    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 156

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 28South 0 11 0.56 0 7.5 CFM/person ---- 22.5

    West 68 165 0.56 6263 TOTAL F/A QTY 51

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0West 68 25 0.38 644 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 156 48 0.11 792 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 68 27 1.13 2068 2. Occupancy in persons 3

    Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 51 27 1.08 0.1 148

    Internal Heat 0

    People 3 245 735

    Lights 156 1.25 3.413 666 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factor

    Credit for Thermal storage 11997

    Sub-Total After storage:10% 1200 8 inch brick

    Room Sensible Heat 13197 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 51 76 0.68 0.1 261 total

    People 3 205 615 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 876 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 876 U factor

    Room Total Heat 14074

    Outside Air Heat 6.102 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.128.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    GENERAL-2

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    2/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 156

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 28South 0 11 0.56 0 7.5 CFM/person ---- 22.5

    West 0 165 0.56 0 TOTAL F/A QTY 51

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0West 0 25 0.38 0 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 156 48 0.11 792 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 0 27 1.13 0 2. Occupancy in persons 3

    Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 51 27 1.08 0.1 148

    Internal Heat 0

    People 3 245 735

    Lights 156 1.25 3.413 666 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factor

    Credit for Thermal storage 3023

    Sub-Total After storage:10% 302 8 inch brick

    Room Sensible Heat 3326 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 51 76 0.68 0.1 261 total

    People 3 205 615 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 876 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 876 U factor

    Room Total Heat 4202

    Outside Air Heat 10.751 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.128.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    ENT

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    3/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 260

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 47South 0 11 0.56 0 7.5 CFM/person ---- 15

    West 0 165 0.56 0 TOTAL F/A QTY 62

    East 41 11 0.56 255

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0

    West 0 25 0.38 0 50mm tk.FG

    East 106 31 0.38 1235 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 260 48 0.11 1323 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 41 27 1.13 1264 2. Occupancy in persons 2

    Partition 169 22 0.35 1308 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 62 27 1.08 0.1 180

    Internal Heat 0

    People 2 245 490

    Lights 260 1.25 3.413 1111 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factor

    Credit for Thermal storage 7848

    Sub-Total After storage:10% 785 8 inch brick

    Room Sensible Heat 8633 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 62 76 0.68 0.1 320 total

    People 2 205 410 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 730 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 730 U factor

    Room Total Heat 9363

    Outside Air Heat 7.285 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    SINGLE RM-3

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    4/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 1453

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 261South 0 11 0.56 0 7.5 CFM/person ---- 120

    West 0 165 0.56 0 TOTAL F/A QTY 381

    East 339 11 0.56 2088

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0

    West 0 25 0.38 0 50mm tk.FG

    East 226 31 0.38 2645 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 1453 48 0.11 7378 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 339 27 1.13 10340 2. Occupancy in persons 16

    Partition 207 22 0.35 1599 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 381 27 1.08 0.1 1112

    Internal Heat 0

    People 16 245 3920

    Lights 1453 1.25 3.413 6197 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 35961

    Sub-Total After storage:10% 3596 8 inch brick

    Room Sensible Heat 39557 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 381 76 0.68 0.1 1971 total

    People 16 205 3280 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 5251 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 5251 U factor

    Room Total Heat 44809

    Outside Air Heat 8.321 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    MALE GENERAL WARD-1

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    5/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 261

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 47South 0 11 0.56 0 5 CFM/person ---- 10

    West 0 165 0.56 0 TOTAL F/A QTY 57

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 102 29 0.38 1113

    West 0 25 0.38 0 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 261 48 0.11 1328 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 0 27 1.13 0 2. Occupancy in persons 2

    Partition 94 22 0.35 727 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 57 27 1.08 0.1 166

    Internal Heat 0

    People 2 245 490

    Lights 261 1.25 3.413 1115 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 5622

    Sub-Total After storage:10% 562 8 inch brick

    Room Sensible Heat 6184 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 57 76 0.68 0.1 295 total

    People 2 205 410 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 705 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 705 U factor

    Room Total Heat 6889

    Outside Air Heat 8.098 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summer.

