Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent 1-1 1.1.1 Corporate Management Structure 1-2 1.1.2 Insurance and Liability Management 1-3 1.1.3 Occupational Health and Safety Plan 1-3 1.1.4 Environmental Management Plan 1-4 1.2 Project Overview 1-5 1.2.1 Project Location 1-5 1.2.2 Project History 1-9 1.2.3 Land Ownership 1-9 1.2.4 Current Land Uses 1-12 1.3 Need for the Project 1-14 1.4 Project Schedule 1-14 1.4.1 Site Preparation Phase 1-14 1.4.2 Construction Phase 1-14 1.4.3 Operation Phase 1-14 1.4.4 Closure and Post-closure Phases 1-15 1.5 Regulatory Framework 1-17 1.5.1 Canada 1-17 1.5.2 Ontario 1-19 1.5.3 Federal and Provincial Alignment 1-19 1.6 Participants in the Environmental Assessment 1-22 1.6.1 Aboriginal Communities 1-22 1.6.2 Federal Government 1-22 1.6.3 Provincial Government 1-23 1.6.4 Municipal Government 1-23 1.6.5 Public and Non-governmental Organizations 1-23 1.7 Document Organization 1-24 2.0 ASSESSMENT OF ALTERNATIVES 2-1 2.1 Background 2-1 2.2 Assessment Methodology 2-1 2.2.1 Project Alternatives 2-1 2.2.2 Alternatives to the Project 2-7 2.3 Project Alternatives Construction and Operations 2-8 2.3.1 Mining 2-8 2.3.2 Minewater Management 2-9 2.3.3 Mine Rock and Overburden Management 2-12

Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xvii Version 4

TABLE OF CONTENTS

1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1

1.1 The Proponent 1-1

1.1.1 Corporate Management Structure 1-2

1.1.2 Insurance and Liability Management 1-3

1.1.3 Occupational Health and Safety Plan 1-3

1.1.4 Environmental Management Plan 1-4

1.2 Project Overview 1-5

1.2.1 Project Location 1-5

1.2.2 Project History 1-9

1.2.3 Land Ownership 1-9

1.2.4 Current Land Uses 1-12

1.3 Need for the Project 1-14

1.4 Project Schedule 1-14

1.4.1 Site Preparation Phase 1-14

1.4.2 Construction Phase 1-14

1.4.3 Operation Phase 1-14

1.4.4 Closure and Post-closure Phases 1-15

1.5 Regulatory Framework 1-17

1.5.1 Canada 1-17

1.5.2 Ontario 1-19

1.5.3 Federal and Provincial Alignment 1-19

1.6 Participants in the Environmental Assessment 1-22

1.6.1 Aboriginal Communities 1-22

1.6.2 Federal Government 1-22

1.6.3 Provincial Government 1-23

1.6.4 Municipal Government 1-23

1.6.5 Public and Non-governmental Organizations 1-23

1.7 Document Organization 1-24

2.0 ASSESSMENT OF ALTERNATIVES 2-1

2.1 Background 2-1

2.2 Assessment Methodology 2-1

2.2.1 Project Alternatives 2-1

2.2.2 Alternatives to the Project 2-7

2.3 Project Alternatives – Construction and Operations 2-8

2.3.1 Mining 2-8

2.3.2 Minewater Management 2-9

2.3.3 Mine Rock and Overburden Management 2-12

Page 2: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xviii Version 4

2.3.4 Processing Methodology 2-14

2.3.5 Process Effluent Treatment 2-17

2.3.6 Tailings Storage Facility 2-19

2.3.7 Water Supply 2-29

2.3.8 Water Discharge Location 2-32

2.3.9 Watercourse Realignments 2-33

2.3.10 Infrastructure and Buildings 2-34

2.3.11 Aggregate Supply 2-37

2.3.12 Non-hazardous Solid Waste Management 2-37

2.3.13 Hazardous Solid Waste Management 2-38

2.3.14 Domestic Sewage Management 2-38

2.3.15 Explosives Storage Facility 2-39

2.4 Project Alternatives - Closure 2-39

2.4.1 Open Pit Closure 2-40

2.4.2 Underground Closure 2-41

2.4.3 Waste Rock Storage Area Closure 2-42

2.4.4 Minewater Management System Closure 2-43

2.4.5 Tailings Storage Facility Closure 2-44

2.4.6 Buildings and Equipment Closure 2-46

2.4.7 Infrastructure Closure 2-46

2.4.8 Drainage Closure 2-48

2.5 Summary of Alternatives 2-49

3.0 PROJECT DESCRIPTION 3-1

3.1 Existing Infrastructure and Facilities 3-3

3.1.1 Roads 3-3

3.1.2 Power 3-3

3.1.3 Natural Gas 3-5

3.1.4 Railway 3-5

3.1.5 Warehousing and Office Facilities 3-5

3.1.6 Dams and Impoundments 3-5

3.2 Project Phases and Schedule 3-5

3.2.1 Site Preparation Phase 3-5

3.2.2 Construction Phase 3-8

3.2.3 Operations Phase 3-8

3.2.4 Closure Phase 3-9

3.3 Open Pit Mine 3-9

3.3.1 Overburden Stripping 3-9

3.3.2 Surface and Mine Water Management 3-10

3.3.3 Open Pit Design 3-10

Page 3: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xix Version 4

3.3.4 Open Pit Mine Operations 3-10

3.4 Underground Mine 3-11

3.5 Stockpiles 3-14

3.5.1 Mine Rock Stockpile 3-14

3.5.2 Overburden Stockpile 3-17

3.5.3 Low-Grade Ore and Other Stockpiles 3-17

3.6 Processing 3-18

3.6.1 General 3-18

3.6.2 Site Layout and Infrastructure 3-19

3.6.3 Pipelines 3-21

3.6.4 Crushing, Ore Storage and Mill Feed 3-21

3.6.5 Milling 3-21

3.6.6 Gravity and Carbon-in-leach (CIL) 3-22

3.7 Tailings Storage Facility (TSF) 3-27

3.7.1 Embankment Height and Construction 3-28

3.7.2 Tailings Storage Facility Embankment 3-29

3.7.3 Seepage Control 3-31

3.7.4 Embankment Stability and Seepage 3-31

3.7.5 Tailings Management 3-32

3.7.6 Monitoring 3-39

3.8 Water Management 3-40

3.8.1 General Approach 3-40

3.8.2 Mine Water Management 3-40

3.8.3 Water Supply for Process Plant Operations 3-41

