    Transformer Testing | Type

    Test and Routine Test ofTransformer

    More related topics:

    .........Previous

    Transformer winding resistance measurement Transformer Ratio Test

    Vector Group Test of Transformer

    Dielectric Test of Transformer

    Temperature Rise Test of Transformer

    Transformer Impulse Test

    Sweep Frequency Response Analysis

    Tan Delta or Dissipation Factor Test

    Over Fluxing in Transformer

    Earthing or Grounding Transformer

    External & Internal Faults in Transformer

    Backup Protection of Transformer

    Differential Protection of Transformer

    SHOW MENU

    http://www.electrical4u.com/over-fluxing-in-transformer/http://www.electrical4u.com/tan-delta-test-loss-angle-test-dissipation-factor-test/http://www.electrical4u.com/voltage-and-turn-ratio-test-of-transformer/http://www.electrical4u.com/buchholz-relay-in-transformer-buchholz-relay-operation-and-principle/http://www.electrical4u.com/http://www.electrical4u.com/transformer-testing-type-test-and-routine-test-of-transformer/http://www.electrical4u.com/transformer-testing-type-test-and-routine-test-of-transformer/http://www.electrical4u.com/transformer-oil-and-winding-temperature-rise-test/http://www.electrical4u.com/transformer-oil-and-winding-temperature-rise-test/http://www.electrical4u.com/vector-group-test-of-power-transformer/http://www.electrical4u.com/http://www.electrical4u.com/sweep-frequency-response-analysis-test-sfra-test/http://www.electrical4u.com/transformer-testing-type-test-and-routine-test-of-transformer/http://www.electrical4u.com/tan-delta-test-loss-angle-test-dissipation-factor-test/http://www.electrical4u.com/differential-protection-of-transformer-differential-relays/http://www.electrical4u.com/impulse-test-of-transformer/http://www.electrical4u.com/transformer-winding-resistance-measurement/http://www.electrical4u.com/buchholz-relay-in-transformer-buchholz-relay-operation-and-principle/http://www.electrical4u.com/voltage-and-turn-ratio-test-of-transformer/http://www.electrical4u.com/insulation-dielectric-test-of-transformer/http://www.electrical4u.com/what-is-earthing-transformer-or-grounding-transformer/http://www.electrical4u.com/external-and-internal-faults-in-transformer/http://www.electrical4u.com/backup-protection-of-transformer-over-current-and-earth-fault/http://www.electrical4u.com/over-fluxing-in-transformer/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    2/17

    Restricted Earth Fault Protection

    Maintenance of Transformer

    Distribution Transformer

    Air Core Transformer

    High Voltage Transformer

    Installation of Power Transformer

    Commissioning of Power Transformer

    This page is all about:

    Type of Transformer Testing

    Type Test

    Routine TestsSpecial Tests

    Pre Commissioning Test

    Winding Resistance Measurement

    Ratio Test

    Magnetic Balance Test

    Procedure of Magnetic Balance Test

    Magnetizing Current Test

    Vector Group Test

    Insulation Resistance Test or Megger Tes

    Procedure of Insulation Resistance Test

    Dielectric Tests of Transformer

    Induced Voltage Test of Transformer

    Temperature Rise Test of Transformer

    For confirming the specifications and performances of an

    electrical power transformer it has to go through numbers of

    testing procedures. Some tests are done at manufacturer

    http://www.electrical4u.com/restricted-earth-fault-protection-of-transformer-ref-protection/http://electrical4u.com/commissioning-of-power-transformer/http://www.electrical4u.com/high-voltage-transformer/http://www.electrical4u.com/electrical-power-transformer-definition-and-types-of-transformer/http://electrical4u.com/installation-of-power-transformer/https://www.sitelock.com/verify.php?site=electrical4u.comhttp://www.electrical4u.com/maintenance-of-transformer/http://www.electrical4u.com/air-core-transformer/http://www.electrical4u.com/distribution-transformer-efficiency-of-distribution-transformer-all-day-efficiency/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    3/17

    premises before delivering the transformer. Mainly two types

    of transformer testing are done at manufacturer premises-

    type test of transformer and routine test of transformer.

    In addition to that some transformer tests are also carried

    out at the consumer site before commissioning and also

    periodically in regular & emergency basis through out its

    service life.

