Total DRIC Cost Windsor Star’s Estimate, February 17, 2010: $5.0 Billion
Citation preview
Transport Action Ontario
Detroit River International Crossing (DRIC):Road Based Infrastructure
In the Era of Climate Change
DRIC Cost (per DRIC documents)
• US portion: • $1.8 billion (includes $0.4 billion for US half of
bridge)• CA portion:
• $1.6 billion for parkway• $0.2 billion for plaza• Unstated amount from CA portion of bridge
• Total cost $4.2 Billion (assuming CA share of bridge cost = US share of bridge cost)
Total DRIC Cost
Windsor Star’s Estimate, February 17, 2010:
$5.0 Billion
Projected Construction Period2021 – 2025
for Michigan Department of Transportationfrom Southeast Michigan Council of Governments website
Annual TrafficAmbassador Bridge, Blue Water Bridge, Detroit Windsor Tunnel
Year CrossingAmbassador
BridgeBlue Water
BridgeDetroit Windsor
Tunnel1999 12,348,762 5,537,827 9,542,1212000 12,219,682 5,967,141 8,549,9342001 11,057,495 5,678,702 7,682,1902002 10,382,458 5,587,915 6,948,3292003 9,572,456 5,433,534 6,535,9712004 9,528,132 5,561,461 5,941,1352005 9,295,824 5,509,311 5,922,8302006 9,366,092 5,334,781 5,397,3922007 8,953,029 5,038,045 4,844,0632008 7,338,015 4,914,072 4,706,6152009 6,471,999 4,474,566 3,948,982
Ambassador Bridge Wait TimesMarch 17, 2010
Traffic Conditions at the Ambassador
Traveling To The U.S.A. Auto Conditions:
traveling to the USA = less than 10 minutesbooths to the USA = 13 booths open, 6 booths closed
Truck Conditions: traveling to the USA = less than 10 minutes booths to the USA = 12 booths open, 1 booth closed
Traveling To Canada Auto Conditions:
traveling to Canada = less than 10 minutesbooths to Canada = 3 booths open
Truck Conditions: traveling to Canada = less than 10 minutes booths to Canada = 7 booths open
Total Booths Closed: to Canada = 19 booths closed
From http://www.ambassadorbridge.com/bridge-report.php