Transportation Operations Group

1

Paso Del Norte Regional Mobility Information System Challenges and Opportunities

Center for International Intelligent Transportation Research

TBWG Data WorkshopDetroit, MichiganJune 4, 2008

Rajat Rajbhandari Texas Transportation InstituteEl Paso, Texas

Page 2: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

2

Agenda

Defining Goals and Objectives of the System

Developing Framework for the System

Designing and Implementing the System

Challenges and Opportunities

Creating a Sustainable System

Future of PDN Regional Mobility Information System

Video Demonstration of PDN RMIS Website

Page 3: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

3

Defining Goals and Objectives of the SystemAnnual Traffic Delay in the El Paso Area

0

1000

2000

3000

4000

5000

6000

7000

8000

1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002

Annu

al D

elay

(per

son-

hour

s in

thou

sand

s)

Traffic Congestion

Annual Volume of Trucks Entering into United States from mexico through POEs in El Paso Only

0

200

400

600

800

1000

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004

Truc

ks (i

n Th

ousa

nds)

All POEs in El Paso

BOTA Only

Border Congestion

Page 4: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

4

Defining Goals and Objectives of the System

Raising awareness of the need for data collection planning

Increasing amount of transportation data being collected

Increasing quality of transportation data being collected

Increasing recognition of the value of data

Encouraging similar efforts in other areas of transportation

Adopted From: Closing the Data Gap: Guidelines for Quality Advanced Traveler Information System (ATIS) Data Version 1.0, ITS America and U.S. Department of Transportation, September 2000.

Creating a centralized transportation data archive

and

Providing advanced traveler information

Page 5: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

5

Defining Objectives of the System

Provide a common medium to store and relay multi-modal transportation data

ADVANCED TRAVELER INFORMATION

Incident Information

Roadway Conditions

Border Crossing Information

Weather Alerts

ARCHIVED TRANSPORTATION DATA

Long and Short Range Planning

Model Calibration

Performance Monitoring

Page 6: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

6

Defining Objectives of the System

Vehicle Sensors

TransVista

El Paso MPO

Sun Metro (Bus Dispatch, Kiosks)

City of El Paso/PD/FD

Local Media, Traveling Public,

Commercial Vehicle Operators

Customs and Border Protection

Motorist Information

TxDOT Design and Planning

Border Wait Times

Incidents

IMIPBorder Crossing

Images

NOAAWeather

Dynamic Message Signs

Highway Advisory Radio

CCTV

Internet

Internet

Internet

Internet

Internet

Number of Lanes OpenPDN Regional

Mobility Information

System

Aggregated Traffic Data

Aggregated Traffic Data

Transit Location Transit Ridership

Traveler Information

Internet

Page 7: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

7

Developing Framework of the System

Outlining “vision” to determine data needs and priorities

Determining and defining the region (boundaries) and roadways

Identifying data types produced by stakeholders

Considering local factors regarding traffic and border crossing needs

Estimating procurement costs and synchronizing strategies with funding profile

Adopted From: Closing the Data Gap: Guidelines for Quality Advanced Traveler Information System (ATIS) Data Version 1.0, ITS America and U.S. Department of Transportation, September 2000.

Page 8: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

8

Developing Framework of the System

Weather Incidents

TrafficSpeed CBP Inspection

Lanes OpenRFID Border

Crossing Time

Travel Time HAZMAT

Information

CameraSnapshots

Archived InformationArchived Information

Planners, Engineers, Researchers

Motorists, Freight Carriers and Shippers

Real-Time InformationReal-Time Information

Extract Traffic and Border Crossing Data fromDiverse Data Sources

Extract Traffic and Border Crossing Data fromDiverse Data Sources

CBP Border Crossing Delay

TIER 1DATA EXTRACTION

TIER 2 DATA FUSION

TIER 3 DATA DISSEMINATION

Page 9: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

9

Designing and Implementing the System

Identifying the overall needs and purpose of mobility information system

Identifying stakeholders in the region

Identifying desired outcomes from the system according to stakeholder needs

Identifying sources and types of data availability

Defining and designing conceptual operation of the system

Phase I – 2006 Scoping and Needs

Phase I –2006Scoping and Needs

Phase I –2006Scoping and Needs

Phase II – 2007Design and Build

Phase II – 2007Design and Build

Phase III – 2008O & M and Expansion

Phase III – 2008O & M and Expansion

Page 10: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

10

Designing and Implementing the System

Establishing a systems architecture (3-tier architecture)

