152
Land off Thieves Lane Hertford For Croudace Homes Transport Assessment March 2013

Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Land off Thieves Lane

Hertford

For Croudace Homes

Transport Assessment

March 2013

Page 2: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Document History

JOB NUMBER: 334/2013

DOCUMENT REF: Transport Assessment

REVISIONS: Draft 2 For Submission

Revision Comments By Checked Authorised Date

Draft 1 For team comment PE SA PE 12/03/2013

Draft 2 For submission PE SA PE 26/03/2013

Page 3: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Contents

1 Introduction 1

2 Pre-application Consultation, HCC Highways 2

3 Policy Review 4

Introduction 4

National Planning Policy Framework 4

East Herts Local Plan (EHLP) 5

Hertford and Ware Urban Transport Plan 7

Summary 10

4 The Existing Site Function and Base Line Conditions 11

Introduction 11

Site Location 11

Existing Site Transport Conditions 11

Local Travel Characteristics 11

Road Traffic Accidents 12

Summary 12

5 Local Facilities and Public Transport 13

Rail 13

Buses 13

Summary 14

6 Proposed Site Layout and Function 15

Proposed Car and Cycle Parking 15

Refuse and Servicing Arrangements 15

Summary 15

7 Traffic Modelling Rationale and Results 16

Local Cordon Survey 16

Census (Work Place Destination) 16

Traffic Surveys 16

Assignment Model 17

Trip Rates 17

TRICS 17

Future Year Assessment 17

ARCADY Model A414/Thieves Lane Roundabout 17

ARCADY Model Thieves Lane/Welwyn Road Roundabout 19

Summary 20

Page 4: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

8 Summary and Conclusion 21

Conclusion 22

Appendices 23

Appendix: A Site Location Plan A-1

Appendix: B HCC Meeting Note and Correspondence B-2

Appendix: C Local Facilities Plan C-3

Appendix: D Five year accident data D-4

Appendix: E Bus Routes E-5

Appendix: F Potential Access Options F-6

Appendix: G Census (work place destination) G-7

Appendix: H Traffic Survey Data H-8

Appendix: I Assignment Model I-9

Appendix: J TRICS data J-10

Appendix: K Arcady results K-11

Page 5: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 1

1 Introduction

1.1 EAS Transport Planning has been commissioned by Croudace Homes to prepare a Transport

Assessment (TA) for a proposed future development off Thieves Lane in Hertford, East Herts District, on

Greenfield Land.

1.2 The site is bordered by Welwyn Road to the north, Thieves Lane to the east and farmland and woodland

to the west and south. The site is an urban extension and the east and northern boundaries are

established urban areas forming the Sele Farm ward. A location plan forms Appendix A.

1.3 For transport review purposes this TA is based on a proposed development of 280 houses with parking

allocation in accordance with the district policy. The site will comprise of a mix of 2 to 4 bedroom houses

although the final content is still to emerge.

1.4 Discussions have been held with Hertfordshire County Council (HCC) as highway authority following a

considerable amount of background surveying and modelling work of local junction capacity.

Hertfordshire have stated that they would not object to this development proposal. Appendix B contains

a meeting note in email form together with other discussion related emails. This document contains all

the discussions with HCC and the additional requirements of HCC following the discussions.

1.5 This TA has been prepared with regard to the DfT Guidance on Transport Assessments (March 2007).

1.6 The contents of this TA based on the agreed scope are:

• Section 2 – sets out the pre-application discussion with HCC

• Section 3 – sets out the policy context;

• Section 4 – describes the existing site function and sets out the baseline conditions;

• Section 5 – is a review of facilities near to the site and describes the available public transport.

• Section 6 – describes the site access, potential layout and function.

• Section 7 - describes the existing and expected transport impacts due to the development trips; and the detailed analysis of modelling undertaken at the nearby junctions as well as the surveys undertaken.

• Section 8 – summarises and concludes this report.

Page 6: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 2

2 Pre-application Consultation, HCC Highways

2.1 As described above EAS completed a range of surveys and modelling and discussed this at a meeting

with officers of HCC in January 2013. The full set of email records form Appendix B. The email note of

the meeting setting out the additional discussion is included below for ease of reading;

“Thanks you for your time last Tuesday when we met at County Hall to discuss the proposed residential

development off Thieves Lane in Hertford for circa 280 units with Croudace Homes

I understand that you will be happy to see a draft of a TA in due course in advance of any application so

that we can discuss any issues and work together on this project.

With respect to the work we have done so far your colleague will be reviewing the modeling but generally

you are content with the approach we have taken and the trip rate of circa 0.6 we have used rather than

the lower one observed at Turpins Close. You would like us to undertake a sensitivity test of assignment

based on the 2011 Census (work location) when this is available I( I believe soon) and compare this to

the findings of our site observations.

We will of course issue all the modeling as part of our TA including the PM ARCADY tests for the A414

junction and both AM and PM for the Welwyn Road junction.

We discussed the approach to access and agreed that this can all be solved in due course and that one

or two access points may be appropriate for the site but that it could operate with one access, in which

case an emergency access would be required. Access layouts should meet the MfS standards of

visibility and consider the position of existing junctions. You described HCC approach that they now

adopt the main routes only and any short cul- de-sacs generally are not adopted.

We discussed any traffic schemes or developments that we should consider as part of the assessment

but you confirmed that there were none in proximity which would impact upon our work.

We will of course include the relevant Local and National Policy within our document to ensure that we

comply on transport grounds and you suggested we review the Hertford and Ware Urban Transport Plan

as well.

You discussed the HCC relationship with Croudace which is good and that you would require a planning

obligation for transport so that benefits can be made strategically.

I believe you asked that we review accident patterns at the A414 roundabout just to the west of the rail-

bridge, we will be reviewing accident patterns as part of our TA and so will extend to this junction as well.

Page 7: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 3

This is all I can recall, so please add if there is anything else. Overall a positive meeting and I believe

you confirmed you would not have an objection on highway grounds as things currently stand.

I would be grateful if you would confirm this is a correct interpretation of our meeting as soon as possible

and please feel free to call with any questions/clarifications.”

2.2 HCC subsequently confirmed the above meeting note.

Page 8: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 4

3 Policy Review

Introduction

3.1 This section reviews the latest relevant policy documents both Nationally and Locally

National Planning Policy Framework

3.2 Paragraph 14 of the NPPF states:

“At the heart of the National Planning Policy Framework is a presumption in favour of sustainable

development, which should be seen as a golden thread running through both plan-making and decision-

taking.”

3.3 Paragraph 17 of the National Planning Policy Framework (NPPF) sets out 12 core planning principles

including core principle 11 which states that planning should:

“actively manage patterns of growth to make the fullest possible use of public transport, walking and

cycling, and focus significant development in locations which are or can be made sustainable.”

3.4 Section 4 of the NPPF on transport includes advice on Transport Assessments at paragraph 32:

“All developments that generate significant amounts of movement should be supported by a Transport

Statement or Transport Assessment. Plans and decisions should take account of whether:

● the opportunities for sustainable transport modes have been taken up depending on the nature and

location of the site, to reduce the need for major transport infrastructure;

● safe and suitable access to the site can be achieved for all people; and

● improvements can be undertaken within the transport network that cost effectively limit the significant

impacts of the development. Development should only be prevented or refused on transport grounds

where the residual cumulative impacts of development are severe”

3.5 Paragraphs 35 and 36 of the NPPF discusses locating development and use of Travel Plans

respectively:

“Plans should protect and exploit opportunities for the use of sustainable transport modes for the

movement of goods or people. Therefore, developments should be located and designed where practical

to

● accommodate the efficient delivery of goods and supplies;

Page 9: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 5

● give priority to pedestrian and cycle movements, and have access to high quality public transport

facilities;

● create safe and secure layouts which minimise conflicts between traffic and cyclists or pedestrians,

avoiding street clutter and where appropriate establishing home zones;

● incorporate facilities for charging plug-in and other ultra-low emission vehicles; and

● consider the needs of people with disabilities by all modes of transport.

A key tool to facilitate this will be a Travel Plan. All developments which generate significant amounts of

movement should be required to provide a Travel Plan.

3.6 Paragraph39 discusses parking policy:

If setting local parking standards for residential and non-residential development, local planning

authorities should take into account:

● the accessibility of the development;

● the type, mix and use of development;

● the availability of and opportunities for public transport;

● local car ownership levels; and

● an overall need to reduce the use of high-emission vehicles.”

East Herts Local Plan (EHLP)

3.7 The Secretary of state confirmed on 22nd March 2010 a range of saved policies from the 2007 EHLP.

Relevant policy extracts are set out below in italics, responses are in plain text;

TR1 Traffic Reduction in New Developments

Developments generating additional traffic will be required to incorporate measures, commensurate with

the scale of additional traffic generated, to ensure that alternative transport options to the private motor

vehicle are available to the users of the site. Such measures may include:

(a) the extension and improvement of pedestrian links;

(b) cycle paths and facilities;

(c) improvements to the passenger transport network which should include bus and/or rail facilities,

either directly to the site or in close proximity to it (i.e. within 400 metres maximum walk distance), and

Page 10: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 6

may involve an extension to existing infrastructure (e.g. additional cycle paths, bus shelters) and/or

enhancements to the existing bus network;

(d) the provision of moorings alongside navigable waterways (as appropriate); to be achieved via the

imposition of conditions and the use of planning obligations (or as subsequently revised) as appropriate

to the individual characteristics of the site.

3.8 The development proposes extensions to footways at the site boundary and refuges to access facilities.

Internally the layout design has yet to be agreed, but the site will be laid out to benefit alternative

transport modes as far as practicably possible.

TR3 Transport Assessments

Developments that are likely to generate significant movement and travel demand will require the

submission of a Transport Assessment to accompany the planning application, which should meet the

criteria contained in Hertfordshire County Council’s Roads in Hertfordshire – Design Guide, 2001 (or as

subsequently superseded, by the local highway authority)

3.9 Hence the production of this document.

TR7 Car Parking – Standards

Car parking provision for new development proposals will be assessed in accordance with the District

Council’s car parking standards (which should be taken as maximum standards), including coach, cycle

and powered two-wheeler provision, as set out at Appendix II. The actual provision made will be

determined on a site-specific basis having regard to the proposed use, location, and availability of, or

potential for access to, modes of transport other than the private car in accordance with the Council’s

SPD ‘Vehicle Parking Provision at New Development’.

3.10 Parking on site will be policy compliant.

TR12 Cycle Routes – New Developments

Where possible, the design of new developments will be required to include coherent, safe, convenient,

direct, comfortable, attractive routes and facilities for cyclists and pedestrians. Where practicable

opportunities exist or can be created, access routes into and through the site for cyclists and pedestrians

should be formed separate from roads, particularly if this would create an advantage over motorised

transport in the distance and time needed to travel to local facilities and services and/or improve the

wider cycle network. Where appropriate, developer contributions (or as subsequently revised) will be

expected to improve pedestrian and cycle routes associated with the use of the site.

3.11 Internally the layout design has yet to be agreed, but the site will be laid out to benefit alternative

transport modes as far as practicably possible.

Page 11: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 7

TR14 Cycling – Facilities Provision (Residential)

Applications for new residential developments should, where appropriate, demonstrate provision of

sufficient cycle storage facilities for occupants of new dwellings to enable cycle usage to become a

realistic option to the use of private motorized transport. Such facilities should include appropriate

secure, covered, waterproof storage facilities and be provided either within the curtilage of the dwelling

or, for example, in the case of flats, within a communal area, provided that such facilities are easily

observed and accessible.

3.12 Secure covered cycle storage will be incorporated into the development.

TR18 Home Zones

The implementation of Home Zones, involving appropriate speed limits and traffic calming measures to

ensure priority is given to the use of residential streets for the benefit of pedestrians, cyclists and local

residents, will be supported provided that they are of good quality design and consistent with and/or

enhance the character, landscape, and residential amenity of the area.

3.13 The development will be design to MfS standards which incorporates ‘Home Zone’ themes.

Hertford and Ware Urban Transport Plan

3.14 At the request of HCC the Hertford and Ware Transport Plan has been reviewed. Appropriate elements

are contained below. Extracts from the transport plan are in italics, responses are in plain text.

4.4.1 The County Council’s vision for Hertfordshire’s transport over the next twenty years is ‘to provide a

safe, efficient and affordable transport system that allows access for all to everyday facilities. Everyone

will have the opportunity and information to choose the most appropriate form of transport and time of

travel. By making best use of the existing network we will work towards a transport system that balances

economic prosperity with personal health and environmental well being.’

3.15 This is the basis of all transport policy which all development must consider.

4.4.2 The LTP has nine objectives set out under the government’s shared priorities of safety,

congestion, accessibility, air quality and quality of life. The objectives, listed under the shared priorities,

include:

Safety

– To improve safety for all by giving the highest priority to minimising the number of collisions and

injuries occurring as a result of the transport system.

3.16 All access points will be designed to meet appropriate standards, there are opportunities (described later)

Page 12: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 8

to improve crossing of roads for pedestrians.

Congestion

– To obtain the best use of the existing network through effective design, maintenance and

management.

– To manage the growth of transport and travel volumes across the county, and thereby secure

improvements in the predictability of travel time.

– To develop an efficient, safe, affordable and enhanced transport system which is attractive, reliable,

integrated and makes best use of resources.

3.17 As will be seen later existing travel patterns exist which combat congestion near to the site via peak

spreading. Any additional traffic from the site is shown to be imperceptible amongst the back ground

traffic.

Accessibility

– To develop a transport system that provides access to employment, shopping,education, leisure and

health facilities for all, including those without a car and those with impaired mobility.

– To ensure that the transport system contributes towards improving the efficiency of commerce and

industry and the provision of sustainable economic development in appropriate locations.

3.18 The location of the site has been shown to be accessible being located adjacent to many bus routes and

close to three schools, a local shopping area and within walking distance to Hertford North Station and

Town Centre.

Quality of Life

– To raise awareness and encourage use of more sustainable modes of transport through effective

promotion, publicity, information and education.

– To reduce the need for the movement of people and goods through integrated land use planning.

3.19 The location of the site would allow integration to existing infrastructure, services and education and

employment. All units would have secure cycle parking. A travel plan is not required as clarified in policy

TR4 of the EHLP.

Bus Strategy

4.4.8 The bus strategy’s objectives contribute to the overall LTP shared priorities of safety, congestion

management, accessibility and quality of life by:

Page 13: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 9

_ Providing an effective and efficient network of bus services as a travel mode which passengers will

choose to use;

_ Reviewing the network with others to ensure resources are used to best effect;

_ Improving bus punctuality through commercial partnerships and better management of the highway

network;

_ Developing accessibility to employment, shopping, education, leisure and health facilities by effective

design of the bus network, the use of less conventional approaches and securing maximum external

funding;

_ Continuing to improve vehicle quality and associated infrastructure at bus stops and interchanges to

increase access to the network by those with impaired mobility; and

_ Raising awareness and encouraging the use of bus services through improved information, marketing

and branding.

3.20 The location of the development site adjacent to many bus routes will increase the use of these routes

and therefore their viability.

Cycling Strategy

4.4.10 The Cycling Strategy documents mentions that Hertfordshire has the lowest levels of cycling to

work in the East of England region. The primary purpose of the cycling strategy is “to encourage more

people to cycle more often, and involve and support other stakeholders in doing the same.”

3.21 All units will have secure cycle parking.

Road Safety Plan

4.4.15 The Road Safety Plan is to deliver the LTP objective of improving safety for all by giving the

highest priority to minimising the number of collisions and injuries occurring as a result of the transport

network. It is to deliver Hertfordshire’s casualty reduction targets:

to reduce the number of people killed or seriously injured in road collisions to no more than 600 by

2010; to reduce the number of children killed or seriously injured in road collisions to no more than 56 by

2010; and no increase in slight casualties (5,509).

4.4.16 It should be noted that the safety targets (KSI and slight) have their own ranking system. Any

scheme the UTP may develop will only have safety as a secondary target and a UTP scheme cannot be

funded by a safety-related target.

Page 14: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 10

3.22 A review of personal injury road accidents close to the site has been undertaken, it is shown that the

level of accidents in the vicinity of the site is low.

A414

5.2.1 Key congestion hotspots in Hertford are cited as being mainly on the A414 on its route through the

town and at its connection with the A10. The Bluecoats and Mill Road junctions are often identified as

areas causing the most significant delays to traffic, both in the morning and evening peak periods.

Congestion also occurs frequently at the Castle Street junction with Parliament Square and at the

junction of Hale Road with Pegs Lane (County Hall and Wallfields roundabout). The proximity of the M25

to the study area also can lead to these problems being exacerbated when disruption occurs on the

motorway network.

3.23 This matter was considered at the outset. It was shown that the level of peak hour trip rates from the site

is low and traffic assigned away from the A414 (Hertford). Nevertheless this matter has been discussed

with HCC as the development could not solve A414 issues which would need a strategic solution.

Contributions will be sought from the developer towards other transport improvements to support

alternative travel options.

Summary

3.24 Numerous transport policies have been considered both nationally and locally. It is clear that the site will

be fully policy compliant.

Page 15: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 11

4 The Existing Site Function and Base Line Conditions

Introduction

4.1 This section describes the existing site function and the existing (baseline) travel characteristics of the

area local to the proposed development site.

Site Location

4.2 A plan of the proposed development site in relation to local centres and key facilities is shown in

Appendix C.

4.3 The site is located in the Sele Farm ward off Thieves Lane which forms a junction with the A414

approximately 300m south of the site and the Welwyn Road B1000 at the sites north east boundary. The

A414 is primary route through Hertfordshire linking to the Essex border and beyond to the east and

Hemel Hempstead to the west. More locally it also links the north south routes of the A10 and A1. The

A10 being approximately 3 miles east of the site and the A1 approximately 5 miles west of the site.

4.4 The A414 is therefore of significant strategic importance and this matter was of high consideration

throughout the study.

Existing Site Transport Conditions

4.5 Whilst the site is currently green field land, it is close to the A414. The A414 is a busy dual carriageway

for most of its length in the vicinity of the site although a bottle neck occurs to the east of the Thieves

Lane/A414 roundabout where it passes under a rail bridge and then continues into the Hertford central

area. As the A414 passes Hertford centre there are a number of roundabouts (some part time

signalized) and pedestrian crossing opportunities. As a result this section of the A414, within the

Hertford central area, is congested locally.

Local Travel Characteristics

4.6 To inform the modeling it was considered prudent to determine the peak hour trip rate for existing

residences off Thieves Lane and for this purpose EAS undertook a cordon count of Turpins Close

between 07.30 and 09.30 on a neutral weekday. At the same time EAS also completed a distribution

survey to determine vehicle assignment from Turpins Close. We expected that there would be peak

spreading from these developments in order to avoid the morning periods of congestion on the A414 and

also that the assignment would generally avoid the A414 into Hertford.

4.7 The results of the survey concurred with the expectations, the peak hour two way trip rate was 0.39 and

only 12% of traffic departing from the development in the peak period headed towards Hertford on the

Page 16: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 12

A414.

Road Traffic Accidents

4.8 Road Traffic Accident data has been obtained from HCC for the five year period ending November 2012.

4.9 No accidents have occurred with the limits of the site boundary. Two slight accidents have occurred to

the east on Thieves Lane and one slight accident has occurred to the north on Welwyn Road. Eight

slight accidents have occurred at the A414/Thieves Lane roundabout.

4.10 At the request of HCC we have also obtained data for the A414/Campfield Road Roundabout located

just to the west of the rail bridge. Two slight accidents have occurred at this roundabout.

4.11 No serious of fatal accidents have occurred in the study area. This is a very good accident record. The

accident data is included at Appendix D.

Summary

4.12 The site is located within a residential area but forming a greenfield extension to the Sele Farm ward.

4.13 The existing traffic conditions immediately surrounding the site are generally light. However the A414 is

located to the south of the site which is a busy dual carriageway for most of its length; a bottle neck

occurs to the east of the Thieves Lane/A414 roundabout junction causing congestion passing the

Hertford Town Centre area.

4.14 Survey results indicate that local residents avoid using the A414 towards Hertford in the peak periods.

This is typical of travel patterns in urban areas where there is peak spreading.

4.15 There have only been slight traffic accidents occurring in the most recent five year period in the study

area and these are low in number.

Page 17: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 13

5 Local Facilities and Public Transport

5.1 The plan attached at Appendix C, illustrates the local facilities with indicative pedestrian walk isochrones

and local public transport links. The site is very well located for accessing facilities by foot or cycle,

including retail, education, health, leisure, and employment.

5.2 Two primary schools and secondary school as well as local shops, a pub and bus stops, are all located

within a 400m walk of the site.

5.3 The local shops consist of;

• Co-op food store

• Fish and chips

• Pharmacy;

• Bakers

• Hairdressers

• Butchers

• Betting Shop

5.4 Hertford North Station is an approximate 900m walk from the site, which is located off North Road. At

this point North Road has marked cycle lanes and the Station has good levels of secure covered cycle

parking.

5.5 The whole of Hertford Town Centre with all amenities is within a 2km walk of the site. 2km is recognized

as a walkable distance.

Rail

5.6 As set out above Hertford North Station is located within 900m of the site but in addition Hertford East

Station is just outside of the Town Centre.

5.7 Hertford North has services to London Kings Cross and Moorgate as well as Stevenage in a northbound

direction. Services to London are generally every 20minutes with an hourly northbound service to

Stevenage.

5.8 Hertford East is at the end of the line for the Hertford Branch of the West Anglia Service; running south

to London Liverpool Street. Connections can be made at Broxbourne to travel northwards to Cambridge.

Two services per hour run from Hertford East Station.

Buses

5.9 The closest bus stops to the site are located on Thieves Lane at the site boundary. Two services pass

Page 18: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 14

the site boundary, the 388 and the H3. The 388 runs between Hertford and Welwyn bus station and the

H3 to Hertford North Station. Just to the north east of the site, within 100m of the boundary, a range of

additional services can be picked up. These run to various destinations including Harlow and Heathrow;

Hertford East and North Bus Stations, Broxbourne and Waltham Cross Train Stations.

