OIL TRANSFORMER HV/LV INSTALLATION AND USE MANUAL Emiss. 10/12 Rev.00 - Pag. 1/19 Installation and use Manual OIL TRANSFORMER

Transformer Installation Guide

Embed Size (px)

DESCRIPTION

Transformer installation guide

Citation preview

Page 1: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 1/19

Installation and use

Manual OIL TRANSFORMER

Page 2: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 2/19

TABLE OF CONTENTS

1  INTRODUCTION ........................................................................................................................................ 3 

1.1  Reference standard .................................................................................................................................. 3 

1.2  Electromagnetic compatibility ................................................................................................................ 3 

1.3  Marking CE ............................................................................................................................................. 3 

2  GENERAL ................................................................................................................................................... 3 

3  OUTLINE OF THE TRANSFORMER AND THE ACCESSORIES ......................................................... 4 

4  RECEPTION, HANDLING, STORAGE .................................................................................................... 8 

4.1  Reception ................................................................................................................................................. 8 

4.2  Handling .................................................................................................................................................. 9 

4.3  Storage ................................................................................................................................................... 11 

5  INSTALLATION ....................................................................................................................................... 11 

5.1  Standard installation conditions ............................................................................................................ 11 

5.2  Ventilation ............................................................................................................................................. 11 

5.3  Insulating distances ............................................................................................................................... 13 

5.4  Earthing connections ............................................................................................................................. 13 

5.5  LV and HV connections ........................................................................................................................ 13 

5.6  Regulation of transformation ratio ........................................................................................................ 14 

5.7  Parallel connection of transformers ....................................................................................................... 14 

6  TRANSFORMER PROTECTIONS .......................................................................................................... 15 

6.1  Over temperature protection .................................................................................................................. 15 

6.2  Overloading and short circuit protection ............................................................................................... 15 

6.3  Protection against over voltages ............................................................................................................ 15 

7  COMMISSIONING ................................................................................................................................... 16 

7.1  Mechanical checks before the commissioning ...................................................................................... 16 

7.2  Electrical checks before the commissioning ......................................................................................... 17 

7.3  Insulating fluid level .............................................................................................................................. 17 

7.4  Arcing horns .......................................................................................................................................... 18 

7.5  Air dryer ................................................................................................................................................ 18 

7.6  Buchholz Relay ..................................................................................................................................... 18 

7.7  Thermometer ......................................................................................................................................... 18 

7.8  Integrated safety device ......................................................................................................................... 18 

7.9  Operations for commissioning .............................................................................................................. 19 

Page 3: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 3/19

1 INTRODUCTION

1.1 Reference standard The oil transformer referred to the attached test report, has been designed and manufactured by TESAR in order to meet to Italian CEI and international IEC Standards requirements in force at the moment of its manufacturing (unless different agreement). • CEI Standards (Italian)

- CEI EN 60076-1 - Power transformer – part 1 : General - CEI EN 60076-2 - Power transformer – part 2 : Temperature Rise - CEI EN 60076-3 - Power transformer – part 3 : Insulation levels, dielectric tests and

external clearances in air - CEI EN 60076-4 - Power transformer – part 4 : Guide to the lightning impulse and

switching impulse testing - Power transformers and reactors - CEI EN 60076-5 - Power transformer – part 4 : Ability to withstand short circuit - CEI EN 60076-10 - Power transformer- part 10 determination of sound levels - CEI 14-7 - Marcatura dei terminali dei trasformatori di potenza - CEI 14-15 - Guida di carico per trasformatori immersi in olio

• IEC Standards (International)

- IEC 60076-1 - Power transformer – part 1 : General - IEC 60076-2 - Power transformer – part 2 : Temperature Rise - IEC 60076-3 - Power transformer – part 3 : Insulation levels, dielectric tests and

external clearances in air - IEC 60076-4 - Power transformer – part 4 : Guide to the lightning impulse and

switching impulse testing - Power transformers and reactors - IEC 60076-5 - Power transformer – part 4 : Ability to withstand short circuit - IEC 60076-10 - Power transformer- part 10 determination of sound levels - IEC 60616 -Terminal and tapping markings for power transformers - IEC 60076-7 - Loading guide for oil-immersed power transformers

1.2 Electromagnetic compatibility The intensity of low frequency magnetic field emitted by the windings is of a limited value and, however, it is equal or lower than those of the field emitted by the connections and the low voltage bars. Its value quickly decreases by increasing of the distance from the transformer.