    JOB NO.: DT / 054

    GMR Kamalanga

    PHARMACY

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    6/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 217

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 39South 0 11 0.56 0 7.5 CFM/person ---- 15

    West 68 165 0.56 6263 TOTAL F/A QTY 54

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0

    West 113 25 0.38 1068 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 217 48 0.11 1104 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 68 27 1.13 2068 2. Occupancy in persons 2

    Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 54 27 1.08 0.1 158

    Internal Heat 0

    People 2 245 490

    Lights 217 1.25 3.413 927 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 12760

    Sub-Total After storage:10% 1276 8 inch brick

    Room Sensible Heat 14036 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 54 76 0.68 0.1 280 total

    People 2 205 410 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 690 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 690 U factor

    Room Total Heat 14726

    Outside Air Heat 6.031 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehum idi fy ing Heat Load Est imate for Summer.

    JOB NO.: DT / 054

    GMR Kamalanga

    TREATMENT RM-2

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    7/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 494

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.18 CFM/SFT 89South 0 11 0.56 0 50 CFM/person ---- 300

    West 0 165 0.56 0 TOTAL F/A QTY 389

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 354 17 0.38 2271

    South 0 29 0.38 0

    West 0 25 0.38 0 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 494 48 0.11 2509 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 0 27 1.13 0 2. Occupancy in persons 6

    Partition 230 22 0.35 1773 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 389 27 1.08 0.1 1134

    Internal Heat 0

    People 6 245 1470

    Lights 494 1.25 3.413 2107 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 11946

    Sub-Total After storage:10% 1195 8 inch brick

    Room Sensible Heat 13141 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 389 76 0.68 0.1 2010 total

    People 6 205 1230 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 3240 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 3240 U factor

    Room Total Heat 16380

    Outside Air Heat 15.421 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    MINOR OT

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    8/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 2523

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0.06 CFM/SFT 151South 0 11 0.56 0 7.5 CFM/person ---- 975

    West 0 165 0.56 0 TOTAL F/A QTY 1126

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0

    West 0 25 0.38 0 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 2523 48 0.11 12816 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 0 27 1.13 0 2. Occupancy in persons 130

    Partition 0 22 0.35 0 3. Equipment Heat load in KW

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 1126 27 1.08 0.1 3285

    Internal Heat 0

    People 130 245 31850

    Lights 2523 1.25 3.413 10765 outside air

    Equipment 0 1 3413 0 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 58716

    Sub-Total After storage:10% 5872 8 inch brick

    Room Sensible Heat 64587 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 1126 76 0.68 0.1 5821 total

    People 130 205 26650 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 32471 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 32471 U factor

    Room Total Heat 97058

    Outside Air Heat 12.572 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehum idi fy ing Heat Load Est imate for Summer.

