculturist

5.0 INDUCTION AND SITE BRIEFING

5.1 As part of the overall tree protection measures inductions of all appointed construction personnel and contractors working near to the retained trees are aware of the protection measures. This will involve briefing personnel on the various constraints and working practices around the retained trees to safeguard them from damage during construction and the importance of the tree protection measures. Site induction meetings would need therefore to include a brief synopsis of section 3 and the full details of section 5 of this document.

5.2 As it would be impractical for the Project Arboriculturalist to be present for all site briefings and inductions through the various phases of the sites development this duty will be delegated to the Site Manager or their appointed staff member, once having been sufficiently briefed by the Project Arboriculturalist.

6.0 INDIVIDUAL RESPONSIBILITIES AND KEY PERSONNEL

6.1 The Project Arboriculturalist, Harry Raffle (FPCR 01509 672772), will be responsible for monitoring the tree protection measures as detailed within this document and will refer all relevant details to the Local Planning Authority Tree Officer upon request.

6.2 The Site Manager will be responsible for the implementation of this AMS on site; ensuring the protective fencing remains in place for the duration of all construction phases and construction activity on site following approval from the Project Arboriculturalist, and is not moved without approval ensuring the general protection measures are fully adhered to at all times.

Page 9: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

AMS and TPP - Arboriculture fpcr

S:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\1871 AMS Plot F.doc 7

7.0 PROCEDURES FOR VARIATION OR INCIDENT

7.1 Should at any time, during the construction of the proposals, a variation to the protection measures be required then advice will be sought from first the Project Arboriculturalist and, if necessary, by submission of an addendum to this document for review by the Local Planning Authority Arboricultural Officer.

7.2 Variations may be required for such work as; facilitation pruning of retained trees where branches conflict with the approved design; temporary removal or movement of protective fencing due to unforeseen circumstances. This will be important as part of the review process of the Tree Protection Scheme as the various phases of the development take place.

8.0 MONITORING OF TREES DURING AND POST CONSTRUCTION

8.1 This is to take place as outlined below and as formerly approved and agreed with the Local Planning Authority. The Project Arboriculturalist will be responsible for monitoring of all arboricultural works and issuing a certificate of practical completion at the various stages.

8.2 In addition, the Project Arboriculturalist will inspect the protective fencing and oversee / monitor any works within exclusion zones. A record of site visits will be maintained for inspection on site and copies can be forwarded to the developer / agent and to the Local Planning Authority.

8.3 Key monitoring stages are summarised below:

• Site visit to check position of tree protection fencing and specification to ensure it has been correctly installed and is fit for purpose. Inspection and approval of fencing.

• Signing off of the protective fencing.

• Eventual removal of all tree protection barriers following the completion of all construction activity and landscaping works on site in agreement with the Project Arboriculturalist.

8.4 The Project Arboriculturalist will carry out inspections of the site at agreed intervals / key stages following decisions made at initial meetings with Construction Team.

8.5 The purpose of the visits will be to approve and monitor the tree protection measures’ including ensuring the position of fencing is correct and overseeing any other works required works within RPAs. A record of site visits will be maintained for inspection on site and copies can be made available upon request. Site monitoring of tree protection fencing will be undertaken daily by the Site Manager and by the Project Arboriculturalist, time frame to be decided, throughout the duration of the development to ensure trees integrate successfully into the development.

Page 10: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

Flag

Flag

STOP

NO ENTRY

NO ENTRY

NO ENTRY

NO ENTRY

NO ENTRY

BLYTHE GATE

A R U P

O R A C L E

3030

30

30

BH

TH

TH

PInv122.40

122.19

PInv122.40

122.19

Bushes

PInv

PInv122.40

122.19

123.95

Bushes

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

GyGy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

IC

Cbox

CboxCbox

Cbox

Mkr

Sv

Sv

St

St

St

Fh

Fh

Fh

DP

DPDP

DP

DP

DP

DP

DP

DP

DP

Gas

GasGas

Gas

Post

Post

Post

Post

Post

Post

Post

Post

PostPost

Post

Post

Post

Post

Post

Post

Post

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Lp

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

WL

WL

THL

THL

THL

THL

THL

THL

THL

THL

THL

BH

BH

BH

TH

TH

TH

TH

TH

Vp

BollBoll

BollBoll

BollBoll

Boll

Boll

Boll

Boll

Boll

Boll

IB

IB

IB

IB

IB

IB

IB

IB

IB

CCTV

CCTV

CCTV

CCTV

ICU

ICU

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

E:

E:

E:

E:

E:

E:

E:

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

ErEr

GrL

GrL

GrL

GrL

GrL

GrL

GrL

GrLGrL

GrL

GrL

GrL

GrL

GrL

GrLGrL

GrL

GrL

GrL

GrL

GrL

GrL

GrL

GrLGrL

GrL

F:

F:

F:

F:

R:

R:

R:

R:

R:

R:

BC3

BC4

BC5

BC6

J26

M2

M3

M4

M5

M6

141.63

142.67

140.90

137.21

140.96

137.28132.34

132.88

133.32

133.79

132.31

132.34132.68

134.21

142.66

141.11

141.05

140.12

139.48

137.79

144.13

142.66

142.65

148.48 131.64

131.41

131.65

131.95

132.17

131.98

131.81

131.96 137.79

137.72

139.18

143.95

130.84

130.98

132.65

131.57131.79

131.32

131.61

130.86

135.61

136.43

137.06

130.93

130.76

139.79

130.92 130.89

143.63

138.26

138.38

139.33

139.41

138.33

138.12

136.28

145.71

145.05

144.42

145.06

131.31

130.36

129.46129.45

130.36

131.07

130.46

129.86

130.99

131.49

131.51

132.85

131.54

139.50

137.72

138.82

140.20

140.65

145.14

148.08

140.83

138.62

142.81

138.21

137.28

131.26

131.16

131.14

140.92

137.07

147.81

132.93

133.09

132.91

132.66

132.67

132.66

132.17

132.19

131.97

132.34

131.77

131.76

131.77

131.20

131.78131.92

140.46

131.53131.19

131.22

131.26

131.30

131.46

131.17

131.25

131.15

131.17

131.16

131.16

130.72

131.03

131.16

131.18

131.15

129.77

129.85

131.21

130.32

129.21

128.99

128.33

129.61

129.47

128.57

128.23

127.23

134.29

138.38

126.98

127.13

127.14

127.46

127.36

127.08

127.14

130.15

134.55

137.02

133.43

126.58

126.91

127.17

127.17

129.78

137.03

137.02

92

G0.6G0.5

G0.5

G0.6G0.8

TT

G1G0.8

G0.8

G0.8G0.8

G0.6

G0.8

G0.6

G0.6

G0.4

G0.6

G0.5

G0.5G0.6

G0.6G0.5

G0.6G0.5

G0.6

G0.6

G0.5

MG

TT

G0.4G0.4

MGMG

MG

WaterFeature

G0.3

G0.4

IC

MG

G0.6

Grass

G0.5G0.5

G0.5

G0.5

G0.4

G0.5

G0.5

GrassGrass

G0.4G0.4G0.5

G0.6

MG

G0.6

G0.5

G0.6

G0.6

G0.8

G0.8

G0.7

G0.7

GritBox

IC

TT

G0.5

G0.5

C\P

R o c k s

IC

Shed

IC

IC

G0.7

Sign

IC

Tarmac

IC

G0.5

MG

MG

MGMG

MG

MG MGMG

G1G0.8

G0.2

G0.6

G0.7G0.5

G1.1

G0.5MG

G1MG

G0.5 G0.7 G0.5

G0.4 G0.3G0.7

G0.5MG

G1MG

G0.5G1

G0.2G0.3

G0.7

G0.5

MGMG

G0.3

B\P

SubStation

IC

B\P

IC

IC

DenseWoodland

Sign

G0.2Sign

Ctv

Bt

Sign

Sign

IC

Ctv

IC

ICC.Box

IC

Ctv

Ctv

CtvCtv

MH

MH

MH

MH

P o n d

D e n s e U n d e r g r o w t h \W o o d l a n d

D e n s e U n d e r g r o w t h \W o o d l a n d

D e n s e U n d e r g r o w t h \W o o d l a n d

DenseUndergrowth

R o u g hG r a s s l a n d

R o u g hG r a s s l a n d

G0.5

G0.5G0.4

G0.3

IC

C.Box

BtCtv

Ctv

Ctv

Sign

Grass

Grass

IC

IC

IC

IC

ICIC

ICIC

Bushes

Bushes

Bushes

ICBt

Ctv

Ctv

Ctv

Sign

C.Box

Bt

Ctv

Ctv

Ctv

Bt

G0.2

G0.4

G0.5

G0.4

G0.1

G0.1

G0.1

G0.3

G0.2

G0.3

PipesG0.3

G0.3

G0.15

G0.4

G0.3

CarCharger

C\PPillar

A\C

G0.4

Concrete

SubStn

Canopy

G0.3

G0.3

WeatherMonitor

MH

MH

MH

MHIC

IC

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

