23 USC § 409
NDDOT Reserves All Objections
TRANSCRIPT OF PUBLIC HEARING
TRANSCRIPT OF PUBLIC HEARING
Project No. SU-1-988(033)044
PCN 18334
City of Mandan Project 2012-01
Sunset Drive: 7th Street NW to approximately 500’ north of 15th Street NW
Prepared by
CITY OF MANDAN
Principal Author: Houston Engineering, Inc.
September 2010
Sunset Drive Reconstruction Project Page 4 Project No. SU-1-988(033)044 PCN 18334
September 2010 Transcript of Public Hearing
accident due to the increase amount of potential strike points. The Safe Routes to School program was explained and how to channelize students through the most common routes instead of multiple crossings. Post Meeting Comments: A Post Public Hearing Meeting was not required, so no comments were received. Comparison of Alternatives:
Alternative Advantages Disadvantages
A - No Build Lowest initial cost Future upgrade is more costly
(Maintenance activities) Frequent repairs required
Poor ride quality
Does not address future needs
Does not address safety issues
B - Reconstruction Storm sewer interception capacity increased High initial cost
Street light coverage and safety increased
On street parking improved
Defined turning lanes to schools
Sidewalk meets current standards
Longer pavement life
Corrects unsafe Y-intersection
Sanitary sewer sized for future flows
Watermain leaks eliminated
Improved fire coverage