Defining interfaces between data sources and the system

Developing functional requirements of the system

Defining processes for data extraction, fusion and dissemination

Procuring of software and hardware

Phase II – 2007 Design and Build

Phase II – 2007Design and Build

Phase II – 2007Design and Build

Phase I – 2006Scoping and Needs

Phase I – 2006Scoping and Needs Phase III – 2008

O & M and Expansion

Phase III – 2008O & M and Expansion

Page 11: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

11

Designing and Implementing the System

Data Extraction Data Fusion Data Dissemination

Data Extraction Process

Data Filter and Aggregation

Extraction

Filter

Data Storage Data Delivery

SQL Reporting Service

Data Use

Web-Based User Interface

Aggregation

Cross Border Wait

Time

Convert to XML Data Format

Microwave Vehicle Sensors

Internet

Internet

Internet

Border Crossing Images

Internet

Internet

Extract IMIP Border Images

Extract Raw Vehicle Detector

Data

Extract Hourly Weather Data from NOAA

Extract Incident Data from EP

Extract Border Wait Times and

Lanes Open from CBP

HS Threat Level

AdvisoryInternet

Extract Homeland Security Threat Level Advisory

Aggregated Traffic Data

Hourly Weather

DataHourly

Incident Data

Stored Procedures

SQL Server Agents

SSIS Packages

Phase II – 2007 Design and Build

Page 12: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

12

Designing and Implementing the System

Traffic Data

Border Crossing Time Data

Weather Data

Incident Data

CBP Border Crossing Delay

HS Threat LevelAdvisoryCBP Inspection

Lanes Open

HAZMAT Crossing Data

Dimensions

Segment ID

Sensor ID

Route ID

Port of Entry ID

Inspection Lane ID

Event ID

Date and Time ID

Phase II – 2007 Design and Build

Page 13: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

13

Designing and Implementing the System

Phase II – 2007 Design and Build

Amber Alerts

Vehicle Sensors

Highway Speed

Traffic Images

Traffic Incidents

Airport Info

Weather Alerts

DMS Messages

Border Crossing Delay from CBP

Inspection Lanes Open

Threat Advisory Level

IMIP Border Images

Page 14: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

14

Designing and Implementing the System

Phase II – 2007 Design and Build

Dashboard Reports

Performance Monitoring

Congestion Monitoring

Micro and Macroscopic Calibration Tools

Data Mining Tools

Aggregated Volume and Speed

Summary Statistics of Border Crossing Delay

from CBP

Data Mining Tools for Border Crossing

Page 15: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

15

Designing and Implementing the System

Data Type Archive Period Archive Frequency Display Frequency

Traffic and Truck Volume and Speed 2 years 30 seconds 1 minute

Segment Travel Time, Other Performance Indices 2 years 1, 15, 60 minutes

24 hours 1 minute

Highway Surveillance Camera Snapshots 1 week and purged then after 30 minutes 1 minute

DMS Messages None None 20 minutes

Incident Location 2 years 60 minutes 20 minutes

NOAA Weather 2 years 60 minutes 60 minutes

CBP – Inspection Lanes Open 1.5 years 60 minutes 60 minutes

CBP – Border Crossing Delay 1.5 years 60 minutes 60 minutes

Homeland Security Threat Level Advisory 1 month 60 minutes 60 minutes

Border Images None 5 minutes 60 minutes

Phase II – 2007 Design and Build

Page 16: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

16

Designing and Implementing the System

Calibrating the system to verify system performance

Modifying system components until acceptable performance is achieved

Maintaining and monitoring the performance of the system

Providing enhancements according to operational experience

Adding processes and functions to maintain the system

Expansion of PDN RMIS by– Integrating with border crossing information– Integrating with HAZMAT monitoring system

