Transportation Asset Management

CDOT

October 17, 2012

Page 2: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Agenda

Commission Retreat Report

Provide Input on FY14 Budget

Scheduling Future Meetings

2

Page 3: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Committee Meeting Purpose:

Commissioner input is requested in these areas:

Short-term:

• Provide input on the FY14 budget (September)

• Discuss pavement least cost analysis findings (October)

• Provide input on Long Range Plan (LRP) goals in coordination with the LRP committee (October/November)

Long-term:

• Establish targets for performance measures

• Incorporate tiering results as applicable

• Provide input on Asset Management Plan

3

Moving Forward

Page 4: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget History

4

FY14 Budget

Page 5: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

“PONTIS”

SAP

Pavement Analysis

Bridge Condition

Strategic Analysis

Including Funding

Needs & Trade-offs

Multi Asset

Management System

Maintenance LOS

SAPITS

SAP

Fleet

dTIMS CT

Investment Tool: MAMS

Note: • There are about 3,000 assets in each asset

category• Summary structure data is manually exchanged

from Pontis to MLOS to support the Structures MPA

5

Page 6: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Overview of 5 Assets

Current TC Goals in Policy Directive 14

Pavement: Achieve 60% good/fair pavement condition system-wide

Bridge: Achieve 95% good/fair bridge deck area condition system-wide

Maintenance: Achieve a B maintenance level of service grade for

system quality measures

Fleet: N/A

ITS: N/A

6

FY14 Budget

Page 7: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

FY13 Budget Workshops - Last Year

7

Page 8: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Pavement ManagementAlternative Budget Scenarios

Analysis Assumptions

• Timeframe: 20 years

• Traffic (AADT) is factor in analysis

8

• Cost Inflation Rate: 4.87%

• Treatment Costs based on past 5 years of project data

FY14 Budget

Page 9: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Pavement ManagementOne Time Infusion of $86 Million

Analysis Assumptions

• Timeframe: 20 years

• Traffic (AADT) is factor in analysis

9

• Cost Inflation Rate: 4.87%

• Treatment Costs based on past 5 years of project data

FY14 Budget

Page 10: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Bridge ManagementTypical and Alternate Budget Ranges, with 1 Time Infusion of $800M

10

FY14 Budget

Page 11: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Maintenance ManagementTypical and Alternate Budget Range

Analysis Assumptions

• Timeframe: 1 year

• Cost Inflation Rate: 0%

Analysis Assumptions cont.

• Based on 9 MPA areas

• MPAs are prioritized (weightings)

11

FY14 Budget

This is FY11 data, FY12 may change this chart slightly

Page 12: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Maintenance ManagementTypical Budget Range

Analysis Assumptions

• Timeframe: 20 years

• Cost Inflation Rate: 4.87%

• Based on overall MLOS grade

12

FY14 Budget

Page 13: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Fleet ManagementTypical and Alternate Budget Range

Analysis Assumptions• Based on % useful life

• Timeframe: 20 years

13

• Maintenance costs include materials/equipment and not labor

• Cost Inflation Rate: 7%: Industry standard (econ/mat/regulations)

FY14 Budget

Fleet Equipment will be a focus of the November, 2012 Committee Meeting

Page 14: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

ITS ManagementTypical Budget Range

• Cost Inflation Rate: 4.87%

• If expected useful life is <= 4 years then replace at 100%; replace between 80-100% for all other devices.

14

FY14 Budget

Analysis Assumptions

• Based on % useful life

• Timeframe: 20 years

Some ITS equipment has short life cycles (2 years), consequently there are devices at 300% and 400% of life cycle. The software parameters have been set to replace these right away, and with a higher budget this can happen earlier. The data converges when these devices have all been replaced, and then we get into a regular cycle of replacing at 80% for most devices, or 100% for devices with shorter life cycles.

ITS will be a focus of the December, 2012 Committee Meeting

Page 15: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

15

Combining Five Assets into

Budget Analysis

Page 16: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Alternate Budget Scenarios

16

FY14 Budget

Page 17: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Alternate Budget Scenarios

17

FY14 Budget

Summary of budget scenario and condition in 2030

Page 18: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget Scenarios: Status Quo

18

FY14 Budget

Page 19: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget Scenarios: Scenario 1A

19

FY14 Budget

Page 20: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget Scenarios: Scenario 1B

20

FY14 Budget

Page 21: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget Scenarios: Scenario 2

21

FY14 Budget

Page 22: Transportation Asset Management - CDOT · SAP PavementAnalysis Bridge Condition Strategic Analysis Including Funding Needs & Trade-offs Multi Asset Management System Maintenance LOS

Budget Scenarios: Scenario 3

22

FY14 Budget