1.3 Marking CE TESAR does not affix the marking CE on its transformers as foreseen at paragraph 5.4.2 of the “Guide to the application of the Directive 89/336/EEC” which excludes from the Directive application field: • High voltage inductor • High voltage transformer

2 GENERAL

This publication aims to guide users on the properties of power and distribution transformers insulated with mineral, silicone or vegetable oil. Two types of transformers are considered:

- Hermetically sealed total filled (Fig. 1) - Breathing with conservator (Fig. 2)

Page 4: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 4/19

3 OUTLINE OF THE TRANSFORMER AND THE ACCESSORIES

Fig. 1 Hermetically sealed total filled transformer

Fig. 2 Breathing with conservator transformer

Page 5: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 5/19

Standard components and accessories:

a. Rating plate (Fig. 3 and Fig. 4) b. HV porcelain bushing (Fig. 4) c. LV porcelain bushing (Fig. 4) d. Off-load tap-changer (Fig. 4) e. N°2 earthing terminals (Fig. 4) f. Tow attachment (Fig. 4) g. Lifting eyes (Fig. 4) h. Truck with rollers for lengthways or sideway travel (Fig. 4) i. Thermometer pocket (Fig. 4) j. Drain valve(Fig. 4) k. Arcing horns on HV porcelain bushing, for transformer without HV cable box (Fig. 4) l. Air dehydrating breathers, for breathing transformer (Fig. 4) m. Oil level indicator, for breathing transformer (Fig. 4)

Optional components and accessories:

I. Plug-in HV terminals (Fig. 5) II. Thermometer, to install on the thermometer pocket (Fig. 5)

III. RIS or equivalent for hermetically sealed transformer (Fig. 5) IV. Buchholz Relay for breathing transformer (Fig. 5) V. Safety valve (Fig. 5)

VI. PT100 thermo-resistance (to install in the thermometer pocket) (Fig. 5) VII. HV and/or LV cable boxes (Fig. 5)

Fig. 3 Rating plate

Page 6: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 6/19

Fig. 4 Standard components and accessories

a

i

b

d

e

g

f

h

c

j

k

m

l

Page 7: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 7/19

I – Plug-in for HV terminals II – Thermometer III – RIS or equivalent

(for hermetically sealed transformer)

IV - Buchholz Relay V - Safety valve VI - PT100 thermo-resistance (for breathing transformer)

VII - HV and/or LV cable boxes

Fig. 5 Optional components and accessories

Page 8: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 8/19

4 RECEPTION, HANDLING, STORAGE

4.1 Reception The transformer is generally supplied totally assembled and ready to be connected to the medium and low voltage line. According to the specification, the transformer is shipped with a polythene protection, or packed into wooden cage, for protection against dust and little shocks, or finally packed into a wooden case for over-sea shipments. On receipt of the transformer, both at the client's plants or at site, it is necessary to carry out the following checks: • Check there are no signs of damage on the packing or on the transformer occurred during the

transport. • The characteristics of the transformer detailed on the rating plate must correspond to those of the

shipping documents and with those of the test report, which is attached to the transformer. • Check each transformer is complete with the accessories foreseen in the contract (wheels, bushing,

etc.). IMPORTANT: In case any anomalies are found, please contact immediately the manufacturer. If within 5 days there will be no notification of anomalies or defects, it can be considered that the transformer has been delivered in perfect conditions. The manufacturer, therefore, cannot be considered responsible neither for what could happen to the transformer during service nor for the eventual consequences.

