31
TRB/APTA 2004 Bus Rapid Transit Conference Luncheon Luncheon BRT: Latin American Experience BRT: Latin American Experience 12:10 – 1:20 p.m. 12:10 – 1:20 p.m. William Millar President, American Public Transportation Association President, American Public Transportation Association (Presiding) (Presiding)

TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Embed Size (px)

Citation preview

Page 1: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

TRB/APTA 2004Bus Rapid Transit Conference

LuncheonLuncheonBRT: Latin American ExperienceBRT: Latin American Experience

12:10 – 1:20 p.m.12:10 – 1:20 p.m.

William MillarPresident, American Public Transportation AssociationPresident, American Public Transportation Association

(Presiding)(Presiding)

Page 2: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

TRB/APTA 2004Bus Rapid Transit Conference

Gerhard Menckhoff

• Masters in Traffic Engineer, Ohio State University• Independent Consultant to the World Bank for urban

transport strategy review• Member of World Bank (1981 – 2000), Senior Urban

Transport Specialist in Latin America• Project Director, Wilbur Smith and Associates (1963 –

1981)• Member ASCE and ITE

Page 3: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

BRT: Latin American Experience Using Lessons Learned

Gerhard Menckhoff

Urban Transport Consultant, World Bank

Bus Rapid Transit ConferenceAmerican Public Transportation Association

Denver, May 5, 2004

Page 4: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Existing busways and BRTs in Latin America

• Brazil– Curitiba – São Paulo– Belo Horizonte– Porto Alegre– others

• Other Countries– Santiago (Chile)– Lima (Peru)– Quito (Ecuador)– Bogotá (Colombia)– Leon de Guanajuato (Mexico)

Page 5: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Conventional busways

Bogotá (before TransMilenio)

Lima

-High passenger throughput-Operational control difficult-Chaotic and unattractive-OFTEN: BAD IMAGE São Paulo

Page 6: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Curitiba (Brazil) BRT

• Segregated Busways– First busway in 1974– Five busways now, 37 miles– 11-14,000 pass/hour/direction

• Operational Aspects– Integrated transport system– Trunk (bi-articulated buses), feeder, express services– High station platforms, fare prepayment– URBS distributes revenues to private bus companies

• Transport - Land Use Coordination– High-density development along busways– City services at transfer terminals– Maintain city center vitality

Page 7: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Bogotá (Colombia) TransMilenio

• Phase 1 (1998-2002)– 25 miles of busway, of which 16 are 2+2 lanes– 57 stations and 4 transfer terminals (connecting with 39 feeder lines)– 490 articulated trunk-line and 243 feeder-line buses– 800,000 pass./day, maximum load point 35,000 pass./hour/direction

• Phase 2 (2003-2005)– 28 miles of busway, 60 stations and 3 terminals– 335 articulated trunk-line and 170 feeder line buses

• Operations– Similar to Curitiba, but much higher volumes– Rapid implementation, reform of bus industry– Commercial success, excellent image

Page 8: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Quito (Ecuador) BRTs

• Trolleybus Busway (“El Trole”)– Started operation in 1996– 10 miles of busway, 32 right-hand stations + terminals with feeder buses– 113 articulated Trolleybuses, Diesel standby motors, right-hand doors– High station platforms, fare prepayment– 170,000 pass./day, maximum load point 8,000 pass./hour/direction

• Ecovías Busway (Diesel Buses)– Started operation in 2002 – 6 miles of busway– 15 median stations + 2 feeder terminals – 42 articulated buses, with left-hand doors– Only limited fare integration with Trole

• Miscellaneous Aspects– Trole: Government run -- Ecovías: private– Electric trole through historic city center– Further extensions planned for Trole+Ecovías (new 10-mile line to open in mid-2004)

Page 9: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

• Started operation in 2003• 16 miles of busway • 52 stations• High station platforms • Fare prepayment• 120 articulated trunk-line buses

(doors on left)• 31 feeder routes with 209

conventional buses

Leon de Guanajuato (Mexico) BRT

Page 10: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

• Physically segregated busways• Trunk-feeder operation• Fare prepayment, flat fares, free transfers with

feeder buses• High station platforms• Mostly operated by private bus companies• High passenger demand• Quick implementation• Much lower cost than LRT or metro alternative• BUT: Metro-like appearance• Distinct identity and good image

