Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences Presented by: Carole Newvine/Noise Specialist Oregon Department of Transportation Presented at: Transportation Research Board ADC40 Transportation-Related Noise and Vibration 2013 Summer Meeting - Santa Fe New Mexico 1

Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

  • Upload
    vandieu

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Traffic Noise Impact Analyses Using a Screening

Methodology: Oregon DOT Experiences

• Presented by: Carole Newvine/Noise Specialist

Oregon Department of Transportation

• Presented at: Transportation Research Board ADC40 Transportation-Related Noise and Vibration 2013 Summer Meeting - Santa Fe New Mexico

1

Page 2: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Outline

• OR DOT previous screening methodology

• New screening methodology

• Project experiences using screening – Local Gov’t – suburban setting

– Rural setting

– Protected forest land

2

Page 3: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Previous Screening Methodology

prior to 23 CFR 772 update (2010)

Assumptions Receptor Distance: 15 meters from roadway CL Site Characteristics: Hard site, infinite flat roadway, no shielding Vehicle Speeds: 30, 40, 50, 60, 70, 80, 90, 100, 110, and 120 km/hr Traffic Characteristics: Peak Hour Traffic Volume (PHT) = 21% of ADT volume Truck Volume = 30% of PHT Volume (27% Heavy Trucks, 3% Medium Trucks) Study Year: 2015

3

Page 4: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Previous Screening Methodology

prior to 23 CFR 772 update (2010)

Year Speed ADT 2015 30 km/hr 950

40 km/hr 600 50 km/hr 450 60 km/hr 300 70 km/hr 250 80 km/hr 200 90 km/hr 150 100 km/hr 140

110 km/hr 130 120 km/hr 110

Traffic volumes, speeds below would result in predicted noise levels of Leq 64 dBA at 15 meters (50 ft) from centerline.

4

Page 5: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

2013 Problem/Solution

• Oregon’s Type I projects in rural areas – project delivery impacted

• No provisions in Federal rule for programmatic streamlining

• Some states already had approval for screening methodologies

- Idaho

- Washington State

- Virginia

5

Page 6: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

ODOT Screening Methodology for Traffic Noise Impacts – March 2013

Applicability:

Type I projects where noise impacts are not anticipated or when there are impacts but no feasible abatement

6

Page 7: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

ODOT Screening Methodology – Highlights:

• Oregon’s screening methodology – mirrors WA, ID, VA methods

• TNM to estimate existing, design year traffic noise levels at selected distances from the roadway centerline – out to 1500 ft.

• Conservative results: assumes worst case conditions not actual roadway design or topography

• Technical report required

7

Page 8: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

ODOT Screening Methodology – Highlights Continued:

• Validation of the straight line model is not required

• Traffic data, vehicle speeds, actual receptor distances from the roadway for Build condition for NAC determination

• Compare Existing to Build to determine substantial increase impacts

8

Page 9: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Complex Modeling Straight-line Modeling

9

Page 10: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

ODOT Screening Methodology Post Modeling

• If abatement appears feasible - detailed analysis required

• No abatement feasible (e.g., driveway access), a detailed noise analysis (full TNM modeling) is not required

• Noise monitoring may be required

• 23 CFR 772 requirements must still be met

10

Page 11: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

ODOT Screening Analysis for Traffic Noise Impacts – March 2013

Advantages: – Can be done in-house – Saves budget – Can be performed earlier in the project development cycle -

only limited design information needed

Disadvantages: – Limited use – conservative results – Can’t be used for analysis of alternatives – Inappropriate use

11

Page 12: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Local Gov’t – Suburban Setting Freeman Road: Central Point

12

Page 13: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Local Gov’t – Suburban Setting Freeman Road: Central Point

13

Page 14: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Local Gov’t – Suburban Setting Freeman Road: Central Point

14

Page 15: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Rural Setting

OR86: Baker County

15

Page 16: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Rural Setting

OR86: Baker County

16

Page 17: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Rural Setting

OR86: Baker County

17

Page 18: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

18

Protected Forest Land US26: Mt Hood Safety Project

Page 19: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Protected Forest Land US26: Mt Hood Safety Project

Critical Viewpoint:

Laurel Hill. Existing Condition

Laurel Hill. Proposed Condition

19

Page 20: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Protected Forest Land US26: Mt Hood Safety Project

Critical Viewpoint:

Mirror Lake. Existing Condition

Mirror Lake. Proposed Condition

20

Page 21: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Protected Forest Land US26: Mt Hood Safety Project

Mirror Lake Trailhead (continued)

21

Page 22: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Protected Forest Land US26: Mt Hood Safety Project

Critical Viewpoint: The Pioneer Bridle Trail at MP 51.30

The Pioneer Bridle Trail at MP 50.90

22

Page 23: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Protected Forest Land US26: Mt Hood Safety Project

23

Critical Viewpoint: Map Curve.

Page 24: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Suburban setting: Impacts with accessibility issues Rural setting: No impacts

USFS lands, 4(f): Impacts; access issues, Federal and County viewshed restrictions; exceeds cost criteria

24

Summary: Type I Projects – Screening Methodology

Page 25: Traffic Noise Impact Analyses Using a Screening ... TRB13.pdf · Traffic Noise Impact Analyses Using a Screening Methodology: Oregon DOT Experiences ... ODOT Screening Methodology

Contact Information

Carole Newvine/ Noise Program Coordinator 503-986-3447 [email protected]