Page 9: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 9/19

4.2 Handling During the transport or the handling, it is recommended to use only the special lifting eyes and tow attachments (see “ g ”and “ f ” letter in the Fig. 4). IMPORTANT: The transformer cannot be moved pushing the cooling fins or radiators or tank. Ropes must be arranged so as not to interfere with the radiators or cooling fins. Lifting can be made using the appropriate hooks remembering to use ropes long enough so that H is never less than L (Fig. 6). Always use all the existing hooks and not only one of them.

Fig. 6 Lifting transformer

Page 10: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 10/19

Example of handling

Fig. 7 Handling by means of bridge crane and forklift truck

Fig. 8 Manual handling

Fig. 9 Wrong handling

Page 11: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 11/19

4.3 Storage

4.3.1 Transformer for indoor installation The transformer must be stored in a sheltered, clean and dry ambient maintaining the packing up to the installation.

4.3.2 Transformer for outdoor installation The transformer may be stored outdoor until the installation time. IMPORTANT: The storage temperature must not be lower than -25°C.

5 INSTALLATION

5.1 Standard installation conditions The maximum height of installation must not exceed 1000 m above sea level. When the transformer is in service, the ambient temperature of the room must be within the following limits: • Minimum temperature: -25°C • Yearly average temperature: +20°C • Monthly average temperature: +30°C • Maximum temperature: + 40°C In case the height of the place of installation and/or the ambient temperature values are higher than the ones specified above, it is necessary to specify it at the ordering stage since a particular dimensioning of the transformer depends upon these values.

5.2 Ventilation The electric current passing through the windings, and the effect of the core magnetising current produce electrical losses resulting in localised heating of the windings and core. The transformer is designed in such a way that natural cooling maintains the transformer temperature under the maximum values foreseen by the standards. In order to avoid temperature accumulation in the room where the transformer is installed, it is necessary to provide suitable ventilation. Each TESAR transformer is equipped with a thermometer pocket where a thermometer with contacts may be installed (optional accessory). The suggested values for setting the contacts are following (oil temperature):

Description Alarm °C Trip °C

Oil 90°C 100°C

Page 12: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 12/19

Dimensioning of air louvers • Natural cooling

In the room where the transformer is installed, it is necessary to install air louvers sufficient to dissipate the heat generated by transformer during service, in order to guarantee the standard service conditions and to prevent exceed the over temperature limits of the transformer. Therefore the room must be provided with a louver on the lower part S, in order to guarantee an appropriate fresh air flow; and a louver S’ on the upper part of the opposite wall, in order to extract the hot air (see Fig. 10). To calculate the surface of the louvers for air incoming and outgoing, for a nominal annual ambient temperature of 20°C, the following formula may be used:

HPS ⋅≡ 188.0 SS ⋅≡ 10.1'

where: P = Sum of the transformer no-load losses and the load losses at 120°C [kW]

(if the losses are at 75°C, they must be multiply for 1.15) S = Surface of the incoming louver [m2] S’ = Surface of the outgoing louver [m2] H = Height between the two louvers [m]

Fig. 10 Natural cooling

In order not to obstruct cooling is necessary that the transformer is installed at a distance not less than 30 cm from the walls and not less than 60 cm from other transformers.

• Forced cooling Forced cooling is necessary in the following cases: • Frequent overloading • Low-dimensioned room • Room scarcely ventilated • Medium daily temperature higher than 30°C. The forced cooling can be realized by means of installation of air extractor located in the upper part of the room controlled by a suitable thermostat or directly by a transformer thermal protection relay, with a suggested flow of approx. 3,5÷4 m3/min for each kW of total losses at 120 °C (if the losses are at 75°C, they must be multiplied by 1.15).