5.10 The bus services local to the site are shown on the plan at Appendix E. It is clear that the site is very well

located to public transport services.

Summary

5.11 The site is located at the edge of an existing residential urban area and therefore benefits from the

existing urban facilities and infrastructure but will also add to the local economy and the viability of these

existing facilities.

5.12 The site is in walking distance of the Hertford North Rail Station, Hertford Town Centre and bus services

pass the site frontage. A range of everyday requirements including schools are also very local to the site.

The site is therefore in a very sustainable development location.

Page 19: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 15

6 Proposed Site Layout and Function

6.1 The development site will contain approximately 280 residential homes of between 2 and 4 bedrooms

although the final content is to be determined.

6.2 The internal layout is also to be determined although it is possible that a link between Thieves Lane and

Welwyn Road will be formed. The site has generous frontage which can accommodate full visibility

splays. Appendix F contains a drawing which provides a potential option for access points and includes

pedestrian refuge options within Thieves Lane and Welwyn Road.

Proposed Car and Cycle Parking

6.3 Parking would be incorporated into the development in accordance with East Herts District Parking

Policy.

Refuse and Servicing Arrangements

6.4 Refuse facilities will be accessible to each unit. The layout would be designed to accommodate the

refuse collection requirements for East Herts District Council.

Summary

6.5 The internal layout has yet to be determined but it will be constructed to adoptable standards and with

the ethos of the ‘Manual for Streets’ which is adopted as a design guide for Hertfordshire.

6.6 There are many access options available, all will have appropriate visibility splays and access geometry.

Page 20: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 16

7 Traffic Modelling Rationale and Results

Local Cordon Survey

7.1 EAS undertook a cordon count of Turpins Close between 07.30 and 09.30 on a neutral weekday. At the

same time EAS also completed a survey to determine vehicle route choice (assignment). It was

expected that there would be peak spreading from the development in order to avoid the worst periods of

congestion on the A414 and also that the assignment would generally avoid the A414 into Hertford.

7.2 The results concur with the expectations, the peak hour two way trip rate was recorded as 0.39 and only

12% of traffic departing from the development in the peak period headed towards Hertford on the A414

(eastbound).

Census (Work Place Destination)

7.3 At the request of HCC we have undertaken a review of the 2011 census to determine ‘work place’

destination from the local area. The results of the data are included at Appendix G. What needs to be

kept in mind is that the census does not tell you;

• the time of the journey, i.e how the journey fits around the peak hour,

• that work place journeys only make up about 30% of all peak hour journeys,

• the route choice.

7.4 The work place locations are also broken down by mode of travel and from this it is likely that 55% would

need to travel east on the A414. The assignment taken to reach the A414 is not possible to determine,

but based on experience and observations it is highly likely that in the most congested periods most

people would choose to travel via Welwyn Road (east) and join the A414 at the North Road roundabout.

This route is generally less congested and has a dedicated left turn slip onto the A414 (east) avoiding

the bottleneck formed by the upstream rail bridge.

7.5 The lack of route choice (assignment) data in the census means that the overall journey to work data

adds no evidence to lend or remove support for the actual route choice observed in the Cordon Survey.

Traffic Surveys

7.6 Traffic surveys were obtained from HCC for the Thieves Lane/Welwyn Road Roundabout. These were

recorded in May 2011.

7.7 A full classified turning count and queue length survey was commissioned for the A414/Thieves Lane

Roundabout, this was competed on 4th

December 2012.

7.8 Both sets of traffic survey data are enclosed as Appendix H.

Page 21: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 17

Assignment Model

7.9 Assignment has been prepared based on the actual turning movements at this junction and the two way

movements of Thieves Lane and Welwyn Road rather than the observed assignment from the cordon

survey. The full assignment model was completed using EXCEL. The assignment model information is

contained in Appendix I.

Trip Rates

7.10 The observed two-way Trip Rate from Turpins Close was 0.39. Turpins Close contains of the order of 50

houses and so is a suitable proxy for the future development site. However, for the purposes of being

robust a 50% higher trip rate than the that observed was used i.e a two way trip rate of 0.6.

7.11 This was agreed as appropriate at the pre-application meeting with HCC. As such no further trip rates

have been calculated, but generally a trip rate of 0.6 for a home county site in a sustainable location is

robust.

TRICS

7.12 To validate the observed trip rates from Turpins Close and prove the robustness of using a 0.6 trip rate,

a TRICS assessment has been undertaken. The TRICS assessment included 43 sites ranging from 9 to

372 units throughout England. 19 of the sites were ‘sub-urban’ and 19 ‘edge of town’. 3 were ‘edge of

town centre’ and 2 were ‘neighbourhood centre’.

7.13 The results gave an AM two way peak hour vehicle trip rate of 0.566 and a PM two way peak hour

vehicle trip rate of 0.609. As a result the use of a two way trip rate of 0.6 following observations of 0.39,

is considered appropriate and robust.

7.14 Full TRICS trip rate information is contained at Appendix J.

Future Year Assessment

7.15 No future year assessment has been completed. HCC confirmed (in the meeting note) there were no

other development sites that needed to be considered within the assessment. Since the commencement

of the recession there has been stagnated traffic growth, therefore for the foreseeable future and for a

site where peak spreading is occurring due to congestion, allowing for a future year assessment is not

necessary.

ARCADY Model A414/Thieves Lane Roundabout

7.16 Arcady models for both the AM and PM peak hours for the A414/Hertingfordbury Road/Thieves Lane

roundabouts have been prepared.

Page 22: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 18

7.17 Full classified turning data for the A414 R/B was collected on a neutral weekday together with a queue

length survey of all arms. Prior to this the junction was visited on three occasions in the AM peak

specifically to observe the traffic.

7.18 The A414/Thieves Lane junction was observed to work very well and queues are minimal. EAS has

modelled the existing operation of the junction using ARCADY for both the AM and PM periods. The

results closely replicate the existing traffic conditions.

7.19 The likely development generated traffic was then added based on actual turning movements at this

junction rather than the observed assignment from the cordon survey and also using a 50% higher trip

rate than the that observed from the cordon survey for reasons of being robust.

7.20 Consideration was given as how to best model the A414 roundabout as it was clear that the flows into

the roundabout from Hertford are regularised by the signals upstream and the bottle neck caused by the

rail bridge just east of Campfield Road. Thus the flows onto the roundabout are remarkably similar in

each quarter of an hour period. EAS therefore built the model using the ‘Direct Input’ and actual HGV

options rather than the more simple OD TAB and default HGV options.

7.21 The results of the ‘existing’ and ‘with development’ ARCADY models for the AM period are as follows;

EXISTING AM ARCADY RESULTS OF THE A414/THIEVES LANE

Max RFC Max Queue

Arm A Hertingfordbury Road 0.243 0.3

Arm B A414 West 0.389 0.6

Arm C Thieves Lane 0.76 3

Arm D A414 West 0.951 12.6

AM ARCADY RESULTS A414/THIEVES LANE ‘WITH DEVELOPMENT’

Max RFC Max Queue

Arm A Hertingfordbury Road 0.255 0.4

Arm B A414 West 0.392 0.6

Arm C Thieves Lane 0.793 3.5

Arm D A414 West 0.966 13.7

Page 23: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 19

Table 7.1 Existing and ‘with development’ traffic flows AM PEAK; A414/Thieves Lane Roundabout

7.22 for the PM period are as follows;

EXISTING PM ARCADY RESULTS OF THE A414/THIEVES LANE

Max RFC Max Queue

Arm A Hertingfordbury Road 0.200 0.2

Arm B A414 West 0.635 1.7

Arm C Thieves Lane 0.253 0.3

Arm D A414 West 0.682 2.1

PM ARCADY RESULTS A414/THIEVES LANE ‘WITH DEVELOPMENT’

Max RFC Max Queue

Arm A Hertingfordbury Road 0.208 0.3

Arm B A414 West 0.649 1.8

Arm C Thieves Lane 0.269 0.4

Arm D A414 West 0.695 2.2

Table 7.2 Existing and ‘with development’ traffic flows PM PEAK; A414/Thieves Lane Roundabout

7.23 As can be seen there is a negligible increase in RFC and Queues ‘with development’ over the existing

situation in both the AM and PM peak periods.

ARCADY Model Thieves Lane/Welwyn Road Roundabout

7.24 The same exercise has been undertaken for the Welwyn Road junction. In this instance traffic flow data

was obtained from HCC. The count was undertaken in May 2011 and is therefore recent enough to be

valid.

7.25 The roundabout works well within capacity and continues to do so following the addition of the

development flows.

7.26 The results of this ARCADY assessment for both junctions are enclosed at Appendix K.

Page 24: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 20

Summary

7.27 Considerable attention has been given to prepare an accurate model of the junctions closest to the site

including the Thieves Lane/ Welwyn Road and Thieves Lane/A414 roundabout junctions. It is clear that

the models replicate very well the existing traffic conditions and the robust assessment prepared

confirms that the traffic generated by the development will be imperceptible.

Page 25: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 21

8 Summary and Conclusion

8.1 For transport review purposes this TA is based on a proposed development of 280 houses with parking

spaces that will be policy compliant. It is a greenfield site but adjacent to an established residential area

forming the Sele Farm ward.

8.2 Considerable pre-application discussion has taken place with Hertfordshire County Council as Highway

Authority and HCC have confirmed that they would have no objection to this application on Highways

Grounds.

8.3 The site is located at the edge of an existing residential urban area and therefore benefits from the

existing urban facilities and infrastructure but will also add to the local economy and the viability of these

existing facilities.

8.4 The site is in walking distance of the Hertford North Rail Station, Hertford Town Centre and bus services

pass the site frontage. A range of everyday requirements including schools are also very local to the site.

The site is therefore in a very sustainable development location.

8.5 The existing traffic conditions immediately surrounding the site are generally light, however the A414 is

located to the south of the site which is a busy dual carriageway for most of its length; a bottle neck

occurs to the east of the Thieves Lane/A414 roundabout junction causing congestion within the Hertford

Town Centre area

8.6 Survey results indicate that local residents avoid using the A414 towards Hertford in the peak periods

and the peak hour trip rates are low. This is typical of travel patterns in urban areas and is indicative of

peak spreading.

8.7 There have only been slight traffic accidents occurring in the most recent five year period in the study

area and these are considered low in number.

8.8 The internal layout has yet to be determined but it will be constructed to adoptable standards and with

the ethos of the ‘Manual for Streets’ which is adopted as a design guide for Hertfordshire.

8.9 There are many access options available, all will have appropriate visibility splays and access geometry.

8.10 Considerable attention has been given to prepare an accurate model of the junctions closest to the site

including the Thieves Lane/ Welwyn Road and Thieves Lane/A414 roundabout junctions. It is clear that

the models replicate very well the existing traffic conditions and the robust assessment prepared

confirms that the traffic generated by the development will be imperceptible.

Page 26: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 22

Conclusion

8.11 Transport Policy relevant in East Herts and nationally has been considered. Traffic generated by the

development will be imperceptible. The site is in a sustainable location and will add to the viability of

local services and infrastructure.

8.12 The site provides a highly policy compliant and sustainable residential development opportunity in

transport terms.

Page 27: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page 23

Appendices

Appendix: A Site Location Plan

Appendix: B HCC Meeting Note and Correspondence

Appendix: C Local Facilities Plan

Appendix: D Five year accident data

Appendix: E Bus Routes

Appendix: F Potential Access Options

Appendix: G Census (work place destination)

Appendix: H Traffic Survey Data

Appendix: I Assignment Model

Appendix: J TRICS data

Appendix: K Arcady results

Page 28: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page A-1

Appendix: A SITE LOCATION PLAN

Page 29: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Land at Thieves Lane, Hertford 3

The Site

1.0km

2.0km

*Town Centre

Page 30: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page B-2

Appendix: B HCC MEETING NOTE AND

CORRESPONDENCE

Page 31: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

1

Patrick Eggenton

From: Vetti Vettivelu [[email protected]]Sent: 18 February 2013 11:47To: Patrick Eggenton; Paul Chappell; Dan TanCc: Ben YallopSubject: RE: Proposed Development off Thieves Lane Hertford

Patrick

I am happy with what you have set out in the notes below. To be a complete TA please provide A414 Arcady for

both AM and PM peaks

Regards

Vetti

From: Patrick Eggenton [mailto:[email protected]]

Sent: 16 February 2013 09:31

To: Vetti Vettivelu; Paul Chappell; Dan Tan Cc: Ben Yallop

Subject: RE: Proposed Development off Thieves Lane Hertford

Hi Vetti and all,

I would be grateful if you could get back to me regarding the email/meeting note below.

I am aware that Croudace Homes would appreciate this which will give them confidence to move on and tackle

other planning issues.

Kind Regards

Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk

From: Patrick Eggenton

Sent: 11 February 2013 12:44

To: 'Vetti Vettivelu'; '[email protected]'; '[email protected]' Cc: 'Ben Yallop'

Subject: Proposed Development off Thieves Lane Hertford

Dear Vetti, Paul and Dan,

Thanks you for your time last Tuesday when we met at County Hall to discuss the proposed residential development

off Thieves Lane in Hertford for circa 280 units with Ben Yallop of Croudace Homes

Page 32: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2

I understand that you will be happy to see a draft of a TA in due course in advance of any application so that we can

discuss any issues and work together on this project.

With respect to the work we have done so far your colleague Dan will be reviewing the modeling but generally you

are content with the approach we have taken and the trip rate of circa 0.6 we have used rather than the lower one

observed at Turpins Close. You would like us to undertake a sensitivity test of assignment based on the 2011 Census

(work location) when this is available I( I believe soon) and compare this to the findings of our site observations.

We will of course issue all the modeling as part of our TA including the PM ARCADY tests for the A414 junction and

both AM and PM for the Welwyn Road junction.

We discussed the approach to access and agreed that this can all be solved in due course and that one or two access

points may be appropriate for the site but that it could operate with one access, in which case and emergency

access would be required. Access layouts should meet the MfS standards of visibility and consider the position of

existing junctions. You described HCC approach that they now adopt the main routes only and any short cul- de-sacs

generally are not adopted.

We discussed any traffic schemes or developments that we should consider as part of the assessment but you

confirmed that there were none in proximity which would impact upon our work.

We will of course include the relevant Local and National Policy within our document to ensure that we comply on

transport grounds and you suggested we review the Hertford and Ware Urban Transport Plan as well.

You discussed the HCC relationship with Croudace which is good and that you would require a planning obligation

for transport so that benefits can be made strategically.

I believe you asked that we review accident patterns at the A414 roundabout just to the west of the rail-bridge, we

will be reviewing accident patterns as part of our TA and so will extent to this junction as well.

This is all I can recall, so please add if there is anything else. Overall a positive meeting and I believe you confirmed

you would not have an objection on highway grounds as things currently stand.

I would be grateful if you would confirm this is a correct interpretation of our meeting as soon as possible and

please feel free to call with any questions/clarifications.

Kind Regards,

Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk

****Disclaimer****

The information in this message should be regarded as confidential and is intended for the addressee only unless explicitly stated. If you have received this message in error it must be deleted and the sender notified. The views expressed in this message are personal and not necessarily those of Hertfordshire County Council unless explicitly stated. Please be aware that emails sent to or received from Hertfordshire County Council may be intercepted and read by the council. Interception will only occur to ensure compliance with council policies or procedures or regulatory obligations, to prevent or deter crime, or for the purposes of essential maintenance or support of the email system.

Page 33: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

1

Patrick Eggenton

From: Patrick EggentonSent: 19 December 2012 16:52To: '[email protected]'Subject: Proposed Development, Land at Thieves Lane HertfordAttachments: EXISTING A414 RB AM PEAK WITH DEV 121212.pdf; EXISTING A414 RB AM PEAK

121212.pdf; 1369 Hertfordshire.xlsm; Location and Facilities Plan pe Layout1 (1).pdf

Matthew,

As discussed just now, EAS has been appointed to prepare a Transport Assessment for a proposed development off

Thieves Lane at the west side of Hertford, (please see location plan attached). The development is likely to be

formed of 250 to 300 residential units and have two access points, one off Thieves Lane and one off Welwyn Road.

The detail of the access points has yet to be resolved but in principal there is space under the developers

control/Highway Land to implement priority junctions.

We have already undertaken some traffic assessment work to prove the viability of the development with mind to

the conditions of the A414 as it passes through Hertford. We decided it would be prudent to determine the peak

hour trip rate for existing residences off Thieves Lane and to this end we undertook a cordon count of Turpins Close

between 07.30 and 09.30 on a neutral weekday. At the same time we also completed a distribution survey to

determine vehicle assignment. We expected that there would be peak spreading from these developments in order

to avoid the worst periods of congestion on the A414 and also that the assignment would generally avoid the A414

into Hertford.

The results thoroughly concur with our expectations, the peak hour two way trip rate was 0.39 and only 12% of

traffic departing from the development in the peak period headed towards Hertford on the A414.

We have prepared a full Arcady for both the AM and PM peak hours for the A414/Hertingfordbury Road/Theives

Lane R/b and the Thieves Lane/Welwyn Road R/B.

Full classified turning data for the A414 R/B was recently collected on a neutral weekday together with a queue

length survey of all arms. Prior to this the junction was visited on three occasions in the AM peak specifically to

observe the traffic. In fact this junction works very well and queues are minimal. We have modeled the junction

using ARCADY and our ‘existing traffic’ ARCADY output (EXISTING A414 RB AM PEAK 121212.pdf) exactly replicates

the existing traffic conditions. We then added development traffic based on actual turning movements at this

junction rather than the observed assignment from the cordon survey and also using a 50% higher trip rate than the

that observed from the cordon survey for reasons of being robust. The results of the ‘existing’ and ‘with

development’ models are as follows;

EXISTING

MAX

RFC MAX Q

Arm A

Hertinfordbury

Road 0.243 0.3

Arm B A414 west 0.389 0.6

Arm C Thieves Lane 0.76 3

Arm D A414 west 0.951 12.6

EXISTING WITH DEVELOPMENT

MAX

RFC MAX Q

Arm A

Hertinfordbury

Road 0.255 0.4

Arm B A414 west 0.392 0.6

Page 34: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2

Arm C Thieves Lane 0.793 3.5

Arm D A414 west 0.966 13.7

As can be seen there is a negligible increase in RFC and Queues with the ‘with development’ over the existing

situation.

We have undertaken the same exercise for the Welwyn Road junction and this continues to operate well within

capacity and I have not attached the results here just to keep the size of this email down.

We spent some time considering how to model the A414 roundabout as it was clear that the flows into the

roundabout from Hertford are regularised by the signals upstream. Thus the flows onto the roundabout are

remarkably similar in each quarter of an hour period. We therefore built the model using the ‘Direct Input’ and

actual HGV options rather than the more simple OD TAB and default HGV option.

I have attached the results of the AM ARCADY Models and the classified traffic flow turning count data for your

perusal.

It is now my intention to comprehensively prepare the Transport Assessment document and so I would be grateful

for your views on the work we have so far completed and also an indication of any committed development in the

area which we should assess together with any committed highway improvement schemes.

If there are any specific matters that you would like to see addressed in the TA please let me know, I would like to

open up some regular dialogue with you as I am sure that new development in Hertford of this order will cause

some concern and I would not want it to come as a surprise for any parties involved.

Please confirm that you have received this email and please contact me should you have any questions, I look

forward to hearing from you shortly. Please note that we are based in Stanstead Abbotts so it would be very easy

for us to meet with you if that would help explain this further; it may equally be expedient for you to visit our offices

as we can the go through all the scheme data we have electronically.

I look forward to discussing this in more detail in the new year.