    JOB NO.: DT / 054

    GMR Kamalanga

    GENERAL WAITING LOUN

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    9/11

    EST.BY SKM

    DATE 12.08.2009

    JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137

    Rev: R0

    Space used for : ROOM 73 61 55% 61

    Size: DIFFERENC 27 76

    Height ft 11.48

    Area sft 2141

    ITEM AREA

    Sun gain /

    D T Factor Btu/hr FRESH AIR

    Solar gain glass

    North 0 11 0.56 0 0 CFM/SFT 0South 0 11 0.56 0 5 CFM/person ---- 135

    West 0 165 0.56 0 TOTAL F/A QTY 135

    East 0 11 0.56 0

    NW 0 118 0.56 0 Formula for 1 Air change per hour

    NE 0 11 0.56 0

    SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60

    SE 0 11 0.56 0

    Solar and trans gain-walls&roof 0

    North 0 17 0.38 0

    South 0 29 0.38 0

    West 0 25 0.38 0 50mm tk.FG

    East 0 31 0.38 0 inside air

    NW 0 19 0.38 0 outside air

    NE 0 23 0.38 0 total

    SW 0 27 0.38 0 U factor

    SE 0 31 0.38 0

    Roof -Sun 2141 48 0.11 10876 Inside Load details

    Roof -Shaded 0

    Transmission gain-except walls & roof 0 1. Lighting watt/sft 1

    Glass part. 0 27 1.13 0 2. Occupancy in persons 27

    Partition 143 22 0.35 1105 3. Equipment Heat load in KW 0.2

    Ceiling 0 22 0.42 0

    Floor 0 22 0.42 0

    Infiltration and Outside air 0

    Infiltration 0

    Outsideair 135 27 1.08 0.1 394

    Internal Heat 0

    People 27 245 6615

    Lights 2141 1.25 3.413 9135 outside air

    Equipment 0.2 1 3413 683 total

    printers 0 1 3.413 0 U factorCredit for Thermal storage 28807

    Sub-Total After storage:10% 2881 8 inch brick

    Room Sensible Heat 31688 plaster on either sides

    Room Latent Heat inside air

    Infiltration 0 outside air

    outsideair 135 76 0.68 0.1 698 total

    People 27 205 5535 U factor

    Steam 0

    Appliance 0 8 inch brick

    Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 6233 inside air

    Supply Duct% +Safety% 0 outside air

    Leakage Loss%+Factor% total

    Room Latent Heat 6233 U factor

    Room Total Heat 37920

    Outside Air Heat 6.834 BTU/LB

    0.68

    0.45

    2.85

    0.35

    O U T P U T S

    D H

    Resistance of Partition Wall - W3

    1.6

    0.12

    0.25

    2.65

    0.38

    Resistance of Wall - W2

    1.6

    0.12

    0.68

    0.25

    2.4

    0.42

    Asphalt Tile 1" 0.32

    inside air 0.68

    Cement Plaster 0.12

    Water Proofing 0.55

    0.25

    9.45

    0.11

    Resistance of Slab

    6 inch Concrete 0.48

    5 inch Concrete 0.4

    plaster on either sides 0.12

    8.0

    0.68

    Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.

    JOB NO.: DT / 054

    GMR Kamalanga

    CORRIDOR-3

    Resistance of Exposed Slab

  • 8/14/2019 Training HL .xls

    10/11

    PROJECT:GMR KAMALANGA, ORISSA HEAT LOAD SUMMARY SHEET

    HOSPITAL BLOCKDESIGNTREE SERVICE CONSULTANTS PVT.LTD.,

    DT.12.08.09

    SL.NO.SPACENAME H

    EIG

    HT

    AREA

    LIGH

    TING

    OCCUPANCY

    EQPTLOAD

    TEMP.

    +/-2

    DEG.F

    RH

    +/-5

    %

    F/AQ

    TY

    CONSIDEREDINHL

    DEHUMIDIFIEDAIR

    QTY

    TOTA

    LACLOAD

    SENS

    IBLELOAD

    REMARKS

    FT SQFT W/SFT NO. KW DEG F % CFM CFM TR TR

    GROUND FLOOR

    1 GENERAL-2 11.48 156 1 3 0.20 73 55 51 647 1.48 1.21

    2 ENT 11.48 156 1 3 0.20 73 55 51 163 0.66 0.39 HW-6

    3 SINGLE RM-3 11.48 260 1 2 0.20 73 55 62 423 1.16 0.86 FCU-3

    PROJECT: GMR KAMALANGA-ORISSA JOB NO.: DT / 054 ENGR: SKM

    BASIS OF DESIGN SUMMARY SHEET FOR HOSPITAL BLOCK

    Page 10 of 11

  • 8/14/2019 Training HL .xls

    11/11

    PROJECT:GMR KAMALANGA, ORISSA HEAT LOAD SUMMARY SHEET

    HOSPITAL BLOCKDESIGNTREE SERVICE CONSULTANTS PVT.LTD.,

    SL.NO.

    SPACE

    NAME HEIGHT

    AREA

    LIGHTING

    OCCUPANCY

    EQPTLOAD

    TEMP.

    +/-2DEG.F

    RH

    +/-5%

    F/AQTY

    CONSIDEREDINHL

    DEHUMIDIFIED

    AIR

    QTY

    TOTALACLOAD

    SENSIBLELOAD

    REMARKS

    FT SQFT W/SFT NO. KW DEG F % CFM CFM TR TR

    4 MALE GENERAL WARD- 11.48 1453 1 16 0.20 73 55 381 1938 6.05 4.16 CSU-05

    5 PHARMACY 11.48 261 1 2 0.20 73 55 57 303 0.92 0.64 HW-7

    6 TREATMENT RM-2 11.48 217 1 2 0.20 73 55 54 688 1.56 1.29 HW-14

    7 MINOR OT 11.48 494 1 6 0.20 73 55 389 644 3.72 1.97 CSU-07

    8 GENERAL WAITING LO 11.48 2523 1 130 0.00 73 55 1126 3164 14.92 7.92

    9 CORRIDOR-3 11.48 2141 1 27 0.20 73 55 135 1552 3.98 2.94 CSU-11

    7662 191 2 2306 9521 34.4 21.4TOTAL

    Page 11 of 11