3.8.4 Potable Water and Other Water Requirements 3-42

3.8.5 Tailings Storage Facility Water Management 3-42

3.8.6 Water Balance 3-48

3.8.7 Final Effluent Discharge 3-50

3.8.8 Water Management Structures 3-52

3.8.9 Water Course Realignment 3-53

3.8.10 Aquatic Habitat Rehabilitation 3-53

3.9 Fuel and Chemical Management 3-53

3.10 Domestic and Industrial Waste 3-56

3.11 Access and Security 3-56

3.12 Power Supply 3-59

3.12.1 Plant Distribution Services and Transformer 3-60

3.12.2 Emergency Power 3-60

3.13 Other Facilities and Infrastructure 3-60

3.13.1 Explosives Storage Facility 3-60

Page 4: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xx Version 4

3.13.2 Additional Facilities 3-60

3.14 Closure and Decommissioning 3-61

3.14.1 Open Pit Mine 3-61

3.14.2 Underground Mine 3-61

3.14.3 Stockpiles 3-61

3.14.4 Tailings Storage Facility (TSF) 3-62

3.14.5 Aggregate Sources 3-63

3.14.6 Buildings, Machinery, Equipment, and Infrastructure 3-63

3.14.7 Petroleum Products, Chemicals, and Explosives 3-63

3.14.8 Roads, Pipelines, and Power Distribution 3-63

3.14.9 Site Drainage and Water Structures 3-63

3.14.10 Dewatering Infrastructure 3-64

3.14.11 Waste Management 3-64

3.14.12 Other Facilities and Infrastructure 3-64

3.15 In-Design Mitigation 3-64

3.15.1 Private Land Use 3-64

3.15.2 Use of Existing Infrastructure 3-64

3.15.3 Air Quality and Noise Mitigation 3-65

3.15.4 Domestic Waste 3-65

3.15.5 Cyanide Detoxification Circuit 3-66

3.15.6 Waste Rock Storage Area 3-66

4.0 ACCIDENTS AND MALFUNCTIONS 4-1

4.1 BACKGROUND 4-1

4.2 Approach 4-1

4.2.1 Data Input 4-2

4.2.2 Risk Registers and Risk Matrices 4-6

4.3 Effects of Failure Modes on Environmental Valued Components 4-9

4.3.1 Identification of Potential Interactions between Failure Modes with Intermediate and

Receptor Valued Components 4-9

4.3.2 Failure of Tailing Storage Facility 4-9

4.3.3 Spills/Releases 4-14

4.3.4 Cyanide 4-17

4.4 Natural Hazards 4-24

4.4.1 Extreme Floods 4-24

4.4.2 Natural Fires 4-24

4.4.3 Earthquakes 4-25

4.4.4 Tornadoes 4-25

4.4.5 Climate Change 4-25

4.5 Conclusions 4-26

Page 5: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxi Version 4

5.0 EXISTING ENVIRONMENT 5-1

5.1 Climate and Meteorology 5-1

5.1.1 Study Area 5-1

5.1.2 Methods 5-1

5.1.3 Air Temperature 5-1

5.1.4 Precipitation 5-1

5.1.5 Evaporation 5-2

5.2 Air Quality 5-5

5.2.1 Baseline Air Quality Levels 5-5

5.3 Acoustic and Light Environment 5-10

5.3.1 Baseline Noise Levels 5-10

5.3.2 Baseline Light Levels 5-13

5.4 Geology 5-15

5.4.1 Geological Setting 5-15

5.4.2 Deposit Geology 5-15

5.4.3 Geochemistry 5-21

5.5 Terrain & Soil 5-27

5.5.1 Regional Soil Classification 5-27

5.5.2 Local Soil Classification 5-27

5.5.3 Soil Nutrient Baseline 5-32

5.5.4 Soil Chemical Baseline 5-35

5.5.5 Summary of Soils in the LSA 5-36

5.5.6 Sediment 5-36

5.6 Hydrogeology 5-38

5.6.1 Hydrogeological Setting 5-39

5.6.2 Overburden Aquifer Conditions 5-41

5.6.3 Bedrock Aquifer Conditions 5-48

5.6.4 Groundwater Development 5-50

5.6.5 Conceptual Hydrogeological Model 5-50

5.7 Surface Hydrology 5-52

5.8 Aquatic Resources 5-56

5.8.1 Surface Water Quality 5-56

5.8.2 Sediment Samples 5-61

5.8.3 Benthic Invertebrate Community 5-71

5.8.4 Fish and Fish Habitat 5-73

5.9 Terrestrial Resources 5-86

5.9.1 Natural Heritage Areas 5-86

5.9.2 Vegetation 5-86

5.9.3 Wetlands 5-91

Page 6: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxii Version 4

5.9.4 Mammals 5-97

5.9.5 Birds 5-97

5.9.6 Amphibians and Reptiles 5-98

5.9.7 Invertebrates 5-98

5.9.8 Significant Wildlife Habitat 5-98

5.10 Species at Risk 5-101

5.10.1 Definition 5-101