Kind Regards,

Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk

Page 35: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page C-3

Appendix: C LOCAL FACILITIES PLAN

Page 36: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 37: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page D-4

Appendix: D FIVE YEAR ACCIDENT DATA

Page 38: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

224

17

36a

7472a

46

66

24

34

Allotment

2016

14

9

1

20

134

El

9

24

110

21

32

12

43

34

99

2826

68

24

48

72

37a

64

104

44

92

49

Hertford

1

35

4

Sta

85

35

22

Sub

1

1

3

19

7

53

36

22

82

17

143

90

123

108

57

56

137

Hall

5

10

24

32

6

Works

4

Blakemore Wood

46

El Sub Sta

58

103

20

44

5

202

111

Lodge

15

2

38

25

1828

1

8

84

32

31

14

37

13

1

96

Sta

5

11

21

65

1

Sta

20

97

53

62

1

7

Sub

44

108

11

57

23

1

80

64

71

Sta

75

84

Sele School

25

9

100

126

22

Depot

8

76

55

87

33

7

82

6491

51

85

16

Chesher's Plantation

72

47

108

50

20

112

74

8

116

The Old Barn

139

142

Hollybush Junior Mixed Infants School

11

77

24

113

30

12

15

16

125

64

76

101

9

6

70

36

PO

24

1

4

4252

9

Sub

2

19

110

29

Shelter

76

4249

66

1

5

21

Colmor

101

95

1

65

61

37

14

132

96

85

Lodge

41

67

86

52

14

2

51

98

73

168

12

29

10

180

Hertford St Andrew

7

46

19

97

30

98

26

37b

40

61

23

1

24

28

11

12

25

74

5

40

20

33

25

27

The Knoll

49

11

Sub

42

6

33

1

6

15

6

10

32

79

77

43

65

91

1

9

63

15

73Station

48

1

153

30

133

24

49

71

Sub Sta

2

Di s

ma

nt le

dR

ai lw

ay

92

1

88

12

Works

15

63

8

97

The

24

45

81

127

Mill Farm

61

46

Sub

ll

64

62

8

10

23

7

127to137

17

28

88

17

49

32

1

29

32

58

130

2

3

68

15

12

2

114

82

91

126a

40

69

34

124

78

126

5

128

8

2

212

11

33

122

42

5

25

109

27

190

16

1

Builder's Yard

93

114

3

45

111

92

16

109

34

28

36

2

33

85

15

2c

Rectory

134a

1to

16

21

10

72b

3840

9

22

29

13

22

29

27

26

25

2

134c

18

76

36

27

124

33

13

53

Sta

1

102

Allo

tmentG

15

C of E Primary School

6

41

142

24

158

6

86

35

34

42

145

25

22

64a

44

Shelter

37

43

40

13

24

65

49

34

Calton House

12

36to78

Golden Griffin

17

12

(PH)

60

1

12

81

2

1

42

Car Park

65

28

2

Tank

8878

131

End

200

Chandlers

Courtyard

82

11

2

136

Works

94

50

7

1

22

El

27

89

1

25

7888

20

45

111

18

25

29

8090

38

8

2

4454

3

16

44

18 116

109

95

108

70

70

9

147

124a

23

17

35

14a

Sub Sta

83

5

34

32

25

14

37

House

3

10

31

Gardens

116

Tank

18

111

1

21

119

21a

58

100

109

6

11

20

14

32

66

23

21

4

2

61

21

16

Dis

man

tled

Ra

ilwa

y

The Sele Arms

72

33

38

83

40

148

47

100a

124

72

El

98

81

21

66

3

11

5

21

99

69

32

25

100

13

73

130

62

75

1222

26

2

13

Tennis Court

24

6

14

El Sub Sta

16

29

108

70

13

136

6

142

100

107

115

54

102

16

1

El

15

2

45

29

87

21

32

100

7

119

20

10

8

1

12

78

9

73

3

El

22

35

27

80

25

49

57

31

10

36

87

17

59

37

2

10a

El

92

Calton

44

84

29

El

23

68

22

34

Gardens

Camps Hill

SM

(PH)

46

14

73

21

98

1

10

to1

3

7

48

1

66

Court

52

3to

6

45

48

109

The Dell

Sub

37

143

98a

El

80

48

145

Dis

mantl e

dR

ai lw

ay

Kingdom

28

26

7

5

2

41

13

to

Sandy Nook

34

3

63

96

54

11

5

114

Sta

1246

40

2

94

149

El Sub Sta

44

106

26

66

83

103

81

5a

92

2

Chelmsford Wood

101

26

50

79

110

90

7

70

16

23

Dismantled

18

Hall

30

46

100

8

32

5

28

31

14

10

North

Weir

3

32

73

91

151

40

5

1

14

137

23

9

50

39

62

26

31

2to

12

32

67

The

21

90

6

41

East

138

126

Epcombs

59

The

117

124

5

5238

34

26

Mece

na

41

1424

9

37

36

17

31

92

25

7282

Tank

2

1

15

28

12

40

122

96

Chelmsford

48

1

143

121

25

26to

37

141a

68

72

36b

25

140

10

1

39

15

Sub

Mill Hill

104

108

1a 114

11

23 20

19

21

101

Railway

21b

23

48

143

35

34

26

27

110

57

71

22

1

9

55

24

13

Sta

89

Allotment

31

Arrowhead

53

28

2

1

30

9

106

107

13

132

2

5

31

13

102

13

42

43

Sta

102a

142

139

38

96

9

17

Lady Hughes's Wood

1

5358

208

214

El

19

33

Sub

115to125

4

14

53

36

56

139

7484

74

El

4

22

4858

33

34

40

30

68

El Sub Sta

56

66

26

113

5060

86

26

El Sub Sta

2030

9

122

89

34

20

4

21

152

134

42

125

16

74

84

29

16

1

StJose

ph's

Catho

l ic

4

42

78

Prim

aryS

choo

l

18

132

12

96

126

23

59

39

120

71

1

13

22

Blakemore Wood

%U

%U

%U

%U

%U%U

%U

%U%U

%U

%U

%U

%U

%U

%U

%U

Slight%U

Serious%U

Fatal%U

Accidents by Maximum Severity

Postal Point CHN204Tel 01992 658339

Transport Planning Data TeamHertfordshire County CouncilCounty HallPegs LaneHertford SG13 8DN

G-DP520.28/001/17653

G-DP520

Hertfordshire County Council

Mar 2013

ACN

Not Held

1 of 1

File.

Prepared ApprovedChecked

Date

Initials

Client Org.

N.T.S.Scale.

Sheet No.

Project No.Project Title.

Drawing Title.

RevDrg No. Legend.

© Crown copyright and database rights 2013 Ordnance Survey 100019606

You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.(This restriction may not apply to HCC and its licensed contractors, agents & partners.)

A414 and B1000HertfordAccidents from 1 Dec 2007 to 30 Nov 2012

Data Services - Accident Data Supply

N

EW

S

N.T.S.

Selection Boundary

Page 39: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Full Confidential Accident Report 08-Mar-13Date Produced:

Set Name (if saved) : 17653 Set Total : 16

2012-4100A0770

Thu

Slight

B1000 Welwyn Road, Hertford Approx 30m West J/w Fordwich Rise

EHerts

Hertford

30mph

Notjunct

Notjunct

Nperpelx

Darklit

Fine

DryNone

None

Yes

B1000/1

Single

2

1

0

531238 212842

08/11/2012 19:29:00

Easting: Northing:

Casualty Details

Acc Ref:Both Vs Cars Trav West On Welwyn Rd. V2 Stopped For Red Ats & V1 Collided With Rear Of V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

2012-4100A0770

1

2

Driver

35

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

MisspeedV 1 A

Speeding ReckdrivV 1 B

137146

1

Car+3whl

None

Stopping

Carw

Notjunct

None

None

No

None

Front Notreq

NothtrunE

W

44

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Car+3whl

None

Stopping

Carw

Notjunct

None

None

No

None

Back Ntprov

NothtrunE

W

35

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 1 of 18Set Name (if saved) : 17653

Page 40: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2012-4100A0273

Tue

Slight

U606 Thieves Lane Hertfordapprox 20m North J/w Ladywood Road

EHerts

Hertford

40mph

T

Gwy/unct

Npernox

Daystlts

Rain

WetNone

None

Yes

U606/10

Single

2

2

0

530792 212560

24/04/2012 11:05:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Following V2 Bus Trav South On Thieves Lane. V2 Has Stopped And V1 Attempts To Overtake But Realises It Is On A Blind Bend And Pulls Back In Andcollides With R/o/s V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U1236/1

2012-4100A0273

1

1

Driver

40

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2012-4100A0273

2

1

Passenge

2

Female

Slight

Other

Notped

Notped

Yes

Rearseat

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

135673

1

Car+3whl

None

Otakesta

Carw

Approach

None

None

No

None

Front Notreq

NothtrunN

S

40

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Psv

None

Waitahea

Carw

Approach

None

None

No

None

Back Notreq

NothtrunN

S

45

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: WorkJ Purpose:

Page 2 of 18Set Name (if saved) : 17653

Page 41: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2011-4100A0543

Sat

Slight

B1000 Welwyn Road, Hertford J/w Bentley Road

EHerts

Hertford

40mph

T

Gwy/unct

Npernox

Daystlts

Fine

DryNone

None

Yes

B1000/3

Single

3

4

0

530401 213106

01/10/2011 16:23:00

Easting: Northing:

Casualty Details

Acc Ref:V3 Car Trav West On Welwyn Rd Stops For Veh Waiting To Turn Right Into Bentley Rd. V2 Car Stops Behind V3. V1 Collides Rear V2 Which Collides Rear V3

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U468/10

2011-4100A0543

1

1

Driver

58

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2011-4100A0543

2

2

Driver

60

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2011-4100A0543

3

3

Driver

62

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2011-4100A0543

4

3

Passenge

18

Female

Slight

Other

Notped

Notped

Yes

Rearseat

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

Flookdri Misspeed ReckdrivV 1 A

134261

1

Ahead

Carw

None

None

Front Negati

NothtrunE

58Acc Ref:

Veh Ref:

Maneouvre:

Location:

Skiding:

Object in Cway:

Impact Point: Driver Breath Test:

Hit and Run:From:

Driver Age:

Page 3 of 18Set Name (if saved) : 17653

Page 42: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Car+3whl

None

Approach

No

None W Female

Slight

Veh Type:

Towing;

Junction:

velcwy

Object off Cway To: Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Car+3whl

None

Waitahea

Carw

Approach

None

None

No

None

Back Negati

NothtrunE

W

60

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

3

Car+3whl

None

Waitahea

Carw

Approach

None

None

No

None

Back Notreq

NothtrunE

W

62

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 4 of 18Set Name (if saved) : 17653

Page 43: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2011-4100A0507

Thu

Slight

A414 Hertingfordbury Road Rbt J/w Willowmead & Campfield Road

EHerts

Hertford

40mph

R/bout

Gwy/unct

Npernox

Darkunkn

Fine

DryNone

None

No-otc

A414/60

Single

2

2

0

531654 212361

22/09/2011 19:55:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Trav West On Hertingfordbury Rd Stops At Rbt, V2 Lgv Approaches Fromrear And Hits R/o/s Corner V1 And F.t.s.

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U1101/1

2011-4100A0507

1

2

Driver

40

Male

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2011-4100A0507

2

2

Passenge

48

Female

Slight

Other

Notped

Notped

Yes

Frontsea

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

FlookdriV 1 A

134061

1

Gdltwght

None

Ahead

Carw

Approach

None

None

No

None

Front Notcon

Hit&runE

W Unknown

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Car+3whl

None

Waitahea

Carw

Approach

None

None

No

None

Back Notcon

NothtrunE

W

40

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 5 of 18Set Name (if saved) : 17653

Page 44: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2011-4100A0187

Sat

Slight

A119 North Road, Hertford Rbt J/w B1000 Welwyn Road

EHerts

Hertford

30mph

R/bout

Gwy/unct

Npercntr

Daystlts

Fine

DryNone

None

Yes

A119/16

R/bout

2

1

0

531611 212958

09/04/2011 09:40:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Entered Rbt To Turn Right From B1000 Welwyn Rd, But Failed To Give Way To Cyclist Riding V2 P/c Nw On A119 North Rd, Negotiating Rbt And V1 Struck R/n/s Of V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

B1000/1

2011-4100A0187

1

2

Driver

47

Male

Slight

Other

Notped

Notped

Notapp

No

No Cyclists

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

FlookdriV 1 A

133179

1

Car+3whl

None

Turnrigh

Carw

Er/about

None

None

No

None

Front Notreq

NothtrunSw

Se

48

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Bicycle

None

Ahead

Carw

Middle

None

None

No

None

Nearside Notap

NothtrunSe

Nw

47

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 6 of 18Set Name (if saved) : 17653

Page 45: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2010-4100A0297

Tue

Slight

Hertingfordbury Road, Hertford 15m Se Rbt J/w A414 Hertingfordbury Road.

EHerts

Hertford

60mph

R/bout

Gwy/unct

Npernox

Daystlts

Fine

DryNone

None

Yes

C152/30

Single

2

3

0

530665 212352

06/04/2010 16:05:00

Easting: Northing:

Casualty Details

Acc Ref:Both Vs Cars. V1 Having Negotiated Roundabout Exited Rbt To Trav Se On Hertingfordbury Road But For U/k Reason Crossed C/way To O/s Colliding Head On With V2 Trav Nw Approaching Rbt.

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

A414/56

2010-4100A0297

1

2

Driver

19

Male

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2010-4100A0297

2

2

Passenge

19

Male

Slight

Other

Notped

Notped

Yes

Frontsea

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2010-4100A0297

3

1

Passenge

22

Male

Slight

Other

Notped

Notped

Yes

Frontsea

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

LostcontV 1 A

130556

1

Car+3whl

None

Turnrigh

Carw

Lr/about

None

None

No

None

Front Notreq

NothtrunW

Se

26

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: WorkJ Purpose:

Page 7 of 18Set Name (if saved) : 17653

Page 46: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2

Car+3whl

None

Ahead

Carw

Approach

None

None

No

None

Front Notreq

NothtrunSe

Nw

19

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 8 of 18Set Name (if saved) : 17653

Page 47: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2010-4100A0214

Fri

Slight

A414 Eastbound C/way Towards Hertford Exact Location Not Reported Gridded 19m East Of Rbt J/w A414 Cole Green Bypass Hertingfordbury Road &Thieves Lane

EHerts

Hertford

70mph

R/bout

Gwy/unct

Npernox

Daystlts

Fine

DryNone

Pedestri

No-otc

A414/57

Dual

2

1

0

530698 212401

26/03/2010 08:00:00

Easting: Northing:

Casualty Details

Acc Ref:V2 Car & V1 M/c 50-125cc Both Trav East Into A414 Hertingfordbury Rd, From Rbt. V2 Stopped Suddenly To Allow Pedestrians To Cross Dual C/way (no X/ng) And V1 Skidded Into Rear Of V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

A414/56

2010-4100A0214

1

1

Driver

18

Male

Slight

Other

Notped

Notped

Notapp

No

No Motorcyclists

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

StoppingV 2 B

130192

1

Mc<=125

None

Starting

Carw

Lr/about

Skidded

None

No

None

Front Notcon

NothtrunW

E

18

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: RideschJ Purpose:

2

Othmotor

None

Stopping

Carw

Exit

None

None

No

None

Back Notcon

Hit&runW

E Unknown

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 9 of 18Set Name (if saved) : 17653

Page 48: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2009-4100A0682

Tue

Slight

A414 Hertingfordbury Road, Hertford 5m East Of Rbt J/w A414 Bypass, Hertingfordbury Road & Thieves Lane

EHerts

Hertford

70mph

R/bout

Gwy/unct

Npernox

Daystlts

Rain

WetNone

None

Yes

A414/57

Dual

2

1

0

530692 212384

03/11/2009 12:10:00

Easting: Northing:

Casualty Details

Acc Ref:Both Vs Cars Trav Westbound In Ln2 Of A414 Hertingfordbury Rd Approaching Rbt Where V2 Stopped And V1 Braked Hard And Skidded Into Rear Of V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

A414/56

2009-4100A0682

1

2

Driver

28

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

StoppingV 1 A

SlipweatV 1 B

129309

1

Gdmdwght

None

Stopping

Carw

Approach

Skidded

None

No

None

Front Negati

NothtrunE

W

33

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: WorkJ Purpose:

2

Car+3whl

None

Waitahea

Carw

Approach

None

None

No

None

Back Negati

NothtrunE

W

28

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 10 of 18Set Name (if saved) : 17653

Page 49: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2009-4100A0605

Sun

Slight

A414 Hertingfordbury Road, Hertford 9m East Of Rbt J/w A414 Cole Green Bypass, Thieves Lane & C152 Hertingfordbury Road

EHerts

Hertford

70mph

R/bout

Gwy/unct

Npernox

Daystlts

Fine

DryNone

None

No-otc

A414/57

Dual

2

2

0

530690 212380

27/09/2009 10:15:00

Easting: Northing:

Casualty Details

Acc Ref:Both V2 Car & V1 U/k Veh Trav Westbound On A414 Hertingfordbury Rd In Ln1, Approaching Thieves Ln Rbt Where V2 Stopped, Waiting To Enter Rbt And V1 Collided With Rear Of V2

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

A414/56

2009-4100A0605

1

2

Driver

31

Female

Slight

Other

Notped

Notped

Unknown

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2009-4100A0605

2

2

Passenge

31

Male

Slight

Other

Notped

Notped

Unknown

Frontsea

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

FlookdriV 1 A

128807

1

Othmotor

None

Ahead

Carw

Approach

None

None

No

None

Front Notcon

NothtrunE

W Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Car+3whl

None

Waitahea

Carw

Approach

None

None

No

None

Back Notcon

NothtrunE

W

31

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 11 of 18Set Name (if saved) : 17653

Page 50: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2009-4100A0587

Tue

Slight

A414 Hertingfordbury Road, Hertford Rbt J/w A414 Hatfield Road, Thieves Lane & Hertingfordbury Road

EHerts

Hertingf

70mph

R/bout

Gwy/unct

Npernox

Darklit

Rain

WetNone

None

Yes

A414/56

R/bout

1

1

0

530649 212360

15/09/2009 19:45:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Negotiating Right Turn From Thieves Ln On Rbt To Trav West On A414 Hertingfordbury Rd When Driver Lost Control And V1 Spun R/n/s Into Raised Kerb Coming To Rest Facing East InLn1 At Exit Onto A414 W/b

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

A414/54

2009-4100A0587

1

1

Driver

24

Female

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

LostcontV 1 A

128791

1

Car+3whl

None

Turnrigh

Carw

Middle

Skidded

Kerb

No

None

Offside Notreq

NothtrunNe

W

24

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 12 of 18Set Name (if saved) : 17653

Page 51: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2009-4100A0420

Mon

Slight

A414 Hertingfordbury Road, Hertford Rbt J/w Thieves Lane & C152 Hertingfordbury Road

EHerts

Hertingf

70mph

R/bout

Gwy/unct

Npernox

Daystlts

Fine

DryNone

None

No-otc

A414/56

R/bout

2

1

0

530639 212405

13/07/2009 17:30:00

Easting: Northing:

Casualty Details

Acc Ref:Cyclist Riding V2 P/c Negotiating Right Turn On A414 Rbt From C152 Hertingfordbury Rd Was Struck From O/s By Front Of V1 Car Also Negotiating Rbt

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U606/10

2009-4100A0420

1

2

Driver

50

Male

Slight

Other

Notped

Notped

Notapp

No

No Cyclists

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

Flookdri Misspeed PassclosV 1 B

128505

1

Car+3whl

None

Turnrigh

Carw

Middle

None

None

No

None

Front Notcon

NothtrunSe

E Female

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Bicycle

None

Turnrigh

Carw

Middle

None

None

No

None

Offside Notap

NothtrunSe

E

50

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 13 of 18Set Name (if saved) : 17653

Page 52: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2009-4100A0251

Fri

Slight

A414 Hertingfordbury Road, Hertford Rbt J/w C152 Hertingfordbury Road And Thieves Lane

EHerts

Hertingf

70mph

R/bout

Gwy/unct

Npernox

Daystlts

Fine

DryNone

None

No-otc

A414/56

R/bout

2

1

0

530655 212415

17/04/2009 12:13:00

Easting: Northing:

Casualty Details

Acc Ref:Both Vs Cars Trav In U/k Direction On A414 Hertingfordbury Rd Negotiating Rbt When V1 Collided With Rear Of V2, Then Reversed And Drove Off

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U606/10

2009-4100A0251

1

2

Driver

35

Male

Slight

Other

Notped

Notped

Unknown

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

Flookdri Misspeed Swerved LostcontV 1 B

127750

1

Car+3whl

None

Rightben

Carw

Er/about

None

None

No

None

Front Notcon

Hit&runSw

E

30

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

2

Car+3whl

None

Rightben

Carw

Er/about

None

None

No

None

Back Notcon

NothtrunSw

E

35

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: TofrowrkJ Purpose:

Page 14 of 18Set Name (if saved) : 17653

Page 53: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2008-4100A0831

Sat

Slight

A414 Hertingfordbury Road, Hertford Est 156m Nw Of J/w Valeside

EHerts

Hertford

70mph

Notjunct

Notjunct

Npernox

Darklit

Fine

WetNone

None

Yes

A414/57

Dual

1

1

0

531123 212337

06/12/2008 23:11:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Trav Se On A414 Hertingfordbury Rd With Driver Intoxicated. V1 Hit N/s Kerb, Driver Lost Control And V1 Left C/way N/s, Colliding With A Tree And Overturned

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

2008-4100A0831

1

1

Driver

43

Female

Slight

Other

Notped

Notped

Unknown

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

Lostcont AlcydrivV 1 A

126906

1

Car+3whl

None

Ahead

Carw

Notjunct

Overturn

Kerb

Nrebound

Tree

Front Positiv

NothtrunNw

Se

43

Female

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 15 of 18Set Name (if saved) : 17653

Page 54: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2008-4100A0701

Tue

Slight

A414 Hertingfordbury Road, Hertford Rbt J/w Thieves Lane & Hertingfordbury Road

EHerts

Hertingf

70mph

R/bout

Gwy/unct

Npernox

Darklit

Rain

WetNone

None

Yes

A414/56

R/bout

1

3

0

530675 212418

21/10/2008 03:00:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Trav Ne On A414 Failed To Negotiate Rbt Colliding With N/s Barrier

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

U606/10

2008-4100A0701

1

1

Driver

18

Male

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2008-4100A0701

2

1

Passenge

18

Male

Slight

Other

Notped

Notped

Yes

Frontsea

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

2008-4100A0701

3

1

Passenge

18

Male

Slight

Other

Notped

Notped

Yes

Rearseat

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

ToofastV 1 A

Slipweat ReckdrivV 1 B

126115

1

Car+3whl

None

Ahead

Carw

Er/about

Skidded

None

Nearside

Sidcrash

Front Negati

NothtrunSw

E

18

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 16 of 18Set Name (if saved) : 17653

Page 55: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2008-4100A0315

Sat

Slight

A414 Hertingfordbury Road, Hertford 29m Sw Of Rbt J/w Willowmead & Campfield Road

EHerts

Hertford

40mph

Notjunct

Notjunct

Nperpelx

Daystlts

Fine

DryNone

None

Yes

A414/58

Dual

1

1

1

531595 212337

26/04/2008 10:12:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Trav Sw On A414 Hertingfordbury Rd From Rbt Collided With Pedestriancrossing C/way From N/s Kerb, Using Pelican X/ng

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

2008-4100A0315

1

1

Pedestri

78

Female

Slight

Other

Xnrside

Pedcross

Notapp

Ped

Ped Pedestrians

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

NoPed Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

IllpedesC 1 B

FlookdriV 1 B

124882

1

Car+3whl

None

Ahead

Carw

Notjunct

None

None

No

None

Front Negati

NothtrunNe

Sw

49

Male

None

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 17 of 18Set Name (if saved) : 17653

Page 56: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

2008-4100A0197

Sat

Slight

Thieves Lane, Hertford 20m Sw Of Ladywood Road

EHerts

Hertford

40mph

Notjunct

Notjunct

Npernox

Darkunli

Fine

WetNone

None

Yes

U606/10

Single

1

1

0

530778 212520

29/03/2008 19:40:00

Easting: Northing:

Casualty Details

Acc Ref:V1 Car Trav Sw On Thieves Ln Into Downhill R/h Bend When, For U/k Reason, Driver Lost Control And V1 Veered O/s, Driver Overcorrected And V1 Left C/wayinto N/s Fence

Accident Details:

Date:

Day of Week:

Acc Severity:

District:

Parish:

Speed Limit:

Jun Detail:

Jun Control:

Weather:

Light:

Road Surface:

Ped Xing:

Spec Conditions:

C/way Hazard:

1st / 2nd Rd:

On Site:

C/way Type:

Num Vehicles:

Num Cas:

Num Peds:

Acc Ref:

Vehicle Details

2008-4100A0197

1

1

Driver

24

Male

Slight

Other

Notped

Notped

Yes

No

No Car Users

Acc Ref:

Veh Ref:

Cas Ref:

Cas Class:

Cas Age:

Cas Gender:

Car Passenger:

PSV Passenger:

School Pupil:

Cas Severity:

Road User Class:

Seat Belt:

Ped Movement:

Ped Location:

Ped Work on Rd:

Participant Confidence

Contributory Factors

Factor 1 2 3 4 5 6

Slipweat LostcontV 1 A

124390

1

Car+3whl

None

Rightben

Carw

Notjunct

None

None

Nearside

Otherobj

Nearside Notreq

NothtrunNe

Sw

24

Male

Slight

Acc Ref:

Veh Ref:

Veh Type:

Towing;

Maneouvre:

Location:

Junction:

Skiding:

Object in Cway:

velcwy

Object off Cway

Impact Point: Driver Breath Test:

Hit and Run:From:

To:

Driver Age:

Driver Gender:

Driver Severity:NotfrvForeign Veh: OtherJ Purpose:

Page 18 of 18Set Name (if saved) : 17653

Page 57: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page E-5

Appendix: E BUS ROUTES

Page 58: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 59: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page F-6

Appendix: F POTENTIAL ACCESS OPTIONS

Page 60: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 61: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 62: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 63: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page G-7

Appendix: G CENSUS (WORK PLACE

DESTINATION)

Page 64: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road West A414 West A414 East Total

Lambeth Ward All people Works at Home Underground Train Bus Taxi Car Driver Car Passenger M/C Bicycle On Foot Other Hertford/North A414 East

Barnet 43 0 0 0 3 0 37 3 0 0 0 0 37

Broxbourne 146 0 0 13 6 0 118 6 3 0 0 0 118

Camden 28 0 0 24 0 0 4 0 0 0 0 0 4

City of London 67 0 0 61 0 0 3 0 3 0 0 0 3

Dacorum 18 0 0 0 0 0 18 0 0 0 0 0 18

East Hertfordshire Bishop's Stortford All Saints 3 0 0 0 0 0 3 0 0 0 0 0 3

Bishop's Stortford Central 6 0 0 0 0 0 3 0 0 0 3 0 3

Bishop's Stortford Meads 4 0 0 0 0 0 4 0 0 0 0 0 4

Bishop's Stortford South 3 0 0 0 0 0 3 0 0 0 0 0 3

Braughing 3 0 0 0 0 0 3 0 0 0 0 0 3

Buntingford 10 0 0 0 0 0 10 0 0 0 0 0 10

Great Amwell 9 0 0 3 0 0 6 0 0 0 0 0 3

Hertford Bengeo 88 0 0 0 4 0 39 11 0 5 29 0 39

Hertford Castle 502 0 0 3 76 3 234 49 4 24 109 0 234

Hertford Heath 31 0 0 0 0 0 19 0 6 3 3 0 19

Hertford Kingsmead 106 0 0 0 6 0 65 9 3 8 12 3 65

Hertford Rural North 8 0 0 0 0 0 8 0 0 0 0 0 8

Hertford Rural South 17 0 0 0 0 0 14 0 0 0 3 0 14

Hertford Sele 420 195 3 11 3 0 129 14 3 11 51 0 129

Hunsdon 6 0 0 0 0 0 3 0 0 0 3 0

Much Hadham 4 0 0 0 0 0 4 0 0 0 0 0 4

Mundens and Cottered 3 0 0 0 0 0 3 0 0 0 0 0 3

Puckeridge 3 0 0 0 0 0 3 0 0 0 0 0 3

Sawbridgeworth 8 0 0 0 0 0 5 0 0 0 3 0 5

Stanstead Abbots 12 0 0 0 0 0 12 0 0 0 0 0 12

Thundridge & Standon 24 0 0 0 0 0 21 3 0 0 0 0 21

Walkern 6 0 0 0 0 0 6 0 0 0 0 0 6

Ware Chadwell 53 0 0 0 4 0 39 4 0 3 0 3 39

Ware Christchurch 41 0 0 3 3 0 29 3 0 0 3 0 29

Ware St Mary's 50 0 0 0 0 0 43 0 3 4 0 0 43

Ware Trinity 3 0 0 0 0 0 3 0 0 0 0 0 3

Watton-at-Stone 11 0 0 0 0 0 8 0 0 0 3 0 8

Enfield 81 0 0 18 0 3 51 9 0 0 0 0 51

Epping Forest 28 0 0 0 0 0 22 3 0 0 3 0 22

Hackney 16 0 0 10 0 0 6 0 0 0 0 0 6

Haringey 12 0 0 3 0 0 9 0 0 0 0 0 9

Harlow 55 0 0 3 0 0 49 3 0 0 0 0 49

Hertsmere 26 0 0 0 0 0 26 0 0 0 0 0 26

Islington 26 0 0 17 0 0 9 0 0 0 0 0 9

Luton 13 0 0 0 0 0 13 0 0 0 0 0 13

Milton Keynes 18 0 0 0 0 0 18 0 0 0 0 0 18

North Hertfordshire Arbury 3 0 0 0 0 0 3 0 0 0 0 0 3

Baldock Town 6 0 0 3 0 0 3 0 0 0 0 0 3

Hitchin Bearton 3 0 0 0 0 0 3 0 0 0 0 0 3

Knebworth 3 0 0 0 0 0 3 0 0 0 0 0 3

Letchworth East 3 0 0 0 0 0 3 0 0 0 0 0 3

Letchworth South West 3 0 0 0 0 0 3 0 0 0 0 0 3

Royston Palace 3 0 0 0 0 0 3 0 0 0 0 0 3

Weston and Sandon 3 0 0 0 0 0 3 0 0 0 0 0 3

St Albans 33 0 0 0 0 0 30 3 0 0 0 0 30

Stevenage 60 0 0 10 0 0 47 3 0 0 0 0 47

Tower Hamlets 10 0 0 7 0 0 3 0 0 0 0 0 3

Uttlesford 19 0 3 0 0 0 16 0 0 0 0 0 16

Watford 17 0 0 0 0 0 17 0 0 0 0 0 17

Welwyn Hatfield 290 0 0 0 6 0 238 25 6 15 0 0 238

Westminster 65 0 6 46 0 0 13 0 0 0 0 0 13

Other 153 0 0 27 0 0 114 0 3 6 3 0

Grand Total 2685 195 12 262 111 6 1604 148 34 79 228 6 309 263 823 89 0 1484

21% 18% 55% 6% 0% 100%

Welwyn Road East

Page 65: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page H-8

Appendix: H TRAFFIC SURVEY DATA

Page 66: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012

Junction: Thieves Lane / A414 / Hertingfordbury Road

Approach: Thieves Lane

TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL

0730 - 0745 0 0 9 2 0 0 0 11 0 0 3 1 0 0 0 4 0 0 79 5 0 0 0 84

0745 - 0800 0 0 20 3 0 0 0 23 0 0 4 1 0 0 0 5 0 1 98 10 1 0 0 110

Hourly Total 0 0 29 5 0 0 0 34 0 0 7 2 0 0 0 9 0 1 177 15 1 0 0 194

0800 - 0815 0 0 26 2 0 0 0 28 0 0 2 2 0 0 0 4 0 0 77 7 1 0 0 85

0815 - 0830 0 0 25 2 0 0 0 27 0 0 15 0 0 0 0 15 0 0 92 6 0 0 0 98

0830 - 0845 0 0 31 2 0 1 1 35 0 0 36 2 0 0 0 38 0 0 120 11 0 0 0 131

0845 - 0900 0 0 18 4 0 0 0 22 0 0 19 1 0 0 0 20 0 2 83 9 0 0 0 94

Hourly Total 0 0 100 10 0 1 1 112 0 0 72 5 0 0 0 77 0 2 372 33 1 0 0 408

0900 - 0915 0 0 22 2 1 0 0 25 0 0 5 1 0 0 0 6 0 1 79 6 0 0 0 86

0915 - 0930 0 0 20 8 2 0 0 30 1 0 2 0 0 0 0 3 0 0 43 3 0 0 0 46

Hourly Total 0 0 42 10 3 0 0 55 1 0 7 1 0 0 0 9 0 1 122 9 0 0 0 132

Session Total 0 0 171 25 3 1 1 201 1 0 86 8 0 0 0 95 0 4 671 57 2 0 0 734

1630 - 1645 0 0 14 2 0 0 0 16 0 0 2 0 0 0 1 3 0 0 39 3 0 0 0 42

1645 - 1700 0 0 12 1 0 0 0 13 0 0 4 1 0 0 0 5 0 0 28 3 0 0 0 31

Hourly Total 0 0 26 3 0 0 0 29 0 0 6 1 0 0 1 8 0 0 67 6 0 0 0 73

1700 - 1715 0 0 7 2 0 0 0 9 0 0 5 0 0 0 0 5 0 0 28 5 0 0 2 35

1715 - 1730 0 0 18 0 0 0 0 18 0 0 4 2 0 0 0 6 0 0 33 5 0 0 0 38

1730 - 1745 0 0 19 3 0 0 0 22 0 0 4 1 0 0 0 5 0 0 34 1 0 0 0 35

1745 - 1800 0 0 20 1 0 0 0 21 0 0 2 1 0 0 0 3 0 0 33 1 0 0 0 34

Hourly Total 0 0 64 6 0 0 0 70 0 0 15 4 0 0 0 19 0 0 128 12 0 0 2 142

1800 - 1815 0 0 18 0 0 0 0 18 0 0 4 1 0 0 0 5 0 0 30 2 0 0 0 32

1815 - 1830 0 0 13 1 0 0 1 15 0 0 3 0 0 0 0 3 0 0 30 1 0 0 0 31

Hourly Total 0 0 31 1 0 0 1 33 0 0 7 1 0 0 0 8 0 0 60 3 0 0 0 63

Session Total 0 0 121 10 0 0 1 132 0 0 28 6 0 0 1 35 0 0 255 21 0 0 2 278

Left to A414 (East) Ahead to Hertingfordbury Road Right to A414 (West)

Page 67: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012

Junction: Thieves Lane / A414 / Hertingfordbury Road

Approach: A414 (East)

TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL

0730 - 0745 0 0 4 2 0 0 0 6 0 1 311 43 8 5 1 369 0 0 13 1 0 0 0 14

0745 - 0800 0 0 5 2 0 0 0 7 0 1 304 49 4 2 2 362 0 1 14 7 0 0 0 22

Hourly Total 0 0 9 4 0 0 0 13 0 2 615 92 12 7 3 731 0 1 27 8 0 0 0 36

0800 - 0815 0 0 10 3 0 0 0 13 0 2 319 39 1 6 0 367 0 0 21 4 0 0 1 26

0815 - 0830 3 0 20 2 0 0 0 25 0 3 268 35 4 2 0 312 0 0 31 5 1 1 0 38

0830 - 0845 0 0 15 3 0 0 0 18 0 0 272 27 2 6 1 308 0 0 41 3 0 0 0 44

0845 - 0900 0 0 12 0 0 0 0 12 0 1 293 25 6 5 1 331 0 0 40 4 0 0 0 44

Hourly Total 3 0 57 8 0 0 0 68 0 6 1152 126 13 19 2 1318 0 0 133 16 1 1 1 152

0900 - 0915 0 0 6 1 0 0 0 7 1 0 267 35 8 6 1 318 0 0 15 3 1 0 1 20

0915 - 0930 0 0 6 2 0 0 0 8 0 1 212 33 6 11 1 264 0 0 20 6 1 0 0 27

Hourly Total 0 0 12 3 0 0 0 15 1 1 479 68 14 17 2 582 0 0 35 9 2 0 1 47

Session Total 3 0 78 15 0 0 0 96 1 9 2246 286 39 43 7 2631 0 1 195 33 3 1 2 235

1630 - 1645 0 0 12 3 0 0 0 15 0 0 214 29 1 2 0 246 0 0 34 6 0 1 0 41

1645 - 1700 0 0 10 1 0 0 0 11 0 0 177 26 1 1 3 208 0 0 40 8 0 0 0 48

Hourly Total 0 0 22 4 0 0 0 26 0 0 391 55 2 3 3 454 0 0 74 14 0 1 0 89

1700 - 1715 0 0 8 0 0 0 0 8 0 0 172 20 3 2 0 197 0 1 49 6 0 0 0 56

1715 - 1730 0 0 12 0 0 0 0 12 0 0 146 14 0 2 0 162 0 0 67 3 0 0 0 70

1730 - 1745 0 0 10 1 0 0 0 11 0 0 163 6 1 0 0 170 0 0 46 8 0 0 0 54

1745 - 1800 0 0 12 4 0 0 0 16 0 0 170 17 2 2 1 192 0 0 59 7 1 1 1 69

Hourly Total 0 0 42 5 0 0 0 47 0 0 651 57 6 6 1 721 0 1 221 24 1 1 1 249

1800 - 1815 0 0 7 0 0 0 0 7 0 1 181 16 2 2 0 202 0 2 66 5 0 0 0 73

1815 - 1830 0 0 12 2 0 0 0 14 0 0 208 18 4 3 1 234 0 0 59 7 0 0 0 66

Hourly Total 0 0 19 2 0 0 0 21 0 1 389 34 6 5 1 436 0 2 125 12 0 0 0 139

Session Total 0 0 83 11 0 0 0 94 0 1 1431 146 14 14 5 1611 0 3 420 50 1 2 1 477

Left to Hertingfordbury Road Ahead to A414 (West) Right to Thieves Lane

Page 68: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012

Junction: Thieves Lane / A414 / Hertingfordbury Road

Approach: Hertingfordbury Road

TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL

0730 - 0745 0 0 1 1 0 0 0 2 0 0 1 0 0 0 0 1 0 0 14 4 0 0 0 18

0745 - 0800 0 0 1 0 0 0 0 1 0 0 1 1 0 0 0 2 0 0 11 2 2 0 0 15

Hourly Total 0 0 2 1 0 0 0 3 0 0 2 1 0 0 0 3 0 0 25 6 2 0 0 33

0800 - 0815 0 0 6 0 0 0 0 6 0 0 6 1 0 0 2 9 0 0 20 1 0 0 0 21

0815 - 0830 0 0 2 0 0 0 0 2 0 0 6 0 0 0 0 6 0 0 18 1 1 0 0 20

0830 - 0845 0 0 5 0 0 0 0 5 0 0 8 1 0 0 0 9 0 0 26 1 0 0 0 27

0845 - 0900 0 0 7 0 0 0 0 7 0 0 8 1 0 0 0 9 0 0 30 2 0 0 0 32

Hourly Total 0 0 20 0 0 0 0 20 0 0 28 3 0 0 2 33 0 0 94 5 1 0 0 100

0900 - 0915 0 0 2 0 0 0 0 2 0 0 6 1 0 0 0 7 0 0 39 2 1 0 0 42

0915 - 0930 0 0 4 0 0 0 0 4 0 0 4 0 0 0 0 4 0 0 21 2 0 0 0 23

Hourly Total 0 0 6 0 0 0 0 6 0 0 10 1 0 0 0 11 0 0 60 4 1 0 0 65

Session Total 0 0 28 1 0 0 0 29 0 0 40 5 0 0 2 47 0 0 179 15 4 0 0 198

1630 - 1645 0 0 4 1 0 0 0 5 0 0 2 1 0 0 0 3 0 0 14 2 0 0 0 16

1645 - 1700 0 0 3 0 0 0 0 3 0 0 6 1 0 0 0 7 0 0 23 5 0 0 0 28

Hourly Total 0 0 7 1 0 0 0 8 0 0 8 2 0 0 0 10 0 0 37 7 0 0 0 44

1700 - 1715 0 0 5 0 0 0 0 5 0 0 7 1 0 0 0 8 0 0 22 1 0 0 0 23

1715 - 1730 0 0 4 0 0 0 0 4 0 0 10 0 0 0 0 10 0 0 17 3 0 0 0 20

1730 - 1745 0 0 2 0 0 0 0 2 0 0 6 3 0 0 0 9 0 0 17 3 0 0 0 20

1745 - 1800 0 0 3 0 0 0 0 3 0 0 13 2 0 0 0 15 0 0 21 4 0 0 0 25

Hourly Total 0 0 14 0 0 0 0 14 0 0 36 6 0 0 0 42 0 0 77 11 0 0 0 88

1800 - 1815 0 0 3 0 0 0 0 3 0 0 8 0 0 0 0 8 0 0 18 1 0 0 0 19

1815 - 1830 0 0 1 0 0 0 0 1 0 0 7 1 0 0 0 8 0 0 16 1 0 0 0 17

Hourly Total 0 0 4 0 0 0 0 4 0 0 15 1 0 0 0 16 0 0 34 2 0 0 0 36

Session Total 0 0 25 1 0 0 0 26 0 0 59 9 0 0 0 68 0 0 148 20 0 0 0 168

Left to A414 (West) Ahead to Thieves Lane Right to A414 (East)

Page 69: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012

Junction: Thieves Lane / A414 / Hertingfordbury Road

Approach: A414 (West)

TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL

0730 - 0745 0 0 13 5 0 0 0 18 0 2 189 35 3 6 0 235 0 0 1 1 0 0 0 2

0745 - 0800 0 0 27 1 1 0 0 29 0 2 200 24 4 2 0 232 0 0 3 0 0 0 0 3

Hourly Total 0 0 40 6 1 0 0 47 0 4 389 59 7 8 0 467 0 0 4 1 0 0 0 5

0800 - 0815 0 0 24 3 0 0 1 28 0 2 180 19 3 2 2 208 0 0 10 1 0 0 0 11

0815 - 0830 0 0 20 0 0 0 0 20 0 2 180 21 4 3 1 211 0 0 9 0 0 0 0 9

0830 - 0845 0 0 17 2 0 0 0 19 0 2 149 14 6 4 1 176 0 0 18 0 0 0 0 18

0845 - 0900 0 0 12 2 1 0 0 15 0 1 155 19 2 3 1 181 0 0 7 1 0 0 0 8

Hourly Total 0 0 73 7 1 0 1 82 0 7 664 73 15 12 5 776 0 0 44 2 0 0 0 46

0900 - 0915 0 0 12 2 1 0 0 15 0 3 135 11 5 1 2 157 0 0 4 1 0 0 0 5

0915 - 0930 0 0 15 2 0 0 0 17 0 0 150 21 4 0 0 175 0 0 3 0 0 0 0 3

Hourly Total 0 0 27 4 1 0 0 32 0 3 285 32 9 1 2 332 0 0 7 1 0 0 0 8

Session Total 0 0 140 17 3 0 1 161 0 14 1338 164 31 21 7 1575 0 0 55 4 0 0 0 59

1630 - 1645 0 0 44 8 1 0 0 53 0 4 199 40 3 3 0 249 0 0 2 1 0 0 0 3

1645 - 1700 0 0 56 19 0 0 0 75 0 3 200 33 1 3 0 240 0 0 13 1 0 0 0 14

Hourly Total 0 0 100 27 1 0 0 128 0 7 399 73 4 6 0 489 0 0 15 2 0 0 0 17

1700 - 1715 0 1 69 10 0 0 0 80 0 1 191 31 0 1 2 226 0 0 4 0 0 0 0 4

1715 - 1730 0 0 85 9 1 0 0 95 0 0 197 37 1 1 0 236 0 0 7 1 0 0 0 8

1730 - 1745 1 1 93 8 0 0 0 103 0 1 197 37 1 0 0 236 0 0 13 0 1 0 0 14

1745 - 1800 0 0 85 6 0 0 0 91 0 1 203 20 2 4 0 230 0 0 6 2 0 0 0 8

Hourly Total 1 2 332 33 1 0 0 369 0 3 788 125 4 6 2 928 0 0 30 3 1 0 0 34

1800 - 1815 0 0 87 8 0 0 1 96 0 0 212 21 2 0 0 235 0 0 7 0 0 0 0 7

1815 - 1830 0 1 69 4 0 0 0 74 0 2 226 11 1 1 0 241 0 0 8 0 0 0 0 8

Hourly Total 0 1 156 12 0 0 1 170 0 2 438 32 3 1 0 476 0 0 15 0 0 0 0 15

Session Total 1 3 588 72 2 0 1 667 0 12 1625 230 11 13 2 1893 0 0 60 5 1 0 0 66

Left to Thieves Lane Ahead to A414 (East) Right to Hertingfordbury Road

Page 70: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 201213 Thieves LnA414 EHertingfordbury RdA414 WN/A 7 2 ## TRUE TRUE TRUE FALSE

Junction: Thieves Lane / A414 / Hertingfordbury Road

Vehicle Class:

Start Time:

End Time:

734 95 201

161 NORTH

1575 235

59 2631

96

29 47 198

Note: The above diagram represents the Junction surveyed, although may not be the exact

layout of the actual location.

Important This spreadsheet & Interactive Vehicle Flow Diagram was produced based on specific

Note: parameters. Consequently, alteration to the spreadsheet format or it's properties

may result in malfunction.

Hert

ing

ford

bu

r

y R

oad

A414 (East)A414 (West)

Th

ieves L

an

e

ALL CLASSES

1) 0730

1) 0930

Peak Hour

Page 71: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012

Junction: Thieves Lane / A414 / Hertingfordbury Road

Approach: A414 (West)

TIME Lane 1 Lane 2 Lane 1 Lane 2 Lane 1 Lane 2 Lane 1 Lane 2

0730 - 0745 2 1 2 2 1 0 3 2

0745 - 0800 2 2 3 2 2 0 3 3

0800 - 0815 1 2 4 2 1 0 4 2

0815 - 0830 1 2 6 4 2 3 3 2

0830 - 0845 2 0 7 6 3 2 5 2

0845 - 0900 0 0 6 5 1 2 4 1

0900 - 0915 1 0 4 4 1 2 3 2

0915 - 0930 1 0 4 3 1 1 3 3

1630 - 1645 4 0 6 3 1 0 6 4

1645 - 1700 0 0 7 2 3 2 6 3

1700 - 1715 2 0 5 3 3 3 3 2

1715 - 1730 2 0 4 2 3 2 4 3

1730 - 1745 3 0 7 4 3 2 5 4

1745 - 1800 1 0 5 3 3 1 7 3

1800 - 1815 0 0 5 2 2 2 6 3

1815 - 1830 0 0 4 2 2 1 5 4

Thieves Lane A414 (East) Hertingfordbury Road A414 (West)

Page 72: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400

Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.

Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59

Weather & comments Fine

STRAIGHT ON RIGHT

TO Welwyn Road eastbound INTO Thieves Lane

FROM Welwyn Road FROM Welwyn Road

HCV HCV HCV

HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR

CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C

07:00 0 0 22 0 3 1 0 26 0 0 9 0 1 0 0 10 07:00 36

07:15 0 0 26 0 4 0 0 30 0 0 7 0 2 0 0 9 07:15 39

07:30 0 0 56 0 12 0 0 68 0 0 14 2 6 0 0 22 07:30 90

07:45 0 0 84 2 11 0 0 97 0 1 22 0 3 0 0 26 07:45 123

08:00 0 2 90 1 8 2 0 103 0 0 36 0 1 0 1 38 08:00 141

08:15 0 0 48 2 6 1 1 58 0 0 24 1 1 0 0 26 08:15 84

08:30 0 2 41 2 7 1 1 54 0 0 30 0 2 0 0 32 08:30 86

08:45 0 0 48 0 6 0 0 54 0 0 16 0 4 0 0 20 08:45 74

09:00 0 0 29 0 4 0 0 33 0 0 12 0 2 0 0 14 09:00 47

09:15 0 0 24 0 3 0 0 27 0 0 17 0 0 0 0 17 09:15 44

09:30 0 0 32 5 1 0 0 38 0 0 9 0 0 0 0 9 09:30 47

09:45 0 0 18 1 5 0 0 24 0 0 10 0 0 0 0 10 09:45 34

Totals 0 4 518 13 70 5 2 612 0 1 206 3 22 0 1 Totals 845

STRAIGHT ON RIGHT

TO Welwyn Road eastbound INTO Thieves Lane

FROM Welwyn Road FROM Welwyn Road

12:00 0 0 37 0 3 2 2 44 0 0 5 1 0 0 1 7 12:00 51

12:15 0 0 25 0 4 0 1 30 0 0 8 0 0 0 0 8 12:15 38

12:30 0 0 19 0 1 1 0 21 0 0 9 0 2 0 0 11 12:30 32

T

O

T

A

L

INTO

FROM

Hertfordshire

Highways

T

O

T

A

L

INTO

FROM

12:30 0 0 19 0 1 1 0 21 0 0 9 0 2 0 0 11 12:30 32

12:45 0 3 35 1 5 0 0 44 0 0 11 0 0 0 1 12 12:45 56

13:00 0 0 24 0 4 0 0 28 0 0 8 0 1 0 0 9 13:00 37

13:15 0 0 32 2 2 0 0 36 0 0 10 0 3 1 0 14 13:15 50

13:30 0 0 28 1 2 0 0 31 0 1 6 0 0 0 0 7 13:30 38

13:45 0 0 17 0 3 0 1 21 0 0 8 0 0 0 0 8 13:45 29

Totals 0 3 217 4 24 3 4 255 0 1 65 1 6 1 2 76 Totals 331

STRAIGHT ON RIGHT

TO Welwyn Road eastbound INTO Thieves Lane

FROM Welwyn Road FROM Welwyn Road

16:00 0 0 49 0 8 0 2 59 0 0 14 0 1 1 1 17 16:00 76

16:15 0 2 60 1 10 1 0 74 0 0 11 0 0 1 0 12 16:15 86

16:30 0 1 44 1 6 0 0 52 0 0 9 0 1 0 0 10 16:30 62

16:45 0 0 46 1 5 0 0 52 0 0 12 0 1 0 0 13 16:45 65

17:00 0 0 134 1 8 1 0 144 0 0 21 0 1 0 0 22 17:00 166

17:15 0 0 127 1 6 0 0 134 0 0 16 0 0 0 0 16 17:15 150

17:30 0 0 79 0 3 0 0 82 0 0 14 0 1 0 0 15 17:30 97

17:45 2 0 115 1 3 1 0 120 0 1 37 1 2 0 0 41 17:45 161

18:00 1 0 83 1 8 0 0 92 0 1 19 0 2 0 0 22 18:00 114

18:15 1 2 42 1 4 0 0 49 0 0 7 0 0 0 0 7 18:15 56

18:30 0 0 50 0 3 0 0 53 1 0 21 0 0 0 0 21 18:30 74

18:45 0 2 47 0 0 0 0 49 0 0 11 0 0 0 0 11 18:45 60

Totals 4 7 876 8 64 3 2 960 1 2 192 1 9 2 1 207 Totals 1167

INTO

FROM

T

O

T

A

L

FORM SF-224a SPECIAL ISSUE 3 Page 1 of 4

Page 73: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400

Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.

Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59

Weather & comments Fine Period changeover at 12:15 was delayed to 12:20.

LEFT RIGHT

Welwyn Road westbound TO INTO Welwyn Road eastbound

Thieves Lane FROM FROM Thieves Lane

HCV HCV HCV

HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR

CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C

07:00 0 0 10 0 5 0 0 15 0 0 8 0 3 1 2 14 07:00 29

07:15 0 0 19 0 3 0 0 22 0 0 14 0 7 0 2 23 07:15 45

07:30 0 1 21 0 2 0 0 24 0 0 37 0 5 0 1 43 07:30 67

07:45 1 3 30 0 6 1 0 40 0 0 28 1 9 1 0 39 07:45 79

08:00 0 1 49 1 3 0 0 54 0 0 35 6 8 2 0 51 08:00 105

08:15 0 0 55 0 3 0 0 58 0 0 34 0 0 1 2 37 08:15 95

08:30 0 0 71 0 1 2 0 74 1 0 46 1 0 0 0 47 08:30 121

08:45 0 0 60 0 5 0 0 65 0 0 41 1 2 1 1 46 08:45 111

09:00 0 0 38 0 0 0 0 38 0 0 25 0 5 1 0 31 09:00 69

09:15 0 0 18 0 3 0 0 21 0 0 22 0 3 1 0 26 09:15 47

09:30 0 0 24 0 6 1 0 31 0 0 15 0 0 2 1 18 09:30 49

09:45 0 0 19 0 0 0 1 20 0 0 23 0 1 0 0 24 09:45 44

Totals 1 5 414 1 37 4 1 462 1 0 328 9 43 10 9 Totals 861

LEFT RIGHT

Welwyn Road westbound TO INTO Welwyn Road eastbound

Thieves Lane FROM FROM Thieves Lane

12:00 0 0 11 0 3 0 0 14 0 0 36 0 4 0 1 41 12:00 55

12:15 0 0 9 0 2 0 0 11 0 1 13 0 4 0 0 18 12:15 29

12:30 1 0 15 0 2 0 0 17 1 0 42 0 5 0 0 47 12:30 64

Hertfordshire

Highways

T

O

T

A

L

INTO

FROM

T

O

T

A

L

INTO

FROM

12:30 1 0 15 0 2 0 0 17 1 0 42 0 5 0 0 47 12:30 64

12:45 1 0 20 0 2 0 0 22 0 0 43 0 1 0 0 44 12:45 66

13:00 0 0 12 0 2 0 0 14 0 0 21 0 7 0 1 29 13:00 43

13:15 0 0 15 0 2 0 0 17 0 0 31 1 1 1 0 34 13:15 51

13:30 0 0 10 0 2 1 0 13 0 0 15 0 2 1 0 18 13:30 31

13:45 0 0 17 0 4 2 0 23 0 0 28 1 5 0 0 34 13:45 57

Totals 2 0 109 0 19 3 0 131 1 1 229 2 29 2 2 265 Totals 396

LEFT RIGHT

Welwyn Road westbound TO INTO Welwyn Road eastbound

Thieves Lane FROM FROM Thieves Lane

16:00 0 2 18 1 2 0 0 23 0 0 49 0 12 0 0 61 16:00 84

16:15 0 1 28 0 6 0 0 35 0 0 52 0 12 0 0 64 16:15 99

16:30 0 0 25 0 1 0 0 26 0 0 60 0 11 0 0 71 16:30 97

16:45 0 0 27 0 4 0 0 31 0 1 90 0 10 2 0 103 16:45 134

17:00 0 0 36 0 9 0 0 45 0 1 94 0 22 1 0 118 17:00 163

17:15 0 0 22 0 1 0 0 23 0 0 83 2 8 0 0 93 17:15 116

17:30 0 0 36 0 5 0 0 41 0 0 106 1 8 2 0 117 17:30 158

17:45 1 0 32 0 2 1 0 35 0 2 82 0 7 0 0 91 17:45 126

18:00 0 1 25 0 3 0 0 29 0 0 87 0 10 3 0 100 18:00 129

18:15 0 1 32 0 1 0 0 34 0 0 62 0 6 0 0 68 18:15 102

18:30 0 0 25 0 2 0 0 27 0 0 63 0 3 0 0 66 18:30 93

18:45 0 0 19 0 2 0 0 21 0 0 43 0 2 0 0 45 18:45 66

Totals 1 5 325 1 38 1 0 370 0 4 871 3 111 8 0 997 Totals 1367

T

O

T

A

L

INTO

FROM

FORM SF-224a SPECIAL ISSUE 3 Page 2 of 4

Page 74: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400

Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.

Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59

Weather & comments Fine

LEFT STRAIGHT ON

Thieves Lane TO Welwyn Road westbound INTO

Welwyn Road FROM Welwyn Road FROM

HCV HCV HCV

HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR

CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C

07:00 0 0 31 0 7 0 0 38 1 1 35 1 5 1 0 43 07:00 81

07:15 0 0 43 1 13 0 1 58 2 1 45 1 9 0 0 56 07:15 114

07:30 0 2 77 0 5 1 1 86 0 2 76 3 10 0 0 91 07:30 177

07:45 0 2 80 0 9 4 1 96 0 0 111 0 11 0 0 122 07:45 218

08:00 0 2 85 1 3 0 1 92 1 0 89 1 10 1 0 101 08:00 193

08:15 0 1 100 0 11 1 0 113 1 1 94 0 11 2 0 108 08:15 221

08:30 0 0 87 2 10 2 0 101 0 0 73 0 4 0 1 78 08:30 179

08:45 0 0 79 0 5 0 0 84 0 0 49 4 3 0 0 56 08:45 140

09:00 0 0 72 2 8 2 1 85 0 1 46 1 4 2 0 54 09:00 139

09:15 0 1 42 0 4 4 0 51 0 0 37 0 4 1 0 42 09:15 93

09:30 0 1 39 2 4 0 0 46 0 1 33 1 3 0 0 38 09:30 84

09:45 0 0 39 0 3 2 0 44 0 0 41 0 4 1 0 46 09:45 90

Totals 0 9 774 8 82 16 5 894 5 7 729 12 78 8 1 835 Totals 1729

LEFT STRAIGHT ON

Thieves Lane TO Welwyn Road westbound INTO

Welwyn Road FROM Welwyn Road FROM

12:00 1 0 33 0 3 0 0 36 0 0 31 0 8 0 0 39 12:00 75

12:15 1 0 29 1 1 1 0 32 1 0 23 0 7 1 0 31 12:15 63

12:30 2 0 25 1 5 1 0 32 0 0 33 1 4 1 0 39 12:30 71

Hertfordshire

Highways

T

O

T

A

L

INTO

FROM

T

O

T

A

L

INTO

FROM

12:30 2 0 25 1 5 1 0 32 0 0 33 1 4 1 0 39 12:30 71

12:45 0 0 30 0 7 0 1 38 0 0 22 1 2 1 0 26 12:45 64

13:00 0 0 29 0 5 0 0 34 0 0 18 0 6 0 1 25 13:00 59

13:15 0 0 21 0 5 1 0 27 0 1 27 0 4 0 1 33 13:15 60

13:30 0 0 19 1 4 1 0 25 0 1 33 1 6 0 0 41 13:30 66

13:45 0 0 28 0 1 0 1 30 0 0 18 0 6 0 0 24 13:45 54

Totals 4 0 214 3 31 4 2 254 1 2 205 3 43 3 2 258 Totals 512

LEFT STRAIGHT ON

Thieves Lane TO Welwyn Road westbound INTO

Welwyn Road FROM Welwyn Road FROM

16:00 0 0 25 1 4 1 0 31 0 0 39 0 6 0 0 45 16:00 76

16:15 0 0 37 3 7 0 1 48 0 0 27 1 6 0 0 34 16:15 82

16:30 0 0 33 0 2 1 0 36 0 1 38 1 6 1 0 47 16:30 83

16:45 0 0 31 0 3 0 0 34 0 0 47 0 9 0 0 56 16:45 90

17:00 0 1 34 2 5 1 0 43 0 2 40 0 3 0 0 45 17:00 88

17:15 0 0 34 0 2 0 0 36 0 0 44 0 6 0 0 50 17:15 86

17:30 0 0 41 0 4 0 0 45 0 0 42 0 5 0 0 47 17:30 92

17:45 0 1 37 0 2 0 0 40 0 2 38 0 1 0 0 41 17:45 81

18:00 0 1 44 1 2 1 0 49 0 0 34 1 6 0 0 41 18:00 90

18:15 0 0 34 1 0 0 0 35 0 0 31 0 4 0 0 35 18:15 70

18:30 1 0 37 0 4 0 0 41 0 1 28 0 3 0 0 32 18:30 73

18:45 0 0 17 1 4 0 0 22 0 0 27 0 1 0 0 28 18:45 50

Totals 1 3 404 9 39 4 1 460 0 6 435 3 56 1 0 501 Totals 961

T

O

T

A

L

INTO

FROM

FORM SF-224a SPECIAL ISSUE 3 Page 3 of 4

Page 75: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page I-9

Appendix: I ASSIGNMENT MODEL

Page 76: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 103

141 3% 38

Welwyn Road W Welwyn Road E

155 101 2%

92 2%

54 51

2% 16%

2%

130 1

Turpin

Close

63 1 4

2

132

63

6%

Thieves Lane

1% 0% 0%

85 4 28

4% 28

3% 208

0% 11

A414 West A414 East

26 4%

367 2%

13 0%

6 9 21

0% 22% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T1

BASELINE SURVEYS AM PEAK 08:00-08:15

DEVELOPMENT SITE

Page 77: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

7% 58

84 4% 26

Welwyn Road W Welwyn Road E

166 108 2%

113 2%

58 37

0% 8%

2%

139 0.8

Turpin

Close

64 1 4

2

141

64

3%

Thieves Lane

0% 0% 0%

98 15 27

0% 20

4% 211

0% 9

A414 West A414 East

38 5%

312 2%

25 0%

2 6 20

0% 0% 5%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T2

BASELINE SURVEYS AM PEAK 08:15-08:30

DEVELOPMENT SITE

Page 78: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

7% 54

86 0% 32

Welwyn Road W Welwyn Road E

152 78 1%

101 1%

74 47

3% 2%

1%

133 1

Turpin

Close

72 1 4

2

135

72

0%

Thieves Lane

0% 0% 6%

131 38 35

0% 19

6% 176

0% 18

A414 West A414 East

44 0%

308 3%

18 0%

5 9 27

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T3

BASELINE SURVEYS AM PEAK 08:30-08:45

DEVELOPMENT SITE

Page 79: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

0% 54

74 0% 20

Welwyn Road W Welwyn Road E

121 56 7%

84 7%

65 46

0% 7%

6%

104 1

Turpin

Close

68 1 4

2

106

68

1%

Thieves Lane

0% 0% 0%

94 20 22

7% 15

3% 181

0% 8

A414 West A414 East

44 0%

331 4%

12 0%

7 9 32

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T4

BASELINE SURVEYS AM PEAK 08:45-09:00

DEVELOPMENT SITE

Page 80: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

4% 269

385 2% 116

Welwyn Road W Welwyn Road E

594 343 3%

390 3%

251 181

1% 8%

3%

506 3

Turpin

Close

267 2 16

9

515

267

2%

Thieves Lane

0% 0% 2%

408 77 112

2% 82

4% 776

0% 46

A414 West A414 East

152 2%

1318 3%

68 0%

20 33 100

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T5

BASELINE SURVEYS AM PEAK 08:00-09:00

DEVELOPMENT SITE

Page 81: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

70% 21

3 30% 23% 13

Welwyn Road W 25% 3 Welwyn Road E

14 7

6 30 9 75% 12 77%

16% 85%

16 42

25% 75%

Dwellings 80

Trips

In Out 24

AM 12 36

PM 36 12

58

Trip Rate

In Out

AM 0.15 0.45 50%

PM 0.45 0.15 62% 56 15 9

38% 34

Dwellings 200

Trips 15 2

In Out 50%

AM 30 90

PM 90 30

Thieves Lane

68% 13% 19%

30 6 8

31% 5

A414 West A414 East

10 57%

2

12%

Hertingfordbury Rd

FIGURE T6

PROPOSED DEVELOPMENT TRAFFIC AM PEAK

DEVELOPMENT SITE

Page 82: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

70% 5

1 30% 23% 3

Welwyn Road W 25% 1 Welwyn Road E

3 2

1 8 2 75% 3 77%

16% 85%

4 10

25% 75%

Dwellings 80

Trips

In Out 6

AM 3 9

PM 9 3

14

Trip Rate

In Out

AM 0.04 0.11 50%

PM 0.11 0.04 62% 14 4 2

38% 9

Dwellings 200

Trips 4 1

In Out 50%

AM 8 23

PM 23 8

Thieves Lane

68% 13% 19%

7 1 2

31% 1

A414 West A414 East

2 57%

1

12%

Hertingfordbury Rd

FIGURE T7

PROPOSED DEVELOPMENT TRAFFIC AM PEAK - 15 MINUTE INTERVAL

DEVELOPMENT SITE

Page 83: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 108

142 3% 41

Welwyn Road W 1 Welwyn Road E

158 103 2%

1 8 2 95 2%

58 61

2% 16%

2%

136 1

Turpin

Close

77 1 4

2

135

64

6%

Thieves Lane

1% 0% 0%

92 5 30

4% 29

3% 208

0% 11

A414 West A414 East

28 4%

367 2%

13 0%

6 10 21

0% 22% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T8

BASELINE + DEVELOPMENT AM PEAK 08:00-08:15

DEVELOPMENT SITE

Page 84: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

7% 63

85 4% 29

Welwyn Road W 1 Welwyn Road E

169 110 2%

1 8 2 116 2%

62 47

0% 8%

2%

145

Turpin

Close

78 1 4

2

14 4 144

9

4 65

3%

Thieves Lane

0% 0% 0%

105 16 29

0% 21

4% 211

0% 9

A414 West A414 East

40 5%

312 2%

25 0%

2 7 20

0% 0% 5%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T9

BASELINE + DEVELOPMENT AM PEAK 08:15-08:30

DEVELOPMENT SITE

Page 85: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

7% 59

87 0% 35

Welwyn Road W 1 Welwyn Road E

155 80 1%

1 8 2 104 1%

78 57

3% 2%

1%

139 1

Turpin

Close

86 1 4

2

14 4 138

9

4 73

0%

Thieves Lane

0% 0% 6%

138 39 37

0% 20

6% 176

0% 18

A414 West A414 East

46 0%

308 3%

18 0%

5 10 27

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T10

BASELINE + DEVELOPMENT AM PEAK 08:30-08:45

DEVELOPMENT SITE

Page 86: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

0% 59

75 0% 23

Welwyn Road W 1 0 Welwyn Road E

124 58 7%

1 8 2 87 7%

69 56

0% 7%

0

110

Turpin

Close

82 1 4

2

1

14 4 109

9

4 69

2%

Thieves Lane

0% 0% 0%

101 21 24

7% 16

3% 181

0% 8

A414 West A414 East

46 0%

331 4%

12 0%

7 10 32

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T11

BASELINE + DEVELOPMENT AM PEAK 08:45-09:00

DEVELOPMENT SITE

Page 87: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

4% 290

388 2% 129

Welwyn Road W 3 Welwyn Road E

608 350 3%

6 30 9 402 3%

267 223

1% 8%

3%

530 3

Turpin

Close

325 2 16

9

56 15 524

34

15 269

3%

Thieves Lane

0% 0% 2%

438 83 120

2% 87

4% 776

0% 46

A414 West A414 East

162 2%

1318 3%

68 0%

20 35 100

0% 6% 1%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T12

BASELINE + DEVELOPMENT AM PEAK 08:00-09:00

DEVELOPMENT SITE

Page 88: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 144

166 0% 22

Welwyn Road W Welwyn Road E

90 45 0%

43 0%

45 118

0% 1%

0%

65 5

Turpin

Close

144 2 1

1

66

144

1%

Thieves Lane

6% 0% 0%

35 5 9

0% 80

3% 226

0% 4

A414 West A414 East

56 4%

197 2%

8 0%

5 8 23

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T13

BASELINE SURVEYS PM PEAK 17:00-17:15

DEVELOPMENT SITE

Page 89: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 134

150 0% 16

Welwyn Road W Welwyn Road E

73 50 0%

36 0%

23 93

0% 2%

0%

52 5

Turpin

Close

175 2 1

1

53

175

2%

Thieves Lane

0% 0% 0%

38 6 18

1% 95

2% 236

0% 8

A414 West A414 East

70 4%

162 2%

12 0%

4 10 20

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T14

BASELINE SURVEYS PM PEAK 17:15-17:30

DEVELOPMENT SITE

Page 90: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 82

97 0% 15

Welwyn Road W Welwyn Road E

88 47 0%

45 0%

41 117

0% 3%

0%

60 5

Turpin

Close

166 2 1

1

61

166

1%

Thieves Lane

0% 0% 0%

35 5 22

0% 103

1% 236

7% 14

A414 West A414 East

54 4%

170 2%

11 0%

2 9 20

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T15

BASELINE SURVEYS PM PEAK 17:30-17:45

DEVELOPMENT SITE

Page 91: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 120

161 2% 41

Welwyn Road W Welwyn Road E

76 41 0%

40 0%

35 91

3% 0%

1%

81 5

Turpin

Close

175 2 1

1

82

175

2%

Thieves Lane

0% 0% 0%

34 3 21

0% 91

3% 230

0% 8

A414 West A414 East

69 4%

192 2%

16 0%

3 15 25

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T16

BASELINE SURVEYS PM PEAK 17:45-18:00

DEVELOPMENT SITE

Page 92: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 480

574 1% 94

Welwyn Road W Welwyn Road E

327 183 0%

164 0%

144 419

1% 1%

0%

258 19

Turpin

Close

660 9 3

2

260

660

2%

Thieves Lane

1% 0% 0%

142 19 70

0% 369

2% 928

3% 34

A414 West A414 East

249 4%

721 2%

47 0%

14 42 88

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T17

BASELINE SURVEYS PM PEAK 17:00-18:00

DEVELOPMENT SITE

Page 93: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

84% 8

21 16% 37% 22

Welwyn Road W 16% 6 Welwyn Road E

4 19

3 9 30 85% 35 63%

25% 75%

15 11

25% 75%

Dwellings 80

Trips

In Out 57

AM 12 36

PM 36 12

26

Trip Rate

In Out

AM 0.15 0.45 62%

PM 0.45 0.15 50% 15 56 1

50% 15

Dwellings 200

Trips 34 11

In Out 38%

AM 30 90

PM 90 30

Thieves Lane

62% 8% 30%

10 1 5

56% 25

A414 West A414 East

17 38%

3

6%

Hertingfordbury Rd

FIGURE T18

PROPOSED DEVELOPMENT TRAFFIC PM PEAK

DEVELOPMENT SITE

Page 94: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

84% 2

5 16% 37% 6

Welwyn Road W 16% 1 Welwyn Road E

1 5

1 2 8 85% 9 63%

25% 75%

4 3

25% 75%

Dwellings 80

Trips

In Out 14

AM 12 36

PM 36 12

7

Trip Rate

In Out

AM 0.15 0.45 62%

PM 0.45 0.15 50% 4 14

50% 4

Dwellings 200

Trips 9 3

In Out 38%

AM 30 90

PM 90 30

Thieves Lane

62% 8% 30%

3 0 1

56% 6

A414 West A414 East

4 38%

1

6%

Hertingfordbury Rd

FIGURE T19

PROPOSED DEVELOPMENT TRAFFIC PM PEAK 15MIN INTERVALS

DEVELOPMENT SITE

Page 95: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 146

171 0% 28

Welwyn Road W 1 Welwyn Road E

91 50 0%

1 2 8 52 0%

49 121

0% 1%

0%

79 5

Turpin

Close

151 2 1

1

4 14 66

4

9 147

1%

Thieves Lane

6% 0% 0%

38 5 10

0% 86

3% 226

0% 4

A414 West A414 East

60 4%

197 2%

8 0%

5 9 23

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T20

BASELINE + DEVELOPMENT PM PEAK 17:00-17:15

DEVELOPMENT SITE

Page 96: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 136

155 0% 22

Welwyn Road W 1 Welwyn Road E

74 55 0%

1 2 8 45 0%

27 96

0% 2%

0%

66 5

Turpin

Close

182 2 1

1

4 14 53

4

9 178

2%

Thieves Lane

0% 0% 0%

41 6 19

1% 101

2% 236

0% 8

A414 West A414 East

74 4%

162 2%

12 0%

4 11 20

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T21

BASE + DEVELOPMENT PM PEAK 17:15-17:30

DEVELOPMENT SITE

Page 97: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 84

102 0% 21

Welwyn Road W 1 Welwyn Road E

89 52 0%

1 2 8 54 0%

45 120

0% 3%

0%

74 5

Turpin

Close

173 2 1

1

4 14 61

4

9 169

1%

Thieves Lane

0% 0% 0%

38 5 23

0% 109

1% 236

7% 14

A414 West A414 East

58 4%

170 2%

11 0%

2 10 20

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T22

BASE + DEVELOPMENT PM PEAK 17:30-17:45

DEVELOPMENT SITE

Page 98: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 122

166 2% 47

Welwyn Road W 1 Welwyn Road E

77 46 0%

1 2 8 49 0%

39 94

3% 0%

1%

95 5

Turpin

Close

182 2 1

1

4 14 82

4

178

2%

Thieves Lane

0% 0% 0%

37 3 22

0% 97

3% 230

0% 8

A414 West A414 East

73 4%

192 2%

16 0%

3 16 25

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T23

BASE + DEVELOPMENT PM PEAK 17:45-18:00

DEVELOPMENT SITE

Page 99: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Welwyn Road Roundabout

3% 488

595 1% 116

Welwyn Road W 6 Welwyn Road E

331 202 0%

3 9 30 199 0%

159 430

1% 1%

0%

315 19

Turpin

Close

686 9 3

2

15 56 261

15

34 671

1%

Thieves Lane

1% 0% 0%

152 20 75 0

0% 394

2% 928

3% 34

A414 West A414 East

266 4%

721 2%

47 0%

14 45 88

0% 0% 0%

Hertingfordbury Rd

Key:

100 Total no. of vehicles

10% Percentage HGVs (inc PSVs)

FIGURE T24

BASE + DEVELOPMENT PM PEAK 17:00-18:00

DEVELOPMENT SITE

Page 100: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page J-10

Appendix: J TRICS DATA

Page 101: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

LIST OF SITES relevant to selection parameters

1 BD-03-A-01SEMI DETACHED, LUTONBEDFORDSHIRE

NEW BEDFORD ROAD

LUTON

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 131

Survey date:THURSDAY 08/07/2004 Survey Type:MANUAL

2 BD-03-A-02SEMI DETACHED, LUTONBEDFORDSHIRE

RIDDY LANE

LUTON

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 82

Survey date:TUESDAY 06/07/2004 Survey Type:MANUAL

3 CA-03-A-02MIXED HOUSES, PETERBOROUGHCAMBRIDGESHIRE

THORPE ROAD

PETERBOROUGH

Edge of Town Centre

Residential Zone

Total Number of dwellings: 363

Survey date:THURSDAY 13/05/2004 Survey Type:MANUAL

4 CA-03-A-04DETACHED, PETERBOROUGHCAMBRIDGESHIRE

THORPE PARK ROAD

PETERBOROUGH

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 9

Survey date:TUESDAY 18/10/2011 Survey Type:MANUAL

5 CB-03-A-03SEMI DETACHED, WORKINGTONCUMBRIA

HAWKSHEAD AVENUE

WORKINGTON

Edge of Town

Residential Zone

Total Number of dwellings: 40

Survey date:THURSDAY 20/11/2008 Survey Type:MANUAL

6 CB-03-A-04SEMI DETACHED, WORKINGTONCUMBRIA

MOORCLOSE ROAD

SALTERBACK

WORKINGTON

Edge of Town

No Sub Category

Page 102: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Total Number of dwellings: 82

Survey date:FRIDAY 24/04/2009 Survey Type:MANUAL

7 CH-03-A-05DETACHED, CREWECHESHIRE

SYDNEY ROAD

SYDNEY

CREWE

Edge of Town

Residential Zone

Total Number of dwellings: 17

Survey date:TUESDAY 14/10/2008 Survey Type:MANUAL

8 CH-03-A-06SEMI-DET./BUNGALOWS,CREWECHESHIRE

CREWE ROAD

CREWE

Suburban Area (PPS6 Out of Centre)

No Sub Category

Total Number of dwellings: 129

Survey date:TUESDAY 14/10/2008 Survey Type:MANUAL

9 CH-03-A-08DETACHED, CHESTERCHESHIRE

WHITCHURCH ROAD

BOUGHTON HEATH

CHESTER

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 11

Survey date:TUESDAY 22/05/2012 Survey Type:MANUAL

10 CW-03-A-01TERRACED, PENZANCECORNWALL

ALVERTON ROAD

PENZANCE

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 13

Survey date:THURSDAY 30/06/2005 Survey Type:MANUAL

11 CW-03-A-02SEMI D./DETATCHED, TRUROCORNWALL

BOSVEAN GARDENS

TRURO

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 73

Survey date:TUESDAY 18/09/2007 Survey Type:MANUAL

12 DS-03-A-01SEMI D./TERRACED, DRONFIELDDERBYSHIRE

THE AVENUE

HOLMESDALE

DRONFIELD

Neighbourhood Centre (PPS6 Local Centre)

Page 103: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Residential Zone

Total Number of dwellings: 20

Survey date:THURSDAY 22/06/2006 Survey Type:MANUAL

13 ES-03-A-02 PRIVATE HOUSING,PEACEHAVENEAST SUSSEX

SOUTH COAST ROAD

PEACEHAVEN

Edge of Town

Residential Zone

Total Number of dwellings: 37

Survey date:FRIDAY 18/11/2011 Survey Type:MANUAL

14 EX-03-A-01 SEMI-DET., STANFORD-LE-HOPEESSEX

MILTON ROAD

CORRINGHAM

STANFORD-LE-HOPE

Edge of Town

Residential Zone

Total Number of dwellings: 237

Survey date:TUESDAY 13/05/2008 Survey Type:MANUAL

15 GM-03-A-10DETACHED/SEMI, MANCHESTERGREATER MANCHESTER

BUTT HILL DRIVE

PRESTWICH

MANCHESTER

Edge of Town

Residential Zone

Total Number of dwellings: 29

Survey date:WEDNESDAY 12/10/2011 Survey Type:MANUAL

16 GS-03-A-01SEMI D./TERRACED, GLOUCESTERGLOUCESTERSHIRE

KINGSHOLM ROAD

KINGSHOLM

GLOUCESTER

Edge of Town Centre

No Sub Category

Total Number of dwellings: 73

Survey date:TUESDAY 25/05/2004 Survey Type:MANUAL

17 LC-03-A-22 BUNGALOWS, BLACKPOOLLANCASHIRE

CLIFTON DRIVE NORTH

BLACKPOOL

Edge of Town

Residential Zone

Total Number of dwellings: 98

Survey date:TUESDAY 18/10/2005 Survey Type:MANUAL

18 LC-03-A-29 DETACHED/SEMI D., BLACKBURNLANCASHIRE

REVIDGE ROAD

FOUR LANE ENDS

BLACKBURN

Page 104: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Edge of Town

Residential Zone

Total Number of dwellings: 185

Survey date:THURSDAY 10/06/2004 Survey Type:MANUAL

19 LE-03-A-01 DETACHED, MELTON MOWBRAYLEICESTERSHIRE

REDWOOD AVENUE

MELTON MOWBRAY

Edge of Town

Residential Zone

Total Number of dwellings: 11

Survey date:TUESDAY 03/05/2005 Survey Type:MANUAL

20 LN-03-A-01MIXED HOUSES, LINCOLNLINCOLNSHIRE

BRANT ROAD

BRACEBRIDGE

LINCOLN

Edge of Town

Residential Zone

Total Number of dwellings: 150

Survey date:TUESDAY 15/05/2007 Survey Type:MANUAL

21 LN-03-A-02MIXED HOUSES, LINCOLNLINCOLNSHIRE

HYKEHAM ROAD

LINCOLN

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 186

Survey date:MONDAY 14/05/2007 Survey Type:MANUAL

22 LN-03-A-03SEMI DETACHED, LINCOLNLINCOLNSHIRE

ROOKERY LANE

BOULTHAM

LINCOLN

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 22

Survey date:TUESDAY 18/09/2012 Survey Type:MANUAL

23 MS-03-A-01TERRACED, RUNCORNMERSEYSIDE

PALACE FIELDS AVENUE

RUNCORN

Neighbourhood Centre (PPS6 Local Centre)

Residential Zone

Total Number of dwellings: 372

Survey date:THURSDAY 06/10/2005 Survey Type:MANUAL

24 NT-03-A-03SEMI DETACHED,KIRKBY-IN-ASHFDNOTTINGHAMSHIRE

B6018 SUTTON ROAD

Page 105: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

KIRKBY-IN-ASHFIELD

Edge of Town

Residential Zone

Total Number of dwellings: 166

Survey date:WEDNESDAY 28/06/2006 Survey Type:MANUAL

25 NY-03-A-01MIXED HOUSES,NORTHALLERTONNORTH YORKSHIRE

GRAMMAR SCHOOL LANE

NORTHALLERTON

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 52

Survey date:TUESDAY 25/09/2007 Survey Type:MANUAL

26 NY-03-A-03PRIVATE HOUSING, BOROUGHBRIDGENORTH YORKSHIRE

NEW ROW

BOROUGHBRIDGE

Edge of Town Centre

Residential Zone

Total Number of dwellings: 14

Survey date:MONDAY 15/09/2008 Survey Type:MANUAL

27 NY-03-A-05HOUSES AND FLATS, RIPONNORTH YORKSHIRE

BOROUGHBRIDGE ROAD

RIPON

Edge of Town

No Sub Category

Total Number of dwellings: 71

Survey date:MONDAY 22/09/2008 Survey Type:MANUAL

28 NY-03-A-06BUNGALOWS/SEMI DET., BBDGENORTH YORKSHIRE

HORSEFAIR

BOROUGHBRIDGE

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 115

Survey date:FRIDAY 14/10/2011 Survey Type:MANUAL

29 SF-03-A-01 SEMI DETACHED, IPSWICHSUFFOLK

A1156 FELIXSTOWE ROAD

RACECOURSE

IPSWICH

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 77

Survey date:WEDNESDAY 23/05/2007 Survey Type:MANUAL

30 SF-03-A-02 SEMI DET./TERRACED, IPSWICHSUFFOLK

STOKE PARK DRIVE

Page 106: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

MAIDENHALL

IPSWICH

Edge of Town

Residential Zone

Total Number of dwellings: 230

Survey date:THURSDAY 24/05/2007 Survey Type:MANUAL

31 SF-03-A-03 MIXED HOUSES, BURY ST EDMDSSUFFOLK

BARTON HILL

FORNHAM ST MARTIN

BURY ST EDMUNDS

Edge of Town

Out of Town

Total Number of dwellings: 101

Survey date:MONDAY 15/05/2006 Survey Type:MANUAL

32 SH-03-A-03DETATCHED, SHREWSBURYSHROPSHIRE

SOMERBY DRIVE

BICTON HEATH

SHREWSBURY

Edge of Town

No Sub Category

Total Number of dwellings: 10

Survey date:FRIDAY 26/06/2009 Survey Type:MANUAL

33 SH-03-A-04TERRACED, SHREWSBURYSHROPSHIRE

ST MICHAEL'S STREET

SHREWSBURY

Suburban Area (PPS6 Out of Centre)

No Sub Category

Total Number of dwellings: 108

Survey date:THURSDAY 11/06/2009 Survey Type:MANUAL

34 ST-03-A-05 TERRACED/DETACHED, STOKESTAFFORDSHIRE

WATERMEET GROVE

ETRURIA

STOKE-ON-TRENT

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 14

Survey date:WEDNESDAY 26/11/2008 Survey Type:MANUAL

35 TV-03-A-01MIXED HOUSES/FLATS, HARTLEPLTEES VALLEY

POWLETT ROAD

HARTLEPOOL

Suburban Area (PPS6 Out of Centre)

No Sub Category

Total Number of dwellings: 225

Survey date:THURSDAY 14/04/2005 Survey Type:MANUAL

36 WL-03-A-01SEMI D./TERRACED W. BASSETTWILTSHIRE

Page 107: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

MAPLE DRIVE

WOOTTON BASSETT

Edge of Town

Residential Zone

Total Number of dwellings: 99

Survey date:MONDAY 02/10/2006 Survey Type:MANUAL

37 WM-03-A-01TERRACED, COVENTRYWEST MIDLANDS

FOLESHILL ROAD

FOLESHILL

COVENTRY

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 79

Survey date:FRIDAY 03/02/2006 Survey Type:MANUAL

38 WM-03-A-02DETACHED/SEMI D., STRBRIDGEWEST MIDLANDS

HEATH STREET

STOURBRIDGE

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 12

Survey date:WEDNESDAY 26/04/2006 Survey Type:MANUAL

39 WM-03-A-03MIXED HOUSING, COVENTRYWEST MIDLANDS

BASELEY WAY

ROWLEYS GREEN

COVENTRY

Edge of Town

Residential Zone

Total Number of dwellings: 84

Survey date:MONDAY 24/09/2007 Survey Type:MANUAL

40 WO-03-A-01DETACHED, BROMSGROVEWORCESTERSHIRE

MARLBOROUGH AVENUE

ASTON FIELDS

BROMSGROVE

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 10

Survey date:THURSDAY 23/06/2005 Survey Type:MANUAL

41 WO-03-A-02SEMI DETACHED, REDDITCHWORCESTERSHIRE

MEADOWHILL ROAD

REDDITCH

Edge of Town

No Sub Category

Total Number of dwellings: 48

Survey date:TUESDAY 02/05/2006 Survey Type:MANUAL

Page 108: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

42 WO-03-A-03DETACHED, KIDDERMINSTERWORCESTERSHIRE

BLAKEBROOK

BLAKEBROOK

KIDDERMINSTER

Suburban Area (PPS6 Out of Centre)

Residential Zone

Total Number of dwellings: 138

Survey date:FRIDAY 05/05/2006 Survey Type:MANUAL

43 WO-03-A-06DET./TERRACED, BROMSGROVEWORCESTERSHIRE

ST GODWALDS ROAD

ASTON FIELDS

BROMSGROVE

Edge of Town

No Sub Category

Total Number of dwellings: 232

Survey date:THURSDAY 30/06/2005 Survey Type:MANUAL

Page 109: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNED

Calculation Factor: 1 DWELLS

Count Type: VEHICLES

ARRIVALS DEPARTURES TOTALS

No. Ave. Trip No. Ave. Trip No. Ave. Trip

Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate

00:00-01:00

01:00-02:00

02:00-03:00

03:00-04:00

04:00-05:00

05:00-06:00

06:00-07:00

07:00-08:00 43 99 0.073 43 99 0.265 43 99 0.338

08:00-09:00 43 99 0.16 43 99 0.406 43 99 0.566

09:00-10:00 43 99 0.178 43 99 0.213 43 99 0.391

10:00-11:00 43 99 0.152 43 99 0.19 43 99 0.342

11:00-12:00 43 99 0.19 43 99 0.179 43 99 0.369

12:00-13:00 43 99 0.202 43 99 0.183 43 99 0.385

13:00-14:00 43 99 0.183 43 99 0.177 43 99 0.36

14:00-15:00 43 99 0.193 43 99 0.196 43 99 0.389

15:00-16:00 43 99 0.282 43 99 0.217 43 99 0.499

16:00-17:00 43 99 0.322 43 99 0.196 43 99 0.518

17:00-18:00 43 99 0.381 43 99 0.228 43 99 0.609

18:00-19:00 43 99 0.272 43 99 0.221 43 99 0.493

19:00-20:00

20:00-21:00

21:00-22:00

22:00-23:00

23:00-24:00

Daily Trip Rates: 2.588 2.671 5.259

Page 110: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Page K-11

Appendix: K ARCADY RESULTS

Page 111: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vai"(drive-on-the-left ) at 17:13:24 on Wednesday, 12 December 2012

FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:

INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST

GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle

TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown

SCALING FACTORS

----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(08.00)AND ENDS(09.00)

Page 112: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 113: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES

LENGTH OF TIME SEGMENT - (15) MINUTES

DEMAND FLOW PROFILES ARE INPUT DIRECTLY.

DEMAND SET TITLE: EXISTING 2012 DEMAND SET TITLE: EXISTING 2012

Page 114: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.167 I 0.250 I 0.583 I I I I 0.0 I 6.0 I 9.0 I 21.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.045 I 0.000 I 0.113 I 0.842 I I I I 11.0 I 0.0 I 28.0 I 208.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.034 I 0.726 I 0.000 I 0.239 I I I I 4.0 I 85.0 I 0.0 I 28.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.032 I 0.904 I 0.064 I 0.000 I I I I 13.0 I 367.0 I 26.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.071 I 0.214 I 0.714 I I I I 0.0 I 2.0 I 6.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.038 I 0.000 I 0.083 I 0.879 I I I I 9.0 I 0.0 I 20.0 I 211.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.107 I 0.700 I 0.000 I 0.193 I I I I 15.0 I 98.0 I 0.0 I 27.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.067 I 0.832 I 0.101 I 0.000 I I I I 25.0 I 312.0 I 38.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.122 I 0.220 I 0.659 I I I I 0.0 I 5.0 I 9.0 I 27.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.085 I 0.000 I 0.089 I 0.826 I I I I 18.0 I 0.0 I 19.0 I 176.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.186 I 0.642 I 0.000 I 0.172 I I I I 38.0 I 131.0 I 0.0 I 35.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.049 I 0.832 I 0.119 I 0.000 I I I I 18.0 I 308.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.146 I 0.188 I 0.667 I I I I 0.0 I 7.0 I 9.0 I 32.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.039 I 0.000 I 0.074 I 0.887 I I I I 8.0 I 0.0 I 15.0 I 181.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.147 I 0.691 I 0.000 I 0.162 I I I I 20.0 I 94.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.031 I 0.855 I 0.114 I 0.000 I I I I 12.0 I 331.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------

QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------

Page 115: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.00-08.15 I I ARM A 2.40 11.50 0.209 - - - 0.0 0.3 3.8 - 0.110 I I ARM B 16.47 37.54 0.439 - - - 0.0 0.8 11.4 - 0.047 I I ARM C 7.80 17.23 0.453 - - - 0.0 0.8 11.7 - 0.105 I I ARM D 27.07 29.37 0.922 - - - 0.0 9.1 108.2 - 0.300 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.15-08.30 I I ARM A 1.87 12.29 0.152 - - - 0.3 0.2 2.8 - 0.096 I I ARM B 16.00 37.12 0.431 - - - 0.8 0.8 11.5 - 0.047 I I ARM C 9.33 17.22 0.542 - - - 0.8 1.2 16.8 - 0.126 I I ARM D 25.00 28.50 0.877 - - - 9.1 7.8 123.8 - 0.302 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.30-08.45 I I ARM A 2.73 11.21 0.243 - - - 0.2 0.3 4.6 - 0.118 I I ARM B 14.20 36.49 0.389 - - - 0.8 0.6 9.7 - 0.045 I I ARM C 13.60 17.91 0.760 - - - 1.2 3.0 40.5 - 0.221 I I ARM D 24.67 25.94 0.951 - - - 7.8 12.6 160.8 - 0.524 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.45-09.00 I I ARM A 3.20 11.45 0.280 - - - 0.3 0.4 5.6 - 0.121 I I ARM B 13.60 36.15 0.376 - - - 0.6 0.6 9.2 - 0.044 I I ARM C 9.07 17.90 0.507 - - - 3.0 1.0 16.7 - 0.117 I I ARM D 25.80 28.40 0.908 - - - 12.6 11.3 176.3 - 0.419 I I I ------------------------------------------------------------------------------------------------------------------

QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.3 08.30 0.2 08.45 0.3 09.00 0.4

QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 0.8 * 08.45 0.6 * 09.00 0.6 *

Page 116: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 6 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 1.2 * 08.45 3.0 *** 09.00 1.0 *

QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 9.1 ********* 08.30 7.8 ******** 08.45 12.6 ************* 09.00 11.3 ***********

QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 153.0 I 153.0 I 16.8 I 0.11 I 16.8 I 0.11 I I B I 904.1 I 904.1 I 41.8 I 0.05 I 41.8 I 0.05 I I C I 597.0 I 597.0 I 85.7 I 0.14 I 85.7 I 0.14 I I D I 1538.1 I 1538.1 I 569.1 I 0.37 I 571.3 I 0.37 I ---------------------------------------------------------------------------- I ALL I 3192.1 I 3192.1 I 713.4 I 0.22 I 715.6 I 0.22 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================

Printed at 17:16:42 on 12/12/2012]

Page 117: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vai"(drive-on-the-left ) at 17:32:04 on Wednesday, 12 December 2012

FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:

INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST

GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle

TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown

SCALING FACTORS

----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(08.00)AND ENDS(09.00)

Page 118: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 119: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES

LENGTH OF TIME SEGMENT - (15) MINUTES

DEMAND FLOW PROFILES ARE INPUT DIRECTLY.

