EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 156
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 28South 0 11 0.56 0 7.5 CFM/person ---- 22.5
West 68 165 0.56 6263 TOTAL F/A QTY 51
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0West 68 25 0.38 644 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 156 48 0.11 792 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 68 27 1.13 2068 2. Occupancy in persons 3
Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 51 27 1.08 0.1 148
Internal Heat 0
People 3 245 735
Lights 156 1.25 3.413 666 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factor
Credit for Thermal storage 11997
Sub-Total After storage:10% 1200 8 inch brick
Room Sensible Heat 13197 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 51 76 0.68 0.1 261 total
People 3 205 615 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 876 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 876 U factor
Room Total Heat 14074
Outside Air Heat 6.102 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.128.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
GENERAL-2
Resistance of Exposed Slab
8/14/2019 Training HL .xls
2/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 156
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 28South 0 11 0.56 0 7.5 CFM/person ---- 22.5
West 0 165 0.56 0 TOTAL F/A QTY 51
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0West 0 25 0.38 0 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 156 48 0.11 792 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 0 27 1.13 0 2. Occupancy in persons 3
Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 51 27 1.08 0.1 148
Internal Heat 0
People 3 245 735
Lights 156 1.25 3.413 666 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factor
Credit for Thermal storage 3023
Sub-Total After storage:10% 302 8 inch brick
Room Sensible Heat 3326 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 51 76 0.68 0.1 261 total
People 3 205 615 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 876 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 876 U factor
Room Total Heat 4202
Outside Air Heat 10.751 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.128.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
ENT
Resistance of Exposed Slab
8/14/2019 Training HL .xls
3/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 260
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 47South 0 11 0.56 0 7.5 CFM/person ---- 15
West 0 165 0.56 0 TOTAL F/A QTY 62
East 41 11 0.56 255
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0
West 0 25 0.38 0 50mm tk.FG
East 106 31 0.38 1235 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 260 48 0.11 1323 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 41 27 1.13 1264 2. Occupancy in persons 2
Partition 169 22 0.35 1308 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 62 27 1.08 0.1 180
Internal Heat 0
People 2 245 490
Lights 260 1.25 3.413 1111 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factor
Credit for Thermal storage 7848
Sub-Total After storage:10% 785 8 inch brick
Room Sensible Heat 8633 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 62 76 0.68 0.1 320 total
People 2 205 410 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 730 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 730 U factor
Room Total Heat 9363
Outside Air Heat 7.285 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
SINGLE RM-3
Resistance of Exposed Slab
8/14/2019 Training HL .xls
4/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 1453
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 261South 0 11 0.56 0 7.5 CFM/person ---- 120
West 0 165 0.56 0 TOTAL F/A QTY 381
East 339 11 0.56 2088
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0
West 0 25 0.38 0 50mm tk.FG
East 226 31 0.38 2645 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 1453 48 0.11 7378 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 339 27 1.13 10340 2. Occupancy in persons 16
Partition 207 22 0.35 1599 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 381 27 1.08 0.1 1112
Internal Heat 0
People 16 245 3920
Lights 1453 1.25 3.413 6197 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 35961
Sub-Total After storage:10% 3596 8 inch brick
Room Sensible Heat 39557 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 381 76 0.68 0.1 1971 total
People 16 205 3280 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 5251 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 5251 U factor
Room Total Heat 44809
Outside Air Heat 8.321 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
MALE GENERAL WARD-1
Resistance of Exposed Slab
8/14/2019 Training HL .xls
5/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 261
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 47South 0 11 0.56 0 5 CFM/person ---- 10
West 0 165 0.56 0 TOTAL F/A QTY 57
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 102 29 0.38 1113
West 0 25 0.38 0 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 261 48 0.11 1328 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 0 27 1.13 0 2. Occupancy in persons 2
Partition 94 22 0.35 727 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 57 27 1.08 0.1 166
Internal Heat 0
People 2 245 490
Lights 261 1.25 3.413 1115 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 5622
Sub-Total After storage:10% 562 8 inch brick
Room Sensible Heat 6184 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 57 76 0.68 0.1 295 total
People 2 205 410 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 705 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 705 U factor
Room Total Heat 6889
Outside Air Heat 8.098 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summer.
