Upload
maui-tomorrow
View
220
Download
0
Embed Size (px)
DESCRIPTION
Letter from traffic engineer stating that new Piilani Promenade development would have 5 times the traffic as the LUC approved light industrial project that was originally planned for this location
Citation preview