IC

Pillar

IC

MH

MH

CarCharger

IC

MH

MH

MH

MH

MH

MH

MH

MH

IC

IC

IC

B\P

IC

MH

Shrubs

Shrubs

ShrubsShrubs

IC

IC

G0.5

IC

G0.6G0.5

G0.5

G0.5

G0.4

G0.4Sign

G0.4

G0.5

G0.5

G0.5

G0.5

G0.5

G0.5

G0.6

G0.4

DenseWoodland

DenseWoodland

G0.4

Dense Undergrowth\Woodland

Unable to gain any survey dataDue to dense undergrowth

IC

ICC\P

IC

IC

IC

Sign

CollarLevel=

CollarLevel=

CollarLevel=

IC

IC

IC

IC

G0.7

G0.7

CtvCtv

Ctv

Sign

Shrubs

Shrubs

Shrubs

Ctv

Bt

Shrubs

Shrubs

Shrubs

Fl

Fl

TCL:

135.53

146.54

Shrubs

Shrubs

DenseWoodland

IC

Gy

Gy

GyGy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Cbox

Cbox

Fh

Fh

Gas

Gas

Flag

Flag

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl Fl

FlFl

Fl

Fl

Fl

Fl

Fl

Fl

Sp Sp Sp Sp Sp Sp

Sp Sp Sp SpSp

Sp Sp

Sp

Sp

SpSp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

SpSpSpSpSp

SpSp Sp

Sp Sp Sp Sp Sp SpSp Sp Sp Sp Sp

THL

THL

THL

THL

THL

Boll

Boll

Boll

Boll

Boll

Boll

Boll

Boll

Boll Boll

Boll

BollBoll

Boll Boll

BollBoll

Boll Boll

BollBoll

Boll Boll

Boll Boll

IB

IB

IBIB

IB

IB

IB

IBIB

IB

IB

IB

IB

IB

IB

IB

IB

IB

IB

IB

IB

IB

IB

Bin

Bin

CCTV

CCTV

CCTV

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:

TCL:TCL:

TCL:

Av

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

Er

GrL

GrL

GrL

GrL

GrL

F:

F:

F:

M5

SW1

SW2

130.04

129.39

129.06129.15

129.77

129.27

129.34

129.65

129.34

139.45

138.72

136.38134.89

136.58

135.44

139.37

131.25

129.59

129.45

129.29129.62

130.55

138.47

138.22

129.35

138.11

138.97

139.08

128.28

128.83

129.23 129.23

134.61

137.28

137.63

138.46

126.14

128.84128.77

141.39

141.40

141.40

142.11140.03

137.72

B\P

MG

MG

MG

MGMG MG

MGTap

MG

Hedgeht 1m

MG

MG

MG

Chippings

MG

MGMG

MG

G0.5

GasSub stn

G0.4

Tap

G0.5

TanksC\P

G0.5

G0.6

G0.4

G0.4

A/C A/C

G0.8

G0.7

G0.6

G0.5

G0.5

G0.4

C\P

IC

Grass

CVR

IC

IC

IC

IC

ICIC

CVR

IC

IC

IC

CVR

CVR

IC

IC

Tarmac

Tarmac

B\P B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

B\P

Elc

CVR

ICShrubs

Grass

GrassIC

IC

Shrubs

Shrubs

Shrubs

ShrubsShrubs

Shrubs

Sign

G0.2

G0.3

G0.1

G0.3

G0.2

G0.2

G0.3

G0.3

G0.3

G0.3

G0.3

G0.3

G0.2

Steps

Steps

G0.3

G0.3

.6

G0.5

G0.5

G0.6

G2.0

G0.5

G2.0G1.4

G1.8

G0.2

Inv

TCL:140.78

TrialPit

DenseWoodland

DenseWoodland

DenseUndergrowth

IL127.18

IL129.72

IL128.30

LandDrain

LandDrain

Catchpit3.03d

SuperceptorNo PipesVisibleWL2.56d4.21d

Catchpit2.13d

Catchpit1.53d

Catchpit1.26d

IL126.06

IL126.62

EOTRoddedTo Stop

IL128.30

IL128.55

IL128.10

UTSFloodedWL0.40d1.04d

UTSFloodedWL0.75d0.94d

IL127.22

IL130.58

IL128.74

new manhole and drainconnection to existing SWS

new manhole and drainconnection to existing FWS

SS

UP

UP

FWC

Plot F2

Plot F3Subject to current PlanningApplication (November 2016)