JOB NO.: DT / 054
GMR Kamalanga
PHARMACY
Resistance of Exposed Slab
8/14/2019 Training HL .xls
6/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 217
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 39South 0 11 0.56 0 7.5 CFM/person ---- 15
West 68 165 0.56 6263 TOTAL F/A QTY 54
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0
West 113 25 0.38 1068 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 217 48 0.11 1104 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 68 27 1.13 2068 2. Occupancy in persons 2
Partition 0 22 0.35 0 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 54 27 1.08 0.1 158
Internal Heat 0
People 2 245 490
Lights 217 1.25 3.413 927 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 12760
Sub-Total After storage:10% 1276 8 inch brick
Room Sensible Heat 14036 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 54 76 0.68 0.1 280 total
People 2 205 410 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 690 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 690 U factor
Room Total Heat 14726
Outside Air Heat 6.031 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehum idi fy ing Heat Load Est imate for Summer.
JOB NO.: DT / 054
GMR Kamalanga
TREATMENT RM-2
Resistance of Exposed Slab
8/14/2019 Training HL .xls
7/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 494
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.18 CFM/SFT 89South 0 11 0.56 0 50 CFM/person ---- 300
West 0 165 0.56 0 TOTAL F/A QTY 389
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 354 17 0.38 2271
South 0 29 0.38 0
West 0 25 0.38 0 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 494 48 0.11 2509 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 0 27 1.13 0 2. Occupancy in persons 6
Partition 230 22 0.35 1773 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 389 27 1.08 0.1 1134
Internal Heat 0
People 6 245 1470
Lights 494 1.25 3.413 2107 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 11946
Sub-Total After storage:10% 1195 8 inch brick
Room Sensible Heat 13141 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 389 76 0.68 0.1 2010 total
People 6 205 1230 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 3240 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 3240 U factor
Room Total Heat 16380
Outside Air Heat 15.421 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
MINOR OT
Resistance of Exposed Slab
8/14/2019 Training HL .xls
8/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 2523
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0.06 CFM/SFT 151South 0 11 0.56 0 7.5 CFM/person ---- 975
West 0 165 0.56 0 TOTAL F/A QTY 1126
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0
West 0 25 0.38 0 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 2523 48 0.11 12816 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 0 27 1.13 0 2. Occupancy in persons 130
Partition 0 22 0.35 0 3. Equipment Heat load in KW
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 1126 27 1.08 0.1 3285
Internal Heat 0
People 130 245 31850
Lights 2523 1.25 3.413 10765 outside air
Equipment 0 1 3413 0 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 58716
Sub-Total After storage:10% 5872 8 inch brick
Room Sensible Heat 64587 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 1126 76 0.68 0.1 5821 total
People 130 205 26650 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 32471 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 32471 U factor
Room Total Heat 97058
Outside Air Heat 12.572 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehum idi fy ing Heat Load Est imate for Summer.
JOB NO.: DT / 054
GMR Kamalanga
GENERAL WAITING LOUN
Resistance of Exposed Slab