    Type of Transformer Testing

    Tests done at factory

    1. Type tests

    2. Routine tests

    3. Special tests

    Tests done at site

    1. Pre-commissioning tests

    2. Periodic/condition monitoring tests

    3. Emergency tests

  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    4/17

    Type Test of Transformer

    To prove that the transformer meets customers specifications

    and design expectations, the transformer has to go through

    different testing procedures in manufacturer premises. Some

    transformer tests are carried out for confirming the basic

    design expectation of that transformer. These tests are done

    mainly in a prototype unit not in all manufactured units in a

    lot. Type test of transformer confirms main and basic

    design criteria of a production lot.

    Routine Tests of Transformer

    Routine tests of transformer is mainly for confirming

    operational performance of individual unit in a production lot.

    Routine tests are carried out on every unit manufactured.

    Special Tests of Transformer

    Special tests of transformer is done as per customer

    requirement to obtain information useful to the user during

    operation or maintenance of the transformer.

    Pre Commissioning Test of Transformer

    In addition to these, the transformer also goes through some

    other tests, performed on it, before actual commissioning of

    the transformer at site. The transformer testing performed

    before commissioning the transformer at site is called pre-

  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    5/17

    commissioning test of transformer. These tests are done to

    assess the condition of transformer after installation and

    compare the test results of all the low voltage tests with the

    factory test reports.

    Type tests of transformer includes

    1. Transformer winding resistance measurement

    2. Transformer ratio test.

    3. Transformer vector group test.

    4. Measurement of impedance voltage/short circuit impedance

    (principal tap) and load loss (Short circuit test).

    5. Measurement of no load loss and current (Open circuit test).

    6. Measurement of insulation resistance.

    7. Dielectric tests of transformer.

    8. Temperature rise test of transformer.

    9. Tests on on-load tap-changer.

    http://www.electrical4u.com/insulation-dielectric-test-of-transformer/http://www.electrical4u.com/transformer-winding-resistance-measurement/http://www.electrical4u.com/transformer-oil-and-winding-temperature-rise-test/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-and-turn-ratio-test-of-transformer/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/vector-group-test-of-power-transformer/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    6/17

    10. Vacuum tests on tank and radiators.

    Routine tests of transformer include

    1. Transformer winding resistance measurement.

    2. Transformer ratio test.

    3. Transformer vector group test.

    4. Measurement of impedance voltage/short circuit impedance

    (principal tap) and load loss (Short circuit test).

    5. Measurement of no load loss and current (Open circuit test)

    6. Measurement of insulation resistance.

    7. Dielectric tests of transformer.

    8. Tests on on-load tap-changer.

    9. Oil pressure test on transformer to check against leakages

    past joints and gaskets.

    That means Routine tests of transformer include all the type

    tests except temperature rise and vacuum tests. The oil

    pressure test on transformer to check against leakages past

    http://www.electrical4u.com/transformer-winding-resistance-measurement/http://www.electrical4u.com/vector-group-test-of-power-transformer/http://www.electrical4u.com/voltage-and-turn-ratio-test-of-transformer/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/insulation-dielectric-test-of-transformer/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    7/17

    joints and gaskets is included.

    Special Tests of transformer include

    1. Dielectric tests.

    2. Measurement of zero-sequence impedance of three-phase

    transformers

    3. Short-circuit test.

    4. Measurement of acoustic noise level.

    5. Measurement of the harmonics of the no-load current.

    6. Measurement of the power taken by the fans and oil pumps.

    7. Tests on bought out components / accessories such as

    buchhloz relay, temperature indicators, pressure relief

    devices, oil preservation system etc.

    Transformer Winding Resistance

    Measurement

    Transformer winding resistance measurement is carried out to

    http://www.electrical4u.com/transformer-winding-resistance-measurement/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    8/17

    calculate the I2R losses and to calculate winding temperature

    at the end of a temperature rise test. It is carried out as a type

    test as well as routine test. It is also done at site to ensure

    healthiness of a transformer that is to check loose

    connections, broken strands of conductor, high contact

    resistance in tap changers, high voltage leads and bushings

    etc.

    There are different methods for measuring of transformer

    winding, likewise

    Current voltagemethod of measurement of windingresistance.

    Bridge method of measurement of winding resistance.

    Kelvin bridge method of Measuring Winding

    Resistance.

    Measuring winding resistanceby Automatic Winding

    ResistanceMeasurement Kit.

    NB:- Transformer winding resistancemeasurement shall be

    carried out at each tap.

    Transformer Ratio Test

    The performance of a transformer largely depends upon

    perfection of specific turns or voltage ratio of transformer. So

    transformer ratio test is an essential type test of transformer.

    This test also performed as routine test of transformer. So

    for ensuring proper performance of electrical power

    transformer, voltage and turn ratio test of transformer one of

    http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electric-power-single-and-three-phase/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/voltage-or-electric-potential-difference/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    9/17

    the vital tests.

