14
Treatment Plant Ozone Treatment Plant Ozone Retrofit Program Retrofit Program California Unified Program 8 California Unified Program 8 th th Annual Training Annual Training Conference Conference February 8, 2006 February 8, 2006 Presented by: Presented by: Paul G. Beswick Paul G. Beswick Metropolitan Water District of Southern California Metropolitan Water District of Southern California Environmental Support Services Environmental Support Services (213) 217-5533 (213) 217-5533 [email protected] [email protected]

Treatment Plant Ozone Retrofit Program California Unified Program 8 th Annual Training Conference February 8, 2006 Presented by: Paul G. Beswick Metropolitan

Embed Size (px)

Citation preview

Treatment Plant Ozone Treatment Plant Ozone Retrofit ProgramRetrofit Program

California Unified Program 8California Unified Program 8thth Annual Training Conference Annual Training ConferenceFebruary 8, 2006February 8, 2006

Presented by: Presented by: Paul G. BeswickPaul G. BeswickMetropolitan Water District of Southern CaliforniaMetropolitan Water District of Southern CaliforniaEnvironmental Support ServicesEnvironmental Support Services(213) 217-5533(213) 217-5533 [email protected]@mwdh2o.com

Southern California’s Imported WaterSouthern California’s Imported Water

California Aqueduct

ColoradoRiver

Aqueduct

SERVICEAREA

Lower SalinityHigh DBPs

High SalinityLow DBPs

Drivers for Treatment Improvements

Drivers for Treatment Improvements

Water Quality– Regulatory compliance– Salinity management– Taste-and-odor control

System Operations– Remove plant capacity limitations–Maximize flexibility of supply

Plant Process LayoutPlant Process Layout

Plant Process Flow DiagramPlant Process Flow Diagram

Meter FlashMix

Flocculation Sedimentation FiltrationFinished

WaterReservoir

Filter AidChlorineAmmonia

AmmoniaChlorineCaustic

PolyChlorineAlum/Ferric

Floc Aid

To MemberAgencyConnection

OzoneContactors

OxygenGeneration

OzoneGeneration

HydrogenPeroxide

OzoneOzone Destruct

Acid CausticLOX

ORP General Design CriteriaORP General Design Criteria

Plant Flow Range is 60 to 750 MGDPlant Flow Range is 60 to 750 MGD

Design Ozone Dose of 2.6 mg/L at 750 mgdDesign Ozone Dose of 2.6 mg/L at 750 mgd

8.6% Design Ozone Concentration8.6% Design Ozone Concentration

O3 Generation up 15,000 lb/dayO3 Generation up 15,000 lb/day

Contactors Designed for 10 Minute HDTContactors Designed for 10 Minute HDT

Ozone Process Flow DiagramOzone Process Flow Diagram

LOX

TANK

OPERATING = 2

STANDBY = 1

FUTURE = 1

OPERATING = 1

STANDBY = 1

DEFROST = 1

FUTURE = 1

LOX

VAPORIZER

LIQUID OXYGEN FEED

GAS SYSTEM

PSU

OZONE

GENERATOR

OPERATING = 4

STANDBY = 1

FUTURE = 2

OZONE

GENERATION

SYSTEM

OZONE

CONTACTOR

OZONE

CONTACTOR

SYSTEM

VENT OZONE

DESTRUCT SYSTEM

OPERATING = 6

STANDBY = 0

FUTURE = 2

OPERATING = 5

STANDBY = 1

FUTURE = 4

OPERATING = 2

STANDBY = 1

FUTURE = 1

HEATER

OZONEDESTRUCTCATALYST

BED

DESTRUCT

BLOWER

NITROGEN SYSTEM

COMPRESSORRECEIVERTANK

DRYER

OPERATING = 1

STANDBY IS A

BOTTLE SYSTEM

ORP Chemical StorageORP Chemical StorageUnit Qty Capacity

Ozone N/A 90 pounds

LOX Tanks 3 44,000 gal. ea.

Hydrogen Peroxide (35%) 2 2,000 gal. ea.

Sulfuric Acid (93%) 2 80,000/25,000 gal.

Caustic (25%) 8 127K/50K gal.

Chlorine 3 90 ton rail cars

Aqueous Ammonia (19%) 4 13,000/10,000 gal.

Sodium Hypochlorite (5.25%) 2 2,000 gal.

LOX Tank FarmLOX Tank Farm

Ozone BuildingOzone Building

Ozone GeneratorsOzone Generators

Ozone Contactor Schematic

OzoneOzone Feed Gas

Ozone Off Gas

Hydrogen Peroxide

RawWater

Contactor GalleryContactor Gallery

Lessons LearnedLessons Learned Standardized Alarm Beacons Disconnected Sample Line Vent to Contactor Warning Signals on Ozone Building Roof Safety Signs Throughout Facilities Automatic Shutoffs in Boiler Room New Gasket Material for Sulfuric Acid New Gasket Material for Ozone System Contactor Sample System Modification Added check valve at O3 generator outlet Seal Drain Sumps and Contactor Cover Plates 1 Year Life on O3 Ambient Detector Probes