9
NA NDT B UK National Aerospace NDT Board 1 Training and approval of initial personnel in new NDT technologies NAndtB_14 Issue 1 2010-03-29

Training and approval of initial personnel in new NDT technologies

Embed Size (px)

DESCRIPTION

Training and approval of initial personnel in new NDT technologies. The application of new NDT methods/technologies requires that personnel be approved at the appropriate levels in the relevant method. - PowerPoint PPT Presentation

Citation preview

Page 1: Training and approval of initial personnel in new NDT technologies

NA NDT B

UK National Aerospace NDT Board

1

Training and approval of initial personnel in new NDT

technologies

NAndtB_14 Issue 1 2010-03-29

Page 2: Training and approval of initial personnel in new NDT technologies

NA NDT B

2 NAndtB_14 Issue 1 2010-03-29

Background The application of new NDT methods/technologies

requires that personnel be approved at the appropriate levels in the relevant method.

Requirement for NDT personnel training and approval is defined by EN4179, but only defines requirements for ‘major’ methods.

There is a risk that formal training and approval could become adhoc across the industry if not prescribed.

The UK NAndtB has a responsibility to ensure this does not happen.

Page 3: Training and approval of initial personnel in new NDT technologies

NA NDT B

3 NAndtB_14 Issue 1 2010-03-29

Rules Must comply with requirements of EN4179

in so far as is possible in the absence of any prescribed method requirements.

Personnel must be approved at appropriate levels commensurate with currently defined responsibilities.

Page 4: Training and approval of initial personnel in new NDT technologies

NA NDT B

4 NAndtB_14 Issue 1 2010-03-29

Training & Experience Latest draft of NAS410/EN4179 proposes the

training and experience hours for some new NDT methods, e.g. IRT:

No reason to presume these are not appropriate for new NDT methods.

 

level 1 level 2 level 2*

Training 20 40 60

Experience 200 600 800

* Direct Access

Page 5: Training and approval of initial personnel in new NDT technologies

NA NDT B

5 NAndtB_14 Issue 1 2010-03-29

Reduced Experience If a new NDT method is being introduced at

technique level, then it should not be unreasonable to allow approval based upon reduced experience.

Proposed that under such circumstances, personnel be initially approved as Level 2 Limited.

Note: EN4179 permits the use of additional levels. The employers written practice must

document the requirements for any additional levels (may be a separate training pack).

When sufficient documented experience has been gained, a Level 2 Limited can be approved as a level 2… in the technique.

Page 6: Training and approval of initial personnel in new NDT technologies

NA NDT B

6 NAndtB_14 Issue 1 2010-03-29

Approval ProcessRequirement Level 2Level 2 Limited

Experience 800hrse.g. 80hrs

Examination

Training

Per EN4179 L2

20+40 = 60hrs*

Per EN4179

20+40 = 60hrs*

720hrs experience at Level 2 Limited

May be reduced where experience is being

gained in other method(s) simultaneously

* for IRT

Page 7: Training and approval of initial personnel in new NDT technologies

NA NDT B

7 NAndtB_14 Issue 1 2010-03-29

Level 2 Limited Must be re-approved annually. Can accept/reject hardware. Can only be approved to level 2 within

technique (after gaining required level 2 experience). Performance of additional techniques

within the method may require further training, experience and examination as considered appropriate by the Level 3 (see later).

Page 8: Training and approval of initial personnel in new NDT technologies

NA NDT B

8 NAndtB_14 Issue 1 2010-03-29

Level 3

Required to fulfil Level 3 responsibilities. Approve

procedure/specification/technique. Approve Level 1, Level 2 Limited, Level 2

personnel. Approve additional level 3’s to full EN4179

requirements. Etc.

Page 9: Training and approval of initial personnel in new NDT technologies

NA NDT B

9 NAndtB_14 Issue 1 2010-03-29

Genesis Level 3 Approval

Requirement

Level 2 Experience

Pass independent qualification, ie. ASNT, PCN

etc.

Establishes procedure/specification

Waive based upon success above. Cannot accept/reject

hardware

General Theory

Specific Theory

Practical

Can o

nly

do t

his

on

ce u

nle

ss n

ew

te

chniq

ue r

equir

es

new

pro

cedure

/speci

fica

tion