Traffic Control on IH 35 TxDOT Short Course October 16, 2012 Andy Petter, P.E. Interim District Engineer (Waco) Texas Department of Transportation Gary Thomas, P.E. I-35 Mobility Coordinator Texas A&M Transportation Institute

Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Traffic Control on IH 35

TxDOT Short Course October 16, 2012

Andy Petter, P.E. Interim District Engineer (Waco) Texas Department of Transportation

Gary Thomas, P.E. I-35 Mobility Coordinator Texas A&M Transportation Institute

Page 2: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

I-35 Expansion Project

TxDOT is committed to finishing the widening of Main Street Texas

(I-35) to six lanes from San Antonio to

Hillsboro. San Antonio

Hillsboro

Page 3: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Highlights

• 45% of Texas population lives within 50 miles of I-35

• Over 30 million travelers per year use this corridor

• Approximately two-thirds travel through the corridor

• Over 1,000 businesses on these 96 miles

Page 4: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Highlights

• 14 segments/17 projects

• 55,000–111,000 vehicles/day

• 25–30% trucks

Total Cost Approx. $2.1B

Construction

Right-of-Way

Utilities$1.6B

$410M

$110M

Page 5: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Highlights

Completed

Nearly completed

Active

Starting soon

6B

6A

5C

5B

4

3C

3A2

3A1

2B

1C 1B

1A

3B

5A

Hill County Safety

Rest Areas

Bell County

Safety Rest Areas

BRB

• Complete: 1A, 3C, 6A, 6B

• Nearly complete: 5C

• Active today: 1B, 1C, 3A1, 3B, BRB, 5A, 5B Hill Co. safety rest areas

• Complete in early 2017

Page 6: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Loop 121 Interchange Belton

Page 7: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

General Improvements

• 3 lanes in each direction on I-35

• Added I-35 crossings

• Added and relocated ramps

• 1-way continuous frontage roads

• U-turns at selected crossings

• Safety rest areas

• Technology/ITS

• Truck lane restrictions

• Aesthetics

• Green initiatives

Page 8: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Aesthetics

• Brazos River Bridges

Page 9: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Aesthetics

• Wall Murals

West

Abbott

Salado

Page 10: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Green Initiatives

• Air Quality – Night-time lane closures delays and emissions

– Warm-mix asphalt technologies to fuel and air quality

• Storm Water Pollution Prevention – Environmental mgmt. system (e.g., const. stage gate

inspections)

– Wetland preservation

• Habitat Protection – Salado Springs salamander

– Cliff and barn swallows’ nests under bridges

– Man-made bat houses (Salado Creek, Lampasas River)

Page 11: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Green Initiatives

• Recycling – Roadway base material, concrete

– Reclaimed asphalt pavement (RAP)

– Recycled asphalt shingles (RAS)

– Rubber for crash and guardrail systems

– Metal for signs, bridge girders, sign posts

• Sustainable Practices – Compost to reestablish vegetation fertilizer

– Solar panels to power irrigation systems + warning beacons

– Xeriscaping focused on native plants irrigation

Page 12: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

FM 2837 Interchange Lorena

Page 13: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

13

Impact

59

64 64

56

15

6

0

10

20

30

40

50

60

70

Today 2013 2014 2015 2016 2017

I-35 Miles Under Construction

Peak Construction: 2012 – 2014 64 miles

Page 14: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Reducing Impacts - Construction

• Lane closures limited to evenings – Sun 10:00pm - Mon 7:00am

– Mon - Fri, 7:00pm - 7:00am

• Lane rental fees

• Lane closure blackout dates

• Advance notifications

• 6-day work week

• Incentives for completing ahead of schedule

Page 15: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Reducing Impacts - Communication

• 80+ outreach efforts

• Business community meetings

• www.my35.org

• I-35 newsletter

• Lane closure notifications

• No surprises!

Page 16: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Work Zone Research

Page 17: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Traveler Information

Bluetooth sensors

Queue

Warning

System

Lane Closure

Notification System

Page 18: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

End of Queue Warning Systems

• Automated monitoring near a work zone

• Warning of slow speeds

• Warning location of stop and go traffic

Page 19: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Lane Closure Notification System

• My35.org • E-mail • Twitter • Facebook • Lane Closure

Assessment

• DMS • HAR • End of Queue

Warning System • Travel Delay

Rules

Automatic

Manual

Page 20: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Estimating Construction Traffic Delay

• Use of TTI research to estimate delay, queue length and duration

Page 21: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Forecast of Future Conditions

• En-route via signage

• Pre-trip via My35.org, social media, email alerts

Current Travel

Time = 70

minutes

Lane

Closure

Anticipated Delay

t+70 = 25 minutes

2 5

Page 22: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Business 77 Interchange Lacy-Lakeview

Page 23: Traffic Control on IH 35 · –Environmental mgmt. system (e.g., const. stage gate inspections) –Wetland preservation •Habitat Protection –Salado Springs salamander –Cliff

Thank you