8/14/2019 Training HL .xls
9/11
EST.BY SKM
DATE 12.08.2009
JOB NAME: CONDITION DB 'F WB 'F RH grains/lbLocation : ORISSA LEVEL: HOSPITAL OUTSIDE 100 82 46% 137
Rev: R0
Space used for : ROOM 73 61 55% 61
Size: DIFFERENC 27 76
Height ft 11.48
Area sft 2141
ITEM AREA
Sun gain /
D T Factor Btu/hr FRESH AIR
Solar gain glass
North 0 11 0.56 0 0 CFM/SFT 0South 0 11 0.56 0 5 CFM/person ---- 135
West 0 165 0.56 0 TOTAL F/A QTY 135
East 0 11 0.56 0
NW 0 118 0.56 0 Formula for 1 Air change per hour
NE 0 11 0.56 0
SW 0 113 0.56 0 Room area (sft) X Room height (ft)/60
SE 0 11 0.56 0
Solar and trans gain-walls&roof 0
North 0 17 0.38 0
South 0 29 0.38 0
West 0 25 0.38 0 50mm tk.FG
East 0 31 0.38 0 inside air
NW 0 19 0.38 0 outside air
NE 0 23 0.38 0 total
SW 0 27 0.38 0 U factor
SE 0 31 0.38 0
Roof -Sun 2141 48 0.11 10876 Inside Load details
Roof -Shaded 0
Transmission gain-except walls & roof 0 1. Lighting watt/sft 1
Glass part. 0 27 1.13 0 2. Occupancy in persons 27
Partition 143 22 0.35 1105 3. Equipment Heat load in KW 0.2
Ceiling 0 22 0.42 0
Floor 0 22 0.42 0
Infiltration and Outside air 0
Infiltration 0
Outsideair 135 27 1.08 0.1 394
Internal Heat 0
People 27 245 6615
Lights 2141 1.25 3.413 9135 outside air
Equipment 0.2 1 3413 683 total
printers 0 1 3.413 0 U factorCredit for Thermal storage 28807
Sub-Total After storage:10% 2881 8 inch brick
Room Sensible Heat 31688 plaster on either sides
Room Latent Heat inside air
Infiltration 0 outside air
outsideair 135 76 0.68 0.1 698 total
People 27 205 5535 U factor
Steam 0
Appliance 0 8 inch brick
Vap.Trans 0 plaster on either sides Room Latent Heat Sub-Total 6233 inside air
Supply Duct% +Safety% 0 outside air
Leakage Loss%+Factor% total
Room Latent Heat 6233 U factor
Room Total Heat 37920
Outside Air Heat 6.834 BTU/LB
0.68
0.45
2.85
0.35
O U T P U T S
D H
Resistance of Partition Wall - W3
1.6
0.12
0.25
2.65
0.38
Resistance of Wall - W2
1.6
0.12
0.68
0.25
2.4
0.42
Asphalt Tile 1" 0.32
inside air 0.68
Cement Plaster 0.12
Water Proofing 0.55
0.25
9.45
0.11
Resistance of Slab
6 inch Concrete 0.48
5 inch Concrete 0.4
plaster on either sides 0.12
8.0
0.68
Cool ing and Dehumidi fy ing Heat Load Est imate for Summ er.
JOB NO.: DT / 054
GMR Kamalanga
CORRIDOR-3
Resistance of Exposed Slab
8/14/2019 Training HL .xls
10/11
PROJECT:GMR KAMALANGA, ORISSA HEAT LOAD SUMMARY SHEET
HOSPITAL BLOCKDESIGNTREE SERVICE CONSULTANTS PVT.LTD.,
DT.12.08.09
SL.NO.SPACENAME H
EIG
HT
AREA
LIGH
TING
OCCUPANCY
EQPTLOAD
TEMP.
+/-2
DEG.F
RH
+/-5
%
F/AQ
TY
CONSIDEREDINHL
DEHUMIDIFIEDAIR
QTY
TOTA
LACLOAD
SENS
IBLELOAD
REMARKS
FT SQFT W/SFT NO. KW DEG F % CFM CFM TR TR
GROUND FLOOR
1 GENERAL-2 11.48 156 1 3 0.20 73 55 51 647 1.48 1.21
2 ENT 11.48 156 1 3 0.20 73 55 51 163 0.66 0.39 HW-6
3 SINGLE RM-3 11.48 260 1 2 0.20 73 55 62 423 1.16 0.86 FCU-3
PROJECT: GMR KAMALANGA-ORISSA JOB NO.: DT / 054 ENGR: SKM
BASIS OF DESIGN SUMMARY SHEET FOR HOSPITAL BLOCK
Page 10 of 11
8/14/2019 Training HL .xls
11/11
PROJECT:GMR KAMALANGA, ORISSA HEAT LOAD SUMMARY SHEET
HOSPITAL BLOCKDESIGNTREE SERVICE CONSULTANTS PVT.LTD.,
SL.NO.
SPACE
NAME HEIGHT
AREA
LIGHTING
OCCUPANCY
EQPTLOAD
TEMP.
+/-2DEG.F
RH
+/-5%
F/AQTY
CONSIDEREDINHL
DEHUMIDIFIED
AIR
QTY
TOTALACLOAD
SENSIBLELOAD
REMARKS
FT SQFT W/SFT NO. KW DEG F % CFM CFM TR TR
4 MALE GENERAL WARD- 11.48 1453 1 16 0.20 73 55 381 1938 6.05 4.16 CSU-05
5 PHARMACY 11.48 261 1 2 0.20 73 55 57 303 0.92 0.64 HW-7
6 TREATMENT RM-2 11.48 217 1 2 0.20 73 55 54 688 1.56 1.29 HW-14
7 MINOR OT 11.48 494 1 6 0.20 73 55 389 644 3.72 1.97 CSU-07
8 GENERAL WAITING LO 11.48 2523 1 130 0.00 73 55 1126 3164 14.92 7.92
9 CORRIDOR-3 11.48 2141 1 27 0.20 73 55 135 1552 3.98 2.94 CSU-11
7662 191 2 2306 9521 34.4 21.4TOTAL