5.10.2 Potential Species at Risk 5-101

5.10.3 Observed Species at Risk 5-105

5.11 Human Environment 5-105

5.11.1 Land Use 5-105

5.11.2 Social Factors 5-106

5.11.3 Economic Factors 5-110

5.11.4 Heritage Resources 5-113

5.11.5 Aboriginal Peoples 5-114

6.0 EFFECTS ASSESSMENT AND MITIGATION 6-1

6.1 Assessment Methodology 6-1

6.1.1 Potential Effects and Valued Components 6-1

6.1.2 Integration of Public and Aboriginal Considerations 6-1

6.1.3 Residual Effects Characterization 6-2

6.1.4 Residual Effects Significance Determination 6-3

6.2 Potential Effects 6-5

6.2.1 Biophysical 6-5

6.2.2 Socio-economic 6-9

6.2.3 Federal Considerations 6-10

6.3 Valued Component Identification 6-11

6.3.1 Biophysical 6-11

6.3.2 Socio-economic 6-16

6.4 Effects Assessment 6-18

6.4.1 Biophysical 6-18

6.4.2 Socio-economic 6-40

6.4.3 Federal Considerations 6-49

7.0 CUMULATIVE EFFECTS ASSESSMENT 7-1

7.1 Definition of Cumulative Effects 7-1

7.2 Scope of Cumulative Effects Assessment 7-1

7.2.1 Spatial and Temporal Scale 7-1

7.2.2 Identification of Cumulative Effects Valued Components 7-2

7.2.3 Identified Planned Projects 7-3

7.3 Cumulative Effects Assessment 7-4

Page 7: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxiii Version 4

7.3.1 Terrain and Soils 7-4

7.3.2 Noise 7-4

7.3.3 Light 7-4

7.3.4 Air Quality 7-4

7.3.5 Climate 7-4

7.3.6 Surface Water Quality and Quantity 7-4

7.3.7 Groundwater Quality and Quantity 7-4

7.3.8 Wildlife and Wildlife Habitat 7-5

7.3.9 Fish and Fish Habitat 7-5

7.3.10 Wetlands and Vegetation 7-5

7.3.11 Land and Resource Use 7-5

7.3.12 Economic Considerations 7-5

7.3.13 Aboriginal and Treaty Rights 7-5

8.0 ABORIGINAL AND PUBLIC ENGAGEMENT 8-1

8.1 Introduction 8-1

8.2 Project Milestones 8-2

8.3 Interested Parties 8-2

8.3.1 Wabigoon/Dryden 8-3

8.3.2 Thunder Lake Road, East Thunder Lake Road, Anderson Road, Tree Nursery Road 8-3

8.3.3 Aboriginal Communities 8-3

8.4 Public Consultation Information 8-4

8.4.1 Community Knowledge 8-4

8.5 Aboriginal Consultation Information 8-4

8.6 Participants in the Environmental Assessment 8-5

8.6.1 Wabigoon 8-5

8.6.2 Wabigoon Local Services Board 8-5

8.6.3 Concerned Citizens of Wabigoon 8-5

8.6.4 City of Dryden 8-5

8.6.5 Participation of Government Agencies 8-8

8.7 Treasury Metals Information Centre 8-9

8.8 Public Concerns 8-9

8.8.1 Measures to Address Public Concerns 8-11

8.8.2 Proponent Commitments 8-12

8.9 Aboriginal Concerns 8-12

8.9.1 Measures to Address Aboriginal Concerns 8-13

8.9.2 Proponent Commitments 8-16

8.9.3 Outstanding Aboriginal and Public Concerns 8-17

9.0 COMMITMENT REGISTRY 9-1

10.0 BENEFITS TO CANADIANS 10-1

Page 8: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxiv Version 4

10.1 Changes to Project Since Initially Proposed 10-1

10.2 Benefits to Canadians 10-5

11.0 CONCEPTUAL CLOSURE PLAN 11-1

11.1 Closure Objectives 11-1

11.2 Progressive reclamation 11-3

11.2.1 Waste Rock Storage Area 11-3

11.2.2 Open Pits 11-3

11.3 Reclamation at closure 11-4

11.3.1 Underground Mine 11-4

11.3.2 Tailings Storage Facility 11-4

11.3.3 Overburden Stockpile 11-5

11.3.4 Low-grade Ore Stockpile 11-5

11.3.5 Project Infrastructure 11-5

11.4 Post-closure Site Conditions 11-6

11.4.1 Pre-development Infrastructure 11-6

11.4.2 Terrain 11-6

11.4.3 Surface and Groundwater 11-6

11.4.4 Aquatic Environment 11-6

11.4.5 Terrestrial Environment 11-7

11.5 Post-closure Monitoring 11-7

11.5.1 Physical Stability 11-7

11.5.2 Chemical Stability and Biological Monitoring 11-7

12.0 SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT PLAN 12-1

12.1 Background 12-1

12.2 Objectives and Context 12-1

12.3 Reporting 12-2