Phase III – 2008 O & M and Expansion

Phase III – 2008O & M and Expansion

Phase III – 2008O & M and Expansion

Phase I – 2006Scoping and Needs

Phase I – 2006Scoping and Needs Phase II – 2007

Design and Build

Phase II – 2007Design and Build

Page 17: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

17

Designing and Implementing the System

RMIS

Location of 16 cameras installed by Instituto Municipal de Investigacion y

Planeacion at US/Mexico Border

Terminal at BorerComm

Secure FTP Access

Phase III – 2008 O & M and Expansion

Page 18: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

18

Designing and Implementing the System

RMIS

RFID Readers Being Installed by TTI

RFID Readers Being Installed by DPS

Bridge of the Americas, El Paso, Texas

Wireless Modems

Dedicated Terminal

Phase III – 2008 O & M and Expansion

Page 19: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

19

Challenges and Opportunities

Overcoming Constraints with Innovative Ideas

Request Direct Access to Data Source

Willing to Help, But Time Consuming

Find Alternative Ways to Extract Data

Applications to Automatically

Read Agency Websites

Commitment from Agencies

Read and Parse Incident Reports from

City of El Paso WebsiteIncident

Data

Read and Parse Border Crossing Delay from

CBP WebsiteCBP Border

Crossing Delay

Read and Parse Number of Inspection Lanes Open from

CBP WebsiteCBP Inspection

Lanes Open

Page 20: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

20

Challenges and Opportunities

Overcoming Constraints with Innovative IdeasTransVista FTMS

Server collects traffic data from sensors

TTI HostTTI SQL Server

Modem, PCAnywhere, Standalone Applications

TTI Web Server

Interactive Reports of Aggregate Data and

Performance Measures

Advanced Traveler Information

FTMS Server Pushes Raw Data to TTI

Processes and stores raw data

TTI initially requested a more efficient WIRELESS

connection

Page 21: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

21

Challenges and Opportunities

Creating a Value-Added System

Traffic Information

Value of PDN Regional Mobility Information

Border Crossing Information

Value of PDN Regional Mobility Information

+

+

HAZMAT Information

Value of PDN Regional Mobility Information

+

+

Page 22: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

22

Challenges and Opportunities

Creating New Opportunities – By Providing Tools to Identify Cause-Effect

Visibility = Visibility in MilesAvgSp = Average Speed of Vehicles in MPHAvgVol = Volume of Vehicles

Agg Volume = Aggregate VolumeAvg Speed Miles = Average Speed in MPH

Page 23: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

23

Challenges and Opportunities

Creating New Opportunities – By Providing Tools for Reality Mining

N u m b er o f C o m m erc ia l V eh ic le In s p ec tio n L an es O p en an d D elay at B rid g e o f th e A m eric as , E l P as o , T ex as d u rin g th e Week o f D ec em b er 12, 2007 as R ep o rted b y C B P

0

5

10

15

20

25

30

35

12/1

0-6a

m

12/1

0-11

am

12/1

0-4p

m

12/1

0-9a

m

12/1

0-11

am

12/1

0-3p

m

12/1

1-7a

m

12/1

1-9a

m

12/1

1-3p

m

12/1

1-5p

m

12/1

1-N

oon

12/1

1-3p

m

12/1

2-8a

m

12/1

2-5p

m

12/1

2-4p

m

12/1

2-7a

m

12/1

2-10

am

12/1

2-N

oon

12/1

2-5p

m

12/1

3-10

am

12/1

3-10

am

12/1

3-7a

m

12/1

3-8a

m

12/1

3-2p

m

12/1

3-4p

m

12/1

4-7a

m

12/1

4-7a

m

12/1

4-10

am

12/1

4-4p

m

Del

ay (

Min

ute

s)