DEMAND SET TITLE: EXISTING 2012

DEMAND SET TITLE: WITH DEV AM DEMAND SET TITLE: EXISTING 2012

Page 120: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.167 I 0.250 I 0.583 I I I I 0.0 I 6.0 I 9.0 I 21.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.045 I 0.000 I 0.113 I 0.842 I I I I 11.0 I 0.0 I 28.0 I 208.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.034 I 0.726 I 0.000 I 0.239 I I I I 4.0 I 85.0 I 0.0 I 28.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.032 I 0.904 I 0.064 I 0.000 I I I I 13.0 I 367.0 I 26.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.071 I 0.214 I 0.714 I I I I 0.0 I 2.0 I 6.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.038 I 0.000 I 0.083 I 0.879 I I I I 9.0 I 0.0 I 20.0 I 211.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.107 I 0.700 I 0.000 I 0.193 I I I I 15.0 I 98.0 I 0.0 I 27.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.067 I 0.832 I 0.101 I 0.000 I I I I 25.0 I 312.0 I 38.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.122 I 0.220 I 0.659 I I I I 0.0 I 5.0 I 9.0 I 27.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.085 I 0.000 I 0.089 I 0.826 I I I I 18.0 I 0.0 I 19.0 I 176.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.186 I 0.642 I 0.000 I 0.172 I I I I 38.0 I 131.0 I 0.0 I 35.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.049 I 0.832 I 0.119 I 0.000 I I I I 18.0 I 308.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.146 I 0.188 I 0.667 I I I I 0.0 I 7.0 I 9.0 I 32.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.039 I 0.000 I 0.074 I 0.887 I I I I 8.0 I 0.0 I 15.0 I 181.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.147 I 0.691 I 0.000 I 0.162 I I I I 20.0 I 94.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.031 I 0.855 I 0.114 I 0.000 I I I I 12.0 I 331.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- DEMAND SET TITLE: WITH DEV AM

Page 121: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 5 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------

QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------

Page 122: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.00-08.15 I I ARM A 2.46 11.24 0.219 - - - 0.0 0.3 4.0 - 0.113 I I ARM B 16.53 37.42 0.442 - - - 0.0 0.8 11.5 - 0.048 I I ARM C 8.40 17.24 0.487 - - - 0.0 0.9 13.4 - 0.112 I I ARM D 27.20 29.08 0.935 - - - 0.0 10.3 119.2 - 0.330 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.15-08.30 I I ARM A 1.93 11.98 0.161 - - - 0.3 0.2 3.0 - 0.100 I I ARM B 16.06 37.00 0.434 - - - 0.8 0.8 11.6 - 0.048 I I ARM C 9.93 17.22 0.577 - - - 0.9 1.3 19.2 - 0.136 I I ARM D 25.13 28.22 0.890 - - - 10.3 9.0 142.3 - 0.345 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.30-08.45 I I ARM A 2.79 10.96 0.255 - - - 0.2 0.3 4.9 - 0.122 I I ARM B 14.26 36.38 0.392 - - - 0.8 0.6 9.8 - 0.045 I I ARM C 14.20 17.91 0.793 - - - 1.3 3.5 47.4 - 0.250 I I ARM D 24.80 25.67 0.966 - - - 9.0 15.0 187.8 - 0.612 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.45-09.00 I I ARM A 3.26 11.13 0.293 - - - 0.3 0.4 6.0 - 0.127 I I ARM B 13.66 36.03 0.379 - - - 0.6 0.6 9.3 - 0.045 I I ARM C 9.67 17.90 0.540 - - - 3.5 1.2 19.3 - 0.126 I I ARM D 25.93 28.10 0.923 - - - 15.0 13.7 213.7 - 0.513 I I I ------------------------------------------------------------------------------------------------------------------

QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.3 08.30 0.2 08.45 0.3 09.00 0.4

QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 0.8 * 08.45 0.6 * 09.00 0.6 *

Page 123: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 7 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.9 * 08.30 1.3 * 08.45 3.5 **** 09.00 1.2 *

QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 10.3 ********** 08.30 9.0 ********* 08.45 15.0 *************** 09.00 13.7 **************

QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 156.6 I 156.6 I 17.9 I 0.11 I 17.9 I 0.11 I I B I 907.7 I 907.7 I 42.3 I 0.05 I 42.3 I 0.05 I I C I 633.0 I 633.0 I 99.3 I 0.16 I 99.4 I 0.16 I I D I 1545.9 I 1545.9 I 663.1 I 0.43 I 666.4 I 0.43 I ---------------------------------------------------------------------------- I ALL I 3243.1 I 3243.1 I 822.6 I 0.25 I 826.0 I 0.25 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================

Printed at 17:38:59 on 12/12/2012]

Page 124: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai"(drive-on-the-left ) at 10:39:48 on Thursday, 13 December 2012

FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:

INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST

GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle

TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown

SCALING FACTORS

----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(17.00)AND ENDS(18.00)

Page 125: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned
Page 126: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES

LENGTH OF TIME SEGMENT - (15) MINUTES

DEMAND FLOW PROFILES ARE INPUT DIRECTLY.

DEMAND SET TITLE: 2012 EXISTING PM DEMAND SET TITLE: 2012 EXISTING PM

Page 127: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 17.00 - 17.15 I I I I I I I I ARM A I 0.000 I 0.139 I 0.222 I 0.639 I I I I 0.0 I 5.0 I 8.0 I 23.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.013 I 0.000 I 0.258 I 0.729 I I I I 4.0 I 0.0 I 80.0 I 226.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.102 I 0.714 I 0.000 I 0.184 I I I I 5.0 I 35.0 I 0.0 I 9.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.031 I 0.755 I 0.215 I 0.000 I I I I 8.0 I 197.0 I 56.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.15 - 17.30 I I I I I I I I ARM A I 0.000 I 0.118 I 0.294 I 0.588 I I I I 0.0 I 4.0 I 10.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.024 I 0.000 I 0.280 I 0.696 I I I I 8.0 I 0.0 I 95.0 I 236.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.097 I 0.613 I 0.000 I 0.290 I I I I 6.0 I 38.0 I 0.0 I 18.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.049 I 0.664 I 0.287 I 0.000 I I I I 12.0 I 162.0 I 70.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.30 - 17.45 I I I I I I I I ARM A I 0.000 I 0.065 I 0.290 I 0.645 I I I I 0.0 I 2.0 I 9.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.040 I 0.000 I 0.292 I 0.669 I I I I 14.0 I 0.0 I 103.0 I 236.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.081 I 0.565 I 0.000 I 0.355 I I I I 5.0 I 35.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.047 I 0.723 I 0.230 I 0.000 I I I I 11.0 I 170.0 I 54.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.45 - 18.00 I I I I I I I I ARM A I 0.000 I 0.070 I 0.349 I 0.581 I I I I 0.0 I 3.0 I 15.0 I 25.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.024 I 0.277 I 0.699 I 0.000 I I I I 8.0 I 91.0 I 230.0 I 0.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.052 I 0.586 I 0.362 I 0.000 I I I I 3.0 I 34.0 I 21.0 I 0.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.058 I 0.693 I 0.249 I 0.000 I I I I 16.0 I 192.0 I 69.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------

QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------

Page 128: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.00-17.15 I I ARM A 2.40 19.03 0.126 - - - 0.0 0.1 2.1 - 0.060 I I ARM B 20.66 36.88 0.560 - - - 0.0 1.3 18.3 - 0.061 I I ARM C 3.26 16.93 0.193 - - - 0.0 0.2 3.5 - 0.073 I I ARM D 17.40 31.61 0.550 - - - 0.0 1.2 17.5 - 0.070 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.15-17.30 I I ARM A 2.26 19.68 0.115 - - - 0.1 0.1 2.0 - 0.057 I I ARM B 22.60 36.26 0.623 - - - 1.3 1.6 23.9 - 0.073 I I ARM C 4.13 16.54 0.250 - - - 0.2 0.3 4.9 - 0.080 I I ARM D 16.27 31.24 0.521 - - - 1.2 1.1 16.7 - 0.067 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.30-17.45 I I ARM A 2.06 20.13 0.102 - - - 0.1 0.1 1.7 - 0.055 I I ARM B 23.53 37.06 0.635 - - - 1.6 1.7 25.5 - 0.074 I I ARM C 4.13 16.34 0.253 - - - 0.3 0.3 5.0 - 0.082 I I ARM D 15.67 31.19 0.502 - - - 1.1 1.0 15.5 - 0.064 I I I ------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.45-18.00 I I ARM A 2.87 14.34 0.200 - - - 0.1 0.2 3.6 - 0.087 I I ARM B 21.93 35.39 0.620 - - - 1.7 1.6 25.0 - 0.074 I I ARM C 3.87 21.32 0.181 - - - 0.3 0.2 3.4 - 0.057 I I ARM D 18.47 27.09 0.682 - - - 1.0 2.1 29.8 - 0.114 I I I ------------------------------------------------------------------------------------------------------------------

QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.2

QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 1.3 * 17.30 1.6 ** 17.45 1.7 ** 18.00 1.6 **

Page 129: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 6 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 0.2 17.30 0.3 17.45 0.3 18.00 0.2

QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 1.2 * 17.30 1.1 * 17.45 1.0 * 18.00 2.1 **

QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 143.9 I 143.9 I 9.5 I 0.07 I 9.5 I 0.07 I I B I 1330.8 I 1330.8 I 92.6 I 0.07 I 92.7 I 0.07 I I C I 230.8 I 230.8 I 16.8 I 0.07 I 16.8 I 0.07 I I D I 1017.1 I 1017.1 I 79.5 I 0.08 I 79.6 I 0.08 I ---------------------------------------------------------------------------- I ALL I 2722.6 I 2722.6 I 198.3 I 0.07 I 198.4 I 0.07 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================

Printed at 10:45:35 on 13/12/2012]

Page 130: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

ARCADY 6GUI Version: 6.2 AG

Analysis Program: Release 7.0 (FEBRUARY 2010)

(c) Copyright TRL Limited, 2004

Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO

For sales and distribution information, program advice and maintenance, contact:

TRL Limited

Crowthorne House

Nine Mile Ride

Wokingham, Berks.

RG40 3GA, UK

Tel: +44 (0)1344 770758

Fax:+44 (0)1344 770864

Email: software@ trl.co.uk

Web:www.trlsoftware.co.uk

The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution

Run Information

Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vaiAt: 15:27:29 on Tuesday, March 12, 2013Mode: Drive On The LeftUnits: Metric

Arm Labelling

Arm Full Arm Names

Arm A HERTINGFORDBURY ROAD

Arm B A414 WEST

Arm C THIEVES LANE

Arm D A414 EAST

Flow Scaling Factor

Arm Flow Scaling Factor(%)

Arm A 100

Arm B 100

Arm C 100

Arm D 100

File Properties

Run Title A414 Thieves Lane RBT Existing Flows 2012

Location A414 WITH THIEVES LANE

Date 10/12/2012

Client CROUDACE

Enumerator EAS [EAS-PC]

Job Number 334

Status

Description

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 1 of 9

Page 131: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Errors and Warnings

[No errors or warnings]

Geometric Data

Data Item Arm A Arm B Arm C Arm D

Approach Road Half-Width (m) 3.20 7.30 3.60 6.71

Entry Width (m) 7.70 8.60 7.36 6.71

Flare Length (m) 18.30 5.00 12.80 0.00

Entry Radius (m) 62.00 45.00 15.50 36.50

Inscribed Circle Diameter (m) 61.00 61.00 61.00 61.00

Entry Angle (degrees) 23.00 30.00 50.00 34.00

Slope 0.589 0.695 0.502 0.614

Intercept (PCU/Min) 30.536 41.547 25.630 34.164

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 2 of 9

Page 132: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Junction Diagram: (View Extent = 80m)

10 Metres

Flare

HERTINGFORDBURY ROAD 18.3 m

A41

4 W

ES

T 5

m

THIEVES LANE 12.8 m

A

41

4 E

AS

T 0

m

Angles Between Arms (Degrees): Arm A(90) Arm B(90) Arm C(90) Arm D(90)

Demand Data

Demand Profiles are Synthesised using DIRECT DataPeriod of interest (for Queue and Delay calculations): 17:00 to 18:00Length of Time Period: 60 minLength of Time Segment: 15 min

Direct Data for Demand Set: 2012 EXISTING PM

Time Period ArmDemand Data

(Veh/Min)

Segment : 1 -17:00 to 17:15

A 2.40

B 20.66

C 3.26

D 17.40

Segment : 2 -17:15 to 17:30

A 2.26

B 22.60

C 4.13

D 16.27

Segment : 3 -17:30 to 17:45

A 2.06

B 23.53

C 4.13

D 15.67

Segment : 4 -17:45 to 18:00

A 2.87

B 21.93

C 3.87

D 18.47

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 3 of 9

Page 133: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Direct Data for Demand Set: PM DEVELOPMENT FLOWS

Time Period ArmDemand Data

(Veh/Min)

Segment : 1 -17:00 to 17:15

A 0.06

B 0.40

C 0.27

D 0.27

Segment : 2 -17:15 to 17:30

A 0.06

B 0.40

C 0.27

D 0.27

Segment : 3 -17:30 to 17:45

A 0.06

B 0.40

C 0.27

D 0.27

Segment : 4 -17:45 to 18:00

A 0.06

B 0.40

C 0.27

D 0.27

Turning Proportions for Demand Set: 2012 EXISTING PM

Turning proportions vary over time and entry and calculated from turning count data (shaded)

Time Period From/To Arm A Arm B Arm C Arm D

Segment : 1 -17:00 to 17:15

Arm A0.000 0.139 0.222 0.639

0.0 5.0 8.0 23.0

Arm B0.013 0.000 0.258 0.729

4.0 0.0 80.0 226.0

Arm C0.102 0.714 0.000 0.184

5.0 35.0 0.0 9.0

Arm D0.031 0.755 0.215 0.000

8.0 197.0 56.0 0.0

Segment : 2 -17:15 to 17:30

Arm A0.000 0.118 0.294 0.588

0.0 4.0 10.0 20.0

Arm B0.024 0.000 0.280 0.696

8.0 0.0 95.0 236.0

Arm C0.097 0.613 0.000 0.290

6.0 38.0 0.0 18.0

Arm D0.049 0.664 0.287 0.000

12.0 162.0 70.0 0.0

Segment : 3 -17:30 to 17:45

Arm A0.000 0.065 0.290 0.645

0.0 2.0 9.0 20.0

Arm B0.040 0.000 0.292 0.669

14.0 0.0 103.0 236.0

Arm C0.081 0.565 0.000 0.355

5.0 35.0 0.0 22.0

Arm D0.047 0.723 0.230 0.000

11.0 170.0 54.0 0.0

Segment : 4 -17:45 to 18:00

Arm A0.000 0.070 0.349 0.581

0.0 3.0 15.0 25.0

Arm B0.024 0.277 0.699 0.000

8.0 91.0 230.0 0.0

Arm C0.052 0.586 0.362 0.000

3.0 34.0 21.0 0.0

Arm D0.058 0.693 0.249 0.000

16.0 192.0 69.0 0.0

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 4 of 9

Page 134: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Turning Proportions for Demand Set: PM DEVELOPMENT FLOWS

Turning proportions vary over time and entry and calculated from turning count data (shaded)

Time Period From/To Arm A Arm B Arm C Arm D

Segment : 1 -17:00 to 17:15

Arm A0.000 0.000 1.000 0.000

0.0 0.0 0.0 0.0

Arm B0.000 0.000 1.000 0.000

0.0 0.0 6.0 0.0

Arm C0.000 0.750 0.000 0.250

0.0 3.0 0.0 1.0

Arm D0.000 0.000 1.000 0.000

0.0 0.0 4.0 0.0

Segment : 2 -17:15 to 17:30

Arm A0.000 0.000 1.000 0.000

0.0 0.0 0.0 0.0

Arm B0.000 0.000 1.000 0.000

0.0 0.0 6.0 0.0

Arm C0.000 0.750 0.000 0.250

0.0 3.0 0.0 1.0

Arm D0.000 0.000 1.000 0.000

0.0 0.0 4.0 0.0

Segment : 3 -17:30 to 17:45

Arm A0.000 0.000 1.000 0.000

0.0 0.0 0.0 0.0

Arm B0.000 0.000 1.000 0.000

0.0 0.0 6.0 0.0

Arm C0.000 0.750 0.000 0.250

0.0 3.0 0.0 1.0

Arm D0.000 0.000 1.000 0.000

0.0 0.0 4.0 0.0

Segment : 4 -17:45 to 18:00

Arm A0.000 0.000 1.000 0.000

0.0 0.0 0.0 0.0

Arm B0.000 0.000 1.000 0.000

0.0 0.0 6.0 0.0

Arm C0.000 0.750 0.000 0.250

0.0 3.0 0.0 1.0

Arm D0.000 0.000 1.000 0.000

0.0 0.0 4.0 0.0

Heavy Vehicle Percentages for Demand Set: 2012 EXISTING PM

Vary over entry

Time Period From/To Arm A Arm B Arm C Arm D

17:00 to 17:15

Arm A 0.0 0.0 0.0 0.0

Arm B 3.0 0.0 0.0 2.0

Arm C 0.0 1.0 0.0 0.0

Arm D 0.0 2.0 4.0 0.0

Heavy Vehicle Percentages for Demand Set: PM DEVELOPMENT FLOWS

Vary over entry

Time Period From/To Arm A Arm B Arm C Arm D

17:00 to 17:15

Arm A 0.0 0.0 0.0 0.0

Arm B 0.0 0.0 0.0 0.0

Arm C 0.0 0.0 0.0 0.0

Arm D 0.0 0.0 0.0 0.0

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 5 of 9

Page 135: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queue Diagrams: (View Extent = 80m)

Queue Length Colour

Mean Queue

5 th % ile

90 th % ile

95 th % ile

Start Time: 17:00---> End Time: 18:00

Queue Interval 1: 17:15

10 Metres

Flare

HERTINGFORDBURY ROAD 18.3 m

A41

4 W

ES

T 5

m

THIEVES LANE 12.8 m

A

41

4 E

AS

T 0

m

Queue Interval 2: 17:30

10 Metres

Flare

HERTINGFORDBURY ROAD 18.3 m

A41

4 W

ES

T 5

m

THIEVES LANE 12.8 m

A

41

4 E

AS

T 0

m

Queue Interval 3: 17:45

10 Metres

Flare

HERTINGFORDBURY ROAD 18.3 m

A41

4 W

ES

T 5

m

THIEVES LANE 12.8 m

A

41

4 E

AS

T 0

m

Queue Interval 4: 18:00

10 Metres

Flare

HERTINGFORDBURY ROAD 18.3 m

A41

4 W

ES

T 5

m

THIEVES LANE 12.8 m

A

41

4 E

AS

T 0

m

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 6 of 9

Page 136: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Demand Data Graphs

Direct Entry/Exit Flows for Demand Set: 2012 EXISTING PM

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh/M

in)

Arm A Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh/M

in)

Arm B Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh/M

in)

Arm C Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh/M

in)

Arm D Entry Flows

17:00 17:15 17:30 17:45 18:00

Direct Entry/Exit Flows for Demand Set: PM DEVELOPMENT FLOWS

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh

/Min

)

Arm A Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh

/Min

)

Arm B Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh

/Min

)

Arm C Entry Flows

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Ra

te o

f F

low

(V

eh

/Min

)

Arm D Entry Flows

17:00 17:15 17:30 17:45 18:00

Capacity (against Time) Graphs, for each 15min Interval (17:00 - 18:00)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

14

15

16

17

18

19

20

14

15

16

17

18

19

20

Time

Ca

pa

ci ty (

Veh

/Min

)

Capacity Vs Time (Arm A)

17:00 17:15 17:30 17:45 18:0035.0

35.2

35.4

35.6

35.8

36.0

36.2

36.4

36.6

36.8

37.0

35.0

35.2

35.4

35.6

35.8

36.0

36.2

36.4

36.6

36.8

37.0

Time

Ca

pa

city (

Veh

/Min

)

Capacity Vs Time (Arm B)

17:00 17:15 17:30 17:45 18:0016

17

18

19

20

21

22

16

17

18

19

20

21

22

Time

Ca

pa

city (

Veh

/Min

)

Capacity Vs Time (Arm C)

17:00 17:15 17:30 17:45 18:0026

27

28

29

30

31

32

26

27

28

29

30

31

32

Time

Ca

pa

city (

Veh

/Mi n

)

Capacity Vs Time (Arm D)

17:00 17:15 17:30 17:45 18:00

RFC (against Time) Graphs, for each 15min Interval (17:00 - 18:00)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm A)

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm B)

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm C)

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm D)

17:00 17:15 17:30 17:45 18:00

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 7 of 9

Page 137: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Start Queue (against Time) Graphs, for each 15min Interval (17:00 - 18:00)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ueu

e (

Ve

hs)

Start Queue Vs Time (Arm A)

17:00 17:15 17:30 17:45 18:000.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

Sta

rt Q

ueu

e (

Ve

hs)

Start Queue Vs Time (Arm B)

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ueu

e (

Ve

hs)

Start Queue Vs Time (Arm C)

17:00 17:15 17:30 17:45 18:000.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

Sta

rt Q

ueu

e (

Ve

hs)

Start Queue Vs Time (Arm D)

17:00 17:15 17:30 17:45 18:00

End Queue (against Time) Graphs, for each 15min Interval (17:00 - 18:00)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

End

Que

ue

(V

eh

s)

End Queue Vs Time (Arm A)

17:00 17:15 17:30 17:45 18:000.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

End

Que

ue

(V

eh

s)

End Queue Vs Time (Arm B)

17:00 17:15 17:30 17:45 18:000.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

End

Que

ue

(V

eh

s)

End Queue Vs Time (Arm C)

17:00 17:15 17:30 17:45 18:000.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

0.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

Time

End

Que

ue

(V

eh

s)

End Queue Vs Time (Arm D)

17:00 17:15 17:30 17:45 18:00

Geometric Delay Graph

No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.

