22
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 Training for Flight Procedure Regulations, Guidelines and Manual Development Hanoi, 13 – 24 August 2012 OPENING 13:30-14:00 13 August 2012

Training for Flight Procedure Regulations, Guidelines and Manual Development

Embed Size (px)

DESCRIPTION

Training for Flight Procedure Regulations, Guidelines and Manual Development Hanoi, 13 – 24 August 2012 OPENING 13:30-14:00 13 August 2012. proceeding. ✈Opening Remarks by JICA Experts ✈Welcome Remarks by CAAV ✈Introduction of Japanese Instructors & Participants - PowerPoint PPT Presentation

Citation preview

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

1

Training for Flight Procedure Regulations,

Guidelines and Manual DevelopmentHanoi, 13 – 24 August 2012

OPENING13:30-14:00

13 August 2012

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

✈Opening Remarks by JICA Experts

✈Welcome Remarks by CAAV

✈ Introduction of Japanese Instructors & Participants

✈Schedule of Lectures and Exercise

✈Others

2

PROCEEDING

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

INSTRUCTORS

3

Mr. Kunihiko AZUMASpecial Assistant to DirectorFlight Procedures and Airspace Program OfficeATC Division, ANS Department, JCABExperience and Responsibility: Flight Procedure and Airspace Design, Design Criteria and RegulationsICAO Instrument Flight Procedure Panel MemberBackground: Air Traffic Controller (Nagoya Airport,Tokyo Area Control Center)

Mr. Yoshinobu NAKANISHI (MA&Sc)Project ManagerFlight Procedure Design, Airspace GroupFirst Division, NTT DATA i Corporation

Background: Proc. Design, Flt Ops, Charting

ICAO Instrument Flight Procedure Panel Advisor

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

Mr. Chhun Sivorn, SSCA Mr. Peang Sary, SSCA Mr. Kim Rathanak, SSCA Mr. Moeung Sovann, SSCA

PARTICIPANTS (1)

4

Mr. Mr. Bountaeng Symoon, DCA Mr. Sohnsacksit Khamkeo, DCA Mr. Manasavanh Kounlath, LATM Mr. Khamphanh Viengmixay, LATM

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

5

Mr. Pham Dai Nghia, CAAV Mr. Tran Van Viet, CAAV Mr. Vu Ngoc Tuan, CAAV Mr. Trinh Hoa Liem, CAAV Mr. Nguyen Tien Giang, VATM Mr. Tran Hieu, VATM Mr. Nguyen Cong Chinh, ACV Mr. Le Anh Dung, ACV Mr. Nguyen Cong Long, CAAV (observer) Ms. Tran Duc Hoai Phuong, CAAV

(observer)

PARTICIPANTS (2)

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

Hiroshi INOGUCHIProject Leader and Air Traffic Management (ATM) Advisor

Contact: [email protected]

Ryuichi NAGAICommunications, Navigation, Surveillance (CNS) Advisor

Contact: [email protected]

Atsushi YAMANEFlight Procedure Office (FPO) Advisor

Contact: [email protected]

6

PROJECT TEAM SUPPORTAdministration for running the Training Course

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

Tomonori ORITAProject Coordinator

Contact: [email protected]

7

Ngo Thi THOMAdministrative Assistant (Secretary)

Contact: [email protected]

Project OfficeRoom 505, Civil Aviation Authority of Vietnam (CAAV)

119 Nguyen Son, Long Bien, Hanoi, Vietnam

Tel: +84(0)43-872-2397 (direct)

Fax: +84(0)43827-4194

PROJECT TEAM SUPPORT

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

OBJECTIVES OF THE TRAININGFor Regulators and Flight Procedure Design Service Providers

1) To understand the roles and responsibilities of regulator and providers in flight procedures design and implementation;

2) To acquire Knowledge & Skill to develop necessary regulations, procedures, technical criteria/guidelines, and manuals, including quality assurance for flight procedure design.

8

Please keep these OBJECTIVEs in mind during the training program

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

COURSE CONTENTS✈ Lectures (Day 1-5)

Regulatory Framework Organizations Standards, Regulations, Procedures Quality Management Audit

✈ Group Works (Day 6-9) Review of existing situation Discussion on the contents of regulations Discussion on how to develop organizations &

regulations✈ Develop ACTION PLAN (Day 6-9)

for your Country’s actions to achieve goals through Group Work & Presentation Discussion

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

TECHNICAL DOCUMENTS

10

Technical documents: ICAO PANS-OPS (Doc 8168) Volume.2, 5th edition with

Amendment No.3 & Corrigendum No.2 (individual participant should have his own copy);

ICAO Quality Assurance Manual for Flight Procedure Design (Doc 9906), Volume 1-Flight Procedure Design Quality Assurance System, 1st edition (2009) (individual participant should have his own copy);

ICAO Quality Assurance Manual for Flight Procedure Design (Doc 9906), Volume 5-Validtaion of Instrument Flight Procedures, Advance edition (unedited) (individual participant should have his own copy);

ICAO PBN Manual (Doc 9613) 3rd edition (one copy for group sharing among each country participants);

ARINC 424-17 Navigation System Data Base (one copy for group sharing among each country participants).

