TRANSFORMING VICTORIA’S RAIL NETWORK
Presentation to Rail Futures Institute26 October 2018
Evan Tattersall, CEO
MAJOR TRANSPORT PROJECTS
GOVERNANCE
RAIL PROJECTS VICTORIA –STATUS OF PROJECTS
THE METRO TUNNELPROJECT
METRO TUNNEL
SIMULTANEOUS CONSTRUCTION
NORTH MELBOURNE STATION
PILING AT NORTH MELBOURNE
ARDEN URBAN RENEWAL PRECINCT
PARVILLE STATION
PILING AT PARKVILLE
STATE LIBRARY STATION
STATION CROSS SECTIONIndicative image only
FRANKLIN STREET ACOUSTIC SHED
FRANKLIN STREET SHAFT
DEMOLITION AT STATE LIBRARY
TOWN HALL STATION
CITY SQUARE CONSTRUCTION SITE
WESTIN SEGREGATION
PORT PHILIP ARCADE
FEDERATION SQUARE
ANZAC STATION
ANZAC STATION CONSTRUCTION SITE
REGIONAL RAIL REVIVAL
REGIONAL RAIL REVIVAL JOINT INITIATIVE OF AUSTRALIAN
AND VICTORIAN GOVERNMENTS
BALLARAT LINE UPGRADE
MADDINGLEY STABLING
ROCKBANK STATION UPGRADE
MELBOURNE AIRPORT RAIL LINK
AIRPORT LINK
• BIPARTISAN
• HEATHROW, CHANGI
• STRONG OPINIONS
• BALANCE
• MLP
WESTERN RAIL PLAN
WESTERN RAIL PLAN
• INTEGRAL TO AIRPORT LINK
• SUN TO SXS – EXISTING, AT GRADE,
TUNNEL
• SXS SOLUTION
CHALLENGES IN DELIVERING MAJOR RAIL PROJECTS
CBD STATIONS
• CHALLENGES AS BIG AS THEY GET
• MASSIVE UNDERGROUND CONSTRUCTION
• GROUND CONDITIONS
• FRAGILE BUILDINGS
TOWN HALL STATION CONCOURSE
STATE LIBRARY PLATFORM
PARKVILLE PRECINCT
BUILDING NEAR STAKEHOLDERS
• HEALTH & EDUCATION HUB
• NOISE, VIBRATION, EMI
• PATIENT CARE, TEACHING,
CRITICAL RESEARCH
• AIRPORT ENVIRONMENT – SIMILAR
CHALLENGES
GRATTAN STREET ACOUSTIC DECK
HIGH CAPACITY SIGNALLING
• NEW TO AUSTRALIA, OFF THE SHELF
• SUPERVISED TRAIN OPERATION
• HCS SYSTEMS TYPICALLY COMPLEX –
INTERNATIONAL FAILURES
• LOCAL ISSUES – CONVENTIONAL
INTERFACE, MIXED FLEET
SYSTEMS INTEGRATION
KEY INTERFACES
• MAJOR UNDERGROUND STATIONS
• SECURITY, FIRE, VENTILATION, EMERGENCY EVACUATION
• HCMT, HCS
• MTM, PPP CO, (HCMTS AND STATIONS)
• ALL SYSTEM NEED TO BE INTEGRATED
• INTERNATIONAL MESSAGE – SYSTEM INTEGRATION RISK
• GOOD PEOPLE IN TEAM
• SYSTEMS INTEGRATION TEAM ESTABLISHED
COMMUNICATIONS & STAKEHOLDER RELATIONS
• VARIED & COMPETING AGENDAS
• CRUCIAL INFRASTRUCTURE - GET ON WITH IT VS
SIGNIFICANT IMPACTS – DO THE RIGHT THING
• EXTENSIVE STAKEHOLDER ENGAGEMENT
• MEDIA
• COST
• INFORMING EVERYONE - MASSIVE TASK
• BALANCE – CAN’T PLEASE EVERYONE ALL THE TIME
• WEIGH UP VARIABLES - GO FOR IT
• PEOPLE WANT RAIL
MANAGING EXPECTATIONS
• ENTHUSIASM, OPTIMISM
• PROJECTS LIKE METRO TUNNEL AND
AIRPORT – MOMENTUM HARD
• COMPLEXITY IN DETERMINING TIME AND
COST
• REFERENCE DESIGN, BUSINESS CASE,
PLANNING APPROVALS, PROCUREMENT
• ASSUMPTIONS VS REALITY – NEED
AGILITY
CONTRAINTS ON RESOURCES
TRANSPORT PROJECTS IN AUSTRALIA
Sydney Metro
NorthConnex
WestConnex
Level Crossing Removal
Metro Tunnel
West Gate Tunnel
PROJECTS AROUND THE WORLD
WHERE TO FROM HERE?
• ELECTION OUTCOME
• POPULATION, CONGESTION,
TRANSPORT SYSTEM FUNCTIONALITY
• ALIGNMENT ON METRO TUNNEL,
AIRPORT, ELECTRIFICATIONS,
REGIONAL UPGRADES
• DIFFER IN OTHER AREAS
• POSITIVE OUTLOOK FOR INDEFINITE
FUTURE