Page 11: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Physically segregated busways

Curitiba

Bogotá

Quito

Page 12: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Trunk-feeder operation

Advantages of “open” operation

- Fewer passenger transfers

- No need for transfer terminals

- Less bus route restructuring

Advantages of trunk-feeder operation

- Better bus control higher capacity and faster + more reliable flow

- Special trunk-line buses can be used

- Fare prepayment and faster boarding/alighting

- Distinct (usually more attractive) image

Page 13: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Fare prepayment

Bogotá

Quito

Page 14: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

High station platforms Bogotá

- only BRT buses have access - rapid boarding and alighting - disability-friendly

Quito

Leon de Guanajuato

Page 15: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Mostly operated by private bus companies

• TransMilenio (Bogotá) -- Phase 1– 4 trunk bus and 5 feeder bus companies, owned by investors

and traditional bus operators– All buses (incl. 470 new articulated trunk buses, at

$195,000/bus) privately financed– Investment and operation paid 100% from fares

• Quito -- Trole operated by municipality; Ecovías by private sector

• Curitiba -- 9 Privately-run area concessions; no Government subsidies

Page 16: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

High passenger demandPassengers on a typical weekday

• Bogotá (TransMilenio) 800,000 passengers

32,000 pass./mile of busway

• Quito (Trole) 170,000 passengers 17,000 pass./mile of busway

********************

• Washington, DC (Metrorail) 700,000 passengers 7,000 pass./mile of metro

Page 17: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Quick implementation

• Bogotá (TransMilenio)

– From idea to commissioning of initial line (9 miles): 29 months

– Total Phase 1 (additional 16 miles): +19 months– Phase 2 (additional 28 miles, 2003-2005): +36 months

TOTAL -- 7 trunk lines totaling 53 miles: 84 months

(Metro Option: 1 line totaling 18 miles was planned to take >100 months)

****************************

• Washington, DC (Metrorail)

5 metro lines totaling 103 miles >360 months

(>30 years)

Page 18: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Much lower cost than rail alternative

• Bogotá– TransMilenio infrastructure investment (Phase 1) $240 million

TransMilenio private investment $100+ million

Total public investment $3.6 million/mile $0.34/pass. (3 years)

– Rail Metro – was ready for bidding in 1998 (18 miles, $3.04 billion, 1.1million pass/day

estimated for 2008) $167 million/mile $2.45/pass. (3 years)

• Quito (Trole Phase 1 – 7 miles)– Total investment $57.6 million, i.e. $3.2 million/mile of which

80% for trolley buses and electrical equipment.

– Non-electrical investment ($11.3 million) $0.6 million/mile

Page 19: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

BUT: Metro-like appearance

Curitiba

Bogotá

Page 20: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

What do these BRTs have in common?

Distinct identity and good image

Curitiba Bogotá

Choice of name Quito

Distinct logo

New type of buses

Attractive stations

Bogotá

Page 21: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

BRT systems being (or soon to be) implemented

• Guayaquil (Ecuador)• Santiago (Chile)• Lima (Peru)• Barranquilla, Bucaramanga, Cali, Cartagena,

Medellín, Pereira (Colombia)• San José (Costa Rica)• San Salvador (El Salvador)• Others?

Page 22: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

BRT systems being implemented Santiago (Chile)

• Integrated Transport System- Full-scale reform, to start in mid - 2005- Covers 100% of public transport- Full ticket and fare integration- Bus-Bus and Bus-Metro

• Institutional and Operational Aspects- Transantiago: Overall management role- Metro de Santiago: Government operated- Buses: Private concessions (trunk and zonal)

• Busways- Alameda (see left) -Pajaritos and Santa Rosa in 2005- Other busways to be added in subsequent years, incl. existing Av.