0

1

2

3

4

5

Lan

es O

pen

D elay on S tandard L anes

D elay on F as t L anes

F as t L anes O pen

S tandard L anes O pen

Page 24: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

24

Challenges and Opportunities

Creating New Opportunities – By Providing Tools for Reality Mining

S tan d ard D ev iatio n o f D elay at B rid g e o f th e A m eric as , E l P as o , T ex as D u rin g th e Week o f D ec em b er 12, 2007 as R ep o rted b y C B P

0

2

4

6

8

10

S tandard F A S T

T yp e o f In sp e c tio n L a n e s

Stan

dard

Dev

iatio

n (M

inut

es)

FAST lanes are 4 times more reliable than Standard lanes

Page 25: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

25

Challenges and Opportunities

Creating New Opportunities– By Providing Platform to Add New Information

RMIS

RFID Readers Being Installed by NMSU through EPA Grant

Santa Teresa Port of Entry, New Mexico

Send Real-Time Hazmat Information to First

Responders in New Mexico, El Paso, and Juarez

Wireless Modems

Dedicated Terminal

Page 26: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

26

Challenges and Opportunities

Commercial Border Crossing Time

Measurement

RFID-Based

Measures border crossing time of commercial vehicles

Transmits information to freight operators and shippers

RFID-Based

Measures border crossing time of commercial vehicles

Transmits information to freight operators and shippers

++

Non-Commercial Border Crossing Time

Measurement

RFID-Based

Measures border crossing time of non-commercial vehicles

Transmits information to motorists crossing the border

RFID-Based

Measures border crossing time of non-commercial vehicles

Transmits information to motorists crossing the border

==

Creating New Opportunities – By Developing State–of–the–Art System

International Border Crossing Information System

International Border Crossing Information System

Border Crossing Information System

Provides real time border crossing information to agencies and public

Provides historical information to planners and researchers

Consistently and objectively measures border crossing performance

Provides real time border crossing information to agencies and public

Provides historical information to planners and researchers

Consistently and objectively measures border crossing performance

==

Page 27: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

27

Challenges and Opportunities

FHWA

UTCMCIITR

Commercial Border Wait Time

Measurement

Border Crossing Information System

Leveraging New Funds

El Paso RFID Non-Commercial

Border Wait Time Measurement

City of El Paso

SWUTCEstimating Benefits of

Advanced Border Crossing Data

SWUTC HAZMAT Information System

International Border Crossing Information System

International Border Crossing Information System

PDN Regional Mobility Information System

Page 28: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

28

Creating a Sustainable System

Sustain growth of storage space– Efficiency of the system

Sustain growth of transaction load– Licensing issues– Growth of users

Sustain growth of data marts– Effect on storage capacity– Increases complexity

Sustain stakeholder support– Keep stakeholders involved

Data Warehouse Estimated Growth

0

50

100

150

200

250

300

2008 2009 2010 2011

YearSt

orag

e Re

quire

men

t in

Giga

Byt

es

Page 29: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

29

Future of PDN Regional Mobility Information System

Who will operate and maintain the system in the long run?

– How to obtain funding to operate and maintain the system.

– How to charge fee to users?

Could public-private partnership be a solution? Need to resolve institutional and technical issues, such as

– Intellectual property rights

– Access to data sources

– Market analysis of user fee

TTI is working on a project to perform a CROSS-CUTTING study on how Traffic Management Centers and Consortiums across U.S. handle INSTITUITIONAL issues

Page 30: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

30

PDN Regional Mobility Information System Demo

Page 31: Transportation Operations Group 1 Paso Del Norte Regional Mobility Information System Challenges and Opportunities Center for International Intelligent

31

Contact Information

Rajat Rajbhandari, Ph.D., P.E.Associate Research EngineerTexas Transportation Institute4050 Rio Bravo, Suite 151El Paso, TexasPhone: 915.532.3759Email: [email protected]: http://tti.tamu.eduRMIS: http://www.eptraffic.com