Delay (against Time) Graphs, for each 15min Interval (17:00 - 18:00)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

0.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

Time

De

lay (

Veh

.Min

)

Delay Vs Time (Arm A)

17:00 17:15 17:30 17:45 18:0019

20

21

22

23

24

25

26

27

28

19

20

21

22

23

24

25

26

27

28

Time

De

lay (

Veh

.Min

)

Delay Vs Time (Arm B)

17:00 17:15 17:30 17:45 18:002.0

2.4

2.8

3.2

3.6

4.0

4.4

4.8

5.2

5.6

6.0

2.0

2.4

2.8

3.2

3.6

4.0

4.4

4.8

5.2

5.6

6.0

Time

De

lay (

Veh

.Min

)

Delay Vs Time (Arm C)

17:00 17:15 17:30 17:45 18:0015

20

25

30

35

15

20

25

30

35

Time

De

lay (

Veh

.Min

)

Delay Vs Time (Arm D)

17:00 17:15 17:30 17:45 18:00

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 8 of 9

Page 138: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queues and Delay:

Segment ArmDemand

(Veh / Min)

Capacity(Veh /Min)

Demand /Capacity

(RFC)

Ped Flow(Ped / Min)

StartQueue (Veh)

EndQueue (Veh)

Delay(Veh.Min /

TimeSegment)

GeometricDelay

(Veh.Min /Time

Segment)

ArrivalDelay(Min /Veh)

Segment : 1 -17:00 to 17:15

A 2.46 18.75 0.131 - 0.0 0.2 2.2 - 0.061

B 21.06 36.67 0.574 - 0.0 1.3 19.4 - 0.063

C 3.53 16.94 0.208 - 0.0 0.3 3.8 - 0.074

D 17.67 31.50 0.561 - 0.0 1.3 18.3 - 0.071

Segment : 2 -17:15 to 17:30

A 2.32 19.40 0.120 - 0.2 0.1 2.1 - 0.059

B 23.00 36.05 0.638 - 1.3 1.7 25.4 - 0.076

C 4.40 16.55 0.266 - 0.3 0.4 5.3 - 0.082

D 16.54 31.14 0.531 - 1.3 1.1 17.4 - 0.069

Segment : 3 -17:30 to 17:45

A 2.12 19.85 0.107 - 0.1 0.1 1.8 - 0.056

B 23.93 36.85 0.649 - 1.7 1.8 27.1 - 0.077

C 4.40 16.34 0.269 - 0.4 0.4 5.5 - 0.084

D 15.94 31.08 0.513 - 1.1 1.1 16.1 - 0.066

Segment : 4 -17:45 to 18:00

A 2.93 14.06 0.208 - 0.1 0.3 3.8 - 0.090

B 22.33 35.17 0.635 - 1.8 1.8 26.7 - 0.078

C 4.14 21.33 0.194 - 0.4 0.2 3.7 - 0.058

D 18.74 26.98 0.695 - 1.1 2.2 31.4 - 0.119

Queuing Delay Information Over Whole Period

ArmTotal Demand Queueing Delay Inclusive Queueing Delay

(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)

A 147.4 147.4 9.9 0.07 9.9 0.07

B 1354.8 1354.8 98.5 0.07 98.6 0.07

C 247.1 247.1 18.3 0.07 18.3 0.07

D 1033.3 1033.3 83.3 0.08 83.4 0.08

ALL 2782.6 2782.6 210.0 0.08 210.1 0.08

Delay is that occuring only within the time period.

Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.

These will only be significantly different if there is a large queue remaining at the end of the time period.

Accident Data

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

Accident Results

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai

Page 9 of 9

Page 139: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

ARCADY 6GUI Version: 6.2 AG

Analysis Program: Release 7.0 (FEBRUARY 2010)

(c) Copyright TRL Limited, 2004

Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO

For sales and distribution information, program advice and maintenance, contact:

TRL Limited

Crowthorne House

Nine Mile Ride

Wokingham, Berks.

RG40 3GA, UK

Tel: +44 (0)1344 770758

Fax:+44 (0)1344 770864

Email: software@ trl.co.uk

Web:www.trlsoftware.co.uk

The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution

Run Information

Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\existing flows thieves lane welwyn rd rb.vaiAt: 15:07:01 on Wednesday, November 28, 2012Mode: Drive On The LeftUnits: Metric

Arm Labelling

Arm Full Arm Names

Arm A Thieves Lane

Arm B Welwyn Road West

Arm C Welwyn Road East

Flow Scaling Factor

Arm Flow Scaling Factor

(%)

Arm A 100

Arm B 100

Arm C 100

File Properties

Run Title existing layout

Location Thieves Lane/Welwyn Road RB

Date 28/11/2012

Client Croudace

Enumerator

Job Number 334

Status Draft 1

Description

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 1 of 7

Page 140: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Errors and Warnings

[No errors or warnings]

Geometric Data

Data Item Arm A Arm B Arm C

Approach Road Half-Width (m) 3.80 3.95 3.95

Entry Width (m) 7.40 6.80 5.70

Flare Length (m) 16.10 25.00 19.00

Entry Radius (m) 33.70 106.50 38.70

Inscribed Circle Diameter (m) 29.50 27.70 30.90

Entry Angle (degrees) 12.00 27.50 17.00

Slope 0.732 0.720 0.682

Intercept (PCU/Min) 32.240 31.969 28.614

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 2 of 7

Page 141: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Junction Diagram: (View Extent = 40m)

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Angles Between Arms (Degrees): Arm A(120) Arm B(120) Arm C(120)

Demand Data

Demand Profiles are Synthesised using ODTAB DataPeriod of interest (for Queue and Delay calculations): 07:45 to 09:15Length of Time Period: 90 minLength of Time Segment: 15 min

Total Traffic Demand (Vehicles/Hour) for Demand Set: existing layout

From/To Arm A Arm B Arm C

Arm A 0.0 251.0 181.0

Arm B 116.0 0.0 269.0

Arm C 390.0 343.0 0.0

Entry Flow Data for Demand Set: existing layout

Arms

Number of Minutes From Start When Rate of flow (Veh/Min)

Flow Starts To

Rise

Top of Peak is

Reached

Flow Stops

FallingBefore Peak At Top of Peak After Peak

Arm A 15.00 45.00 75.00 5.40 8.10 5.40

Arm B 15.00 45.00 75.00 4.81 7.22 4.81

Arm C 15.00 45.00 75.00 9.16 13.74 9.16

Turning Proportions

ODTAB Demand Data type is used, no turning proportions available.

Heavy Vehicle Percentages for Demand Set: existing layout

Default vehicle percentages

Time Period From/To Arm A Arm B Arm C

07:45 to 09:15

Arm A 10.0 10.0 10.0

Arm B 10.0 10.0 10.0

Arm C 10.0 10.0 10.0

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 3 of 7

Page 142: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queue Diagrams: (View Extent = 40m)

Queue Length Colour

Mean Queue

5 th % ile

90 th % ile

95 th % ile

Start Time: 07:45---> End Time: 09:15

Queue Interval 1: 08:00

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m Queue Interval 2: 08:15

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 3: 08:30

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 4: 08:45

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 4 of 7

Page 143: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queue Interval 5: 09:00

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 6: 09:15

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Demand Data Graphs

No graph available

Capacity (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

24.0

24.4

24.8

25.2

25.6

26.0

26.4

26.8

27.2

27.6

28.0

24.0

24.4

24.8

25.2

25.6

26.0

26.4

26.8

27.2

27.6

28.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm A)

07:45 08:15 08:45 09:1526.0

26.2

26.4

26.6

26.8

27.0

27.2

27.4

27.6

27.8

28.0

26.0

26.2

26.4

26.6

26.8

27.0

27.2

27.4

27.6

27.8

28.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm B)

07:45 08:15 08:45 09:1524.0

24.2

24.4

24.6

24.8

25.0

25.2

25.4

25.6

25.8

26.0

24.0

24.2

24.4

24.6

24.8

25.0

25.2

25.4

25.6

25.8

26.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm C)

07:45 08:15 08:45 09:15

RFC (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm C)

07:45 08:15 08:45 09:15

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 5 of 7

Page 144: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Start Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm C)

07:45 08:15 08:45 09:15

End Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm C)

07:45 08:15 08:45 09:15

Geometric Delay Graph

No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.

Delay (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm A)

07:45 08:15 08:45 09:153.0

3.5

4.0

4.5

5.0

5.5

6.0

3.0

3.5

4.0

4.5

5.0

5.5

6.0

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm B)

07:45 08:15 08:45 09:158

10

12

14

16

18

20

8

10

12

14

16

18

20

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm C)

07:45 08:15 08:45 09:15

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 6 of 7

Page 145: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queues and Delay:

Segment ArmDemand

(Veh / Min)

Capacity

(Veh /

Min)

Demand /

Capacity

(RFC)

Ped Flow

(Ped / Min)

Start

Queue

(Veh)

End

Queue

(Veh)

Delay

(Veh.Min /

Time

Segment)

Geometric

Delay

(Veh.Min /

Time

Segment)

Arrival

Delay

(Min /

Veh)

Segment : 1 -

07:45 to 08:00

A 5.42 26.17 0.207 - 0.0 0.3 3.8 - 0.048

B 4.83 27.43 0.176 - 0.0 0.2 3.1 - 0.044

C 9.20 25.02 0.368 - 0.0 0.6 8.4 - 0.063

Segment : 2 -

08:00 to 08:15

A 6.47 25.55 0.253 - 0.3 0.3 5.0 - 0.052

B 5.77 27.11 0.213 - 0.2 0.3 4.0 - 0.047

C 10.98 24.83 0.442 - 0.6 0.8 11.5 - 0.072

Segment : 3 -

08:15 to 08:30

A 7.93 24.71 0.321 - 0.3 0.5 6.9 - 0.060

B 7.06 26.67 0.265 - 0.3 0.4 5.3 - 0.051

C 13.45 24.56 0.548 - 0.8 1.2 17.4 - 0.090

Segment : 4 -

08:30 to 08:45

A 7.93 24.70 0.321 - 0.5 0.5 7.1 - 0.060

B 7.06 26.67 0.265 - 0.4 0.4 5.4 - 0.051

C 13.45 24.56 0.548 - 1.2 1.2 18.0 - 0.090

Segment : 5 -

08:45 to 09:00

A 6.47 25.54 0.253 - 0.5 0.3 5.2 - 0.052

B 5.77 27.11 0.213 - 0.4 0.3 4.1 - 0.047

C 10.98 24.83 0.442 - 1.2 0.8 12.3 - 0.072

Segment : 6 -

09:00 to 09:15

A 5.42 26.15 0.207 - 0.3 0.3 4.0 - 0.048

B 4.83 27.43 0.176 - 0.3 0.2 3.3 - 0.044

C 9.20 25.02 0.368 - 0.8 0.6 9.0 - 0.063

Queuing Delay Information Over Whole Period

ArmTotal Demand Queueing Delay Inclusive Queueing Delay

(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)

A 594.6 396.4 32.0 0.05 32.0 0.05

B 529.9 353.3 25.2 0.05 25.2 0.05

C 1008.9 672.6 76.6 0.08 76.6 0.08

ALL 2133.5 1422.3 133.8 0.06 133.8 0.06

Delay is that occuring only within the time period.

Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.

These will only be significantly different if there is a large queue remaining at the end of the time period.

Accident Data

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

Accident Results

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

28 November 2012 334 existing flows thieves lane welwyn rd rb.vai

Page 7 of 7

Page 146: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

ARCADY 6GUI Version: 6.2 AG

Analysis Program: Release 7.0 (FEBRUARY 2010)

(c) Copyright TRL Limited, 2004

Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO

For sales and distribution information, program advice and maintenance, contact:

TRL Limited

Crowthorne House

Nine Mile Ride

Wokingham, Berks.

RG40 3GA, UK

Tel: +44 (0)1344 770758

Fax:+44 (0)1344 770864

Email: software@ trl.co.uk

Web:www.trlsoftware.co.uk

The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution

Run Information

Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\existing flows thieves lane welwyn rd with dev

rb.vaiAt: 15:59:27 on Wednesday, November 28, 2012Mode: Drive On The LeftUnits: Metric

Arm Labelling

Arm Full Arm Names

Arm A Thieves Lane

Arm B Welwyn Road West

Arm C Welwyn Road East

Flow Scaling Factor

Arm Flow Scaling Factor

(%)

Arm A 100

Arm B 100

Arm C 100

File Properties

Run Title existing layout

Location Thieves Lane/Welwyn Road RB

Date 28/11/2012

Client Croudace

Enumerator

Job Number 334

Status Draft 1

Description

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 1 of 7

Page 147: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Errors and Warnings

[No errors or warnings]

Geometric Data

Data Item Arm A Arm B Arm C

Approach Road Half-Width (m) 3.80 3.95 3.95

Entry Width (m) 7.40 6.80 5.70

Flare Length (m) 16.10 25.00 19.00

Entry Radius (m) 33.70 106.50 38.70

Inscribed Circle Diameter (m) 29.50 27.70 30.90

Entry Angle (degrees) 12.00 27.50 17.00

Slope 0.732 0.720 0.682

Intercept (PCU/Min) 32.240 31.969 28.614

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 2 of 7

Page 148: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Junction Diagram: (View Extent = 40m)

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Angles Between Arms (Degrees): Arm A(120) Arm B(120) Arm C(120)

Demand Data

Demand Profiles are Synthesised using ODTAB DataPeriod of interest (for Queue and Delay calculations): 07:45 to 09:15Length of Time Period: 90 minLength of Time Segment: 15 min

Total Traffic Demand (Vehicles/Hour) for Demand Set: forecast flows

From/To Arm A Arm B Arm C

Arm A 0.0 276.0 222.0

Arm B 137.0 0.0 290.0

Arm C 406.0 351.0 0.0

Entry Flow Data for Demand Set: forecast flows

Arms

Number of Minutes From Start When Rate of flow (Veh/Min)

Flow Starts To

Rise

Top of Peak is

Reached

Flow Stops

FallingBefore Peak At Top of Peak After Peak

Arm A 15.00 45.00 75.00 6.22 9.34 6.22

Arm B 15.00 45.00 75.00 5.34 8.01 5.34

Arm C 15.00 45.00 75.00 9.46 14.19 9.46

Turning Proportions

ODTAB Demand Data type is used, no turning proportions available.

Heavy Vehicle Percentages for Demand Set: forecast flows

Default vehicle percentages

Time Period From/To Arm A Arm B Arm C

07:45 to 09:15

Arm A 10.0 10.0 10.0

Arm B 10.0 10.0 10.0

Arm C 10.0 10.0 10.0

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 3 of 7

Page 149: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queue Diagrams: (View Extent = 40m)

Queue Length Colour

Mean Queue

5 th % ile

90 th % ile

95 th % ile

Start Time: 07:45---> End Time: 09:15

Queue Interval 1: 08:00

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m Queue Interval 2: 08:15

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 3: 08:30

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 4: 08:45

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 4 of 7

Page 150: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queue Interval 5: 09:00

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Queue Interval 6: 09:15

5 Metres

Flare

Thieves Lane

16.1 m

Welwyn Road W

est

25 m

W

elw

yn R

oa

d E

ast

19

m

Demand Data Graphs

No graph available

Capacity (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

24.0

24.4

24.8

25.2

25.6

26.0

26.4

26.8

27.2

27.6

28.0

24.0

24.4

24.8

25.2

25.6

26.0

26.4

26.8

27.2

27.6

28.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm A)

07:45 08:15 08:45 09:1526.0

26.2

26.4

26.6

26.8

27.0

27.2

27.4

27.6

27.8

28.0

26.0

26.2

26.4

26.6

26.8

27.0

27.2

27.4

27.6

27.8

28.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm B)

07:45 08:15 08:45 09:1524.0

24.1

24.2

24.3

24.4

24.5

24.6

24.7

24.8

24.9

25.0

24.0

24.1

24.2

24.3

24.4

24.5

24.6

24.7

24.8

24.9

25.0

Time

Cap

acity (

Ve

h/M

in)

Capacity Vs Time (Arm C)

07:45 08:15 08:45 09:15

RFC (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

RF

C

RFC Vs Time (Arm C)

07:45 08:15 08:45 09:15

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 5 of 7

Page 151: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Start Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

Sta

rt Q

ue

ue

(V

eh

s)

Start Queue Vs Time (Arm C)

07:45 08:15 08:45 09:15

End Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm A)

07:45 08:15 08:45 09:150.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm B)

07:45 08:15 08:45 09:150.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Time

En

d Q

ueu

e (

Ve

hs)

End Queue Vs Time (Arm C)

07:45 08:15 08:45 09:15

Geometric Delay Graph

No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.

Delay (against Time) Graphs, for each 15min Interval (07:45 - 09:15)

(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm A)

07:45 08:15 08:45 09:153.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm B)

07:45 08:15 08:45 09:155

10

15

20

5

10

15

20

Time

De

lay (

Ve

h.M

in)

Delay Vs Time (Arm C)

07:45 08:15 08:45 09:15

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 6 of 7

Page 152: Transport Assessment 260313 - cdn-eastherts.onwebcurl.comcdn-eastherts.onwebcurl.com/s3fs-public/documents/Transport_Assessment.pdf1.1 EAS Transport Planning has been commissioned

Queues and Delay:

Segment ArmDemand

(Veh / Min)

Capacity

(Veh /

Min)

Demand /

Capacity

(RFC)

Ped Flow

(Ped / Min)

Start

Queue

(Veh)

End

Queue

(Veh)

Delay

(Veh.Min /

Time

Segment)

Geometric

Delay

(Veh.Min /

Time

Segment)

Arrival

Delay

(Min /

Veh)

Segment : 1 -

07:45 to 08:00

A 6.25 26.10 0.239 - 0.0 0.3 4.6 - 0.050

B 5.36 27.06 0.198 - 0.0 0.2 3.6 - 0.046

C 9.50 24.84 0.382 - 0.0 0.6 9.0 - 0.065

Segment : 2 -

08:00 to 08:15

A 7.46 25.47 0.293 - 0.3 0.4 6.1 - 0.055

B 6.40 26.67 0.240 - 0.2 0.3 4.7 - 0.049

C 11.34 24.61 0.461 - 0.6 0.8 12.4 - 0.075

Segment : 3 -

08:15 to 08:30

A 9.14 24.61 0.371 - 0.4 0.6 8.6 - 0.064

B 7.84 26.13 0.300 - 0.3 0.4 6.3 - 0.055

C 13.89 24.30 0.572 - 0.8 1.3 19.1 - 0.096

Segment : 4 -

08:30 to 08:45

A 9.14 24.59 0.372 - 0.6 0.6 8.8 - 0.065

B 7.84 26.13 0.300 - 0.4 0.4 6.4 - 0.055

C 13.89 24.30 0.572 - 1.3 1.3 19.8 - 0.096

Segment : 5 -

08:45 to 09:00

A 7.46 25.45 0.293 - 0.6 0.4 6.4 - 0.056

B 6.40 26.66 0.240 - 0.4 0.3 4.8 - 0.049

C 11.34 24.61 0.461 - 1.3 0.9 13.3 - 0.076

Segment : 6 -

09:00 to 09:15

A 6.25 26.08 0.240 - 0.4 0.3 4.8 - 0.050

B 5.36 27.06 0.198 - 0.3 0.2 3.8 - 0.046

C 9.50 24.84 0.382 - 0.9 0.6 9.5 - 0.065

Queuing Delay Information Over Whole Period

ArmTotal Demand Queueing Delay Inclusive Queueing Delay

(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)

A 685.5 457.0 39.3 0.06 39.3 0.06

B 587.7 391.8 29.6 0.05 29.6 0.05

C 1042.0 694.6 83.1 0.08 83.1 0.08

ALL 2315.1 1543.4 152.0 0.07 152.0 0.07

Delay is that occuring only within the time period.

Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.

These will only be significantly different if there is a large queue remaining at the end of the time period.

Accident Data

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

Accident Results

No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.

28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai

Page 7 of 7