ATTENTION: an insufficient air circulation, besides reducing the nominal life of the transformer, causes over heating which, in the worst cases, can determine the intervention of the thermal protection relay.

Page 13: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 13/19

5.3 Insulating distances The transformer supplied for service without HV/LV cable-box (IP00) must be installed in the room respecting the insulating distances specified in the national standard (in Italy, CEI 11-1). The transformer, also with plug-in bushing, must be protected against direct contacts.

5.4 Earthing connections Tesar is not responsible for the transformer installation. The installation must be carried out according to the standards in force, to the applicable laws and to the present instructions. The following points must be taken into consideration when the installation is carried out: • connect the earthing conductors to the relative earth points on the metallic parts of the transformer

and cable boxes. • connect the low voltage neutral to earth when required or when required by the protection system

to earth.

5.5 LV and HV connections • Execution without cable boxes (IP00) The cables and the bus bars which are connected to the transformer must be duly fixed to avoid any mechanical stress on the LV and HV transformer terminals. Both upper and bottom cable connections can be performed, being sure, however, to respect the configuration showed in the drawings. In case the connections arrive from the bottom please ensure that there is sufficient depth for the bending of the cables. • Execution with cable boxes The cables and/or the bus bars which are connected to the transformer must enter in the cable boxes only through suitable flanges specified at the ordering stage. In any case the cables and/or the bus bars must be duly fixed outside the cable boxes to avoid any mechanical stress on the LV and HV terminals of the transformer and also on the cable boxes. After the installation please check the correct degree of protection is maintained near the passageway of the cables and/or the bus bars. HV cable box: cables coming only from the bottom LV cable box: cables coming from the bottom or from the top

Fig. 11 Cables coming from the bottom (left) and from the top (right)

Page 14: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 14/19

5.6 Regulation of transformation ratio The variation of the primary voltage is obtained by changing the position of the voltage off-load tap-changer located on the cover of the tank. Ensure always that the position of the tap-changer is properly inserted and not in an intermediate position. In case the primary voltage of the system does not correspond exactly to the voltage of the central tap, it is necessary to modify the position of the tap duly positioning it on one of the other taps in order that the secondary obtained is the no-load voltage shown on the rating plate. Note: At the time of shipping, the position of the voltage off-load tap-changer are located on the central tap. In case of transformers with double ratio, please be sure that the position corresponding to the voltage of the system feeding the transformer is properly connected. Note: At the time of shipping, the position of the voltage off-load tap-changer are connected on the position of the higher primary voltage. Important A) In case of transformers with double ratio, please be sure the tap corresponding to

voltage of the system feeding the transformer it-self, is duly connected. B) In case the position of the tap-changer has to be changed after the transformer has

been put into service the first time, it is recommended to put the transformer out of service and to connect to ground the LV and HV circuits before approaching the transformer.

5.7 Parallel connection of transformers If the transformer must be connected in parallel with other transformers, please verify the total compatibility of the voltage ratio and of the conditions stated by the IEC 60076-1 standards, and particularly: • Identical voltage ratio • Identical frequency of functioning • Identical vector group • Identical short circuit voltage (Tolerance ± 10%) • The rated power (kVA) of the biggest transformer should not be larger than twice the smallest

transformer • The LV connections must be the same length from the LV terminals (of two different units) to the

switch junction.

Page 15: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 15/19

6 TRANSFORMER PROTECTIONS

6.1 Over temperature protection The protection can be realized with: - thermometer (optional accessories) - RIS or equivalent equipment (optional accessories for hermetically sealed transformer) • The thermometer is generally installed in the thermometric pocket on the cover of the tank. The thermometer may be equipped with two settable contacts, one for alarm, the other for trip. The suggested values are written at paragraph 5.2. • The integrated safety device for hermetically sealed transformer (RIS or equivalent) provides:

- two settable contacts for temperature, one for alarm and the other for trip. The suggested values are written at paragraph 5.2.