12.4 Monitoring Measures and Plans 12-2

12.5 Occupational Health and Safety Plan (OHSP) 12-11

13.0 ENVIRONMENTAL MONITORING PROGRAM 13-1

13.1 Background 13-1

13.2 Air Quality 13-1

13.2.1 Objectives 13-1

13.2.2 Monitoring Methods 13-1

13.2.3 Progressive Management 13-2

13.2.4 Reporting 13-2

13.3 Sound and Vibration 13-2

13.3.1 Objectives 13-2

13.3.2 Monitoring Methods 13-2

13.3.3 Progressive Management 13-3

Page 9: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxv Version 4

13.3.4 Reporting 13-3

13.4 Surface Water and Aquatics 13-3

13.4.1 Objectives 13-3

13.4.2 Monitoring Methods 13-3

13.4.3 Progressive Management 13-4

13.4.4 Reporting 13-4

13.5 Geochemistry 13-4

13.5.1 Objectives 13-4

13.5.2 Monitoring Methods 13-4

13.5.3 Progressive Management 13-4

13.5.4 Reporting 13-5

13.6 Groundwater 13-5

13.6.1 Groundwater Monitoring Wells 13-5

13.6.2 Groundwater Monitoring Installations 13-5

13.6.3 Groundwater Level Monitoring 13-10

13.6.4 Groundwater Quality Monitoring 13-10

13.6.5 Post-Closure 13-10

13.7 Terrestrial Species and Species at Risk 13-10

13.7.1 Objectives 13-10

13.7.2 Monitoring Methods 13-11

13.7.3 Progressive Management 13-11

13.7.4 Reporting 13-11

13.8 Metal Mine Effluent Regulations 13-11

13.8.1 Annual Effluent and Water Quality Monitoring 13-11

13.8.2 Biological Monitoring Studies 13-12

14.0 CONCLUSIONS 14-1

15.0 REFERENCES 15-1

Page 10: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxvi Version 4

LIST OF TABLES

Table 1.1.1 Proponent contact information 1-2

Table 1.5.1 Anticipated Provincial Permits 1-20

Table 1.5.2 Anticipated Federal Permits 1-21

Table 2.2.1 Financial criteria for the alternatives assessment 2-3

Table 2.2.2 Technical feasibility criterion for the alternatives assessment 2-3

Table 2.2.3 Environmental criteria for the alternatives assessment 2-4

Table 2.2.4 Closure criteria for the alternatives assessment 2-6

Table 2.3.1 Comparison of process methodologies using evaluation criteria 2-16

Table 2.3.2 Identification of TSF Candidates and General Location 2-23

Table 2.3.3 Identification of TSF Candidates and Methodology of Tailings Disposal 2-23

Table 2.3.4 Pre-screening Assessment of TSF Candidates 2-24

Table 2.3.5 TSF Alternatives Characterization Environmental Account 2-25

Table 2.3.6 TSF Alternatives Characterization Technical Account 2-26

Table 2.3.7 TSF Alternatives Characterization Economic Account 2-27

Table 2.3.8 TSF Alternatives Characterization Socio-economic Account 2-28

Table 2.3.9 Alternatives for Water Management, Source, Effluent, Destruction, and Receivers 2-30

Table 2.3.10 Spot Heights and Flow for On-site Tributaries 2-31

Table 2.5.1 Summary of Alternatives 2-49

Table 3.2.1 Key Project Components Listed by Phase 3-7

Table 3.7.1 CDA guidelines 3-32

Table 3.8.1 Tailings Rate of Rise 3-44

Table 3.8.2 Water Balance Conditions 3-48

Table 3.8.3 Discharge Qualities 3-50

Table 4.2.1 FMEA Workshop Participants 4-2

Table 4.2.2 Ratings for Likelihood of Failure Modes 4-4

Table 4.2.3 Rating for Severity of Failure Modes 4-5

Table 4.2.4 Criteria for Risk Matrix 4-6

Table 4.2.5 Summary of Residual Risk Ranks 4-7

Table 4.2.6 Risk Level by Impact Category 4-7

Table 4.2.7 Summary of Identified Environmental Residual Risks 4-8

Table 4.3.1 Minimum Factors of Safety 4-10

Table 4.3.2 Description, Prevention, and Responses to Potential Medium Environmental

Residual Risk Failure Modes 4-21

Table 5.1.1 Mean Annual Precipitation in the LSA/RSA 5-2

Table 5.1.2 Extreme 24-Hr Rainfall Depth – LSA (Dryden) 5-2

Table 5.2.1 Air Quality Assessment Criteria 5-8

Table 5.2.2 Measured Ambient Air Quality Data from the MOE Monitoring Stations 5-10