    The procedure of transformer ratio test is simple. We just

    apply three phase 415 V supply to HV winding, with keeping

    LV winding open. The we measure the induced voltages at

    HV and LV terminals of transformer to find out actual voltage

    ratio of transformer. We repeat the test for all tap position

    separately.

    Magnetic Balance Test of Transformer

    Magnetic balance test of transformer is conducted only on

    three phase transformers to check the imbalance in the

    magnetic circuit.

    Procedure of Magnetic Balance Test of Transformer

    1. First keep the tap changer of transformer in normal position.

    2. Now disconnect the transformer neutral from ground.

    3. Then apply single phase 230 V AC supply across one of the

    HV winding terminals and neutral terminal.

    4. Measure the voltagein two other HV terminals in respect of

    neutral terminal.

    5. Repeat the test for each of the three phases.

    In case of auto transformer, magnetic balance test of

    transformer should be repeated for LV winding also.

    http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/what-is-magnetic-field/#Magnetic-Circuit
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    10/17

    There are three limbs side by side in a core of transformer.

    One phase winding is wound in one limb. The voltage

    induced in different phases depends upon the respective

    position of the limb in the core. The voltageinduced in

    different phases of transformer in respect to neutral terminals

    given in the table below.

    Left side

    phase

    Central

    phase

    Right side

    phase

    AN BN CN

    Voltage applied at left side

    phase

    230 V 180 V 50 V

    Voltage applied at central

    phase115 V 230 V 115 V

    Voltage applied at right

    side phase50 V 180 V 230 V

    Magnetizing Current Test of

    Transformer

    Magnetizing current test of transformeris performed to

    locate defects in the magnetic core structure, shifting of

    windings, failure in turn to turn insulation or problem in tapchangers. These conditions change the effective reluctance of

    the magnetic circuit, thus affecting the currentrequired to

    establish flux in the core.

    1. First of all keep the tap changer in the lowest position and

    open all IV & LV terminals.

    http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    11/17

    2. Then apply three phase 415 V supply on the line terminals

    for three phase transformers and single phase 230 V supply

    on single phase transformers.

    3. Measure the supply voltageand currentin each phase.

    4. Now repeat the magnetizing current test of

    transformertest with keeping tap changer in normal

    position.

    5. And repeat the test with keeping the tap at highest position.

    Generally there are two similar higher readings on two outer

    limb phases on transformer core and one lower reading on the

    centre limb phase, in case of three phase transformers. An

    agreement to within 30% of the measured exciting current

    with the previous test is usually considered satisfactory. If the

    measured exciting current value is 50 times higher than the

    value measured during factory test, there is likelihood of a

    fault in the winding which needs further analysis.

    Caution: This magnetizing current test of transformer is

    to be carried out before DC resistancemeasurement.

    Vector Group Test of Transformer

    In three phase transformer, it is essential to carry out a vector

    group test of transformer. Proper vector grouping in a

    transformer is an essential criteria forparallel operation of

    transformers.

    http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/single-three-phase-transformer-vs-bank-of-three-single-phase-transformers/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/parallel-operation-of-transformers/http://www.electrical4u.com/electric-current-and-theory-of-electricity/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    12/17

    There are several internal connection of three phase

    transformerare available in market. These several

    connections gives various magnitudes and phase of the

    secondary voltage the magnitude can be adjusted for parallel

    operation by suitable choice of turn ratio, but the phase

    divergence can not be compensated. So we have to choose

    those transformer for parallel operation whose phase sequence

    and phase divergence are same. All the transformers with

    same vector ground have same phase sequence and phase

    divergence between primary and secondary. So before

    procuring one electrical power transformer, one should ensure

    the vector group of the transformer, whether it will be

    matched with his or her existing system or not. The vector

    group test of transformer confirms his or her requirements.

    Insulation Resistance Test or Megger

    Test of Transformer

    Insulation resistancetest of transformeris essential type

    test. This test is carried out to ensure the healthiness of over

    all insulation system of an electrical power transformer.

    Procedure of Insulation Resistance Test of Transformer

    1. First disconnect all the line and neutral terminals of the

    transformer.

    2. Megger leads to be connected to LV and HV bushing studs to

    measure insulation resistanceIR value in between the LV and

    HV windings.

    http://www.electrical4u.com/single-three-phase-transformer-vs-bank-of-three-single-phase-transformers/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-power-transformer-definition-and-types-of-transformer/http://www.electrical4u.com/electrical-power-transformer-definition-and-types-of-transformer/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    13/17

    3. Megger leads to be connected to HV bushing studs and

    transformer tank earth point to measure insulation resistance

    IR value in between the HV windings and earth.

