14
TRAILS DESIGN GROUP TRAILS DESIGN GROUP Week 9 Update Week 9 Update Robert Gransbury, Team leader Robert Gransbury, Team leader Ruel Binonwangan Ruel Binonwangan Nick Choromanski Nick Choromanski Kyle Hardie Kyle Hardie David Krom David Krom Kristine Smulski Kristine Smulski

TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Embed Size (px)

Citation preview

Page 1: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

TRAILS DESIGN GROUPTRAILS DESIGN GROUPWeek 9 UpdateWeek 9 Update

Robert Gransbury, Team leaderRobert Gransbury, Team leaderRuel BinonwanganRuel BinonwanganNick ChoromanskiNick Choromanski

Kyle HardieKyle HardieDavid KromDavid Krom

Kristine SmulskiKristine Smulski

Page 2: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Trail DesignationsTrail Designations

• Hiking-Pedestrian• Bicycle• Cross Country Ski• Snowmobile• Classes:

– I – Smallest/hardest– II– III – Moderate– IV– V – Largest/easiest

 

Page 3: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski
Page 4: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Trail Parameters By UseTrail Parameters By Use

• Hiking/Pedestrian– 12-124” width– 25-5% grade (avg.)– 0-24” clearing

• Bicycle– 6-60” width– Native to hardened surface– 18-5% grade (avg.)– 36-18” clearing

• XC Skiing– 3’-10’ width (single)– Ski packed or groomed– 15-8% (avg.)– 6’-2’ clearing

• Snowmobile– 4’ to 10’ width– User packed or groomed– 20-10% grade (avg.)– 8’ to 25’ turn radii

Page 5: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Trail QuantitiesTrail Quantities

• Hiking/Pedestrian– Class 2: 18.3 mi– Class 3: 1.9 mi– Class 4: 4.7 mi

• Bicycle– Class 2: 44.4

• XC Skiing– Class 2: 4.4 mi– Class 3: 2.3 mi– Class 4: 7.2 mi

• Snowmobile– Class 2: 17.0 mi

• Signs:– Trailheads/X-ings: 36

Page 6: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Trail Typical SectionsTrail Typical Sections

Page 7: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

SignageSignage

Page 8: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Group TasksGroup Tasks

• - locate all trails (50%)•  - give cost group estimates

(25%)•  - designate trail types (75%)•  - designate trail classes (25%)•  - check grades, radii, etc. to

design parameters (0%)•  - designate sign locations and

type (25%) • - locate remote campsites, not

seen from trail/river/road (10%)

•  - locate remote cabins, not seen from trail/river/road (0%)

•  - develop winter use plan, with use conflict in mind (25-50%)

•  - coordinate trailhead locations with other groups (25%)

•  - Final report, presentation, drawings (10%)

Page 9: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Full Trails PlanFull Trails Plan

Page 10: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Summer TrailsSummer Trails

Page 11: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Winter TrailsWinter Trails

Page 12: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

More work to do…

Page 13: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

“The Great One”

Page 14: TRAILS DESIGN GROUP Week 9 Update Robert Gransbury, Team leader Ruel Binonwangan Nick Choromanski Kyle Hardie David Krom Kristine Smulski

Entrance Area

VC Area

Princess/Blair Lake Area