Table 5.3.1 Ambient Sound Levels at the Goliath Gold Project 5-11

Table 5.3.2 Current Light Levels within the Light Study Area 5-14

Table 5.4.1 Estimated Volumes of Mined Materials 5-22

Table 5.4.2 Estimated Volumes of Mine Waste Rock 5-22

Table 5.4.3 Sample Numbers for Static Tests on Waste Rock Material 5-24

Table 5.6.1 Overburden Hydraulic Conductivity Testing Summary 5-43

Table 5.6.2 2013/2014 Groundwater Monitoring Data 5-44

Table 5.6.3 2013 Groundwater Quality 5-47

Table 5.6.4 Hydraulic Conductivity Summary of Bedrock Units 5-49

Page 11: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxvii Version 4

Table 5.7.1 Average Daily Discharge, 2012 to 2013 5-52

Table 5.8.1 Location and Dates for Surface Water Sample Collection 5-57

Table 5.8.2 Water Quality Parameters Measured 5-58

Table 5.8.3 PWQO for Freshwater 5-62

Table 5.8.4 MMER Authorized Limits of Deleterious Substances 5-63

Table 5.8.5 Surface Water PWQO Exceedances 5-64

Table 5.8.6 Surface Water MMER Exceedances 5-66

Table 5.8.7 Sediment Parameters Measured 5-67

Table 5.8.8 MOE Sediment Effects Levels 5-70

Table 5.8.9 PSQG Exceedances 5-71

Table 5.8.10 Benthic Invertebrate Sample Locations 5-73

Table 5.8.11 Waterbodies Assessed in the RSA and LSA 5-74

Table 5.8.12 Summary of Fish Species Confirmed by Field Surveys 5-75

Table 5.8.13 Summary of Mercury Concentrations in Fish Tissue Samples 5-76

Table 5.8.14 Stream Habitat Summary 5-81

Table 5.8.15 Fish Species of Management Concern in the RSA 5-85

Table 5.9.1 Ecosites of the RSA And LSA (Based On Table 9.5 KCB 2012) 5-87

Table 5.9.2 Summary Of OWES Scores for Each Wetland Evaluated 5-95

Table 5.9.3 Proportional Distribution of Wetland Types and Dominant Vegetation for Evaluated

Wetlands in the Goliath Gold Project Study Area (2012) 5-96

Table 5.9.4 Dominant Plant Species in All Assessed Wetlands 5-96

Table 5.9.5 Provincially Significant Species Identified During the Wetland Survey 5-96

Table 5.9.6 Assessment of Seasonal Concentrations of Wildlife in the LSA (Modified from

Table 8.12 in KCB 2012) 5-99

Table 5.9.7 Assessment of Specialized Wildlife Habitat in the LSA (Modified From

Table 8.13 in KCB 2012) 5-100

Table 5.10.1 Plant Species at Risk Potentially Occurring within the LSA and RSA 5-102

Table 5.10.2 Wildlife Species at Risk Potentially Occurring or Known to Occur within

the LSA and RSA 5-103

Table 5.11.1 Education Facilities in the Study Area 5-107

Table 5.11.2 Level of Education In Thunder Bay And Kenora 5-107

Table 5.11.3 Health Services and Programs in the Study Area 5-108

Table 5.11.4 Housing Supply in the Study Area 5-109

Table 5.11.5 Police Services and Crime in the Study Area 5-110

Table 5.11.6 Labour Force, Labour Participation and Employment in the Study Area 5-111

Table 5.11.7 Income Levels in the Study Area Compared to Provincial Average 5-111

Table 5.11.8 White-Tailed Deer Hunting Activity 5-119

Table 5.11.9 Moose Hunting Activity 5-119

Table 6.3.1 Wildlife and Wildlife Habitat Valued Components 6-15

Table 6.4.1 Environmental Effects Assessment for the Construction Phase 6-51

Table 6.4.2 Environmental Effects Assessment for the Operational Phase 6-60

Table 6.4.3 Environmental Effects Assessment for the Closure Phase 6-69

Table 6.4.4 Effects Assessment for Air Quality 6-78

Table 6.4.5 Estimated TSP and PM10 at Nearest Receptors 6-80

Table 6.4.6 Socio Economic Effects Matrix for the Construction Phase 6-81

Table 6.4.7 Socio-Economic Effects Matrix for the Operational Phase 6-85

Table 6.4.8 Socio-Economic Effects Matrix for the Closure Phase 6-90

Table 7.3.1 Environmental Cumulative Effects Matrix for the Goliath Gold Project 7-6

Page 12: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xxviii Version 4

Table 7.3.2 Socio-Economic Cumulative Effects Matrix for The Goliath Gold Project 7-18

Table 9.0.1 Treasury Commitments for the Project 9-1

Table 10.1.1 Changes to the Project since Initially Proposed 10-1

Table 11.2.1 Annual Pit Water Requirements for Filling the Project Open Pits 11-4

Table 12.4.1 Proposed Physical Monitoring Parameters, Standards, and Locations 12-3

Table 12.4.2 Proposed Biological Monitoring Parameters, Standards, and Locations 12-8

Table 12.4.3 Proposed Socio-economic Monitoring Parameters, Standards, and Locations 12-10

Table 13.6.1 Location and Type of Groundwater Monitoring Wells in Proposed Goliath