- one settable trip contact for pressure (The suggested value is 0.3 bar) - one trip contact for oil level

6.2 Overloading and short circuit protection According to the parameters of the standards shown at point 1.1, the transformer is designed and manufactured in such a way to withstand limited abnormal situation of over-voltages, overloading and short circuit. Therefore, the transformer must be protected against thermal and dynamic effects caused by continuous overloading and secondary short circuits by means of an automatic switch or suitable fuses, able to disconnect the transformer in case of current flow higher than the one fixed by the protection. The protections setting and/or the choice of fuses HV and LV side, must be carried out taking into consideration the primary and secondary rated currents stated in the transformer rating plate, taking also into consideration that when we feed the transformer, a very high magnetizing current is established on the primary, by means of variable starting from a minimum of 10 times the rated current (in the worst conditions of insertion depending from the instant when the feeding circuit is closed, from the electric characteristics of the feeding network, from the reactance and resistance values of the circuit network-transformer, the insertion current can reach also 20 times the rated current), even if the automatic switch located on the secondary is open and therefore without loading. Therefore, it is necessary to duly set the relay of maximum current HV side, in current and time value, by introducing a little delay (approx. some tens of ms), in such a way that the protection relay will not operate. Furthermore, we suggest limiting the number of connections and disconnection of the transformer on the network.

6.3 Protection against over voltages In order to protect the transformers against over-voltages at industrial frequencies or the ones due to atmospheric origin, it is recommended that voltage surge arrester with variable resistance are used. The characteristics of the surge arresters depend on the transformer insulation level and from the characteristics of the distribution system line. It is recommended to install the surge arresters when the transformer is connected, directly or through a short cable, to the main networks.

Page 16: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 16/19

7 COMMISSIONING

7.1 Mechanical checks before the commissioning • Check the earth connections • Check of the insulating distance of the parts under voltage towards ground as shown at paragraph

5.3 • Check the tightening of HV and LV terminals applying the following values of the tightening

torque.

Bushing On the central conductor LV/HV in copper or brass

Bolts M8 M12 M20 M30x2 M42x3 M48x3 M55x3 M75x3 Torque N*m 10 13 30 70 110 180 250 250

On the fixing stud screw HV insulators

Bolts M10 M12 M16Torque N*m 15 25 40

On the pinch bolts connecting flags

Bolts M10 M12 M16Torque N*m 25 40 90 Mechanical parts

Bolts M8 M10 M12 M14 M16 M18 M20 M22

Torque N*m 20 45 75 125 190 275 385 530

With torque wrench set in kgm, divide the values by 10

Page 17: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 17/19

7.2 Electrical checks before the commissioning

• Verify that the position of the tap-changer is inserted correctly. In case of double primary voltages, please check the feed to the transformer correspond to the correct position.

• Check the correct functioning of the switches located as protection of the transformer on HV and LV side.

• Check the correct setting and functioning of the overloading and short-circuit protection relay.

• Check the correct setting and functioning of the over-temperature protection relay and of the thermometer.

• Check the functioning of the fans. • Check the general conditions of the transformer and proceed with the measurement of the

insulating resistance by means of a Megger at 2500 V. This measurement must be carried out with HV and LV terminals disconnected from the equipment, it means before connecting the cables and/or the bus bars. The values of the measured resistances must be approx. the following: • HV terminals / LV terminals grounded ≥ 20 MΩ • LV terminals / HV terminals grounded ≥ 10 MΩ • HV terminals - LV terminals / ground terminal ≥ 10 MΩ In case the measured values are lower, please contact our after sale service.

ATTENTION: In case a transformer is put into service after a long storage period, or after a long de-energised period, it will be necessary: 1) clean the HV/LV bushings from eventual dust and condensation by means of dry

compressed air jets and dry cloth. 2) if the transformer has been held in stock far more than six months in normal climates

or far more than a month in damp climates, check the dielectric strength of the insulating oil. Using the procedure established by the IEC standard to check the dielectric strength of the insulating oil, if the test is negative proceed to dry the dielectric oil of the transformer, otherwise contact Tesar.

