15
Transmission & Distribution of Electricity – The Challenge Peter Vaessen CWI in bedrijf, Amsterdam, November 11 th 2010

Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

Transmission & Distribution of Electricity – The Challenge Peter Vaessen

CWI in bedrijf, Amsterdam, November 11th 2010

Page 2: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

2

The digital dilemma

Data tsunami Networking/Sensors functionality

New equipment and players

Security risk ?

Page 3: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

3

Acting on aging assets

Grey wave from the 1970-ties

Less money available Different component

life cycles Maintenance / Replacement ?

Page 4: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

4

European Power System

495 million people served 3500 TWh/year

760 GW installed capacity 250.000 km HV network Approx. 6.000.000 km MV & LV network

Largest business sector (capital) Largest man-made system

Approximately 1500 € investment per EU citizen

Page 5: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

5

Increased bulk transmission

DC links and interconnections

Control

50GW wind in the North?

30GW sun in the south?

Source: Nexans

Smart Equipmt.

Page 6: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

6

Wind at sea impact

Ready for large scale deployment

AC and DC solutions Grid operation effects Sea-grid ?

Page 7: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

7

Doing more with less

Dynamic rating needs sensors & rules

Overhead underground Public voice = CAVE Use existing right of way

wintrack

increasecapacity

Page 8: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

8

An internet-like distribution grid

Central & local sources

Smart (power)electronics

Central & localintelligence

Integration of new applications

Real-time information & active participation

Page 9: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

9

Solar Power up

Exponential growth Prices drop fast

from 5 to 2.5€/Wp in 2 year

Grid parity: 2015 ?

Page 10: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

10

E-mobility (storage) a growing force

Means of decoupling generation & demand

Controllability issue Slow take off …or not ?

Opel Ampera

Page 11: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

11

PowerMatching City - Full Concept Smart Grid Solution

(partners: KEMA, ECN, HUMIQ, RWE/Essent)

Page 12: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

12

430320

120.0007.000.000

100.000.000

The pyramid Challenge (Netherlands)

Page 13: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

13

Process information challenge

Assetmanagement

Market facilitation

Operation

Component control

ms + 1000 bits > 100 ms

Sec. A4 GByte <10 years

Responsetime

• Data need• Trends, Analyses Aggregation

• Measurements• Feed-in• Billing• Energy saving

• Measuring information• Grid information• Power Quality• HV-MV-LV

• Micro CHP• Wind turbine• Configuration (switching)• Measurements• Power Quality• Voltage control• Protection

Information Control parameters

Data size Datalifetime

Page 14: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

14

Even more challenges

-4000

-2000

0

2000

4000

6000

8000

10000

12000

2010 2020 2030 2040 2050 2060

Jaar

Verb

ruik

MW

h Jaar totaal

Winter verbruik

Zomer verbruik

Lente/herfst verbruik

-4

-3

-2

-1

0

1

2

3

4

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Customer profile

Scenario / Prediction Voltage at connection point

Feeder voltage profile

connection point1 30 60

volta

ge

load

generation kW

time of day

year

Con

sum

ptio

n M

Wh

Year (total)WinterSummerSpring/Autumn

Page 15: Transmission & Distribution of Electricity – The Challenge...2010/11/11  · 14 Even more challenges -4000-2000 0 2000 4000 6000 8000 10000 12000 2010 2020 2030 2040 2050 2060 Jaar

Peter VaessenT +31 26 356 3584

[email protected]

www.kema.com

Thank you for your attention