Groundwater Monitoring Network 13-8

Table 14.0.1 Summary Table of Potential Adverse or Potential Impacts, Issues or Concerns

to Aboriginal and Treaty Rights and Related Interests 14-2

Table 14.0.2 Summary of Responses to Public Concerns Regarding the Project 14-15

Table 14.0.3 Summary of Feedback from Aboriginal Communities as provided by the

CEA Agency to Treasury 14-18

Table 14.0.4 Environmental Effects Assessment for the Construction Phase 14-31

Table 14.0.5 Environmental Effects Assessment for the Operational Phase 14-40

Table 14.0.6 Environmental Effects Assessment for the Closure Phase 14-49

Table 14.0.7 Socio Economic Effects Matrix for the Construction Phase 14-58

Table 14.0.8 Socio Economic Effects Matrix for the Operation Phase 14-62

Table 14.0.9 Socio-Economic Effects Matrix for the Closure Phase 14-67

Table 14.0.10 Potential Accidents and Malfunctions Summary for the Project 14-72

Table 14.0.11 Environmental Cumulative Effects Matrix for the Goliath Gold Project 14-75

Table 14.0.12 Socio-Economic Cumulative Effects Matrix for the Goliath Gold Project 14-87

Page 13: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xvii Version 4

LIST OF FIGURES

Figure 1.1.1 Corporate Management Structure 1-3

Figure 1.2.1 Location of the Goliath Gold Project (Regional Scale) 1-7

Figure 1.2.2 Location of the Goliath Gold Project (Local Scale) 1-8

Figure 1.2.3 Claims and Dispositions 1-11

Figure 1.2.4 Aboriginal groups with related interests to the Goliath Gold Project 1-13

Figure 1.4.1 Goliath Gold Project phases and schedule 1-16

Figure 2.3.1 Location of tailings storage facility alternatives. 2-21

Figure 2.3.2 Infrastructure and buildings processing plant options 2-36

Figure 3.0.1 General Arrangement of Project Site During Operations Phase 3-2

Figure 3.1.1 Project Office 3-3

Figure 3.1.2 Existing Infrastructure Highlight 3-4

Figure 3.2.1 Project Phases and Schedule 3-6

Figure 3.3.1 Aerial View of Proposed Open Pit 3-9

Figure 3.4.1 Underground Operational Long Section 3-12

Figure 3.4.2 Plan View At 50 EL 3-13

Figure 3.5.1 Maximum Open Pit, Waste Rock, Overburden and Low Grade Stockpile 3-15

Figure 3.5.2 Open Pit With In-Pit Waste Rock 3-16

Figure 3.6.1 Aerial View of the Proposed Processing Plant Location 3-18

Figure 3.6.2 Flow Diagram of Preferred Option for Ore Processing 3-24

Figure 3.6.3 Detailed Processing Plant Drawing 3-25

Figure 3.7.1 Aerial View of Proposed Tailings Storage Facility Location 3-28

Figure 3.7.2 TSF Capacity 3-34

Figure 3.7.3 Embankment Staging 3-35

Figure 3.7.4 Stage 1 TSF 3-36

Figure 3.7.5 Stage 4 TSF 3-37

Figure 3.7.6 Cross Section of TSF Embankment 3-38

Figure 3.8.1 Tree Nursery Irrigation Ponds for Water Intake 3-42

Figure 3.8.2 Water/Solids Balance Schematic 3-47

Figure 3.8.3 Overall Site Process Water Balance Diagram 3-49

Figure 3.8.4 Existing and Proposed Water Structures 3-54

Figure 3.8.5 Blackwater Creek Tributary #2 Water Course Realignment 3-55

Figure 3.11.1 Access Roads and Stream Crossings 3-57

Figure 3.12.1 Plant Power Supply 3-58

Figure 3.12.2 Power Line Infrastructure 3-59

Figure 5.1.1 Mean, Maximum and Minimum Air Temperature – LSA/RSA (Dryden, Dryden A and

Sioux Lookout A) 5-3

Figure 5.1.2 Mean Rainfall and Total Precipitation by Month Through The Goliath Gold

Project Regional Study Area 5-4

Figure 5.2.1 Environmental Air Quality Assessment Local Study Area 5-6

Figure 5.2.2 Regional Air Quality Monitoring Stations 5-7

Figure 5.3.1 Baseline Noise and Light Monitoring Stations 5-12

Figure 5.4.1 Regional Geology 5-16

Figure 5.4.2 Bedrock geology 5-19

Figure 5.4.3 Cross-sectional View of the Eastern High-Grade Shoot within the Main Zone 5-20