It is recommended, finally, to carry out always a visual check of the transformer in order to verify any unlikely presence on the surface the cooling ducts

7.3 Insulating fluid level Check that the reading on the level indicator approximately correspond to ambient temperature (transformer with conservator or RIS for hermetically sealed). If the insulating fluid needs to be topped up, only fluid with the same characteristic and not containing PCBs must be used and with the required dielectric strength. The oil transformer must be topped up according to the manufacters’instruction.

Page 18: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 18/19

7.4 Arcing horns If the transformer is equipped with arcing horns, check that the position of the spark gap rods mounted on HV porcelain bushings corresponds to the insulation class, as shown in the following chart.

Insulation Class [kV]

A [mm]

B [mm]

12

≥15

70

17.5

≥15

90

24

≥15

100

36

≥15

200

Fig. 12 Arcing horns

7.5 Air dryer If the transformer is equipped with air dryer (transformer with conservator), check that the salts of silicagel are orange. If they are neutral colour, they have already picked up moisture and do not fulfil their function as dehydrating air. It is necessary to remove the salts and regenerate the dryer by placing them in an oven at 150°C until they are come back to orange colour.

7.6 Buchholz Relay If the transformer is equipped with Buchholz relay (transformer with conservator) to avoid unnecessary activation, proceed carefully with the leaking operation of the relay, acting on the taps (see instruction relay). If during commissioning or in the first hours of the energization the Buchholz relay should signal the formation of gas, in small quantities, first to believe that there is a fault in the transformer and repeat the leaking operation.

7.7 Thermometer If the transformer is equipped with the thermometer check the threshold of the alarm and trip are set at the operating conditions. The setting temperature are provided to the manufacturers in according to transformer type and the insulation class.

7.8 Integrated safety device If the transformer is equipped with the integrated safety device (RIS or equivalent) check the setting of the alarm and trip of the thermometer and the values of pressure shown are matched to operating conditions. For more additional information, consult the operating manual supplied with the integrated security device, you must be careful not to change the orientation fixing RIS or equivalent (the exact position should be required before delivery).

Page 19: Transformer Installation Guide

OIL TRANSFORMER HV/LV

INSTALLATION AND USE MANUAL

Emiss. 10/12 Rev.00 - Pag. 19/19

7.9 Operations for commissioning

Closing of HV switch When the switch is closed the transformer gives out a sharp noise, which decreases in few ms until it stabilises. Check of secondary voltages Before closing the low voltage switch or make additional checks for parallel operation with other transformers, it is necessary: • Check by means of a voltmeter the proper value between each two phases and of the three

wye-connected voltage. • Check the proper phases displacement and the correct vector group. In case the values correspond to those stated in the rating plate, it is possible to proceed and complete the commissioning or to carry out the checks for the parallel service. Run in parallel service with other transformer In case the transformer has to run in parallel with another, it is also necessary: • Check the compatibility of the rating plates of both transformers • Verify the concordance of the phases by measuring the voltage between the phase "one" of

the transformer already in service and the phase "one" of the transformer to be connected in parallel by means of a voltmeter. The value of this result must be zero. Continue in the same way for phase 2 and phase 3

Closing of LV switch Complete the commissioning of the transformer closing the LV switch. IMPORTANT We remind you that qualified technical personnel must carry out the operation, commissioning and energization. Furthermore, during the voltage measurements and the phase displacement checks on the upper terminals of the LV switches, you are recommended to use suitable instruments and suitable insulating gauntlets.

For more accurate and complete checks, please contact our Assistance Service

Phone (+39)-0575.317.1 Fax (+39)-0575.317.201 E-Mail [email protected]