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

ICAO QUALITY ASSURANCE MANUAL

11

Electronic version of the above-mentioned ICAO Quality Assurance Manual for Flight Procedure Design (Doc 9906) can be downloaded from ICAO website of the PBN Symposium and Workshops to be held in Montreal, 16-19 October 2012.

http://www.icao.int/Meetings/PBN-Symposium/ Pages/Reference%20Documentation.aspx

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

SCHEDULE OF THE TRAINING (1)

12

DAY 1 (Monday, 13 August)13:30-14:00 Opening14:00-16:30 Session

DAY 2 (Tuesday, 14 August) - DAY 9 (Thursday, 23 August)08:30-12:00 Session12:00-13:30 Lunch13:30-16:30 Session

DAY 10 (Friday, 24 August)09:00-10:00 Closing Ceremony10:30-11:30 Report to CAAV

Any change to Schedule and Administrative matters will be advised to participants by JICA Experts

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

Certificate of Attendance

✈Certificate will be issued to participants who have attended more than 95% of Programs and achieved 80% (or higher) of examinations, which may be conducted during the Training to assess the level of understanding (Participants will also be evaluated by JICA).

✈Certificate is jointly signed by JICA Short-term Experts and Project Leader

Evaluation/Assessment of the Training

✈ Feedback from participating counterpart in the Training is essential for JICA and Project to improve our programs.

No Interpretation/Translation Services

13

CERTIFICATE AND ASSESSMENT (1)

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

14

Participants are requested to provide their Feedback by

✈ Submitting Country Group Evaluation/Assessment (in English) everyday after Lectures/Exercise (Country Leader summarizes feedback of all participants). Group Evaluation Form will be provided to Country Leader every afternoon.

✈ Submitting Individual Evaluation/Assessment (in English) on 24 August. Individual Evaluation Form will be provided to the Participants in advance.

✈ Copy of Country Group Evaluation and Individual Evaluation Forms submitted will be made available to respective CAA (SSCA, DCA, CAAV) for records.

CERTIFICATE AND ASSESSMENT (2)

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

✈ “Basic PBN Training Course” was successfully conducted in Hanoi from 17 July till 10 August. 4 from Cambodia, 4 from Lao PDR and 8 from Vietnam.

✈ “Training for Flight Procedure Regulations, Guidelines and Manual Development” in Hanoi from 13 till 24 August. 4 from Cambodia, 4 from Lao PDR and 10 from Vietnam.

✈OJT on “Airport Obstacle Survey” will start in Cambodia (Phnom Penh, 27 August-7 September), followed by Lao PDR (Vientiane, 10-21 September) and Vietnam (Hue, 10-21 September). Approximately 8 participants for each OJT.

✈OJT on “PBN Procedure Design with PANADES” (2 weeks) will start on 24 September. 2 courses for Vietnam from 24 September till 5 October, and from 8 October till 19 October. 1 course for Lao PDR from 22 October till 2 November, and 1 course for Cambodia from 5 till 16 November. 4 participants for each course. 15

TRAINING PLAN (1) You are here

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

✈OJT on “Design Verification/Ground Validation” will start in Vietnam (Hue, 22 October-2 November), followed by Lao PDR (Vientiane, 19-30 November) and Cambodia (Phnom Penh, 3-14 December). Approximately 8 participants for each OJT.

✈ “Familiarization Training on PBN Operations for ATC” in Hanoi is being coordinated for 2 weeks from 24 September till 5 October.

✈ “Flight Inspection/Validation” is under consideration for early 2013.

16

TRAINING PLAN (2)

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

News Articles on CAAV website the Communist Party of Vietnam People’s Army

17

BASIC PBN TRAINING

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

2012 July Aug Sep Oct Nov Dec

Procedure Design

Regulations/Quality Assurance

ATC

18

TRAINING PLAN AT GLANCE

Basic PBN

Regulation Development

OJTObstacle

C L

V

OJTPANADES

VV L C

OJTValidation

V L C

PBN Familiarization

GOALS: 4 PBN Designers in Cambodia, 4 PBN Designers in Lao PDR, and 8 PBN Designers in Vietnam by end of 2012

Asia-Pacific States with PBN Approach

1) Based on Jeppensen Database for January 20122) Only approaches to international airports are shown.

LNAV APVAustralia 56 4New Zealand 14 18Japan 10 9China 4 4Republic of Korea 5 2Solomon Islands 7 0Cook Islands 4 2Indonesia 6 0Kiribati 4 2Maldives 4 2Micronesia 6 0Thailand 6 0Fiji 4 0Marshall Islands 4 0Papua New Guinea 4 0Philippines 2 2Samoa 2 2Singapore 2 2Tonga 4 0Afghanistan 3 0Vanuatu 3 0Hong Kong, China 0 2Malaysia 2 0

PBN, yet to be implemented

Your mission isto change

white to green!

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

✈ Cambodia will implement 1st PBN (RNP1 SID&STAR and PBN Approaches) at Phnom Penh Airport by June 2013, and then at Siem Reap Airport by December 2013.

✈ Lao PDR will implement 1st PBN (RNP1 SID&STAR and PBN Approaches) at Vientiane Airport by May 2013, and then at Luang Phabang Airport by December 2013.

✈ Vietnam will implement 1st PBN (RNP1 SID&STAR and PBN Approaches) at Hue, Phu Bai Airport in 2012.

20

PBN IMPLEMENTATION

FPO and JICA Experts are committed to supportingthe PBN implementation efforts of 3 countries

by organizing training programs.

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

21

Please Switch Off Your Mobile Phone or

Use Vibration Mode in the Training Room

Thank Youfor Your Understanding and Cooperation

Please Be On Time!

The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam

22

Do not be an observer!Participate actively!!

Get involved!!!

and Enjoy the Program