    4. Megger leads to be connected to LV bushing studs and

    transformer tank earth point to measure insulation resistance

    IR value in between the LV windings and earth.

    NB : It is unnecessary to perform insulation resistancetest

    of transformer per phase wise in three phase transformer.

    IR values are taken between the windings collectively asbecause all the windings on HV side are internally

    connected together to form either star or delta and also all

    the windings on LV side are internally connected together

    to form either star or delta.

    Measurements are to be taken as follows:

    For auto transformer: HV-IV to LV, HV-IV to E,

    LV to E.

    For two winding transformer: HV to LV, HV to E, LV to

    E.

    Three winding transformer: HV to IV, HV to LV, IV to

    LV, HV to E, IV to E, LV to E.

    Oil temperature should be noted at the time of insulation

    resistancetest of transformer. Since the IR value of

    transformer insulating oil may vary with temperature.

    IR values to be recorded at intervals of 15 seconds, 1 minute

    http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/http://www.electrical4u.com/electrical-resistance-and-laws-of-resistance/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    14/17

    and 10 minutes.

    With the duration of application of voltage, IR value

    increases. The increase in IR is an indication of dryness of

    insulation.

    Absorption coefficient = 1 minute value/ 15 secs. value.

    Polarization index = 10 minutes value / 1 minute value.

    Dielectric Tests of Transformer

    Dielectric tests of transformeris one kind of insulation test.

    This test is performed to ensure the expected over all

    insulation strength of transformer. There are several test

    performed to ensure the required quality of transformer

    insulation, dielectric test is one of them. Dielectric tests of

    transformeris performed in two different steps, first one

    called Separate source voltagewithstand test of transformer,

    where a single phase power frequency voltageof prescribed

    level, is applied on transformer winding under test for 60

    seconds while the other windings and tank are connected to

    the earth and it is observed that whether any failure of

    insulation occurs or not during the test. Second one is induced

    voltagetest of Transformer where, three phase voltage, twice

    of rated secondary voltageis applied to the secondary

    winding for 60 second by keeping the primary of the

    transformer open circuited. The frequency of the applied

    voltageshould be double of power frequency too. Here also if

    no failure of insulation, the test is successful.

    http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/insulation-dielectric-test-of-transformer/http://www.electrical4u.com/insulation-dielectric-test-of-transformer/http://www.electrical4u.com/voltage-or-electric-potential-difference/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    15/17

    In addition to dielectric tests of transformerthere are other

    type test for checking insulation of transformer, such as

    lightning impulse test, switching impulse test and partial

    discharge test.

    Induced Voltage Test of Transformer

    The induced voltagetest of transformer is intended to check

    the inter turn and line end insulation as well as main

    insulation to earth and between windings-

    1. Keep the primary winding of transformer open circuited.

    2. Apply three phase voltageto the secondary winding. The

    applied voltageshould be twice of rated voltageof

    secondary winding in magnitude and frequency.

    3. The duration of the test shall be 60 second.

    4. The test shall start with a voltagelower than 1/3 the full test

    voltage, and it shall be quickly increased up to

    desired value.

    The test is successful if no break down occurs at full test

    voltageduring test.

    Temperature Rise Test of

    Transformer

    Temperature rise test of transformeris included in type test of

    transformer. In this test we check whether the temperature

    http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/insulation-dielectric-test-of-transformer/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/voltage-or-electric-potential-difference/http://www.electrical4u.com/transformer-oil-and-winding-temperature-rise-test/http://www.electrical4u.com/voltage-or-electric-potential-difference/
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    16/17

    rising limit of the transformer winding and oil as per

    specification or not.

    In this type test of transformer, we have to check oil

    temperature rise as well as winding temperature rise limits of

    an electrical transformer.

    Objective Questions on Transformer (MCQs)

    Enter your suggestion/comment hereName : -

    Enter your name here

    Email : -

    Enter your email here

    Location : -

    Enter your location here

    Suggestion / Comment : -

    Enter your comments/suggestion here

    Enter the above code here

    Regenerate Code Submit Reset

    http://www.electrical4u.com/electrical-engineering-objective-questions-mcq/#Objective-Questions-on-Transformer
  • 7/24/2019 Transformer Testing _ Type Test and Routine Test of Transformer _ Electrical4u

    17/17

    2011-2015 electrical4u.The content is copyrighted to electrical4uand may not be reproducedon other websites.

    http://jigsaw.w3.org/css-validator/check/refererhttp://www.electrical4u.com/http://www.electrical4u.com/