Subject to current PlanningApplication (November 2016)

Plot F1NIA 60,000sqft approx

2No. existingtrees to beremoved

4No. existingtrees to beremoved

2No. existing treesto be removed

2No. existing treesto be removed

Plot F

TG70(C)

TG71(C)

TG72(C)

T98(C)

T99(B)

TG61(B)

TG70(C)

TG70(C)

3.0m

2.5m

NOTESAll dimensions to be verified on site. Do not scale this drawing. All discrepancies to beclarified with project Arboriculturalist. Drawing to be read in conjunction with ArboriculturalAssessment and Appendix A - Tree Schedule .

Drawing produced in colour, a monochrome copy should not be relied upon, and is basedon digital information supplied by the client in dwg format. The exact position of trees are tobe checked and verified on site prior to any tree work or construction work beingundertaken.

Trees are living organisms that change over time, the condition of all trees illustratedherein, are to be checked by a qualified arboriculturalist or tree surgeon should workscommence 12 months after the time of this survey. Please note that no works should beundertaken to any trees illustrated herein without first obtaining the proper authorisation todo so.This drawing is the property of FPCR Environment and Design Ltd and is issued on thecondition it is not reproduced, retained or disclosed to any unauthorised person, eitherwholly or in part without written consent of FPCR Environment and Design Ltd.

Ordnance Survey material is used with the permission of The Controller of HMSO, Crowncopyright 100018896.

rev date description by

CAD file:

client

project

drawing title

scale

drawing number

drawn date

rev

environmental assessment

arboriculture

ecology

masterplanning

landscape designurban design FPCR Environment and Design Ltd

Lockington HallLockingtonDerby DE74 2RH

t: 01509 672772f: 01509 674565e: [email protected]: www.fpcr.co.uk

fpcrarchitecture

IM Properties

Blythe Valley Park - Plot F5

TREE PROTECTION PLAN

1:1000 @ A3 HR March 2017

1871-A-03 (F5) AS:\1800\1871\2015\Arb\Commercial plots\Plot F5\AMS\Tree Protection Plan Plot F.dwg

KEY

N

0

Scale 1:1000 @ A3

25 50m

06.03.2017 First issue HRA 10.03.2017 Updated Layout (Proposed Site Layout Plan) HR

Tree/Group to be Retained

Tree/Group to be removed to facilitate the proposals

Category U - Unsuitable for retention onarboricultural grounds

Root Protection Area(Shown for retained trees only)

Individual / Group Number and BS CategoryT1 (A)G1 (A)

Line of Protective Barriers(and distance from tree or retained structure)

6.0m

Sporadic areas of new tree planting

Page 11: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration

2

3

6

4

1

0.6m

5

7

1

2

3

Standard specification for protective

barrier

1. Standard scaffold poles

2. Heavy gauge 2m tall galvanized tube and

welded mesh infill panels

3. Panels secured to scaffold frame with wire ties

4. Ground level

5. Uprights driven into the ground until secure

(min depth of 0.6m)

6. Standard scaffold clamps

7. Construction Exclusion Zone signs

NOTES

This drawing is the property of FPCR Environment and Design ltd and is issued on the

condition it is not reproduced, retained or disclosed to any unauthorised person, either

wholly or in part with written consent of FPCR Environment and Design Ltd.

CAD file:

drawing title

environmental assessment

arboriculture

ecology

masterplanning

landscape design

urban design

FPCR Environment and Design Ltd

Lockington Hall

Lockington

Derby DE74 2RH

t: 01509 672772

f: 01509 674565

e: [email protected]

w: www.fpcr.co.uk

architecture

APPENDIX A

PROTECTIVE FENCING SPECIFICATIONS

S:\1800\1871\2015\Arb\Commercial plots\Plot A2\Appendix A - Protective Fencing A4.dwg

Above ground stabilising systems

1. Stabiliser strut with base plate secured with

ground pins

2. Feet blocks secured with ground pins

3. Construction Exclusion Zone signs

Page 12: Tree Protection Plan and Arboricultural Method Statement · PDF fileTree Protection Plan and Arboricultural Method Statement ... Protection Areas extend into the ... taking into consideration