Figure 5.5.1 Regional Landforms 5-29

Figure 5.5.2 Soil Sampling Test Pit Location and Local Soil Classification 5-30

Page 14: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xviii Version 4

Figure 5.5.3 Project Site Overburden Geology and Soil Profile Location 5-31

Figure 5.5.4 South-West to North-East Cross-Section Through Overburden (a) South-East

of Proposed Open Pit 5-33

Figure 5.5.5 South-West to North-East Cross-Section Through Overburden (a) North-West

of Proposed Open Pit 5-34

Figure 5.6.1 Hydrogeological Model Domain and Boundary Conditions 5-40

Figure 5.6.2 Groundwater Level Contours 5-42

Figure 5.6.3 Private Water Wells and Surface Water Features 5-45

Figure 5.7.1 Hydrographic Network in the Goliath Gold Project Area 5-54

Figure 5.7.2 Hydrostation and Barometer Locations 5-55

Figure 5.8.1 Surface Water Quality Sampling Locations 5-59

Figure 5.8.2 Sediment Sampling Location 5-68

Figure 5.9.1 Ecosites of the RSA and LSA 5-90

Figure 5.9.2 Forest Working Groups of the RSA and LSA 5-92

Figure 5.9.3 Wetlands Assessed Within Goliath Gold Project Area 5-94

Figure 5.11.1 Country Foods (Regional) 5-116

Figure 5.11.2 Country Foods (Local) 5-117

Figure 6.1.1 Decision Tree for the Determination of Significance for Residual Effects 6-4

Figure 6.4.1 Model Predicted Drawdown in Basal Sand/Shallow Bedrock for the Fully

Developed and Dewatered Goliath Mine (Base Case) 6-27

Figure 6.4.2 Project Infrastructure and Facilities 6-33

Figure 11.1.1 General Arrangement of Project Site During Operations Phase 11-2

Figure 13.6.1 Proposed Groundwater Monitoring Network 13-7

Page 15: Treasury Metals Incorporated Goliath Gold Project ... · Environmental Impact Statement xvii Version 4 TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT OVERVIEW 1-1 1.1 The Proponent

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

xix Version 4

LIST OF APPENDICES

APPENDIX A TABLE OF CONCORDANCE

APPENDIX B OPTIMIZATION STUDY

APPENDIX C MINING STUDY

APPENDIX D TAILINGS STORAGE FACILITY

APPENDIX E TRAFFIC

APPENDIX F WATER MANAGEMENT PLAN

APPENDIX G ENVIRONMENTAL BASELINE

APPENDIX H ACCOUSTIC ENVIRONMENT

APPENDIX I LIGHT ENVIRONMENT

APPENDIX J AIR QUALITY

APPENDIX K GEOCHEMISTRY

APPENDIX L GEOCHEMICALMODELING

APPENDIX M HYDROGEOLOGY

APPENDIX N SURFACE HYDROLOGY

APPENDIX O HYDROLOGIC MODELING

APPENDIX P AQUATICS DST

APPENDIX Q FISHERIES AND HABITAT

APPENIDX R TERRESTRIAL

APPENDIX S WETLANDS

APPENDIX T SOCIO-ECONOMIC

APPENDIX U HERITAGE RESOURCES

APPENDIX V PUBLIC ENGAGEMENT

APPENDIX W SCREENING LEVEL RISK ASSESSMENT

APPENDIX X ALTERNATIVES ASSESSMENT MATRIX

APPENDIX Y EIS GUIDELINES

APPENDIX Z TML COROPORATE POLICIES

APPENDIX AA LIST OF MINERAL CLAIMS

APPENDIX BB PRELIMINARY ECOMONIC ASSESSMENT

APPENDIX CC MINING, DYNAMIC AND DEPENDABLE FOR ONTARIO’S FUTURE

APPENDIX DD ABORIGINAL CONSULTATION REPORT

APPENDIX EE COUNTRY FOODS ASSESSMENT

APPENDIX FF PHOTO RECORD OF THE GOLIATH GOLD PROJECT

APPENDIX GG TSF FAILURE MODELING

APPENDIX HH FAILURE MODES AND EFFECTS ANALYSIS

APPENDIX II DRAFT FISHERIES COMPENSATION STRATEGY AND PLANS