Grecia busway (see bottom left)- Some trunk bus lines extend beyond busway- Low-floor buses, doors on the right- On-bus fare control - contact-less cards

Page 23: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

BRT systems soon to be implemented Lima (Peru)

• Proposed BRT System– 18 miles of exclusive busway, 35 stations– 31 miles of feeder bus routes– Construction scheduled for 2004-2007– Total investment: $134 million, including complementary works, goods and services

• Segregated Busways– First busway (Vía Expresa -- built in 1972-74), will be incorporated in system– Main adaptation: extra passing lanes at stations, to increase busway capacity– 2+2 lanes on most other busway sections

• Operational Aspects– Trunk and feeder services– High station platforms, fare prepayment, bus doors on left– 520,000 passengers per day (forecast for 2007)– Protransporte distributes revenues to private bus companies

Page 24: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

BRT systems soon to be implemented Colombian cities (in addition to Bogotá)

• Barranquilla 2006 – 9 miles – 2 busways – maybe CNG

• Bucaramanga 2005/6 – 5 miles

• Cali 2005 – 31 miles – replaces previous LRT plan – maybe underground busway section

• Cartagena 2005 – 9 miles – maybe CNG - buses to be designed by local artists

• Medellín 2006 – 5 miles – feeder to metro

• Pereira 2005 – 9 miles

All are expected to have high station platforms and fare prepayment

Page 25: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Can we learn from these experiences?

• Key advantages when compared to rail alternatives– Less costly to implement and (often) operate

– Often: quicker to implement

• BUT: Commonly voiced doubts when considering BRT– BRT (as opposed to LRT) would not attract car users

– BRT is slow

– BRT has a low capacity

– BRT pollutes and creates a barrier effect

– No development impact with BRT

Page 26: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Commonly voiced doubts when considering BRT

BRT (as opposed to LRT) would not attract car users

not so in Latin America!• Curitiba:

– City has relatively high income per capita and car ownership is second highest in Brazil

– BUT: gasoline consumption per capita is lower than any other comparable city

• Bogotá:– About 15% of passengers previously traveled by

private car

Page 27: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Commonly voiced doubts when considering BRT

BRT is slow

not so in Latin America!If at-grade, with intersections:

- slower than Metro - same as LRT

• If grade separated -- faster than rail- express services can overtake at stations

• Commercial speeds (mph)• BRT: Bogotá 13-19 Quito: 11-16• LRT: Tunis 8-13• Metro: Hong Kong 21 São Paulo: 18

Page 28: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Commonly voiced doubts when considering BRT

BRT has a low passenger capacity

But its throughput is generally higher than LRT! See regularly achieved volumes (observed passengers/hour per direction)

Conventional busways (with at-grade crossings)

- Belo Horizonte 16,000 - São Paulo 20,000 - Porto Alegre 20,000

Bus Rapid Transit (with at-grade crossings)

- Bogotá (2+2 lanes) 36,000 - Quito (1+1) 8,000 - Curitiba (1+1) 14,000

Light Rail Transit (with at-grade crossings – 1+1 track)

- Alexandria El Rami 13,000 - Tunis 9,000

Rail Rapid Transit (fully grade separated – 1+1 track)

- Hong Kong 81,000 - Mexico City 65,000 - Washington, DC 17,000* * Blue/Orange Line – highest RRT volume in the US, outside New York City

Page 29: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Commonly voiced doubts when considering BRT

BRT pollutes and creates a barrier effect

• Yes, much more than underground metro• Somewhat more than at-grade LRT

– Even clean Diesel creates more local pollution than electricityelectric Trole in Quito, CNG in buses in Cartagena, “clean” buses in Santiago

– Long bus stations in Bogotá, “wall of buses” in São Paulo

Bogotá

Frankfurt

• Environmental problems caused mostly by cars

Page 30: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Commonly voiced doubts when considering BRT

No development impact with BRT BUT Bogotá:New shopping center at TransM. terminal

AND Curitiba

AND

Curitiba

“Trinary” Road System

Express Bus Corridor

Local Collectors

High CapacityOne-Way

Page 31: TRB/APTA 2004 Bus Rapid Transit Conference Luncheon BRT: Latin American Experience 12:10 – 1:20 p.m. William Millar President, American Public Transportation

Conclusions

• Curitiba’s BRT (1970s) used to be considered a “special case”• Quito (1997) and Bogotá (2000) demonstrated that, yes, this

concept could be replicated elsewhere

• Latin America has become a fantastic laboratory for innovative urban transport solutions

• Now: dozens of new BRTs are being considered, in Latin America, Asia, Africa, Europe and the USA– BRT starts to be taken seriously as a mass rapid transit mode in the USA

– US [and European+Japanese] consultants are associating with Latin American experts when advising other countries