Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
Battersea Park
Qeenstown Road
Wandsworth Road
Vauxhall
Stockwell
Plot_K
National RailTube Victoria LineBus stop around
A’
B’C’
A
B C
A class Public Road
Local path
Green Network Road + Cycle network
A’
B’
C’
A
B
C
Open Space Open Space
Open Space Open Space
Open Space
Road Road
RoadRoad
Car Park Space
Road
Road RoadRoad
Roadschool
school
English Social Housing
Green cycle network
Car Park Space
21. July. 9:00
21. September. 9:00 21. September. 12:00 21. September. 15:00
21. December. 9:00 21. December. 12:00 21. December. 15:00
21. July. 12:00 21. July. 15:00
January
May
September October Nobember December
June July August
Febuary March April
2012 By 2037 Primary School
Community Centre
Community Car Parking
Semi-Private Open Space
Community Farm
Community Square
Passive Energy House Passive Energy House
( Retrofit Refurbishment)
Pedestrian Path
N
By 2112
Complex Culture centre
(cinema, cafe, roof garden, residence)
Water Garden
Water Garden
Community Garden
Solar Roof
SOHO building
(Retrofit
Refurbishment)
2062ByPassive Energy House
Gallery, Market, Cafe
Small Office, Guest Space
Complex Building (Shop, Office, Restaurant)Pedestrian Path
Tree
Community Center Square
Pedestrian Road + Cycle Lane
This location is linked to each public transport within possible access distance.
Promote ordinary use of Public Transport.
Enhance safe pedestrian/cycle link to the public transport.
Transit Oriented Development
Battersea Park
Qeenstown Road
Wandsworth Road
Vauxhall
Stockwell
Plot_K
National Rail
Tube Victoria Line
Bus stop around Plot K
50m50m50m50m
50m50m
within 50-100m Around 300-400m
Bus stopUnderground or National Rail
House
Detroit Energy StarategySource: Buro Happold
Wind and Ventilation and Sun Light CHP (Combined Heating Plant)
Wind Path
Sun Light
Solar PV Roof (Shading)
Sun Light
30°
Passive Energy House
MIxed UseActivate urban area as more flexible use.
Increase housing options for different house holds.
Create local sense of place.
Decrease travel frequency.
http://www.amgencorp.com/services.html
Open SpaceEnhance enviromental bio-diversity.
Create effective wind pass.
Create confortable community spaces.
Enhance open space network for pedestrians and children.
http://www.amgencorp.com/services.html
Planting StrategyGreen can create natural circulate system.
Create proper shade for pedestrians and houses.
Mitigate noise and protect privacy.
Recycle grey water for cultivating trees.
Provide local foods from local gardens.walking path Grey water recycle
Local Food
Rain water collection
Waste Management and RecyclingNowadays waste is no longer just waste. It can be a resource that is being utilised effectively. This way is more economical and environmental friendly. Separating waste can also promote reducing the overall amount of waste.Then waste can be used as new materials and energy resources.
Water Management
There is a new technology system dealing with waste water. Hammarby Sjostad has four separate treatment lines fo greywater. This greay water can be extracted bio-natural resources auch as bio bas fual.
http://www.dw.de/dw/article/0,,5876336,00.ht
Waste Water Treatment
http://www.hammarbysjostad.se/inenglish/pdf/HS_miljo_bok_eng_ny.pdf
Flooding Lisk Management
Environmental Agency 2012
This area has much potential of flood risk (Environmental Agency, 2012).There are several way to mitigate this risk. Firstly Planting might be helpful for mitigating this situation.Secondly, the building design should apply for the looftop evacuation space such as loof garden. Loof network around neighbourhood is also effective.
Transition Pathways
Strategies
Target 70% reduction of CO2 emissions
Scenario for over 70% reduction of community-scale CO2 emissions through 100 years
Site Transport Link Shade Analysis Building Typology
Wind Analysis
Conclusions (Summary)
2012 2037 2062 2112
200400
600800100012001400160018002000
02012 2037 2062 2112
Life style footprint
5,00010,00015,00020,00025,00030,00035,00040,00045,000
02012 2037 2062 2112
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
embodied footprint
energy footprint
0
2012 2037 2062 2112
350,000,000
300,000,000
250,000,000
200,000,000
150,000,000
100,000,000
50,000,000
0
sales
construction
balanceTotal Thermal
Total Electrical
Total Thermal Renewable
Total Electrical Renewable
2012 2037 2062 21120
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
Embodied footprint/Energy footprint (kg/co2/year) Lifestyle footprint (kg/co2/year) Total footprint per Person (kg/co2/year)
Electrical & Thermal reduction Cost Benefit Balance (£)Final Image CG
Acknowledgement: This work is partly supported by S-6 and SATREPS projects.Miho Kemei, Sustainabile Social System Section, National Institute for Environmental Studies